You are on page 1of 2

AMT 8.

12 Release Notes
Enhancement / Fix Form / Report / Area ID
Enhancement Various FLOC
Enhancement Business Intelligence E109
Enhancement Cost Per Interval Report 9782
Enhancement Add Unplanned Strategy Work orders 9772
Enhancement Projection & Interval Analysis Report 9777
Enhancement Projection Details Report 9773
Enhancement Forecast Worksheet Report (Serial Number) 9771
Enhancement Copy Projected Task Dialog 9781
Enhancement Multi Strategy Task Editor 9786
Defect Recalc 9793
Defect Budget and Forecast Manager 9794
Defect Quoter 9895
Defect CBM 9959
Defect Parts Demand Analysis Report 9981
Defect Workorder Settlement Manager 9984
Defect Lifecycle Cost Summary Report 10070
Defect Workorder Details Import Process 10285
Defect Component Changeout Grid 10424
Defect Component Status Report 10555
Defect Parts Demand Analysis Report 11152
Defect Forecast Worksheet Report 11165
Defect Contracts Administration 11387
Defect Equipment Locations 11634
Defect Planning 11647
Defect Workorder Duration Analysis Report 11708
Defect AMT Mobile 11747
Defect AMT Mobile 11748
Defect Component Changeout Grid 11749
Defect Planning 11751
Defect Parts Usage Report 11756
Defect Part Demand Analysis Report 11757
Defect Multi-Task Editor 12133
Description
Added support for functional locations/hierarchies to AMT. Support includes a Functional Location M
Added the Default Rebuild Location to the Strategy Task Data Model
Extended the Cost Per Interval Report (Base, Centreline and Modelling) to show a summary of the c
Modified the Add Unplanned Strategy Work orders to Event view so the description column shows t
Modified the Projection & Interval Analysis Report (Base, Centreline and Modelling) so the Strategy
Modified the Projection Details Report (Base, Centreline and Modelling) by renaming the Componen
Added a new report, Forecast Worksheet (Serial Number). Based on the existing Forecast Workshe
Fleet is no longer a mandatory field in the Copy Projected Task Dialog so that it is possible to copy
Modified the Multi Strategy Task Editor to support multiple projections if the equipment type is Mod
Fixed an error in the recalculation manager
Fixed a problem in the Budget and Forecast Manager where the Usages option is not shown if the 'E
Fixed a problem where Quoter could not be used with Centrelines that use Dependency rather than
Fixed a problem with missing icons and options not being active in CBM
Fixed a problem with the Part Demand Analysis report that could render it unusable under some cir
Fixed a problem with the Work order Settlement Manager where it could display the incorrect mode
Fixed a issue with future costs in the Lifecycle Cost Summary report
Fixed a problem with the Work order Details import process
Fixed a problem with the Component Changeout Grid where the last occurrence would not be corre
Fixed a problem that could cause the Component Status report to run slowly against specific equip
Fixed a problem with the Parts Demand Analysis Report that could raise a memory error.
Fixed a problem with the Forecast Worksheet Report where selecting 'Contract' could result in an er
Fixed a problem where contracts from different internal organisations would incorrectly appear in C
Fixed a problem with the selection of equipment in System Administration | Equipment where not a
Fixed a problem where the incorrect message would be displayed when creating a new work order
Fixed a problem that could cause the Work order Duration Analysis Report to not run under specific
Fixed a problem in AMT Mobile where the Component Forecasting filter settings were lost after app
Fixed a problem in AMT Mobile where the Quoter Clear all Filter did not work
Fixed a problem with the Component Changeout Grid where user-defined column sizing and sorting
Fixed a problem in the Planning Scheduling tab where dragging and dropping an employee onto th
Fixed a problem in the Part Usage Report where selecting a specific component code could result in
Fixed a problem where the bottom part of the filters form could be obscured when running AMT at
Fixed a problem with the Multi-Task Editor where modifying the First Occurrence could result in an e