2
ABSTRACT
This Industrial Training Report is to introduce or clarify the organization of which has
involved or become the platform for the industrial training carried out as well as the
base which gives the overall training to the student. This includes the organizations
main activity and nature of business as well as its structure. The organization expertise
in the oil and gas industry, which stands as one of the well-known company which
serves as the oilfield service provider. The structure of whole organization, including
the departmental aspects as well as the segments involved in the business production.
More information and details regarding to the organization are provided within this
report accordingly.
3
ACKNOWLEDGMENT
Management. I would also like to thank my lecturers and internal supervisor for
Next, I would like to thank Continental Platform (M) Sdn Bhd, for giving me an
would like to thank my supervisor, Mr Kamal Syafiq and the colleagues for giving me
the opportunities to experience and handle different kinds of tasks which are related
Last but not least, I would like to take the opportunity to thank all the
colleagues in Continental Platform (M) Sdn Bhd, for the patience in teaching me the
4
TABLE OF CONTENTS
LIST OF FIGURES
FIGURE 1.. 10
FIGURE 2.. 11
FIGURE 3.. 12
FIGURE 4.. 12
FIGURE 5.. 13
FIGURE 6.. 14
FIGURE 7.. 18
FIGURE 8.. 29
FIGURE 9.. 29
FIGURE 10 30
FIGURE 11 31
5
CHAPTER 1: INTRODUCTION
1.1 INTRODUCTION OF PROJECT (TASK/ASSIGNMENT)
Along with the company as a broker, the overall tasks and projects are
and benefits.
The shipping operation teams are responsible for the chartering services
which the teams need to prepared all documents such as Domestic Shipping
Licences (DSL), demurrage claims and negotiate for the pricing methods.
Since the operation related to the shipping industry that used vessel for
6
DAILY TASKS
Before I started doing the daily tasks, the most important things is I need to
learn the five stages of shipping operations. Where I need to study the shipping
Stage 1: negotiation/planning
The broker will find a vessel and negotiate with the owner. Shell scheduler will
give out the cargoes to the company for the whole month first, but they do not have
the vessel to perform it yet. So it is the company job to get them vessel to carry their
cargo. The company will propose the cargo-by-cargo to the owner, propose vessel to
shell/ charterer. The owner will reply and send the stowage plan and Q88 to the
charterer to let them know that the vessel able to carry the cargo.
Usually the company will receive cargo nomination from the charterer and will
receive the cargo nomination after the negotiation is done. After receiving the cargo
nomination, the company will forward it to the owner and pass to the master. So that
the master can proceed the voyage with the instruction provided and then the master
must give the ETA notice to the relevant people. Fixture note is a contract between
broker, owner, and charterer. The fixture note is signed by both parties is essentially
a simple chartering contract performed by both parties. The company needs to issue
Then, the broker, owner and charterer must know the berthing prospect before
reaches the terminal. It is a scheduled to know the number of the vessel berth. Then
7
the NOR (Notice of readiness) must be tendered within the laycan to avoid the risk of
cancellation of the shipment. If it is too early, she will probably have to wait. And the
company needs to monitor the loading operations thoroughly. After the cargo
discharged, the master and agent will submit the cargo documentation to all ETA
notifying parties.
After receiving the loading cargo document, the company will issue the full time
log together with the cargo documents to be sent to the charterer for the custom
clearance purpose at discharge port. After loading is done, LOI (letter of indemnity)
will be prepared and sent to the charterer to invoke it and forward it to the owner. LOI
is a letter for charterers to invoke that the vessel need to discharge the cargo at
discharge port. This indemnity got a secure which the charterer need to secure the
vessel to discharge according to the description of the bill of lading. LOI is needed for
discharge without the presentation of original bill of lading on board. Finally, the
company can issue freight invoice to the charterer once they received the bill of lading
ETA must be served to the relevant people at discharge port as listed in cargo
nomination. Broker, owner, charterer must know the berthing prospect before reaches
the terminal. NOR is tender for discharge operations. And the company must monitor
the operation thoroughly. A master and an agent will submit the discharge cargo
documents. Full time log will be prepared by the broker to the owner and need to pay
Stage 5: Demurrage
8
Demurrage can be done after the shipment completed discharge. It can be
referred from the itinerary that have been updated day by day. After know which
shipment or voyage number is completed discharging, we can proceed to print out all
cargo documents which is load port documents and discharge port documents then
After done the calculation with all documents, we need to get owner revert with
If there are NIL demurrage, the person in charge according to demurrage who
is Janny will send NIL demurrage notice by email (for non STSB and SMT) or submit
as NIL in i-demurrage system for STSB and SMT within 30 days from date of
If there is demurrage incurred, Janny will reconcile the calculation with owners
calculation. If there is any error, Janny will request owner to revise the calculation
before submitting to charterer (in order to expedite claim process). Then, Janny will
send demurrage notice to charterer by email (for non STSB and SMT) within 30 days
Last but not least, Janny will submit demurrage claim with full documents in i-
demurrage system or by email if SRC and Shell cargo within 60 days from date of
completed discharging.
9
Update itinerary of the vessel
Itinerary of the vessel must be updated every day which the information of the
vessel can be find at the email. The itinerary must be updated since the Shell parties
request for some vessels itinerary for the vessel related that carry their cargo. So that,
by the itinerary they will know current location of the vessel and also estimated time
An email is a medium for the all parties to get information fast, accurate and
communicate with each other to get some information. But, before I can reach the
information, the laptop or pc need to be installed with this outlook by the person in
charge.
After done installed, then I can start digging for the information to update the
itinerary.
Figure 1
The image of the outlook
I just need to search the name of the vessel and her voyage number and then
the list of the vessel will come out. Just need to filter the information and make sure it
10
After that, I can proceed to update the itinerary by using the Microsoft excel. I
That is not as easy as ABC where I need to understand the status required to
fill at the load port and discharge port. For example, move load port means that the
vessel is moving to the load port and await berth means that the vessel is berthing. At
first I always makes mistake where I always stated the wrong status just because I do
not really understand the meaning of the status first. But practice makes perfect when
Figure 2
Daily itinerary using Microsoft Excel
After done updating the itinerary, I need to give to Atta who is Operation
Assistant that always send the itinerary at the email to the related parties. After the
11
Figure 3
Daily itinerary send in the email
After sending the daily itinerary through email, it will be print out and given to all the
colleagues as a references.
Since I already master with the itinerary, I have given a task to update the track
of the vessel. I need to update daily with the summary of the vessel tracking and
the boss.
Figure 4
Vessel Tracker in Microsoft Excel
12
The word marking with red colour means there is no updated of the vessels and
maybe updated from the site but still it is not the latest so still it will consider as no
update.
From this vessel tracking, I can know whether this foreign vessel enter the
Malaysian water or not. Since the vessels are foreign vessel, they are not allowed to
I get the information of the vessels by searching at the search engine and make
sure that I have enter the correct name of the vessels. And the information will appear
like this and I just fill the information in excel.
Figure 5
Information get by using search engine
13
Demurrage
Since I have learned demurrage theoretically, it is easy to apply the work in real
demurrage whether there is nil demurrage or demurrage incurred. Then, I will submit
is quite simple which I just need to submit in idemmurage and update in the work card.
Work card need to be updated for the references of the company and no need to be
Figure 6
Idemurrage website
The idemmurage id and password will be key in by Janny, the senior claim and
demurrage executives. After that, I can start key in the details of the voyage and submit
14
CHAPTER 2: REPORT OF TASK ASSIGNED
2.1 INTRODUCTION
Report of Task Assigned is a compulsory to be accomplished in order to
The purpose of this report is to evaluate the skill has been developed
during internship. There is a section in this report where the students will explain
of their placement. By doing this report, students will come out with some
recommendations for better improvement either for students itself and the
15
2.2 PROJECT DESCRIPTION
For three months doing my internship in Conti, I was placed in chartering
Senior Demurrage and Claim Executive, and Operation Assistant. I was guided
to do the shipping operations for the department. This activity is to support the
performances.
of the vessels and make sure that the vessels able to perform well and the
2.3 ROLES/RESPONSIBILITIES
Make a research to maximize the vessel performances
control of them can with an optimised ship design into a single integrated
ship design, waste heat recovery and the recovery of other losses,
technologies.
depending on the type engine. The peaking efficiency of 52% for the best
16
engines is one of the highest efficiency ratings among existing prime
possible.
17
For ships like oil tankers and container vessels with annual fuel
of a ships propeller and will thus increase the vessel overall efficiency
Figure 7
Propeller with four blades
accurate operation of ship. For this purpose, the ships machinery plant
should be kept well maintained and clean at all times for assuring safe
18
Furthermore, it is most significant that ample new spare parts
according to the manufacturers instructions. Fuel oil and lube oil must
be analysed in order to ensure that they do not contain any debris and
that cause severe damage like fire that may require the ship from
terminating its service until lengthy and costly repairs and maintenance
1) Lubricating oil
must be evaluated for ensuring the optimum flow rate between the
feed pump and the purifiers capacity. Old lube oil feed system designs
utilize a direct drive pump that bears a large capacity as against the
19
2) Crankshaft safety
Celsius. Also, lube oil filters must be maintained and placed in clean
3) Bunkers
available in order to allow proper testing before any new bunkers are
20
I. Improvement in the hull strength as well as energy
absorption.
The hull of the ship is a key piece of the ship efficiency puzzle.
The key factors that affect hull performance are the shape of the
hull, the condition of the hull itself, the coating used on the hull and the
reduce fuel costs by as much US$30 billion per year and achieve an
dry docking interval (the interval between two dry docking). This
21
understanding ship, and therefore hull performance. Any increase in hull
roughness will increase the hull frictional resistance which will either
maintaining constant power, will result in speed loss and longer voyage
times.
There has been a great deal of attention amongst ship hull paint
22
2.4 CONCLUSION
Continental Platform (Conti) has been established to provide high
Since I was intended under operation teams which is one of the job is
to discuss, monitor the pricing, operation and HSSE concept, I was asked by
performances without any problem incurred that will caused delays and extra
sea transport is very crucial where they need to maintain according to the
23
CHAPTER 3: CONCLUSION
3.1 INTRODUCTION
Continental Platform Sdn Bhd (Conti) is a premier provider of Continental
chartering services that meets the requirements of the clients who competitive
vast experience in the commercial and technical aspects of shipboard and fleet
management.
Mariners, who not only have extensive knowledge in the technical and
related to each other which chartering is more focused on the ship brokering
and chartering services related to the oil and gas and the negotiation will be
done by the operations team based in KL. And hydrocarbon is also the
operation team which also the third party between supplier and clients such as
Shell, Petron and Chevron. The hydrocarbon team responsible for the handling,
24
3.2 LESSON LEARNED SKILLS DEVELOPED (TECHNICAL,
COMMUNICATION, HUMAN, AND ETC.)
During my placement in Conti for three months in Operation Teams
environment.
schedule where I need to be alert to make sure that we do not exceed the
time barred which is demurrage need to claim within 30 days of the vessel to
Operation Team but also all departments in Conti shall able to have
communication skills between co-workers and ship owners and all parties.
This is to build good relationship between Conti and ship owners so that the
25
3.3 KNOWLEDGE GAINED
While accomplish my Internship Programme, I have been exposed to do
the operation daily activities. To provide the payment of the demurrage and
purpose and ask for the payment advice and payment value date that they will
pay for us. The Purchase Order (PO) is issue if the broker want to pay for the
agents. For example, total freight charges is USD 120,000.00 and we will issue
the Sale Order (SO) to make a claim as a broker. For example, we as broker
and the charterer is Shell and the owner is Hong Lam. So we will pay the total
of freight to Hong Lam and for the broker commission will be deducted from the
26
3.4 LIMITATIONS AND RECOMMENDATIONS
Based on my experience on Internship Continental Platform (Conti),
there is only two matters need to improve by Conti for Internship Programme.
experiencing site work. I also admit the site works more challenging and need
suitable place and time for students to experience real time works although
there is impossible for company to give real works and responsibilities for
trainee to handle the job scope in order to avoid any mistakes that may lead
to the losses.
Platform Sdn Bhd where the trainee is send to Tanjung Langsat Port in Johor
Bharu and site visit and vessel visit under Ship Management in MarOff.
Usually the male trainee was send to the port for 3 months. But, in my opinion,
for the female trainee is more than enough for them to experience such
knowledge at least for a week. Give them a try and evaluate their work done
according three associates marine company which are Marine & Offshore
Solution Sdn Bhd (MarOff), Energy Platform Sdn Bhd and Continental
Platform (M) Sdn Bhd. The company can rotate the department each months
Technology (NMIT) which NMIT shall also take the opportunity to link up with
the industries while the students undergone training so that they will also get
2) The top 4 levers for improving vessel performance. (n.d.). Retrieved December 18, 2016,
from http://blogs.dnvgl.com/performance/the-top-4-levers-for-improving-vessel-performance/
28
APPENDICES
Figure 8
MT Erowati
Figure 9
Calculation demurrage done by Microsoft Excel
29
Figure 10
MT Aquabelle one of the CVC vessel.
Figure 11
MT precedence the spot vessel.
30