Professional Documents
Culture Documents
MIKHAIL GRIGORYEV
GECON
3 4+ 5 6
7 8 1.Kola
2.Arkhangelsk
3.Nenets
4.Vorkuta
5.Yamal-Nenets
6.Taimyr-Turukhansk
7.North Yakutia
8.Chukotka
3 Source: Ministry of economic development
MINERAL PROJECTS PILLARS OF THE SUPPORT ZONES
4 GECON
5
MILLIONS OF TONS
0
1
2
3
4
5
6
7
8
1933
1935
1937
1939
1941
1943
1945
1947
1949
1951
1953
1955
1957
1959
1961
1963
TRANSIT
1965
1967
1969
1971
1973
1975
1977
INTERNAL
1979
1981
1983
1985
1987
6.6
1989
TOTAL
1991
1993
1995
1997
1999
1.5
2001
2003
2005
2007
2009
2011
DYNAMICS OF THE TRANSPORTATIONS ALONG THE NORTHERN SEA ROUTE
2013
7.5
2015
Data sources: Plaksiy, Mikhailichenko, NSRA, analysis of GECON
NORTHERN SEA ROUTE LEGISLATIVE DEFINITION
The Federal Law of July 28, 2012, N 132-FZ " On Amendments to Certain Legislative Acts of the Russian Federation Concerning State
6 Regulation of Merchant Shipping on the Water Area of the Northern Sea Route (Source: http://www.nsra.ru)
NORTHERN MARITIME TRANSPORT CORRIDOR
The Northern Maritime Transport Corridor is formed by water areas of the seas of the Arctic zone of the Russian Federation
and the navigable rivers flowing into them.
7 GECON
DYNAMICS OF THE MAIN TRANSPORTATIONS
ALONG THE NORTHERN MARITIME TRANSPORT CORRIDOR
20
18
18
16
14 13 OTHER CARGOES
13
PELYATKINSKOE (COND.)
MILLIONS OF TONS
12 PESCHANOOZERSKOYE
10 SANDIBINSKOTE
10 9
10 PRIRAZLOMNOYE
8 NOVY PORT
8
8 7 7 VARANDEY
6 CRUDE OIL
6
6 TOTAL
4 TRANSIT
4 3
Latin America
Mediterranean
MILLION TONS
Other Western
10 Europe
Finland
Great Britain
Netherlands
0
2012 2013 2014 2015 2016
9 Data sources: FCS of Russia, analysis of GECON
THE FORECAST OF THE ARCTIC SEA FREIGHT TRAFFIC OF HYDROCARBONS
(7 PROJECTS APPROVED FOR DEVELOPMENT)
. 40
35
30
25
MILLION TONS
20
15
10
0
2016 fact
2017
2018
2020
2022
2024
2026
2028
2030
2032
2034
2035
2036
2037
2038
2039
2019
2021
2023
2025
2027
2029
2031
2033
2040
Varandey oil Prirazlomnoye oil Novy Port oil&cond Pelyatkinskoye cond
Pechanoozerskoye oil Sandibinskoye oil Yamal LNG cond Yamal LNG
10 Data sources: Rosnedra; analysis of GECON
ASSESSMENT OF POSSIBLE NEED FOR MARITIME SHIPBUILDING
CRUDE OIL Operating projects
Varandey, Prirazlomnoye, Pelyatkinskoye (condensate Dudinka) are provided with specially constructed
tanker fleet.
Peschanoozerskoye (Kolguyev Island) and Sandibinskoye - use the freighted vessels, small shipment value.
Novy Port field: the operating experience of tankers of the Shturman Albanov series showed that the sizes
of cargo batches less than planned and six vessels won't provide export amounts; the construction of two
more vessels is necessary.
11 Data sources: companies; analysis of GEON
ASSESSMENT OF POSSIBLE NEED FOR MARITIME SHIPBUILDING
LNG Projects
.Under construction
Yamal LNG: construction of 15 gas carriers of the class Arc7 goes according to the plan, but involvement of 11 more vessels
of the ice class Arc4 is necessary (contracted 7 6 constructed and 1 in construction; 4 vessels aren't defined obviously
that construction will be required).
Declared projects
Arctik LNG: the cargo fleet equal to Yamal LNG, the port fleet and construction of the bases for placement of the plant on
the water area of Gulf of Ob is necessary (shipyard in Murmansk). Ice-class heavy carriers for the project of Yamal LNG can
be used.
Pechora LNG technical solution isn't defined
12 Data sources: companies; analysis of GEON
ASSESSMENT OF POSSIBLE NEED FOR MARITIME SHIPBUILDING
ORE CONCENTRATE AND COAL
. Operating projects
Polymetal (Pevek) - use the freighted vessels, small shipment value
Norilsk Nickel: growth of a cargo flow twice freighted vessels, a construction isn't planned
Vostokugol (Taimyr): the freight of Nordic Bulk Carriers AS Panamax of the class Arc4 requiring icebreaking maintenance;
ensuring steady year-round navigation in a southwest part of the Kara Sea requires vessel construction of the class Arc7.
35
MILLION TONS 30
25
Plus 30 mln t
20
15
10
0
2016 fact
2018
2019
2021
2022
2025
2026
2028
2029
2032
2033
2035
2036
2039
2040
2017
2020
2023
2024
2027
2030
2031
2034
2037
2038
Total FSO Kola Bay Barents and Pechora SW Kara sea Northern Sea Route
Additional SW Kara sea: Norilsk Nickel 1.5 mln t + VostokUgol (Taimyr coal) exp. 10 mln.t + Arctic LNG exp. 18 mln t
14 Data sources: Rosnedra, companies ; analysis of GECON
OPERATION AND CONSTRUCTION OF NUCLEAR ICEBREAKERS
Type Name IMO 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Data sources: Atomflot, Afrikantov OKBM, Baltic plant Shipbuilding; analysis of GECON
15
ASSESSMENT OF POSSIBLE NEED FOR MIXED RIVER-SEA NAVIGATION VESSELS
SCHEME OF TRANSPORTATION OF THE CONCENTRATE
On prospect till 2030 it is possible to assume that the main projects will be realized
onshore; the Prirazlomnoye field will be the only one producing on the shelf.
There is a expected need for the construction not only ocean ships, but also mixed
river-sea navigation vessels.
Thank you for attention!
mgrigoriev@gecon.ru
Gecon LLC, 2017 All rights reserved. Neither the whole nor any part of this document shall be reproduced in any form nor used in any manner
without express prior permission from Gecon LLC and applicable acknowledgements. No trademark, copyright or other notice shall be altered or
removed from any reproduction.