You are on page 1of 50

Multi-step Vacuum Technology for

High Pressure Die Casting (HPDC)

Vacu
[vk.ju tu:]

A newly developed process by

Pfeiffer Vacuum GmbH

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 11
Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 12
High Pressure Die Casting Machine

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 13
High Pressure Die Casting Machine Schematics

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 14
HPDC Sleeve and Parts

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 15
Vacuum for HPDC

Why vacuum? Does it always make sense?


z Classical HPDC : more then 30% to 50% enclosed air
- Nitrogen
- Compressed to small volume

z Vacuum
- when 100 mbar would be reached in the die f.e. 10%
- if something goes wrong, no air can escape
- Which pressure is realy achieved in the die ?
- How reliable and stable is the process?

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 16
Applications in HPDC

Parts with complex geometry

Heat treatable castings

Weldable castings

Later:
Normal parts with better quality and higher outputs?

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 17
Examples for valves and pistons

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 18
Old: Standard Vacuum System

Limited area
Blocking-effect

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 19
Old: Standard Vacuum System

Limited time
No equilibrium

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 20
Old: Standard Vacuum System

Large influence
from leakage on
equilibrium

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 21
Old: Standard Vacuum System

Measurement

Pressure in the
die ???

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 22
Old: Standard Vacuum System

Process-
stability
???
Process-
control

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 23
Old: Vacuum System with metal-dosing

More time
Nearer at
reachable
equilibrium

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 24
Old: Vacuum System with metal-dosing

Limited area
Blocking-effect

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 25
Old: Vacuum System with metal-dosing

Measurement

Pressure in the
die ???

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 26
Old: Vacuum System with metal-dosing

Large
influence from
leakage on
equilibrium
Elaborate
sealing

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 27
Old: Vacuum System with metal-dosing

vulnerable
dosing system

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 28
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 29
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Smaller volumes

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 30
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Bigger Area
Equilibrium is reached in very
short time and has lower value
Less influence from leakage

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24


Page 31
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Dosing amount and


vacuum are
independent

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 32
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Process-stability:
Two steps / lower equil. Reached, 2nd
order stability
Less influence leakage

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 33
New: Multi-step Vacuum System
invented by Pfeiffer Vacuum (Principle)

Process-control
-Before production starts
-During production

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 34
Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 35
Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 37
Results

< Normal vacuum

Multi-Step Vacuum >


Vacu
Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 38
Results

< Normal vacuum

Multi-Step-Vacuum >
Vacu
Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 39
Results Comp. X-Ray
Multi-Step Normal Without

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 40
First trials with Pilot Plant in the HPDC technology centre of

Test conditions:
HPDC-Machine 2000 t

Simple sealing in closing surface


(parting line)

Second step over piston-type vents with


venting surface area 2x 65 mm2

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24


Page 41
Glhtest - Glowtest

Standard-Vakuum / Standard Vacuum 2 Stufen-Vakuum / 2-Step Vacuum

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 42
Glhtest - Glowtest

Standard-Vakuum / Standard Vacuum 2 Stufen-Vakuum / 2-Step Vacuum

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 43
Glhtest - Glowtest

Standard-Vakuum / Standard Vacuum 2 Stufen-Vakuum / 2-Step Vacuum

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24


Page 44
Pfeiffer Vacuum Vacu2

Versuche 04/2005 Trials


Pilotanlage Pilot plant
bei at

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 45
Versuchsbedingungen Test conditions

Projekt tiefes Vakuum und Legierungsentwicklung

Druckgussanlage 700 t
Ohne Abdichtungen in der Form
Zweite Stufe ber Waschbrett-Ventil 90 x 0.9mm

Project low vacuum and alloy-development

High pressure die casting machine 700 t


Without sealing in the die
Second vacuum-step over Washboard-Vent 90 x 0.9mm

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 46
Vergleich Mikrostruktur / Comparisson microstructure

2 Stufen-Vakuum Standardvakuum Ohne Vakuum


2 Step-Vacuum Standardvacuum Without Vacuum

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 47
Mechanische Eigenschaften Mechanical Properties

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 48
Measurements die side
good sealing

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 49
Measurements die side
bad sealing

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 50
Measurements sleeve side
bad sealing

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 51
Measurements 2 Step
bad sealing / poor throughput valve

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 52
Messkurven
Produktion

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 53
Messkurven
Produktion

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 54
Korrelation
Prozessparameter / erreichter Enddruck (zurckgerechnet)

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 55
Vacu - System (patents pending)

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 57
Control Panel

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 58
Brochures / Literature

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 60
Brochures / Literature

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 61
Vacu - Market Introduction
Press Release

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24


Page 62
Thank you !

Pfeiffer Vacuum 2007 Business Unit Systems, Volkmar Gibietz, 2007-04-24 Page 63

You might also like