MACHINERY
1 machinery list
32 Machinery breakdown
2A Diesel Consumption
MATERIAL LIST
2 Material list
3 concrete -sarawak , KL,S'gor, trengganu, penang, kelantan
3A concrete -site cast
4 Formworks
5 steel and BRC
6 brickwall and interlocking paver
7 DPC and DPM
8 paint
9 tiles
9 A Tiles
10 plaster
12 hardcore
15 sanitary
19 Sewerage treatment
28 Glass
24 Toilet - BSAS
41 timber flooring
47 gutterupvc
61 Security
77 Ceiling works
80 Security grill - Profit element Sdn bhd penjara Kuching sarawak
81 Stone
IRONMONGERY
83 Ironmongery and lockset - Penjara kuching - CHUBB MALAYSIA
14 lockset
ROOFING ACCESSORIES
11 roof tiles - Monier and golden clay
11 A roof covering and accessories
11 B Roof covering and accessories
list
ROAD WORKS & ACCESSORIES
16 Road : binder
16 A road
16 B Roadworks - TAC cyberjaya
91 kuala kerai tender - road works
66 guard rail - road tech
BRIDGE
21 Light bridge
68 Pedistrian bridge
76 Bearing for bridge
CULVERT / L UNIT
34 Culvert ( box )
22 L unit
23 Culvert
44 Culvert
45 pipe culvert and beeding
78 Pipe , culvert etc ( material )
WATER PROOFING
17 Waterproofing works
69 Waterproofing works
LANDSCAPING WORKS
18 landscaping
18A landscaping - uniscape johor
88 Landscaping
49 turf
list
89 Piping works - arau perlis
58 Forcemain PS5 - cyberjaya
96A relocation _ pipe works labuan
96B relocation _ pipe works labuan
27 Chainlink
29 tioman AIRPOTRT
30 ulu Tiram - external works
31 RC Wall
40 Drain
57 RE wall - courts
82 rubble wall
PILING WORKS
20 sheet piles
63 Piling ( Johor, Perlis, S'gor )
63 A Piling -Trengganu
list
B Piling -200 mm x 200mm
84 Bore piles - Alpha project
84 a Bore piles - Heritage faber union
85 Instrument test piles - alpha project
86 PDA testing - alpha
50 capping piles
51 vertical piles
52 cut of piles
53 excavate rock bore piles
54 casing
55 boring
56 fill
OTHERS
92 Hoarding
95 Survey works
95A Survey works -johor
M & E WORKS
list
\\Server\Public\Documents\Database\Database.xls
Quotation
Premix Concrete
a. Concrete grade 30 m3 RM275.00 Supeready Mix Concrete S/B Sabah 07.01.2009
b. Concrete grade 30N m3 RM328.80 Supeready Mix Concrete S/B Sabah 18.10.2008
" m3 RM150.00 *Nas Irenic Ipoh 16.09.2009
c. Concrete grade 25N m3 RM296.70 Supeready Mix Concrete S/B Sabah 18.10.2008
d. Concrete grade 25P m3 RM310.50 Supeready Mix Concrete S/B Sabah 18.10.2008
e. Concrete grade 20N m3 RM275.50 Supeready Mix Concrete S/B Sabah 18.10.2008
h. Concrete G45 m3 RM217.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM212.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM227.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM237.00 Macro Dimension Concrete S/B Kangar 21.01.2009
i. Concrete G40 m3 RM204.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM199.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM214.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM224.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM229.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
j. Concrete G35 m3 RM192.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM187.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM202.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM212.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM217.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
k. Concrete G30 m3 RM198.00 Al-Jofrie Melaka 07.01.2009
" m3 RM182.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM177.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM192.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM202.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM207.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
l. Concrete G25 m3 RM189.00 Al-Jofrie Melaka 07.01.2009
" m3 RM173.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM168.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM183.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM193.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM198.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
m. Concrete G20 m3 RM165.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM160.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM175.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM185.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM190.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
n. Concrete G15 m3 RM168.00 Al-Jofrie Melaka 07.01.2009
" m3 RM160.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM155.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM170.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM180.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM184.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
o. Concrete G10 m3 RM155.00 Macro Dimension Concrete S/B Butterworth 21.01.2009
" m3 RM150.00 Macro Dimension Concrete S/B Sungai Petani 21.01.2009
" m3 RM165.00 Macro Dimension Concrete S/B Alor Star 21.01.2009
" m3 RM175.00 Macro Dimension Concrete S/B Kangar 21.01.2009
" m3 RM178.00 Macro Dimension Concrete S/B Padang Besar Perlis 25.02.2009
p. Mortar 1:3 m3 RM315.00 Uni-Mix S/B Sabah 07.11.2008
" m3 RM215.00 Macro Dimension Concrete S/B B'worth/ Sg. Petani/ 21.01.2009
A.Star/Kangar
q. Mortar 1:6 m3 RM325.00 Uni-Mix S/B Sabah 07.11.2008
" m3 RM185.00 Macro Dimension Concrete S/B B'worth/ Sg. Petani/ 21.01.2009
A.Star/Kangar
r. Waterproofing to concrete (additional to concrete m3 RM20.00 Macro Dimension Concrete S/B B'worth/ Sg. Petani/ 21.01.2009
price) A.Star/Kangar
Reinforcement Bar
a. Mild Steel 6mm x 12m tonne RM2,821.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM2,300.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
b. Mild Steel 8mm x 12m tonne RM1,979.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
c. High Yield Steel 10mm x 12m tonne RM2,632.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM2,184.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
" tonne RM1,990.00 Makin Juta S/B Ipoh 18.05.2009
d. High Yield Steel 12mm x 12m tonne RM2,300.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM2,100.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
" tonne RM1,990.00 Makin Juta S/B Ipoh 18.05.2009
e. High Yield Steel 16mm x 12m tonne RM2,300.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM1,995.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
f. High Yield Steel 20mm x 12m tonne RM2,200.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM1,995.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
g. High Yield Steel 25mm x 12m tonne RM2,200.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM1,995.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
h. High Yield Steel 32mm x 12m tonne RM2,200.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" tonne RM1,995.00 Kean Soon Hardware Selangor/ Melaka 08.01.2009
Timber
a. 12mm UTI Waterproof Plywood no RM52.00 Chua Yun Timber S/B Sabah 07.01.2009
" no RM65.00 March Merit S/B Sabah 07.01.2009
b. 12mm BBCC/WBP Waterproof Plywood no RM55.00 Chua Yun Timber S/B Sabah 07.01.2009
c. HFW OT 1"x2"x3'-7' no RM10.50 Chua Yun Timber S/B Sabah 07.01.2009
d. HFW OT 1"x2"x8' UP no RM20.50 Chua Yun Timber S/B Sabah 07.01.2009
e. HFW OT 2"x2"x6'-7', 3'-7' no RM11.00 Chua Yun Timber S/B Sabah 07.01.2009
f. HFW OT 2"x3"x8' UP no RM21.00 Chua Yun Timber S/B Sabah 07.01.2009
g. HFW OT 2"x3" & 2"x4" @ 8' length below no RM13.00 Chua Yun Timber S/B Sabah 07.01.2009
h. HFW OT 2"x3" & 2"x4" @ 8' UP no RM23.00 Chua Yun Timber S/B Sabah 07.01.2009
i. HFW OT 1"x6" & 1"x8" @ 8' length below no RM13.00 Chua Yun Timber S/B Sabah 07.01.2009
j. HFW OT 1"x6" & 1"x8" @ 8' UP no RM24.00 Chua Yun Timber S/B Sabah 07.01.2009
k. 2" x 3" x 1.9mm x 6m no RM84.00 Jitu Megah S/B Sabah 07.01.2009
l. 2" x 3" x 2.3mm x 6m no RM97.30 Jitu Megah S/B Sabah 07.01.2009
m. 2" x 3" x 1.5mm x 6m no RM82.10 Jitu Megah S/B Sabah 07.01.2009
Water Tank
a. TS 202 (L 45" (1143mm) x W 47" (1194mm) x H 25"
(635mm)) no RM190.00 Tomher Industrial S/B Sabah 07.01.2009
b. TS 200 (L 47" (1194mm) x W 47" (1194mm) x H 25"
(635mm)) no RM236.00 Tomher Industrial S/B Sabah 07.01.2009
Metal Roofing System
a. Coloured G28 Metaldeck Roofing and Steel Roof-
Truss System c/w full metaldeck roofing accessories &
fittings required insulation layer. Rainwater goods
fittings. UPVC 100mm dia. Rainwater down-piping
system. ft2 RM18.35 Sabah Wiremesh & Fencing S/B Sabah 07.11.2008
Tiles
a. 200mm x 200mm Glazed/ Semi-glazed floor tiles
(Labuan series) -std. pc RM1.00 Guocera Marketing S/B Sabah 07.12.2008
b. 200mm x 200mm Non-slip Homogeneous floor tiles
(BV series) -std. pc RM1.52 Guocera Marketing S/B Sabah 07.12.2008
c. 200mm x 200mm Glazed wall tiles (Labuan series)
-std. pc RM1.00 Guocera Marketing S/B Sabah 07.12.2008
d. 300mm x 300mm Glazed/ Semi-glazed floor tiles
(Labuan series) -std. pc RM2.14 Guocera Marketing S/B Sabah 07.12.2008
e. 300mm x 300mm Non-slip Homogeneous floor tiles
(DV series) -std. pc RM3.27 Guocera Marketing S/B Sabah 07.12.2008
f. 300mm x 300mm Glazed wall tiles (Labuan series)
-std. pc RM2.14 Guocera Marketing S/B Sabah 07.12.2008
g. 300mm x 250mm Glazed wall tiles (std. Marble) pc RM1.42 Guocera Marketing S/B Sabah 07.12.2008
Door
a. PVC Door 750mm x 2100mm x 3.2mm c/w
accessories and cylindrical lockset fitting no RM213.00 Sabah Wiremesh & Fencing S/B Sabah 07.11.2008
b. 3.2mm Plywood Flush Door 900mm x 2100mm c/w
std accessories andcylindrical lockset fitting no RM283.00 Sabah Wiremesh & Fencing S/B Sabah 07.11.2008
Ceiling
a. UAC ceiling sheet 1200mm x 1200mm x 3.5mm thk
no RM17.80 Sabah Wiremesh & Fencing S/B Sabah 07.11.2008
Sand
a. Washer fine riversand yd3 RM48.50 Sri Boikiah Entreprise Sabah 07.11.2008
" yd3 RM46.50 AC Entreprise Sabah 07.11.2008
b. Unwashed riversand yd3 RM33.80 Sri Boikiah Entreprise Sabah 07.11.2008
" yd3 RM30.00 AC Entreprise Sabah 07.11.2008
c. 3/4" standard limestone aggregates m3 RM59.80 Sri Boikiah Entreprise Sabah 07.11.2008
Concering 3/4" quarry aggregates tonne RM56.00 AC Entreprise Sabah 07.11.2008
d. 2" standard limestone crusher run m3 RM42.00 Sri Boikiah Entreprise Sabah 07.11.2008
e. Red clay fascia brick (class 1) pc RM0.85 Sri Boikiah Entreprise Sabah 07.11.2008 450pcs/bundle
f. Red clay brick (class 2) pc RM0.38 Sri Boikiah Entreprise Sabah 07.11.2008 450pcs/bundle
" pc RM0.35 AC Entreprise Sabah 07.11.2008 600pcs/bundle
e. Cement bricks pc RM0.31 Sri Boikiah Entreprise Sabah 07.11.2008 600pcs/bundle
" pc RM0.28 AC Entreprise Sabah 07.11.2008 600pcs/bundle
Cement
a. Ordinary Portland Cement (CMS) 50kg bag bag RM17.20 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
" bag RM13.40 Procurement & Contracts S/B Ipoh 25.05.2009
" bag RM13.40 Terus Maju Industrial Hardware S/B Ipoh 25.05.2009
b. Ordinary Portland Bulk Cement (CMS) tonne RM332.00 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
Walcrete
a. Walcrete bag RM14.00 Lafarge Cement S/B Ipoh 16.10.2009
UCO Superflex
a. 1220 x 1200 x 4.5mm no. RM11.00 Ho Shen Lee M S/B Ipoh 16.10.2009
b. 1220 x 610 x 4.5mm no. RM5.40 Ho Shen Lee M S/B Ipoh 16.10.2009
BRC
a. A5 (2m x 5m) pc RM68.53 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
b. A6 (2m x 5m) pc RM91.05 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
" pc RM63.90 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" pc RM71.28 Kean Soon Hardware Selangor/ Melaka 08.01.2009 size 2.2m x 6m
c. A7 (2m x 5m) pc RM88.30 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" pc RM96.94 Kean Soon Hardware Selangor/ Melaka 08.01.2009 size 2.2m x 6m
d. A8 (2m x 5m) pc RM161.95 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
" pc RM114.90 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" pc RM126.88 Kean Soon Hardware Selangor/ Melaka 08.01.2009 size 2.2m x 6m
e. A10 (2m x 5m) pc RM175.50 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" pc RM197.68 Kean Soon Hardware Selangor/ Melaka 08.01.2009 size 2.2m x 6m
f. B6 (2m x 5m) pc RM109.50 Hap Seng Trading (BM) S/B Sabah 07.01.2009
" pc RM119.75 Kean Soon Hardware Selangor (only) 08.01.2009 size 2.2m x 6m
g. B7 (2m x 5m) pc RM133.00 Hap Seng Trading (BM) S/B Sabah 07.01.2009
h. A5 cut to size m2 RM7.50 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
i. A6 cut to size m2 RM9.35 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
j. A7 cut to size m2 RM12.70 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
k. B6 cut to size m2 RM15.75 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
l. B7 cut to size m2 RM19.00 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
m. B10 cut to size m2 RM34.20 Sabah Wiremesh & Fencing S/B Sabah 06.11.2008
Rental of Scaffold
a. 490mm ladder frame pc RM600.00 HSP Entreprise Sungai Besi 19.05.2009
Transport charges to Ipoh (one-way) trip RM700.00 HSP Entreprise Ipoh 19.05.2009
Roofing
a. 3" X 120' Exmet roll RM4.80 Deluxe Corporation (M) S/B Ipoh 19.05.2009
b. Roofing felt - 15lbs roll RM19.25 Deluxe Corporation (M) S/B Ipoh 19.05.2009
c. Bitumen compound roll RM16.85 Deluxe Corporation (M) S/B Ipoh 19.05.2009
Diesel
a. Diesel Lit RM1.75 Nikmat Mujur S/B Ipoh 19.05.2009
Drain
a. 225mm X 600mm Pre-cast U-Drain with Sirim aprvl m RM5.00 Gerak Laju Enterprise Ipoh 29.05.2009
Sand
a. Fine sand Load RM250.00 SGBC K.Kangsar/Ipoh 21.05.2009
Clay brick
a. 100mm X 213mm X 50mm pc RM0.24 Deluxe Corporation (M) S/B Ipoh 12.05.2009
" pc RM0.23 JTI S/B Ipoh 12.05.2009
Crusher Run
a. Crusher Run Tonne RM22.00 Mutual Way Ipoh 25.06.2009
b. Granite Crusher Run Tonne RM18.00 Mutual Way Ipoh 16.10.2009
Quarry Dust
a. Quarry Dust Tonne RM21.00 Mutual Way Ipoh 16.10.2009
Polythylene Sheet
a. 12' X 160' X 0.25mm Roll RM180.00 Regionvest Industry Ipoh 25.06.2009
Plywood
a. 12mm Pc RM41.00 Deluxe Ipoh 16.10.2009
Pipe Culvert
a. 1500ND x 3050L No. RM955.50 ACP Marketing S/B Ipoh 16.10.2009
Manhole
a. 24" Ductile Iron Manhole No. RM330.00 *Nas Irenic Ipoh 16.09.2009
b. 9" Stainless Steel Manhole No. RM21.00 *Nas Irenic Ipoh 16.09.2009
PVC Pipe
a. 3" 'O' PVC Pipe No. RM15.00 *Nas Irenic Ipoh 16.09.2009
Sand
a. Mining Sand 10W Load RM460.00 *Nas Irenic Ipoh 16.09.2009
b. Mining Sand 6W Load RM290.00 *Nas Irenic Ipoh 16.09.2009
c. Coarse Sand 10W Load RM520.00 *Nas Irenic Ipoh 16.09.2009
d. Coarse Sand 6W Load RM240.00 *Nas Irenic Ipoh 16.09.2009
e. Wash Fine Sand 10W Load RM620.00 *Nas Irenic Ipoh 16.09.2009
f. Wash Fine Sand 6W Load RM290.00 *Nas Irenic Ipoh 16.09.2009
Workstation
a. 1650mm W x 3000mm L x 1200mm H (2 person) No. RM5,758.00 *PF Furniture & Construction S/B Kota Kinabalu 27.01.2010
a. 3300mm W x 4500mm L x 1200mm H (6 person) No. RM13,846.00 *PF Furniture & Construction S/B Kota Kinabalu 27.01.2010
list of machinery
ITEM DESCRIPTION UNIT PRICE UNIT PRICE FACTOR WASTAGE LABOUR & PLANT TOTAL w/o UNIT PRICE per Cu Yd. Con. to (M)
profit & o/h
% AMOUNT
1. Cement
a. Cement (50 kg) bag 17.00 bag 17.00 1.00 bag -
b. White cement bag 9.90 bag 9.90 1.00 bag
c. colour cement bag 25.00 bag 25.00 1.00 bag
d non shrink grout mix bag 25.00 bag 1 bag can cover 0.45 ft3 ( 13.2 L )
e PSC bondite 151A/B 2 - epoxy mortar pack 69.00
2. Sand
a. Fine Cu. Y 27.50 m3 21.00 1.31 m3 22.80 17.40 0.76 1.31
b. Fine ( cheras : 1 load RM 450.00 - 10m3 )
c. Coarse Cu. Y 25.00 m3 19.10 1.31 m3 20.40 15.60 0.76 1.31
Course ( cheras : 1 load RM 350.00 - 10m3 )
3. Quarry material
a. Aggregate ton 22.50 m3 36.80 1.64 m3
b. Crusher run ton 15.00 m3 21.30 1.42 m3
c. Crusher run ( Kangar site ) ton 15.00 m3 21.30 1.42 m3
d. Quarry dust ton 15.00 m3 21.30 1.42 m3
e. Quarry dust ( Kangar site ) ton 20.00 m3 28.40 1.42 m3
f. Premix ton 78.00 m3 110.80 1.42 m3
g. colpave ( minyak hitam ) drum 150.00 m2
h. Premix - kangar ton 90.00 127.80 1.42 m3
h. Premix - sarawak ton 120.00 m3 170.40 1.42 m3
I. Bitumen ( sarawak ) -209 L drum 350.00 m2 0.88 400.00 can cover 400 m2
j. Quarry sand - sarawak ton 17.50 m3 24.90 1.42 m3
k block stone - sarawak ton 20.50 m3 29.10 1.42 m3
4. Brick
a. Common Clay pcs 0.23 pcs 0.23 1.00 pcs
b. Cement & Sand pcs 0.19 pcs 0.19 1.00
c. Fire Rated Cement & Sand pcs 0.18
d. Facing Brick pcs 0.75
e. vent block ( 300 x 150 x 114mm ) no 1.00
f. Hollow Block pcs 1.00 pcs 1.00 1.00 pcs
costa roca stone m2 3.20
6. Geotextile m2 2.80
Page 10
Mat
ITEM DESCRIPTION UNIT PRICE UNIT PRICE FACTOR WASTAGE LABOUR & PLANT TOTAL w/o UNIT PRICE per Cu Yd. Con. to (M)
profit & o/h
9. Plywood
Plywood 12mm thick (4' x 8') pcs 50.00 * m2 16.80 2.97 m2
Waterproof Plywood 12mm thick. pcs 52.00 m2 17.50 2.97 m2
Waterproof Plywood 18mm thick. (4' x 8') pcs 65.00 m2 21.90 2.97 m2
17. L shape -
a. 4.5 x 3.5 x 0.6M nr 1,048.00 API
b. 4.5 x 3.5 x 1.0M nr 1,296.00 API
c. 2.5 x 3.5 x 1.0M nr 734.00 API
d. dry flow section - 4.3 x 1 x 250 mm thick nr 600.00 API
Page 11
Mat
ITEM DESCRIPTION UNIT PRICE UNIT PRICE FACTOR WASTAGE LABOUR & PLANT TOTAL w/o UNIT PRICE per Cu Yd. Con. to (M)
profit & o/h
29. Group C - swan pressure treated timber
a. 85mm x 17mm packing piece m 0.98 desa selatan
46 Sewerage tank
a. 5 person type SS2 no 2,200.00
b. 10 person type SS3 no 3,600.00
Page 12
Mat
ITEM DESCRIPTION UNIT PRICE UNIT PRICE FACTOR WASTAGE LABOUR & PLANT TOTAL w/o UNIT PRICE per Cu Yd. Con. to (M)
profit & o/h
65. Marble
a. Polish finish - 600mm x 600mm x 20mm pc 62.00 new m.k 0.36 2.78 172.22 m2
b. Polish finish - 300mm x 300mm x 12mm pc 9.50 new m.k 0.36 2.78 26.39 m2
GFRC
a. 5.4 x 2.00 - square + arch no 5,900.00
b. 0.6 x 2.70 - square no 1,450.00
c. 2.0 x 1.7 - arch patern no 1,300.00
formworks accessories
a. Rapid clamp ( taiwan ) no 4.30
b. spring clip ( taiwan ) no -
c. Rapid clamp tensional no 120.00
d. spring clip tensional no -
e. dywidag bar 6M ( germany ) no 45.00
f. dywidag bar 6M ( local ) no 32.00
g. wing nut 100mm base 2 legs no 4.30
h. wing nut 100mm base 3 legs no 4.70
I. PVC cone 22mm no 0.25
j. u clip no 1,300.00
67 230mm half round P.C. drain (600mm length) no 2.80 m 4.70 m length 3% 15% 0.70 5.40
Page 13
5 month
ESTIMATED DIESEL CONSUMPTION FOR CATEGORY A - EARTH MOVING PLANTS
AND OTHER EQUIPMENT
353,600.00
18 month
ESTIMATED DIESEL CONSUMPTION FOR CATEGORY B -
DIESEL ENGINE TYPE
35,942.40
18 month
ESTIMATED DIESEL CONSUMPTION FOR CATEGORY C
MISCELLANEOUS PLANTS AND EQUIPMENTS
673,920.00
1,063,462.40
Conc
CONCRETE - READY MIX - KL AND SELANGOR
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 182.00 182.00 173.00 173.00 165.00 165.00 160.00 160.00 150.00 150.00 192.00 192.00 - - - -
4) CRANE - in prelim - - - - - - - -
COST PER m3 205.50 196.20 188.00 182.80 172.50 215.80 18.00 18.00
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
4) CRANE - in prelim - - - - - - - -
COST PER m3 301.30 275.50 254.90 234.30 18.00 18.00 18.00 18.00
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 221.00 221.00 205.00 205.00 170.00 170.00 143.00 143.00 119.20 119.20 229.00 229.00 - - - -
4) CRANE - in prelim 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00
COST PER m3 362.60 346.20 295.10 267.30 242.80 370.90 135.00 135.00
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 192.00 192.00 184.00 184.00 175.00 175.00 170.00 170.00 165.00 165.00 202.00 202.00 214.00 214.00 227.00 227.00
2) WASTE 3.00% 5.80 5.50 5.30 5.10 5.00 6.10 6.40 6.80
4) CRANE - in prelim - - - - - - - -
COST PER m3 215.80 207.50 198.30 193.10 188.00 226.10 238.40 251.80
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 182.00 182.00 173.00 173.00 165.00 165.00 170.00 170.00 160.00 160.00 192.00 192.00 204.00 204.00 217.00 217.00
2) WASTE 3.00% 5.50 5.20 5.00 5.10 4.80 5.80 6.10 6.50
4) CRANE - in prelim - - - - - - - -
COST PER m3 205.50 196.20 188.00 193.10 182.80 215.80 228.10 241.50
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 207.00 207.00 198.00 198.00 190.00 190.00 184.00 184.00 178.00 178.00 217.00 217.00 229.00 229.00 - -
4) CRANE - in prelim - - - - - - - -
COST PER m3 231.20 221.90 213.70 207.50 201.30 241.50 253.90 18.00
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 140.00 #VALUE! 137.00 #VALUE! 130.00 #VALUE! - #VALUE! - #VALUE! 149.00 #VALUE! 159.00 #VALUE! #VALUE!
2) WASTE 3.00% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4) CRANE - in prelim - - - - - - - -
COST PER m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 133.00 #VALUE! 126.00 #VALUE! 120.00 #VALUE! 115.00 #VALUE! 110.00 #VALUE! 154.00 #VALUE! 164.00 #VALUE! 187.00 #VALUE!
2) WASTE 3.00% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4) CRANE - in prelim - - - - - - - -
COST PER m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 132.00 #VALUE! 124.00 #VALUE! 117.00 #VALUE! 112.00 #VALUE! 107.00 #VALUE! 154.00 #VALUE! 153.00 #VALUE! 187.00 #VALUE!
2) WASTE 3.00% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4) CRANE - in prelim - - - - - - - -
COST PER m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 145.00 #VALUE! 137.00 #VALUE! 128.00 #VALUE! 113.00 #VALUE! - #VALUE! 150.00 #VALUE! 155.00 #VALUE! - #VALUE!
2) WASTE 3.00% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4) CRANE - in prelim - - - - - - - -
COST PER m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
1) Concrete m3 1 145.00 145.00 137.00 137.00 128.00 128.00 113.00 113.00 - - 150.00 150.00 155.00 155.00 - -
4) CRANE - in prelim - - - - - - - -
COST PER m3 167.35 159.11 149.84 134.39 18.00 172.50 177.65 18.00
FORMWORK** FORMWORK**
(To General Area - Sawn Formwork) (To General Area - Sawn Formwork)
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
2) Timber (all sizes) ton 0.035 750.00 26.30 2) Timber (all sizes) ton 0.035 750.00 26.30
Usage times 3
3) Nail m2 incl
TOTAL 47.84
6) USAGE 3 17.50
7) LABOUR 18.00
Page 19
Rebar
REINFORCEMENT BAR**
Selangor
Rebar Size Y10 Y12 Y16 Y20 Y25 Y32 R6
DESCRIPTION UNIT QTY RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT RATE AMOUNT
transport 50
Rebar - Basic price. ton 1 2,184.00 2,184.00 2,100.00 2,100.00 1,995.00 1,995.00 1,995.00 1,995.00 1,995.00 1,995.00 1,995.00 1,995.00 2,300.00 2,300.00
Govt. control price 2,184.00 2,100.00 1,995.00 1,995.00 1,995.00 1,995.00 2,300.00 2,080.57
1) Steel bar ton 1 2,184.00 2,100.00 1,995.00 1,995.00 1,995.00 1,995.00 2,300.00 2,080.57
4) LABOUR & TYING WIRE ton 350.00 350.00 350.00 350.00 350.00 350.00 350.00
- allow 1 skilled labour can
tied for 5kg/ 10 minute 70.00 /day
- so, total cost per kg kg 0.35
bending machinery
- - - - - - -
TOTAL PER TON 2,599.50 2,513.00 2,404.90 2,404.90 2,404.90 2,404.90 2,719.00
COST PER kg 2.60 2.51 2.40 2.40 2.40 2.40 2.72 2.49
Wire mesh per m2 m2 1 14.00 14.00 16.00 16.00 18.00 18.00 20.00 20.00 23.00 23.00 13.50 13.50 12.70 12.70 8.50 8.50 17.00 17.00 19.70 19.70
less: discount 0% - - - - - - - - - -
1) Wire mesh m2 1 14.00 16.00 18.00 20.00 23.00 13.50 12.70 8.50 17.00 19.70
2) WASTE & LAP 25.00% 3.50 4.00 4.50 5.00 5.80 3.40 3.20 2.10 4.30 4.90
TOTAL m2 17.50 20.00 22.50 25.00 28.80 16.90 15.90 10.60 21.30 24.60
3) LABOUR m2 1 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
- allow 20 minute to lay 6m x 2m 12.00 /m2
- labour skilled allow 2 person 70.00 /day m2 0.50
COST PER m2 18.00 20.50 23.00 25.50 29.30 17.40 16.40 11.10 21.80 25.10
Page 20
BRICKWALL - 110mm THICK Brick
MORTAR
CEMENT SAND MIX 1: 6
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
1) Brick pcs 50.00 0.19 9.50 1) Cement bag 28.24 17.00 480.08
0.18 labour
COST PER m2 21.30
4.2515
CEMENT SAND
TOTAL 8.10
5) WASTAGE 3% 0.20
CEMENT SAND
TOTAL 27.40
5) WASTAGE 3% 0.80
Page 21
BRICKWALL - 114mm THICK Brick
COMMON BRICKS
TOTAL 15.60
5) WASTAGE 3% 0.50
CLAY BRICKS
TOTAL 31.00
5) WASTAGE 3% 0.90
FACING BRICKS
Page 22
Brick
VENT BLOCK
3) Exmet m2 3.00 - -
TOTAL 59.00
5) WASTAGE 3% 1.80
6) LABOUR m2 59.00 - -
2) mortar m3 0.02 - -
3) Exmet m2 3.00 - -
TOTAL 41.30
5) WASTAGE 3% 1.20
6) LABOUR m2 55.00 - -
Page 23
Brick
INTERLOCKING PAVER
TOTAL 30.00
5) WASTAGE 3% 0.90
INTERLOCKING PAVER
3) Paving m2 - 181.90 -
TOTAL 25.70
5) WASTAGE 3% 0.80
Page 24
DPM
DAMP PROOF MEMBRANE** Exmet
0.25mm Polythene Sheet
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
TOTAL m 2.00
WATERSTOP
150MM WIDE
DESCRIPTION UNIT QTY RATE AMOUNT
TOTAL m 14.00
Page 25
Paint
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
1) One Coat Sealer m2 175.00 276.00 1.60 1) One Coat Sealer m2 175.00 276.00 1.60 1 litre can cover for 7m2
2) Two Coat Finish m2 116.00 276.00 2.40 2) Two Coat Finish m2 136.00 276.00 2.00 1 litre can cover for 7m2
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
1) One Coat Sealer m2 175.00 276.00 1.60 1) One Coat Sealer m2 175.00 276.00 1.60
2) Two Coat Finish m2 116.00 4.30 - 2) Two Coat Finish m2 136.00 4.30 -
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
2) Two Coat Finish m2 116.00 276.00 2.40 2) Two Coat Finish m2 136.00 276.00 2.00
Page 26
Tile
TILING WORKS
25.00 pcs/m2
TOTAL 24.80
3) LABOUR m2 19.00
11.11 pcs/m2
TOTAL 34.20
3) LABOUR m2 19.00
Page 27
Tile
11.11 pcs/m2
TOTAL 42.80
3) LABOUR m2 19.00
11.11 pcs/m2
TOTAL 44.00
3) LABOUR m2 19.00
Page 28
Tile
pcs/m2
TOTAL 8.80
25.00 pcs/m2
TOTAL 31.90
Page 29
Tile
TOTAL 2.80
3) LABOUR m 2.80
TOTAL 18.70
3) LABOUR m2 19.00
Page 30
Tile
TOTAL 70.40
3) LABOUR m2 19.00
2.78 pcs/m2
TOTAL 79.40
3) LABOUR m2 19.00
Page 31
Tile
TOTAL 41.30
3) LABOUR m2 19.00
95mm 30.15
6.25 pcs/m2
TOTAL 119.10
3) LABOUR m2 19.00
Page 32
Tile
6.25 pcs/m2
TOTAL 33.00
3) LABOUR m2 19.00
25.00 pcs/m2
TOTAL 44.00
3) LABOUR m2 19.00
Page 33
Tile
25.00 pcs/m2
TOTAL 52.80
3) LABOUR m2 19.00
25.00 pcs/m2
TOTAL 48.20
3) LABOUR m2 19.00
Page 34
Tile
44.44 pcs/m2
TOTAL 34.20
3) LABOUR m2 19.00
50.00 pcs/m2
TOTAL 35.80
3) LABOUR m2 19.00
Page 35
Tile
25.00 pcs/m2
TOTAL 39.90
3) LABOUR m2 19.00
11.11 pcs/m2
TOTAL 14.60
3) LABOUR m2 19.00
Page 36
Tile
sarawak price
TYPE OF TILES LENGTH WIDTH QTY / m2 PRICE 1.00
(mm) (mm) (pcs) (pcs)
0.20 0.20
kimgress 198.00 198.00 25.51 1.13
0.04
25.51 pcs/m2
TOTAL 31.70
3) LABOUR m2 19.00
20.00 pcs/m2
TOTAL 19.80
3) LABOUR m2 19.00
Page 37
Tile
6.25 pcs/m2
TOTAL 32.10
3) LABOUR m2 19.00
6.25 pcs/m2
TOTAL 42.70
3) LABOUR m2 19.00
Page 38
Tile
25.00 pcs/m2
TOTAL 28.90
3) LABOUR m2 19.00
Page 39
MML Homogenous Floor Tiles ( 300 x 300 )
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
1) Cement bag 28.00 17.00 476.00 1) Cement bag 28.00 17.00 476.00 1) Cement bag 28.00 17.00 476.00
2) Fine Sand m3 4.00 21.00 84.00 2) Fine Sand m3 3.00 21.00 63.00 2) Fine Sand m3 6.00 21.00 126.00
A) 19mm thick m2 0.019 9.90 A) 19mm thick m2 0.019 10.50 A) 20mm thick m2 0.020 9.30
B 12mm thick m2 0.013 9.00 B 12mm thick m2 0.012 9.20 B 13mm thick m2 0.013 8.50
B 13mm thick m2 0.013 9.40
C 25mm thick m2 0.025 10.80 C 25mm thick m2 0.025 11.50 C 25mm thick m2 0.025 9.90
D 20mm thick m2 0.020 10.00 12mm thk m2 0.012 8.40
DESCRIPTION UNIT QTY RATE AMOUNT DESCRIPTION UNIT QTY RATE AMOUNT
1) Cement bag 28.00 17.00 476.00 1) Cement bag 28.00 17.00 476.00
2) Coarse Sand m3 3.00 20.40 61.20 2) Fine Sand m3 3.00 21.00 63.00
COST PER m2
COST PER m2
A) 20mm thick m2 0.020 8.60 A) 19mm thick m2 0.019 10.50
B 19mm thick m2 0.019 8.40 B 12mm thick m2 0.012 9.20
C 25mm thick m2 0.025 9.50 C 25mm thick m2 0.025 11.50
d 20mm thk m2 0.02 10.60
AMOUNT 2,021.20
3) CONSOLIDATION 5% 606.40
4) WASTE 3% 60.60
5) LABOUR m2 5.00
COST PER m2
A) 20mm thick m2 0.020 18.40
B 19mm thick m2 0.019 17.80
C 25mm thick m2 0.025 21.80
D 50mm thick m2 0.050 38.60
Page 43
Plaster
Page 44