You are on page 1of 27

NEW FLOWLINES FOR 5 EXTG.

INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923


PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 1 of 10 DATE: 06.01.2016

DESIGN CALCULATION OF 8-AW-5017-F30A PIPLINE ANCHOR


BLOCK AT MWIP AREA AND MN-47 WELL HEAD AREA

B 06.01.2016 ISSUED FOR APPROVAL PKK SUS/NK

A 18.11.2015 ISSUED FOR APPROVAL PKK SUS/NK

PREPARED CHECKED VERIFIED APPROVED


REV DATE DESCRIPTION
(GS) (GS) (MUSHRIF) (KOC)
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 2 of 10 DATE: 06.01.2016

INDEX

1. INTRODUCTION .................................................................................................................................. 3
2. APPLICABLE STANDRDS/REFERENCES................................................................................................ 3
3. MATERIAL PROPERTIES AND CONSTANTS .......................................................................................... 3
4. DESIGN OF ANCHOR BLOCK ............................................................................................................... 5
ANNEXURE-I PIPING LAYOUT ............................................................................................................... 8
ANNEXURE-II STRESS ANALYSIS REPORT ............................................................................................. 9
ANNEXURE-III SOIL REPORT ............................................................................................................... 10
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 3 of 10 DATE: 06.01.2016

1. INTRODUCTION:
The design report indicates the calculation of 8-AW-5017-F30A pipeline anchor block at MWIP area
and MN-47 well head area for the New flow lines for 5 existing injection wells, 1 new source well &
replacement of 19 existing brackish water flow lines WK plus emergency brackish water line to NTF
project.

2. APPLICABLE STANDARDS/REFERENCES:
1. ACI 318-11, Building code requirements for Reinforced Concrete

2. AISC - Specification for structural steel buildings

3. ASCE 7.05 - Minimum design loads for buildings and other structures

4. KOC Standards for Basic civil Engineering design data - KOC-C-001

5. Foundation analysis & design by Bowles, fourth edition, published by McGraw Hill

6. Design of concrete structures by Winter & Nilson, Published by McGraw Hill.

3. MATERIAL PROPERTIES AND CONSTANTS:


CONCRETE:
Cube Crushing Strength (fcu)
RCC = 30 MPa

Blinding Concrete = 15 MPa

Cylinder compressive strength of RCC (fc)= 0.8x30 = 24 MPa

Youngs Modulus of Elasticity (Ec) = 4700 fc = 2.30x104 MPa

Unit Weight of RCC (Yc) = 24 kN/m3

REINFORCING STEEL:
Modulus of Elasticity (Es) = 2 x 105 MPa

= 29 x 106 psi

Yield Strength (Fy) = Grade 60


NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 4 of 10 DATE: 06.01.2016

= 414 MPa

Unit Weight (Ys) = 78.5 kN/m3

STRUCTURAL STEEL:
Modulus of Elasticity (Es) = 2 x 105 MPa

Yield Strength (Fy) = 250 MPa

Unit Weight (Ys) = 78.5 kN/m3


NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 5 of 10 DATE: 06.01.2016

4.0 DESIGN OF ANCHOR BLOCK


NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 6 of 10 DATE: 06.01.2016

4.1 DESIGN OF ANCHOR BLOCK AT MN-47 WELL HEAD


LOCATION
DESIGN OF ANCHOR BLOCK AT MN47 WELL HEAD LOCATION:
Caesar forces:
Anchor forces from stress analyis report,
Caesar node no = 3070
Force along X direction Fx = 120.586 kN
Force along Y direction Fy = 0.394 kN
Force along Z direction Fz = 120.586 kN
Moment along X direction Mx = 0.649 kN.m
Moment along Z direction Mz = 0.662 kN.m
Inclination of pipe line with respect to Caesar axis = 45 degree
= 0.79 radians

Z Z'

X'
ANCHOR POINT

The resolved forces are,


Vertical load, F'Y = 0.394 kN
Horizontal force along the pipe, F'X = (120.586 X SIN(0.79 ))+( 120.586 X COS(0.79))
= 170.53 kN
Horizontal force across the pipe, F'X = (120.586 X COS(0.79 ))-( 120.586 X SIN(0.79))
= -0.78 kN
Moment about the X', M'X = (0.649 X COS(0.79 ))-( 0.662 X SIN(0.79))
= 0 kN.m
Moment about the Z', M'Z = (0.649 X SIN(0.79 ))+( 0.662 X COS(0.79))
= 0.93 kN.m
The anchor loads in pipe flowing direction is higher in order to compared with the loads across pipe flowing direction & lateral force is very very
minimum and force in lateral direction is negligible in nature, however anchor block design check carried only for the anchor force.

Soil characteristics for anchor block design:


Co-efficient of passive earth pressure, p = 3.33
Co-efficient of active earth pressure, a = 0.3
Soil density = 18 kN/m3
Co-efficient of friction b/w concrete and soil, = 0.4
Alllowable Net Safe bearing pressure = 300 kN/m2
Height between bottom of block to NGL = 2.858 m
Overburden pressure = 51.444 kN/m2
Alllowable gross Safe bearing pressure = 351.444 kN/m2
Anchor block dimensions:
Natural ground level = 178.4 EL
Center of pipe (COP) level = 176.292 EL
Height from NGL to Center of pipe = 2.108 m
Diameter of the pipe = 0.216 m
Total Length of the anchor block along the pipe direction, L = 3 m
Length from centre of block to tip-1 , L1 = 1.5 m
Length from centre of block to tip-2 , L2 = 1.5 m
Total Width of the anchor block across the pipe direction, B = 2 m
Thickness of the anchor block, H = 1.5 m
Thickness of the anchor block top to centre of pipe, H1 = 0.75 m
Thickness of the anchor block base to centre of pipe, H2 = 0.75 m
Height of anchor block top to NGL = 1.358 m
Unit weight of concrete = 24 kN/m3
Anchor block arrangement :
Centre line of anchor block
1.5 m 1.5 m

1 2

Anchor flange
0.75 m

Centre line of pipe/anchor block

Z'
2m
0.75 m

4 3
3m Pipe line axis X'
Plan of anchor block
Ground level NGL 178.4

1.358 m

3m
Top of Anchor block

Pipe flow directiion

1.5 m

Section of anchor block

Self weight of the concrete block:


Self weight of the concrete block without deducting pipe portion = 3 x 2 x 1.5 x 24
= 216 kN
Volume of the concrete replaced by the pipe = pi() x 0.216 x 0.216 / 4 x 3
0.11 m3
Net weight of concrete block with reducing the pipe portion = 216 - 24 x 0.11
= 213.36 kN
Moment due to pipeline shear forces:
Moment due to shear force along pipe direction at base, MZ = 170.53 x 0.75
= 127.8975 kN.m
Moment due to shear force along pipe direction at base, MX = -0.78 x 0.75 (Very minimum compared with
= -0.585 kN.m anchor force hence it is neglected)

Earth pressure calculation:

NGL 178.4
Zero pressure at top

1.36 m

3.33x18x1.36= 0.3x18x1.36=
82 kN/m^2 Pressure at top of anchor block 7.3 kN/m^2

Centre of pipe flow 1.5 m

3.33x18x2.86= Pressure at bottom of anchor block 0.3x18x2.86=


171.43 kN/m^2 15 kN/m^2
Passive earth preesure Earth pressure on anchor block Active earth preesure
opposite to flow direction along to flow direction

Force excerted on anchor block base due to active earth pressure along X- = (7.34x2x1.5)+(0.5x(15.44-7.34)x2x1.5)
direction = 34.17 kN
Force excerted on anchor block base due to passive earth pressure along X- = (81.52x2x1.5)+(0.5x(171.43-81.52)x2x1.5)
direction = 379.43 kN
Overturning moment on anchor block bottom due to active earth pressure = (7.34x2x1.5x1.5/2)+(0.5x(15.44-7.34)x2x1.5x1.5/3)
along X-direction (Moment about Z direction) = 22.59 kN.m
Overturning moment on anchor block bottom due to passive earth pressure = (81.52x2x1.5x1.5/2)+(0.5x(171.43-81.52)x2x1.5x1.5/3)
along X-direction (Moment about Z direction) = 250.85 kN.m

Load due to soil cover on anchor block:


Lengh of the anchor block = 3 m
Width of the anchor block = 2 m
Distance from NGL to top of anchor block = 1.358 m
Weight of the soil on above the top of anchor block = 3x2x1.358x18
= 146.664 KN

Design forces for anchor block design:


Forces along X direction,
Force along X direction from pipe stress = 170.53 KN (+ve direction)
Force along X direction from active earth pressure = 34.17 KN (+ve direction)
Force along X direction from passive earth pressure = 379.43 KN (-ve direction)

Forces along Y direction,


Force along Y direction from pipe stress = 0.39 KN (downward direction)
Force along Y direction from anchor block weight = 213.36 KN (downward direction)
Force along Y direction from soil weight above block = 146.66 KN (downward direction)

Moment about Z direction,


Moment about Z direction from pipe stress, = 0.93 (Clockwise rotation)
Moment about Z direction due to pipe lateral load in X direction, = 127.8975 (Clockwise rotation)
Moment about Z direction due to active earth pressure in X direction, = 22.59 (Clockwise rotation)
Moment about Z direction due to passive earth pressure in X direction, = 250.85 (Anti Clockwise rotation)

Base pressure check:


Actual base pressure = (P/A) (MZ/ZZ) (MX/ZX)
Total vertical load, P = 0.394+213.36+146.664
= 360.418 kN
Area of the anchor block at base = 3x2
= 6 m2
Section modulus, ZZ = BL2/6
= 2 x 3 x 3 /6
3 m3
Total moment along the pipe direction, MZ (moment about Z direction) = (0.93+127.8975+22.59-250.8525)
99.44 kN.m
Maximum base pressure (P/A) + (MZ/ZZ) = (360.418/6)+(99.435/3)
93.215 kN/m2
Minimum base pressure (P/A) - (MZ/ZZ) = (360.418/6)-(99.435/3)
26.925 kN/m2
2
Maximum base pressure = 93.215 kN/m < 351.444 kN/m2 Safe in base pressure

Minimum base pressure = 26.925 kN/m2 > 0 kN/m2 No tension

Check for sliding:


Sliding force along X-direction = 170.53 + 34.17
204.7 kN
Resisting force against sliding along X-direction = + Passive earth pressure load
= (360.418 x 0.4 )+ 379.43
= 523.6 kN
Factor of safety against sliding (along X-direction) = 523.6 / 204.7
= 2.56 > 1.5 Safe in sliding

Check for overturning moment:


Overturning moment about Z-direction = (0.93+127.8975+22.59)
151.42 kN.m
Resiting moment about Z-direction = (360.418x3/2+250.8525)
791.4795 kN.m
Factor of safety against overturning moment (About Z-direction) = 791.4795 / 151.42
= 5.23 > 1.75 Safe in Overturning

Reinforcement calculation:
Reinforcement calculation for anchor block outer skin:
Minimum steel required in kg per metre cube of concrete for block = 25 kg/m3
foundation in static case (Distributed in all faces of block foundation)
Length of the anchor block = 3 m
Width of the anchor block = 2 m
Thickness of the anchor block = 1.5 m
Concrete Volume of the anchor block = 3 x 1.5 x 2
= 9 m3
Minimum steel required = 25 x 9
= 225 kg
Assume diameter of reinforcement for all faces = 12 mm = 0.012 m
Assume spacing of reinforcement for all faces = 175 mm = 0.175 m
Clear cover to reinforcement for all faces = 75 mm = 0.075 m
Length wise reinforcement in top and bottom face of anchor block = 0.007 m3
Width wise reinforcement in top and bottom face of anchor block = 0.007 m3
Length wise reinforcement in both side face of anchor block = 0.006 m3
Width wise reinforcement in both side face of anchor block = 0.004 m3
Vertical reinforcement in both side face of anchor block-length face = 0.005 m3
Vertical reinforcement in both side face of anchor block-width face = 0.004 m3
Total volume of provided steel = 0.033 m3
Unit weight of reinforcement steel = 7850 kg/m3
Total weight of provided steel = 259.05 kg > 225 kg
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 7 of 10 DATE: 06.01.2016

4.2 DESIGN OF ANCHOR BLOCK AT INSIDE MWIP LOCATION


DESIGN OF ANCHOR BLOCK AT MWIP LOCATION:
Caesar forces:
Anchor forces from stress analyis report,
Caesar node no = 3830
Force along X direction Fx = 58.629 kN
Force along Y direction Fy = 1.313 kN
Force along Z direction Fz = 0.253 kN
Moment along X direction Mx = 0.371 kN.m
Moment along Z direction Mz = 1.227 kN.m
Inclination of pipe line with respect to Caesar axis = 0 degree
= 0 radians

Z Z'

X'
ANCHOR POINT

The resolved forces are,


Vertical load, F'Y = 1.313 kN
Horizontal force along the pipe, F'X = (58.629 X COS(0 ))-( 0.253 X SIN(0))
= 58.63 kN
Horizontal force across the pipe, F'X = (58.629 X SIN(0 ))+( 0.253 X COS(0))
= 0.25 kN
Moment about the X', M'X = (0.371 X COS(0 ))-( 1.227 X SIN(0))
= 0.37 kN.m
Moment about the Z', M'Z = (0.371 X SIN(0 ))+( 1.227 X COS(0))
= 1.23 kN.m
The anchor loads in pipe flowing direction is higher in order to compared with the loads across pipe flowing direction & lateral force is very very
minimum and force in lateral direction is negligible in nature, however anchor block design check carried only for the anchor force.

Soil characteristics for anchor block design:


Co-efficient of passive earth pressure, p = 3.33
Co-efficient of active earth pressure, a = 0.3
Soil density = 18 kN/m3
Co-efficient of friction b/w concrete and soil, = 0.4
Alllowable Net Safe bearing pressure = 200 kN/m2
Height between bottom of block to NGL = 2.658 m
Overburden pressure = 47.844 kN/m2
Alllowable gross Safe bearing pressure = 247.844 kN/m2
Anchor block dimensions:
Natural ground level = 187.4 EL
Center of pipe (COP) level = 185.492 EL
Height from NGL to Center of pipe = 1.908 m
Diameter of the pipe = 0.216 m
Total Length of the anchor block along the pipe direction, L = 3 m
Length from centre of block to tip-1 , L1 = 1.5 m
Length from centre of block to tip-2 , L2 = 1.5 m
Total Width of the anchor block across the pipe direction, B = 2 m
Thickness of the anchor block, H = 1.5 m
Thickness of the anchor block top to centre of pipe, H1 = 0.75 m
Thickness of the anchor block base to centre of pipe, H2 = 0.75 m
Height of anchor block top to NGL = 1.158 m
Unit weight of concrete = 24 kN/m3
Anchor block arrangement :
Centre line of anchor block
1.5 m 1.5 m

1 2

Anchor flange
0.75 m

Centre line of pipe/anchor block

Z'
2m
0.75 m

4 3
3m Pipe line axis X'
Plan of anchor block
Ground level NGL 187.4

1.158 m

3m
Top of Anchor block

Pipe flow directiion

1.5 m

Section of anchor block

Self weight of the concrete block:


Self weight of the concrete block without deducting pipe portion = 3 x 2 x 1.5 x 24
= 216 kN
Volume of the concrete replaced by the pipe = pi() x 0.216 x 0.216 / 4 x 3
0.11 m3
Net weight of concrete block with reducing the pipe portion = 216 - 24 x 0.11
= 213.36 kN
Moment due to pipeline shear forces:
Moment due to shear force along pipe direction at base, MZ = 58.63 x 0.75
= 43.9725 kN.m
Moment due to shear force along pipe direction at base, MX = 0.25 x 0.75 (Very minimum compared with
= 0.1875 kN.m anchor force hence it is neglected)

Earth pressure calculation:

NGL 187.4
Zero pressure at top

1.16 m

3.33x18x1.16= 0.3x18x1.16=
70 kN/m^2 Pressure at top of anchor block 6.3 kN/m^2

Centre of pipe flow 1.5 m

3.33x18x2.66= Pressure at bottom of anchor block 0.3x18x2.66=


159.44 kN/m^2 14 kN/m^2
Passive earth preesure Earth pressure on anchor block Active earth preesure
opposite to flow direction along to flow direction

Force excerted on anchor block base due to active earth pressure along X- = (6.26x2x1.5)+(0.5x(14.36-6.26)x2x1.5)
direction = 30.93 kN
Force excerted on anchor block base due to passive earth pressure along X- = (69.53x2x1.5)+(0.5x(159.44-69.53)x2x1.5)
direction = 343.46 kN
Overturning moment on anchor block bottom due to active earth pressure = (6.26x2x1.5x1.5/2)+(0.5x(14.36-6.26)x2x1.5x1.5/3)
along X-direction (Moment about Z direction) = 20.16 kN.m
Overturning moment on anchor block bottom due to passive earth pressure = (69.53x2x1.5x1.5/2)+(0.5x(159.44-69.53)x2x1.5x1.5/3)
along X-direction (Moment about Z direction) = 223.88 kN.m

Load due to soil cover on anchor block:


Lengh of the anchor block = 3 m
Width of the anchor block = 2 m
Distance from NGL to top of anchor block = 1.158 m
Weight of the soil on above the top of anchor block = 3x2x1.158x18
= 125.064 KN

Design forces for anchor block design:


Forces along X direction,
Force along X direction from pipe stress = 58.63 KN (+ve direction)
Force along X direction from active earth pressure = 30.93 KN (+ve direction)
Force along X direction from passive earth pressure = 343.46 KN (-ve direction)

Forces along Y direction,


Force along Y direction from pipe stress = 1.31 KN (downward direction)
Force along Y direction from anchor block weight = 213.36 KN (downward direction)
Force along Y direction from soil weight above block = 125.06 KN (downward direction)

Moment about Z direction,


Moment about Z direction from pipe stress, = 1.23 (Clockwise rotation)
Moment about Z direction due to pipe lateral load in X direction, = 43.9725 (Clockwise rotation)
Moment about Z direction due to active earth pressure in X direction, = 20.16 (Clockwise rotation)
Moment about Z direction due to passive earth pressure in X direction, = 223.88 (Anti Clockwise rotation)

Base pressure check:


Actual base pressure = (P/A) (MZ/ZZ) (MX/ZX)
Total vertical load, P = 1.313+213.36+125.064
= 339.737 kN
Area of the anchor block at base = 3x2
= 6 m2
Section modulus, ZZ = BL2/6
= 2 x 3 x 3 /6
3 m3
Total moment along the pipe direction, MZ (moment about Z direction) = (1.23+43.9725+20.16-223.875)
158.51 kN.m
Maximum base pressure (P/A) + (MZ/ZZ) = (339.737/6)+(158.5125/3)
109.46 kN/m2
Minimum base pressure (P/A) - (MZ/ZZ) = (339.737/6)-(158.5125/3)
3.785 kN/m2
2
Maximum base pressure = 109.46 kN/m < 247.844 kN/m2 Safe in base pressure
2
Minimum base pressure = 3.785 kN/m > 0 kN/m2 No tension

Check for sliding:


Sliding force along X-direction = 58.63 + 30.93
89.56 kN
Resisting force against sliding along X-direction = + Passive earth pressure load
= (339.737 x 0.4 )+ 343.46
= 479.35 kN
Factor of safety against sliding (along X-direction) = 479.35 / 89.56
= 5.35 > 1.5 Safe in sliding

Check for overturning moment:


Overturning moment about Z-direction = (1.23+43.9725+20.16)
65.36 kN.m
Resiting moment about Z-direction = (339.737x3/2+223.875)
733.4805 kN.m
Factor of safety against overturning moment (About Z-direction) = 733.4805 / 65.36
= 11.22 > 1.75 Safe in Overturning

Reinforcement calculation:
Reinforcement calculation for anchor block outer skin:
Minimum steel required in kg per metre cube of concrete for block = 25 kg/m3
foundation in static case (Distributed in all faces of block foundation)
Length of the anchor block = 3 m
Width of the anchor block = 2 m
Thickness of the anchor block = 1.5 m
Concrete Volume of the anchor block = 3 x 1.5 x 2
= 9 m3
Minimum steel required = 25 x 9
= 225 kg
Assume diameter of reinforcement for all faces = 12 mm = 0.012 m
Assume spacing of reinforcement for all faces = 175 mm = 0.175 m
Clear cover to reinforcement for all faces = 75 mm = 0.075 m
Length wise reinforcement in top and bottom face of anchor block = 0.007 m3
Width wise reinforcement in top and bottom face of anchor block = 0.007 m3
Length wise reinforcement in both side face of anchor block = 0.006 m3
Width wise reinforcement in both side face of anchor block = 0.004 m3
Vertical reinforcement in both side face of anchor block-length face = 0.005 m3
Vertical reinforcement in both side face of anchor block-width face = 0.004 m3
Total volume of provided steel = 0.033 m3
Unit weight of reinforcement steel = 7850 kg/m3
Total weight of provided steel = 259.05 kg > 225 kg
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 8 of 10 DATE: 06.01.2016

ANNEXURE-I PIPING LAYOUT


P.O.Box 46551, Fahaheel-64016, Kuwait.
P.O.Box 46551, Fahaheel-64016, Kuwait.
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 9 of 10 DATE: 06.01.2016

ANNEXURE-II STRESS ANALYSIS REPORT


668
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: AUG 15, 2015 Time: 11:19
Job:: MN-47B
Licensed To:: GULF SPIC GENERAL TRADING AND CONTRACTING COM
RESTRAINT SUMMARY REPORT: Loads On Restraints
Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m.

Bi-linear X2;
3793 Bi-linear X2;
Bi-linear Y2
1(HYD) 2157 0 -5308 0 0 0
2(OPE) 10164 0 -25054 0 0 0
3(SUS) 1427 0 -3510 0 0 0
MAX 10164/L2 0/L3 -25054/L2

Bi-linear X2;
3800 Bi-linear Z2;
Bi-linear Y2
1(HYD) -11 0 -462 0 0 0
2(OPE) -61 0 -1948 0 0 0
3(SUS) -7 0 -307 0 0 0
MAX -61/L2 0/L1 -1948/L2

Bi-linear X2;
3810 Bi-linear Z2;
Bi-linear Y2
1(HYD) -516 0 -17377 0 0 0
2(OPE) -2857 0 -71085 0 0 0
3(SUS) -338 0 -11562 0 0 0
MAX -2857/L2 0/L1 -71085/L2

Bi-linear X2;
3820 Bi-linear Z2;
Bi-linear Y2
1(HYD) 0 0 14 0 0 0
2(OPE) 184 0 68 0 0 0
3(SUS) 0 0 9 0 0 0
MAX 184/L2 0/L2 68/L2

Bi-linear X2;
Bi-linear Z2;
3830
Bi-linear Y2;
Rigid ANC
1(HYD) -909 -426 109 -22 -120 398
2(OPE) -58629 -1313 253 -371 -819 1227
3(SUS) -505 -270 86 30 -68 253
MAX -58629/L2 -1313/L2 253/L2 -371/L2 -819/L2 1227/L2

Bi-linear X2;
3840 Bi-linear Z2;
Bi-linear Y2
1(HYD) -0 -4 1 0 0 0
2(OPE) -22 -13 2 0 0 0
3(SUS) -0 -3 1 0 0 0
MAX -22/L2 -13/L2 2/L2
580
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: AUG 15, 2015 Time: 11:19
Job:: MN-47B
Licensed To:: GULF SPIC GENERAL TRADING AND CONTRACTING COM
RESTRAINT SUMMARY REPORT: Loads On Restraints
Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m.


3(SUS) 1837 -3128 1756 0 0 0
MAX 5244/L2 -7572/L2 4782/L2

Bi-linear X2;
3031 Bi-linear X2;
Bi-linear X2
1(HYD) 768 -1338 744 0 0 0
2(OPE) 1841 -3053 1768 0 0 0
3(SUS) 543 -962 525 0 0 0
MAX 1841/L2 -3053/L2 1768/L2

Rigid -X; Bi-


linear X2;
3032 Bi-linear X2;
Bi-linear X2;
Rigid +Y
1(HYD) 323 -875 300 0 0 0
2(OPE) 589 -1013 578 0 0 0
3(SUS) 252 -765 232 0 0 0
MAX 589/L2 -1013/L2 578/L2

Bi-linear X2;
3040 Bi-linear X2;
Bi-linear Y2
1(HYD) 70 463 69 0 0 0
2(OPE) 206 1914 216 0 0 0
3(SUS) 44 211 42 0 0 0
MAX 206/L2 1914/L2 216/L2

Bi-linear X2;
3050 Bi-linear X2;
Bi-linear Y2
1(HYD) 1048 -540 1113 0 0 0
2(OPE) 3181 2261 3329 0 0 0
3(SUS) 641 -969 692 0 0 0
MAX 3181/L2 2261/L2 3329/L2

Bi-linear X2;
3060 Bi-linear X2;
Bi-linear Y2
1(HYD) 1 -7 1 0 0 0
2(OPE) 50 -24 50 0 0 0
3(SUS) 1 -4 1 0 0 0
MAX 50/L2 -24/L2 50/L2

Bi-linear X2;
Bi-linear X2;
3070
Bi-linear Y2;
Rigid ANC
1(HYD) 26060 -112 26061 191 -2 -183
581
CAESAR II 2014 Ver.7.00.00.2800, (Build 140416) Date: AUG 15, 2015 Time: 11:19
Job:: MN-47B
Licensed To:: GULF SPIC GENERAL TRADING AND CONTRACTING COM
RESTRAINT SUMMARY REPORT: Loads On Restraints
Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m.


2(OPE) 120586 -394 120586 649 -0 -662
3(SUS) 15932 -62 15933 108 -2 -100
MAX 120586/L2 -394/L2 120586/L2 649/L2 -2/L1 -662/L2

Bi-linear X2;
3080 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 0 -0 0 0 0
2(OPE) -141 0 -141 0 0 0
3(SUS) -0 0 -0 0 0 0
MAX -141/L2 0/L2 -141/L2

Bi-linear X2;
3081 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 -0 -0 0 0 0
2(OPE) -139 -0 -139 0 0 0
3(SUS) -0 -0 -0 0 0 0
MAX -139/L2 -0/L3 -139/L2

Bi-linear X2;
3082 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 -0 -0 0 0 0
2(OPE) -72 -0 -72 0 0 0
3(SUS) -0 -0 -0 0 0 0
MAX -72/L2 -0/L2 -72/L2

Bi-linear X2;
3083 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 -0 -0 0 0 0
2(OPE) -35 -0 -35 0 0 0
3(SUS) -0 -0 -0 0 0 0
MAX -35/L2 -0/L3 -35/L2

Bi-linear X2;
3084 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 -0 -0 0 0 0
2(OPE) -16 -0 -16 0 0 0
3(SUS) -0 -0 -0 0 0 0
MAX -16/L2 -0/L2 -16/L2

Bi-linear X2;
3085 Bi-linear X2;
Bi-linear Y2
1(HYD) -0 -0 -0 0 0 0
2(OPE) -8 -0 -8 0 0 0
3(SUS) -0 -0 -0 0 0 0
NEW FLOWLINES FOR 5 EXTG. INJECTION WELLS, 1 NEW SOURCE CONTRACT NUMBER : 15050923
PROJECT: WELL & REPLACEMENT OF 19 EXTG.BRACKISH WATER FLOWLINES
WK PLUS EMERGENCY BRACKISH WATER LINE TO NTF PROJECT NUMBER : EF/1874
DOCUMENT NUMBER: 15050923-A-C-5003 REV B Page 10 of 10 DATE: 06.01.2016

ANNEXURE-III SOIL REPORT