Doc No.

7704002
Appendix II
Rev: 00

Inspection and Test Plan for Storage


InspectionTank
Activity By Remark
No. and Reference Acceptance Verifying
Test Plan Document Criteria Document Manuf TPI Clien
. t
1 PreInspection Spec Spec MOM H H H
Meeting . .
Befor
Manufacturing
Approval of
2 Data sheets, PO, API 650, Spec. Calcualtion H H A
Mechanical
Spec. Book
Calculation
Approval of
3 DWG, Spec. API 650, Spec. DWG H H A
Fabrication
Drawing
Materia
ls
Review mill
4 DWG, ASME SEC II Certificates H W R
test certificates
Certificates
of plates
Review mill test
5 certificates of pipe, DWG, ASME SEC II, Certificates H W R
flange, etc. Certificates 16.5

Review mill test


6 certificates of WPS, Certificates ASME SEC II Certificates H W R
welding
consumable
Visual &
7 DWG, Spec. ASME SEC II Repor H W R
Dimensional
t
Chec
During manufacturing Marking, Cutting, Beveling and Grinding

8 Bottom Plates DWG, WPS, API 650, Spec. Repor H SW R


Spec. t
9 Annular Plates DWG, WPS, Spec API 650, Spec. Repor H SW R
t

1
10 Shell Courses DWG, WPS, Spec API 650, Spec. Repor H SW R
t
11 Roof Plates DWG, WPS, Spec API 650, Spec. Repor H SW R
t
12 Roof Structures DWG, WPS, Spec API 650, Spec. Repor H SW R
t
13 Wind Griders (If DWG, WPS, Spec API 650, Spec. Repor H SW R
required) t
14 Top Angles (if DWG, WPS, Spec API 650, Spec. Repor H SW R
required) t
15 Reinforcement DWG, WPS, Spec API 650, Spec. Repor H SW R
Pads
Manhole Nozzle t
16 Neck DWG, WPS, Spec API 650, Spec. Repor H SW R
Pipe For Column
(From t
17 (if DWG, WPS, Spec API 650, Spec. Repor H SW R
t
required
18 Pipe For Nozzles DWG, WPS, Spec API 650, Spec. Repor H SW R
t
19 Internal Pipes DWG, WPS, Spec API 650, Spec. Repor H SW R
t
Internal or
20 DWG, WPS, Spec API 650, Spec. Repor H SW R
External
t
Support
21 Sump DWG, WPS, Spec API 650, Spec. Repor H SW R
s t
Spiral
22 DWG, WPS, Spec API 650, Spec. Repor H SW R
Stairway &
t
Platforms
Visual &
23 DWG, WPS, Spec API 650, Spec. Repor H H R
Dimensional
t
Check of Loose
During manufacturing Forming
and Rolling
24 Shell Courses DWG, Spec. API 650, Spec. Repor H W R
t
25 Sump DWG, Spec. API 650, Spec. Repor H SW R
s t
26 Top Angles DWG, Spec. API 650, Spec. Repor H W R
t
Manhole Nozzle
27 DWG, Spec. API 650, Spec. Repor H SW R
Neck
t
(From

2
Visual &
28 DWG, Spec. API 650, Spec. Repor H H R
Dimensional
t
Chec
During Manufacturing
Foundation
Levelness of Ring
29 DWG, Spec. API 650, Spec. Repor H H R
Wall (if applicable)
t
30 Center Point and DWG, Spec. API 650, Spec. Repor H H R
Radius t
31 Flatness & Slope DWG, Spec. API 650, Spec. Repor H H R
t
32 Orientation DWG, Spec. API 650, Spec. Repor H H R
t
Anchor
bolts(Distance,
33 DWG, Spec. API 650, Spec. Repor H H R
Projection
t
,etc.) as
required
During Manufacturing
Welding
34 WPS & PQR DWG, WPS, PQR, ASME SEC IX Repor H R/A R
Spec t
Welder/Weldi
35 ng Operator DWG, WPS, WQT, ASME SEC IX Repor H R/A R
Qualification Spec t

NDT
36 Operator Certificates API 650, Spec. Repor H R/A R
t
Certificate
37 Fitup of bottom DWG, WPS, Spec API 650, Spec. Repor H H R
platesWelding t
38 sequence DWG, WPS, Spec API 650, Spec. Repor H H R
implementati t
Visual
39 DWG, WPS, Spec API 650, Spec. Repor H H R
inspection of
t
Vacuumweldmen
box test
40 Spec API 650, Spec. Repor H H R
of
. t
bottom

3
Annular
41 plate DWG, Spec. API 650, Spec. Repor H H R
orientation t
Fit up &
42 DWG, WPS, Spec API 650, Spec. Repor H H R
welding of
t
annular plate
NDT of annular
43 Spec API 650, Spec. Repor H H R
plate
. t
/ Vacuum Test(If
44 Fitup of Shell DWG, WPS, Spec API 650, Spec. Repor H H R
Plate t
45 Welding of Shell DWG, WPS, Spec API 650, Spec. Repor H H R
Plate t
46 PWHT (if Required) WPS, Spec API 650, Spec. Repor H H R
t
47 NDT of Shell Plate Spec API 650, Spec. Repor H H R
. t
Oil Test of Annular
48 Spec API 650, Spec. Repor H H R
Plate to shell
. t
Plate
Fitup & welding
49 compression ring & DWG, WPS, Spec API 650, Spec. Repor H H R
roof plate t
50 Welding of roof DWG, WPS, Spec API 650, Spec. Repor H H R
plates t
51 Air test of roof Spec API 650, Spec. Repor H H R
plate . t
Air test of
52 Spec API 650, Spec. Repor H H R
reinforceme
. t
nts
During Manufacturing
Dimentional Check
53 Plumbness DWG, Spec. API 650, Spec. Repor H H R
t
54 Roundness DWG, Spec. API 650, Spec. Repor H H R
t
55 Peaking & DWG, Spec. API 650, Spec. Repor H H R
Banding t

4
Nozzle Elevation,
56 DWG, Spec. API 650, Spec. Repor H H R
Orientation and
t
Projection
Manhole Elevation,
57 DWG, Spec. API 650, Spec. Repor H H R
Orientation and
t
Projection
During Manufacturing Hydro
Static Test
Verification of
58 Report API 650, Spec. Repor H H R
Test Package
s t
Hydro
59 Spec API 650, Spec. Repor H H H
test(Water
. t
level/Holding
Settlement check
60 (Refer to DWG, Spec. API 650, Spec. Repor H H R
applicable t
61 Water discharge Spec API 650, Spec. Repor H W R
. t
62 Cleaning check Spec API 650, Spec. Repor H H R
. t
During ManufacturingPainting
Activities
Painting
63 Spec API 650, Spec. Repor H H R
material
. t
identification/ch
Weather
64 condition & Spec API 650, Spec. Repor H H R
Surface . t
Preparation
Primer Layer
65 Inspection Spec API 650, Spec. Repor H H R
(Including Dry . t
Thickness check)
Intermediate/Final
66 Layer Spec API 650, Spec. Repor H H R
Inspection . t
(Including
During ManufacturingCathodic Protection and Electrical (If applicable)

5
Check of material
67 Spec API 650, Spec. Repor H H R
prior to
. t
installation
Installation of
68 Spec API 650, Spec. Repor H H R
Earthing
. t
Bosse
69 Anode Installation Spec API 650, Spec. Repor H H R
. t
Check of
70 Spec API 650, Spec. Repor H H R
Anode &
. t
conducto
Check the
71 Spec API 650, Spec. Repor H H R
Bonding
. t
of UG
72 Cable Installation Spec API 650, Spec. Repor H H R
. t
Check the Test
73 Spec API 650, Spec. Repor H H R
Box, Reference
. t
Electrode
installation of
74 Spec API 650, Spec. Repor H H R
reference electrode
. t
including cable
Abbreviatio
ns:

H: Hold Point = Hold on the production till TPI Inspector performs inspection and supervise the required test
W: Witness Point = Manufacture shall notify client and TPI Inspector but there is no
hold on the production; Client can waive this inspection based on his discretion and
informs TPI Inspector accordingly.

R: Document Review = Review means Review document, which includes of material test certificates, WPS, PQR, NDT
Procedures and etc.

A: Approval

MOM: Minute of Meeting

P.O: Purchase Order


6