PAYLENGTH
(i)
The paylength for supply of piles be measured in
linear metre, commencing from cut-off level to toe
of pile when the driven to set. The cut-off level
shall be 75mm above the base of the capping
beam
(ii)
Driving of piles shall be measured and paid for by
linear metre, measured nett from toe of pile when
pitched to the commencing level i.e. toe of pile
when driven. Fractions of a metre will be
measured to the nearest metre. Mark each pile
with its length in linear metre at 1.00m intervals
for each whole length.
To Collection : -
J2/1
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
C
Allow for the provision of all necessary hydraulic
operated piling equipments, plants, tools and ancillary
equipments and for their transportation to site,
handling, assembling, erecting, dismantling and
removal on completion. ITEM - - 5,000.00
J2/2
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
BANGLO RS1
J
Single V-butt weld connection 1200mm girth between
chamfered edges of head and base plates of piles
including 32mm diameter mild steel bars, 1000mm long
inserted in and including 500mm deep mortices in head
and base of piles NO 21 6.50 136.50
______________________________
J2/3
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
BANGLO RS2
G Ditto exceeding 10.00m and not exceeding 13.00m M 120 5.00 600.00
J
Single V-butt weld connection 1200mm girth between
chamfered edges of head and base plates of piles
including 32mm diameter mild steel bars, 1000mm long
inserted in and including 500mm deep mortices in head
and base of piles NO 40 6.50 260.00
______________________________
J2/4
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
J2/5
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
PILE CAP
BLOK RS 1
B Ditto exceeding 1.50m deep and not exceeding 3.00m MC 2 8.50 14.50
Pile Cap
To Collection : 4,957.33
J2/5
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
BLOK RS 2
B Ditto exceeding 1.50m deep and not exceeding 3.00m MC 3 8.50 29.56
deep
Lean concrete Grade 15-38mm aggregate as described
Pile Cap
To Collection : 9,630.07
J2/7
SECTION 'J2' - PILING AND FOUNDATION WORKS FOR BANGLOW (cont'd)
COLLECTION
J2/7