You are on page 1of 4

View of 3 months during Internship design

Total Week - 12 Total Theory Week - 12 Total Practical Week - 12

Total Theory In A Week - 3 days Total Theory Classes - 36 days Total 72 Working Days
(or more) (or more) Within 90 Days During
Internship
Total Practical In A Week 3 Total Practical Classes 36 +
days (Minimum, But almost 5 days days
in a week practical offered)

Describe of Three Months during Internship Design

SL Effluent Treatment Plant/Water Treatment Plant (Theory & Practical)

1.1 What is ETP, Why need it, Present condition of Bangladesh regarding ETP.

1.2 Types of ETP, Chemicals & Basic Chemical Operation of ETP.

1.3 Tank of ETP & Their Operation (Unit Processes)

1.4 Various Types of ETP. and their difference.

1.5 Mechanical Equipment for ETP and their functions.

1.6 Basic Test of ETP Such BOD, DO, TSS, TDS, Color, etc.

1.7 Biological unit operations, Food to Microorganism and calculation.

1.8 Coagulation & Flocculation Method

1.9 Working Procedure of ETP

1.10 Design Criteria of ETP

1.11 ETP Design or CAD

1.12 Chemical Design for a Plant.

1.13 Details about STP and Others

1.14 Sludge Treatment and Filter press operations.

So Enough Experiment of ETP

Physical Show & Visit ETP Industries, WTP and STP also.

Practically Operation by Own

2 Renewable Energy (Theory & Practical)

2.1 What is Renewable Energy & Non-Renewable Energy

2.2 Conventional Energy Resources & World Crisis, Specially Bangladesh


2.3 Tidal Power, Biomass Energy, Wind Power, Geothermal Energy & Solar Energy and Their
Possibility in Bangladesh

2.4 Basic of Solar, Biomass & Wind Turbine

2.5 Basic Knowledge of Electricity

2.6 Calculation of Watt Volt & Ampere for Panel

2.7 Produce Electricity by Biogas & Wind Turbine

2.8 SHS (Solar Home Systems) & Their Components, Grid Systems

2.9 SHS Design

2.10 Introduce With Market and Solar Field in Bangladesh

Enough Experiment

Visit on Solar Market and a Biogas Plant.

Practically Operation

Special offer from GRAMEEN SHAKTI of Grameen Bank

3 Solid Waste Management (Theory & Practical)

3.1 What is Waste, Classification of Waste & Basic Concept regarding SWM

3.2 Compare SWM between Bangladesh & Developed Country

3.3 Key and Collection & Sorting of SW

3.4 Hospitality Waste Management

3.5 Safely SWM among Residential Industries & Commercial Area

3.6 Procedure of Energy Generation from SW

3.7 Design a sanitary land fill (sanitary land fill and overview in Bangladesh, leachate
management, land fill design operation etc.)

Require Experiment

Physical Visit on Matuail and/or Amin Bazar Landfill with help by JAICA & City
Corporation

4 Civil Engineering (Construction), (Theory & Practical)

4.1 Responsibility of Environmental Engineer as a site Engineer in Construction site or


Developer Company

4.2 Basic Construction Process ( types of building, footing, building contractor, brick bonding,
Project layout and Step of building work)

4.3 Estimate of Reinforcement, Tiles, Paint etc.


4.4 Estimate of Sand, Cement, Brick, Stone

4.5 Construction of Sub & Super Structure

4.6 Construction of Roof

4.7 Estimate of Wood Work, Steel Work in Construction

4.8 Describe of Pilling

4.9 Beam, Column, Grade Beam, Water Reservoir etc.

4.10 Working Procedure of paint and tiles work

4.11 Working Procedure of Brick, plaster and Concrete casting.

4.12 Description of Construction materials Sand, Brick. (type, source, Problem)

4.13 Description of Construction materials Cement, Stone, etc.

4.14 Basic Knowledge of electrical work.

4.15 Basic Knowledge of sanitary work.

4.16 Description of Thai work with Thai section, stair railing, Preparation of ground
floor/parking garage.

4.17 Every Engineer is know that the unite weight, see symbol & select object, full meaning
etc.

So Enough Experiment

Practically Visit on different Construction Site

Operation of Construction Work With Site Engineer/Project Engineer in Site

Practically Maintains of Pilling Operation

5 Personal Skills Development & Grooming

5.1 Basic about Health Safety and Risk Assessment. Knowledge about Safety Signs.

5.2 Knowledge Growing Class (About Career Plan and Study Plan)

5.3 AutoCAD & GIS

6.1 Basic Office Language Development Bengali and English both, Preconception of Office
Management, Reporting.

6.2 Briefly Knowledge of Home & Abroad Environmental Science & Engineering Education
and Working Space.

6.3 EIA Preparation and Check Knowledge.

6.4 Special Lecture on ISO 14001 and buyer and Bangladeshi industrial sector.

6.5 Ability of Preparing CV, Application: Viva Skills, Communication Skills etc.
6.7 Evaluation test, Viva and written both, Final Ceremony for Obtaining Certificate & Closing
Internship

Construction Practical Continue.

Construction Practical Continue.

Reporting of EIA of Different Environmental Works, CAD and Others.

Various Training and Closing

Key Benefits of This Internship: - * Students Must be Introduced with their Job Sector Specially in Dhaka *
Developed Their Interview Skills * Introduce about Environmental Field in Both GO & NGOs * Effective Uses
Online for Job Searching * Developed Their Presentation Skills & Grooming. (It may changes as need basis,
Construction work may take more duration.), Developed their Construction works knowledge.)

LEGEND

Weekly View of BEEA Internship THEORY PRACTICAL

Topics 01 01 01 01 Topics 01 01 01 01 01 01
week week week week week week week week week week
Week Week

ETP/WTP P ETP/WTP

RE T R RE

SWM H A SWM

Construction E C Construction

Health O T AUTOCAD,
Safety GIS
R I
AUTOCAD, Personal
Y C
GIS Skills and
A Grooming

Personal L Closing
Skills and
Grooming

Previous View of BEEA Internship

Total Polytechnics participanted: Pabna, Jhenidah, Barguna,


Satkhira, Chitagong Polytechnics

Total Participants (Up to 2016) 163

Average in a Year 40+ Students.

You might also like