You are on page 1of 85

APPROVAL SHEET

PACKAGE INA-17 : PADANG BYPASS CAPACITY EXPANSION PROJECT

JOB MIX FORMULA


AC - BASE COURSE
FROM QUARRY TANDIKEK
KYERYONG YALA - PRODUCTION

Approved by Engineer Submitted by Contractor


Dohwa Engineering International (Korea) Kyeryong Construction Industrial Co. Ltd
in Assosiation with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan

Chun Sen-Won. Wi, Sam Hwan


Team Leader General Superintendent

SUPERVISION CONSULTANT CONTRACTOR


DOHWA Engineering, Co.Ltd in Ass. Kyeryong Construction Industrial Co. Ltd
with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan
REPUBLIC of INDONESIA
MINISTRY of PUBLIC WORKS
DIRECTORY GENERAL of HIGHWAY

PACKAGE INA-17 : PADANG BYPASS CAPACITY EXPANSION PROJECT

JOB MIX FORMULA


AC - BASE CPOURSE
FROM QUARRY KAYU TANDIKEK
KYERYONG YALA PRODUCTION
PASAR USANG STONE CRUSHER

SUPERVISION CONSULTANT C O NTRACTO R


DOHWA Engineering, Co.Ltd in Ass. Kyeryong Construction Industrial Co. Ltd
with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation W
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Konsu
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO
- Date : April 29th 2014 PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : September, 22nd 2015


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUQRRY : Pasar Usang Ex. Tandikek CHECKED BY : Kanif Setiady

COMPACTION TEST
Aditional Water Water Content beginning are = 1.50%
Additional water % 2 4 6 8 10
Additional water cc 120 240 360 480 600
COMPACTION DATA
Wt. wet soil + mould Gram 9,509 9,645 9,774 9,921 9,939
Weight of mould Gram 5,065 5,065 5,065 5,065 5,065
Weight of wet soil Gram 4,444 4,580 4,709 4,856 4,874
Volume of mould Cc 2,049
Wet unit weight Gr/Cc 2.169 2.235 2.298 2.370 2.379
Dry unit weight Gr/Cc 2.096 2.129 2.154 2.170 2.150
{ gd /(100+w) } x100
MOISTURE CONTENT
Wt. wet soil + tare Gram 591.0 216.1 194.1 245.2 196.6
Wt. dry soil + tare Gram 517.9 207.6 184.4 229.4 182.1
Weight of tare Gram 55.0 58.3 55.0 59.7 58.8
Weight of water Cc 8.4 8.5 9.7 15.8 14.5
Weight of dry soil 73.1 Gr/Cc 240.8 234.1 228.3 251.4 262.8
Moisture content Gr/Cc 3.49 4.98 6.69 9.22 10.66
Moisture content ` Gr/Cc 1.75 2.49 3.35 4.61 5.33

2.500

2.400

2.300 2.200
gr/cc
2.200

Dry Unit 2.100


Weight (gD)

2.000

1.900
7.30 %

1.800

1.700

1.600

1.500
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15
M oisture Content (%)
Result :
Moisture Content Optimum = 7.30 %
g D max = 2.200 t/m3
Checked by the Engineer Submitted by the Contractor
DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Andi Sadriansyah, ST.


Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation W
PT. Perentjana Djaya and Hasfarm Dian Konsu
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO
- Date : April 29th 2014 PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : 13 - 20 November 201


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
: Pasar Usang Ex. Tandikek CHECKED BY : Kanif Setiady

COMPACTION AND C.B.R GRAPH

2.500

2.400

2.300

2.200 2.218

2.100
Dry Unit We ight (gD)

2.000

1.900

95.50 %
7.30 %

1.800

1.700

1.600

1.500
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 20 30 40 50 60 70 80 90

M oisture Content (%) CBR (%)

Result : Specfic Grafity = 2.736 t/m3


Moisture Content Optimum = 7.30 %
g D max = 2.200 t/m3
CBR = 95.50 %
Remark :

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa
Andi Sadriansyah, ST.
Lab. Technician Quality Control
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: September, 22nd 2015

ACTION TEST
7.30 %

00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00


M oisture Content (%)
PT. Kyeryong Construction Industrial Co. Ltd.
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: 13 - 20 November 2014

ON AND C.B.R GRAPH

2.50

2.40

2.30

2.20

2.10

2.00

1.90
95.50 %

1.80

1.70

1.60

1.50

20 30 40 50 60 70 80 90 100 110

CBR (%)

PT. Kyeryong Construction Industrial Co. Ltd.


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


- Province : West Sumatera DOHWA Engineering,
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya

CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Medium Aggregate 5-13 mm TESTED BY
Quarry : PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 1,451.0 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
3 in 76.2
2 in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 0.0
1 in 25,4 0.0 0.0 0.00 100.00 100.00 0.0
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 64.9 64.9 4.47 95.53 95.90 54.3
No. 4 4,76 869.4 934.3 64.39 35.61 35.54 886.0
No. 8 2.38
No. 10 2,00 429.8 1,364.1 94.01 5.99 6.12 425.6
No. 16 1.181
No. 30 0.59
No. 40 0,425 29.2 1,393.3 96.02 3.98 4.14 28.4
No. 50 0.300
No. 100 0.150
No. 200 0,074 30.8 1,424.1 98.15 1.85 2.01 31.2
PASS No. 200
100

80

60
Pas sing ( % )

40

20

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )
Remark :

Checked by the Engineer Submitted


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyery
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Andi Sad
Lab. Technician Quality C
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: 08 - 10 Novemebr 2014
: Kanif Setiady
: Andi Sadriansyah
WEIGHT OF SAMPLE II : 1,457.0 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


0.0 0.00 100.00

54.3 3.73 96.27


940.3 64.54 35.46

1,365.9 93.75 6.25

1,394.3 95.70 4.30

1,425.5 97.84 2.16

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Andi Sadriansyah, ST.


Quality Control
REPUBLIC of INDONESIA
MINISTRY of PUBLIC WORKS
DIRECTORY GENERAL of HIGHWAY

PACKAGE INA-17 : PADANG BYPASS CAPACITY EXPANSION PROJECT

JOB MIX FORMULA


AGGREGATE BASE CLASS A
FROM QUARRY EX. TANDIKEK
KYERYONG YALA PRODUCTION
PASAR USANG STONE CRUSHER

SUPERVISION CONSULTANT C O NTRACTO R


DOHWA Engineering, Co.Ltd in Ass. Kyeryong Construction Industrial Co. Ltd
with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan
APPROVAL SHEET
PACKAGE INA-17 : PADANG BYPASS CAPACITY EXPANSION PROJECT

JOB MIX FORMULA


AGGREGATE BASE CLASS A
FROM QUARRY TANDIKEK
KYERYONG YALA - PRODUCTION

Approved by Engineer Submitted by Contractor


Dohwa Engineering International (Korea) Kyeryong Construction Industrial Co. Ltd
in Assosiation with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan

Chun Sen-Won. Choi-Hyoung Su


Team Leader General Superintendent

SUPERVISION CONSULTANT CONTRACTOR


DOHWA Engineering, Co.Ltd in Ass. Kyeryong Construction Industrial Co. Ltd
with PT. Perentjana Djaya and (JO) PT. Yala Persada Angkasa
Hasfarm Dian Konsultan
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contractor : KYERYONG - YALA, JO.
CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa

SUMMARY OF LABORATORY TEST


JOB MIX FORMULA AGGREGATE BASE CLASS A
NO DESCRIPTION UNIT RESULT SPECIFICATION REMARK
I Gradation
1 1/2" % 100.00 100.00
1" % 84.31 79 - 85
3/8" % 48.85 44 - 58
#4 % 32.98 29 - 44
# 10 % 25.02 17 - 30
# 40 % 11.61 7 - 17
# 200 % 3.17 2-8
II Atterberg Limit
- Liquid Limit 0 - 25
- Plastic Limit
- Indeks Plasticity NP 0-6
- Product Plasticity Index Times
Max. 25
Percentage Passing # 200
III Compaction Method Modified
- Max. Dry Density gr/cc 2.218
- Opt. Moisture Content % 7.50
CBR at 100 % Max Dry Density
IV % 91.90 Min 90
after 4 days soaking
V Specific Gravity gr/cc 2.736
VI Soft Fragments % 0.43 Max 5
VII Fracture Face % 100.00 Max 100
VIII Abration % 30.90 Max. 40
Remark : From Quarry Tandikek (Kyeryong Yala Production)
( Second Stone Crusher, Lacated Pasar
Checked by the Engineer Submitted by the Contractor
DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Rozian Zainal Ahmad Najib M.


Quality Engineer Quality Control Manager
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation W
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Konsu
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO
- Date : April 29th 2014 PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : February, 08th 2016


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

COMPACTION TEST
Aditional Water Water Content beginning are = 2.80%
Additional water % 2 4 6 8 10
Additional water cc 50 150 250 350 450
COMPACTION DATA
Wt. wet soil + mould Gram 8,999 9,320 9,514 9,442 9,314
Weight of mould Gram 4,606 4,606 4,606 4,606 4,606
Weight of wet soil Gram 4,393 4,714 4,908 4,836 4,708
Volume of mould Cc 2,049
Wet unit weight Gr/Cc 2.144 2.301 2.395 2.360 2.298
Dry unit weight Gr/Cc 2.057 2.175 2.228 2.164 2.074
{ gd /(100+w) } x100
MOISTURE CONTENT
Wt. wet soil + tare Gram 371.9 368.5 469.9 534.7 529.8
Wt. dry soil + tare Gram 359.1 351.4 441.3 495.1 483.6
Weight of tare Gram 57.5 54.4 59.7 58.1 55.5
Weight of water Cc 12.8 17.1 28.6 39.6 46.2
Weight of dry soil Gr/Cc 301.6 297.0 381.6 437.0 428.1
Moisture content Gr/Cc 4.24 5.76 7.49 9.06 10.79
Moisture content Gr/Cc 4.24 5.76 7.49 9.06 10.79

2.300

2.218 gr/cc
Z
Dry Unit Weight (gD)
2.200 A
V
7,5 %

2.100

2.000
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15
M oisture Content (%)
Result :
Moisture Content Optimum = 7.50 %
g D max = 2.218 t/m3
Checked by the Engineer Submitted by the Contractor
DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Syefria Indra, ST Kanif Setiady


Quality Engineer Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation W
PT. Perentjana Djaya and Hasfarm Dian Konsu
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO
- Date : April 29th 2014 PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : September, 28th 2015


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

COMPACTION AND C.B.R GRAPH

2.300

2.218
Dry Unit We ight (gD)
Z

2.200
A
V
6,85 %

91,9 %
2.100

2.000
2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 20 30 40 50 60 70 80 90 1001101201

M oisture Content (%) CBR (%)

Result : Specfic Grafity = 2.736 t/m3


Moisture Content Optimum = 7.50 %
M D D max = 2.218 t/m3
CBR = 91.90 %
Remark :

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa
Syefria Indra, ST Kanif Setiady
Quality Engineer Lab. Technician
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: February, 08th 2016

ACTION TEST

1.57
1.74
1.51
7,5 %

00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00


M oisture Content (%)
PT. Kyeryong Construction Industrial Co. Ltd.
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: September, 28th 2015

ON AND C.B.R GRAPH

2.77

2.67

2.57

2.47

2.37

2.27

2.17

2.07
91,9 %

1.97

1.87

1.77

1.67

1.57

20 30 40 50 60 70 80 90 100110120130140150

CBR (%)

PT. Kyeryong Construction Industrial Co. Ltd.


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Kon
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (J
- Date : April 29th 2014 PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : September, 23rd - 27th 2015


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

CALIFORNIA BEARING RATIO (CBR) TEST


BLOW 65 x
Before
Date 23-Sep-15 24-Sep-15 25-Sep-15 26-Sep-15 27-Sep-15 Wt. of soil + mould gr 11,317.5
Time 11.30 11.30 11.30 11.30 11.30 Wt. of mould gr 6,444
Reading 4 4 4 4 4 Wt. of wet soil gr 4,874
Sweling 0 0 0 0 0 Volume of mould cm3 2,132.3
Wet unit weight gr/cm3 2.286
Factor of Calibration (k) = 31.9 lb = 14.47 kg Dry unit weight gr/cm3 2.141
Penetration Reading Load (kg)
( mm ) Minute Up Down Up Down
0.318 1/4 10.0 144.7 8000
0.635 1/2 25.0 361.7
7500
1.270 1 70.0 1012.9
1.905 1 1/2 110.0 1591.7 7000
2.540 2 150.0 2170.5
3.810 3 220.0 3183.4 6500
5.080 4 295.0 4268.6
6000
7.620 6 370.0 5353.8
10.160 8 480.0 6945.5 5500
12.700 10
5000

4500
WATER CONTENT Before After Load (lb)
Wt. of wet soil + tare 514.2 457.5 4000
Wt. of dry soil + tare 485.2 428.5
Weight of tare 54.9 57.6 3500
Weight of water 1-2 29.0 29.0
3000
Weight of dry soil 2-3 430.3 370.9
Water Content % 6.74 7.82 2500
Average 6.7 7.8
2000
CBR Value
CBR 1500
0.1 " 0.2 "
Up 2170.5 x 100 4268.6 x 100 1000
3000 4500
= 72.35 = 94.86 500
Average 83.60
0
Down 6,945.52 x 100 - x 100 0 0.1 0.2 0.3 0.4 0
3000 4500
Pe ne tration (in)
= 231.52 = -
Remark :

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Jamaluddin Siswanto
Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


DOHWA Engineering, Co.Ltd in Assosiation W
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Konsu
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO
- Date : April 29th 2014 PT. Yala Persada Angkasa
LOCATION : Laboratorium Project DATE : September, 23rd - 27th 2015
MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

CALIFORNIA BEARING RATIO (CBR) TEST


BLOW 35 x
Before
Date 23-Sep-15 24-Sep-15 25-Sep-15 26-Sep-15 27-Sep-15 Wt. of soil + mould gr 11,323
Time 11.30 11.30 11.30 11.30 11.30 Wt. of mould gr 6,563
Reading 1 1 1 1 1 Wt. of wet soil gr 4,760
Sweling 0 0 0 0 0 Volume of mould cm3 2,131.3
Wet unit weight gr/cm3 2.233
Factor of Calibration (k) = 31.9 lb = 14.47 kg Dry unit weight gr/cm3 2.087
Penetration Reading Load (kg)
( mm ) Minute Up Down Up Down 8000
0.318 1/4 7.0 101.3
0.635 1/2 19.0 274.9 7500
1.270 1 40.0 578.8
7000
1.905 1 1/2 65.0 940.5
2.540 2 90.0 1302.3 6500
3.810 3 145.0 2098.1
5.080 4 200.0 2894.0 6000
7.620 6 310.0 4485.7
5500
10.160 8 420.0 6077.3
12.700 10 5000

4500
Load (lb)
WATER CONTENT Before After
4000
Wt. of wet soil + tare 498.3 632.4
Wt. of dry soil + tare 469.6 585.6 3500
Weight of tare 59.7 54.7
Weight of water 1-2 28.7 46.8 3000
Weight of dry soil 2-3 409.9 530.9
2500
Water Content % 7.00 8.82
7.0 8.8 2000

CBR Value 1500


CBR
0.1 " 0.2 "
1000
Up 1302.3 x 100 2894.0 x 100
3000 4500 500
= 43.41 = 64.31
Average 53.86 0
Down 6,077.33 x 100 - x 100 0 0.1 0.2 0.3 0.4 0
3000 4500 Penetration (in)
= 202.58 = -

Remark :
Checked by the Engineer Submitted by the Contractor
DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Jamaluddin Siswanto
Lab. Technician Quality Control

REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian Kon
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
- Date : April 29 2014
th Kyeryong Construction Industrial Co., Ltd. (J
PT. Yala Persada Angkasa

LOCATION : Laboratorium Project DATE : September, 23rd - 27th 2015


MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

CALIFORNIA BEARING RATIO (CBR) TEST


BLOW 10 x
After
Date 23-Sep-15 24-Sep-15 25-Sep-15 26-Sep-15 27-Sep-15 Wt. of soil + mould gr 10,945
Time 11.30 11.30 11.30 11.30 11.30 Wt. of mould gr 6,956
Reading 0.05 0.05 0.05 0.05 0.05 Wt. of wet soil gr 3,989
Sweling 0 0 0 0 0 Volume of mould cm3 2,138.8
Wet unit weight gr/cm3 1.865
Factor of Calibration (k) = 31.9 lb = 14.47 kg Dry unit weight gr/cm3 1.757
Penetration Reading Load (kg)
( mm ) Minute Up Down Up Down
0.318 1/4 4.0 57.9 4000
0.635 1/2 10.0 144.7
1.270 1 25.0 361.7
1.905 1 1/2 45.0 651.1 3500
2.540 2 61.0 882.7
3.810 3 88.0 1273.3
5.080 4 112.0 1620.6
3000
7.620 6 145.0 2098.1
10.160 8 180.0 2604.6
12.700 10
2500

WATER CONTENT Before After Load (lb)


Wt. of wet soil + tare 511.8 422.1 2000
Wt. of dry soil + tare 485.3 390.6
Weight of tare 55.0 55.7
Weight of water 1-2 26.5 31.5
1500
Weight of dry soil 2-3 430.3 334.9
Water Content % 6.16 9.41
6.2 9.4
1000

500
1000
CBR Value
CBR
0.1 " 0.2 "
Up 882.7 x 100 1620.6 x 100 500
3000 4500
= 29.42 = 36.01
Average 32.72
0
Down 2,604.57 x 100 - x 100
0 0.1 0.2 0.3 0.4 0
3000 4500
= 86.82 = - Penetration (in)

Remark :

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Jamaluddin Siswanto
Lab. Technician Quality Control
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: September, 23rd - 27th 2015

RING RATIO (CBR) TEST

After
11,446.5
6,444
5,003
2,132.3
2.346
2.176

8000

7500

7000

6500

6000

5500

5000

4500
Load (lb)
4000

3500

3000

2500

2000

1500

1000

500

0
0 0.1 0.2 0.3 0.4 0.5
Pe ne tration (in)
PT. Kyeryong Construction Industrial Co. Ltd.
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa
: September, 23rd - 27th 2015

RING RATIO (CBR) TEST

After
11,420
6,563
4,857
2,131.3
2.279
2.094

8000

7500

7000

6500

6000

5500

5000

4500
Load (lb)
4000

3500

3000

2500

2000

1500

1000

500

0
0 0.1 0.2 0.3 0.4 0.5
Penetration (in)
PT. Kyeryong Construction Industrial Co. Ltd.

SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

: September, 23rd - 27th 2015

RING RATIO (CBR) TEST

Before
11,103
6,956
4,147
2,138.8
1.939
1.772

4000

3500

3000

2500

Load (lb)
2000

1500

1000

500
1000

500

0
0 0.1 0.2 0.3 0.4 0.5
Penetration (in)

PT. Kyeryong Construction Industrial Co. Ltd.


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosia
- Province : West Sumatera
PT. Perentjana Djaya and Hasfarm Dian
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., L
- Date : April 29th 2014 PT. Yala Persada Angkasa
LOCATION : Laboratorium Project DATE : September, 25th 20
MATERIAL : Aggregate Base Class A TESTED BY : Kanif Setiady
QUARRY : PT. Persada Raya Kembar CHECKED BY : Kanif Setiady

TEST of CONSISTENCY ATTERBERG

LIQUID LIMIT (LL)


Blow
Number of tare
Wt. wet soil + tare
Wt. dry soil + tare
Weight of tare
Weight of water NP
Weight of dry soil
Moisture content
Average

45

40

35

M oisture Content (%)


30

25 NP
20
LL PL PI
15

10
10 15 20 25 30 35 40 45

Blow

Remark :
Checked by the Engineer Submitted by the Contractor
DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial C
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Kanif Setiadi
Lab. Technician Lab. Technician
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa
: September, 25th 2015
: Kanif Setiady
: Kanif Setiady

SISTENCY ATTERBERG

PLASTIC LIMIT (PL)

NOTE :

Sample with condition


- Real
- Sieve / Not Sieve
Submitted by the Contractor
PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation With
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa
LOCATION : Laboratorium Project DATE : September, 25th 2015
MATERIAL : Aggregate Base Class A TESTED BY : Ali Mashuri
QUARRY : PT. Persada Raya Kembar CHECKED BY : Ali Mashuri

SPESIFIC GRAVITY AND ABSORPTION TEST (AASHTO T 85-81)


FOR COARSE AGGREGATE 1 2
RETAINED # No. 4 (Percentage %) 67.02
WEIGHT OF SAMPLE OVEN DRY IN AIR A 2,898 2,970
WEIGHT OF SAMPLE SATURATED SURFACE DRY IN AIR B 2,981 3,065
WEIGHT OF SAMPLE IN WATER C 1,834 1,890
A 2.527 2.528
BULK SPESIFIC GRAFITY (OVEN DRY BASIS)
B-C AV 2.527
B 2.599 2.609
BULK SPESIFIC GRAFITY (S.S.D. BASIS)
B-C AV 2.604
A 2.724 2.750
APPARENT SPECIFIC GRAFITY
A- C AV 2.737
B -A 2.864 3.199
ABSORPTION x 100
A AV 3.031
FOR FINE AGGREGATE 1 2
PASSING # No. 4 (Percentage %) 32.98
WEIGHT OF SAMPLE OVEN DRY IN AIR A 484.0 483
WEIGHT OF FLASK FILLED WITH WATER TO CALIBRATION B 715.4 700.7
WEIGHT OF FLASK + WATER + SAMPLE TO CALIBRATION C 1022.2 1007.1
WEIGHT OF SAMPLE SATURATED SURFACE DRY IN AIR D 500 500
A 2.505 2.495
BULK SPESIFIC GRAFITY (OVEN DRY BASIS)
B+500-C AV 2.500
500 2.588 2.583
BULK SPESIFIC GRAFITY SATURATED SURFACE DRY
B+500-C AV 2.585
A 2.731 2.735
APPARENT SPECIFIC GRAFITY
B +A- C AV 2.733
500 - A 3.306 3.520
ABSORPTION x 100
A AV 3.413
MAIN SPECIFIC GRAFITY (COMBINED)
BULK SPESIFIC GRAFITY (OVEN DRY BASIS) gr/cm3 2.518
BULK SPESIFIC GRAFITY SATURATED SURFACE DRY gr/cm3 2.598
APPARENT SPECIFIC GRAFITY gr/cm3 2.736
ABSORPTION % 3.157
REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa
Jamaluddin Ali Mashuri
Lab. Technician Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS
- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT
- Province : West Sumatera DOHWA Engineering, Co.Ltd in
PT. Perentjana Djaya and Hasfarm
- Contractor : KYERYONG - YALA, JO.
CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Construction Industrial
- Date : April 29th 2014 PT. Yala Persada Angkasa

SOFT FRAGMENTS
( AASHTO T-112-81 / SNI 03 -4141-1996 )
LOCATION : Laboratorium Project DATE
MATERIAL : Aggregate Base Class A TESTED BY
QUARRY : PT. Persada Raya Kembar CHECKED BY
Retained # No. 4 (G) =
Passing # No. 4 (H) =

SIEVE SIZE PROSENTASE of


SIEVE OF SAMPLE WEIGHT of SAMPLE WEIGHT of SAMPLE WEIGHT of LOSS
WEIGHT FROM LOSS
WITH PROSENTASE BEFORE TEST AFTER TEST SAMPLE
SAMPLE
NO
D
A B C D=B-C E= X 100
PASSING RETAINED B

I II I II I II I II I II

1 1 1/2 " (38,10 mm) 100.00 100.00 0 0 0 0 0 0 0.00 0.00


2 1 1/2 " (38,10 mm) 3/4 " (19,10 mm) 31.01 25.57 640.5 697.6 639.0 696.3 1.5 1.3 0.23 0.19
3 3/4 " (19,10 mm) 3/8" (9,50 mm) 18.36 15.14 379.2 560.3 376 558.6 3.3 1.7 0.87 0.30
4 3/8" (9,50 mm) # 4 (4,75 mm) 8.91 7.35 184.0 227.9 180.4 227.1 3.6 0.8 1.96 0.35
AMOUNT OF CLAY LUMPS AND FRIABLE PARTICLES IN COARSE AGGREGATE (I)
5 # 4 (4,75 mm) # 16 (1,18 mm) 18.51 15.26 382.3 445.2 353.8 445.0 28.5 0.2 7.45 0.04
AMOUNT OF CLAY LUMPS AND FRIABLE PARTICLES IN FINE AGGREGATE (J)
TOTAL = (G x I) + (H x J)

REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Ind
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Kanif Setiadi
Lab. Technician Lab. Technician
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

AGMENTS
1 / SNI 03 -4141-1996 )
: September, 25th 2015
: Kanif setiadi
: Kanif setiadi
60.39%
39.61%
AVERAGE
PROSENTASE of
WEIGHT
( CORECCTION BY
LOSS SAMPLE
PROSENTASE )
AxE
F= 100

I II

0.00 0.00
0.07 0.05
0.16 0.05
0.17 0.03
0.41 0.12
1.38 0.01
1.38 0.01
0.79 0.07
0.43

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSUL


- Province : West Sumatera DOHWA Engineering, Co.L
PT. Perentjana Djaya and Ha
- Contractor : KYERYONG - YALA, JO.
CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 Kyeryong Construction Indu
- Date : April 29th 2014 PT. Yala Persada Angkasa

FRACTURE FACE

LOCATION : Laboratorium Project DATE


MATERIAL : Aggregate Base Class A TESTED BY
QUARRY : PT. Persada Raya Kembar CHECKED BY

No. Description I

1 Weight of Dry Sample (Retained sieve No. 4) 2,000.0

2 Weight of Sample Fracture Face 2,000.0

3 Prosentase Fracture Fase % 100.0

4 Prosentase Fracture Fase (Average) % 100.0

Remark :

Checked by the Engineer Submitted by the Con


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Constru
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada A

Ali Mashuri
Lab. Technician Lab. Technician
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

RACTURE FACE

: September, 25th 2015


: Kanif setiadi
: Kanif setiadi

II III

1,945.0

1,945.0

100.0

100.00 %

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Ali Mashuri
Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa

UNIT WEIGHT
LOCATION : Laboratory DATE : February, 4th 2015
MATERIAL : Coarse aggregate 20 - 30 mm TESTED BY : Siswanto
QUARRY : PT. Persada Raya Kembar CHECKED BY : Siswanto

No. Description Gram Gram Gram

I II III

1 Weight of Container + Sample 6,620 6,617

2 Weight of Container 4,783 4,783

3 Weight of Sample (1-2) 1,837 1,834

4 Volume of Container 1413 1413

5 Unit Weight (3/4) 1.300 1.298


1.299 Gr/cm3
Avarage Unit Weight
REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Asrial Yasniwar Siswanto


Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa

UNIT WEIGHT
LOCATION : Laboratory DATE : February, 4th 2015
MATERIAL : Coarse aggregate 10 - 20 mm TESTED BY : Siswanto
QUARRY : PT. Persada Raya Kembar CHECKED BY : Siswanto

No. Description Gram Gram Gram

I II III

1 Weight of Container + Sample 6,649 6,658

2 Weight of Container 4,783 4,783

3 Weight of Sample (1-2) 1,866 1,875

4 Volume of Container 1413 1413

5 Unit Weight (3/4) 1.321 1.327


1.324 Gr/cm3
Avarage Unit Weight
REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Asrial Yasniwar Siswanto


Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa

UNIT WEIGHT
LOCATION : Laboratory DATE : February, 4th 2015
MATERIAL : Medium aggregate 05 - 10 mm TESTED BY : Siswanto
QUARRY : PT. Persada Raya Kembar CHECKED BY : Siswanto

No. Description Gram Gram Gram

I II III

1 Weight of Container + Sample 6,589 6,574

2 Weight of Container 4,783 4,783

3 Weight of Sample (1-2) 1,806 1,791

4 Volume of Container 1413 1413

5 Unit Weight (3/4) 1.278 1.268


1.273 Gr/cm3
Avarage Unit Weight
REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Asrial Yasniwar Siswanto


Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


- Province : West Sumatera DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
- Date : April 29th 2014 PT. Yala Persada Angkasa

UNIT WEIGHT
LOCATION : Laboratory DATE : February, 4th 2015
MATERIAL : Fine aggregate 00 - 05 mm TESTED BY : Siswanto
QUARRY : PT. Persada Raya Kembar CHECKED BY : Siswanto

No. Description Gram Gram Gram

I II III

1 Weight of Container + Sample 6,890 6,895

2 Weight of Container 4,783 4,783

3 Weight of Sample (1-2) 2,107 2,112

4 Volume of Container 1413 1413

5 Unit Weight (3/4) 1.491 1.495


1.493 Gr/cm3
Avarage Unit Weight
REMARKS

Checked by the Engineer Submitted by the Contractor


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Construction Industrial Co. Ltd.
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angkasa

Asrial Yasniwar Siswanto


Lab. Technician Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSU


- Province : West Sumatera DOHWA Engineering, Co
PT. Perentjana Djaya and H
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction In
- Date : April 29th 2014 PT. Yala Persada Angkasa

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Coarse Aggregate 20-30 mm TESTED BY
QUARRY : PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 4,227.5 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
3 in 76.2
2 in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 0.0
1 in 25,4 2,564.7 2,564.7 60.67 39.33 60.78 751.6
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 1,634.6 4,199.3 99.33 0.67 0.67 3,447.5
No. 4 4,76 5.3 4,204.6 99.46 0.54 0.54 5.5
No. 8 2.38
No. 10 2,00 4.5 4,209.1 99.56 0.44 0.44 4.2
No. 16 1.181
No. 30 0.59
No. 40 0,425 0.1 4,209.2 99.57 0.43 0.43 0.4
No. 50 0.300
No. 100 0.150
No. 200 0,074 9.8 4,219.0 99.80 0.20 0.20 9.7
PASS No. 200
100

80

60
Pass ing ( % )

40

20

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )
Remark :

Checked by the Engineer Submitted


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyery
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Yul Hend
Lab. Technician Lab. Tech
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: February, 3rd 2015
: Yul Hendro
: Yul Hendro
WEIGHT OF SAMPLE II : 4,227.5 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


751.6 17.78 82.22

4,199.2 99.33 0.67


4,204.7 99.46 0.54

4,208.9 99.56 0.44

4,209.3 99.57 0.43

4,219.0 99.80 0.20

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Yul Hendro
Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


- Province : West Sumatera DOHWA Engineering,
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya

CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Coarse Aggregate 10-2 mm TESTED BY
Quarry : PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 3,020.5 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
3 in 76.2
2 in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 0.0
1 in 25,4 0.0 0.0 0.00 100.00 100.00 0.0
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 2,796.0 2,796.0 92.57 7.43 36.58 1,062.6
No. 4 4,76 222.5 3,018.5 99.93 0.07 0.08 2,035.4
No. 8 2.38
No. 10 2,00 0.5 3,019.0 99.95 0.05 0.06 0.6
No. 16 1.181
No. 30 0.59
No. 40 0,425 0.3 3,019.3 99.96 0.04 0.05 0.3
No. 50 0.300
No. 100 0.150
No. 200 0,074 0.2 3,019.5 99.97 0.03 0.04 0.3
PASS No. 200
100

80

60
Pas sing ( % )

40

20

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )
Remark :

Checked by the Engineer Submitted


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyery
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Yul Hend
Lab. Technician Lab. Tech
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: February, 3rd 2015
: Yul Hendro
: Yul Hendro
WEIGHT OF SAMPLE II : 3,100.8 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


0.0 0.00 100.00

1,062.6 34.27 65.73


3,098.0 99.91 0.09

3,098.6 99.93 0.07

3,098.9 99.94 0.06

3,099.2 99.95 0.05

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Yul Hendro
Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


- Province : West Sumatera DOHWA Engineering,
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya

CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Coarse Aggregate 05-10 mm TESTED BY
Quarry : PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 2,135.0 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
###in 76.2
###in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 0.0
1 in 25,4 0.0 0.0 0.00 100.00 100.00 0.0
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 0.0 0.0 0.00 100.00 100.00 0.0
No. 4 4,76 1,947.6 1,947.6 91.22 8.78 8.79 2,135.7
No. 8 2.38
No. 10 2,00 169.4 2,117.0 99.16 0.84 0.83 186.9
No. 16 1.181
No. 30 0.59
No. 40 0,425 5.3 2,122.3 99.41 0.59 0.60 4.9
No. 50 0.300
No. 100 0.150
No. 200 0,074 9.1 2,131.4 99.83 0.17 0.18 9.8
PASS No. 200
100

80

60
Pass ing ( % )

40

20

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )
Remark :

Checked by the Engineer Submitt


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyer
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Kanif Set
Lab. Technician Lab. Tech
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: February, 3rd 2015
: Kanif Setiady
: Kanif Setiady
WEIGHT OF SAMPLE II : 2,341.8 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


0.0 0.00 100.00

0.0 0.00 100.00


2,135.7 91.20 8.80

2,322.6 99.18 0.82

2,327.5 99.39 0.61

2,337.4 99.81 0.19

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Kanif Setiady
Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


- Province : West Sumatera DOHWA Engineering,
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya

CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Fine Aggregate 0-5 mm (Stone Dust) TESTED BY
: PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 1,530.8 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
3 in 76.2
2 in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 0.0
1 in 25,4 0.0 0.0 0.00 100.00 100.00 0.0
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 0.0 0.0 0.00 100.00 100.00 0.0
No. 4 4,76 0.6 6.6 0.43 99.57 99.61 5.2
No. 8 2.38
No. 10 2,00 483.7 346.4 22.63 77.37 77.36 334.5
No. 16 1.181
No. 30 0.59
No. 40 0,425 1,267.4 987.4 64.50 35.50 35.53 626.7
No. 50 0.300
No. 100 0.150
No. 200 0,074 1,703.5 1,384.8 90.46 9.54 9.57 389.6
PASS No. 200
100

80

60
Pas sing ( % )

40

20

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )
Remark :

Checked by the Engineer Submitted


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyery
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Kanif Set
Lab. Technician Lab. Tech
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: February, 3rd 2015
: Kanif setiady
: Kanif setiady
WEIGHT OF SAMPLE II : 1,500.0 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


0.0 0.00 100.00

0.0 0.00 100.00


5.2 0.35 99.65

339.8 22.65 77.35

966.5 64.43 35.57

1,356.0 90.40 9.60

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Kanif Setiady
Lab. Technician
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTANT


DOHWA Engineering, Co.Ltd in
- Province : West Sumatera PT. Perentjana Djaya and Hasfarm
- Contractor : KYERYONG - YALA, JO.
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 CONTRACTOR
Kyeryong Construction Industrial
- Date : April 29th 2014 PT. Yala Persada Angkasa

SIEVE ANALYSIS COMBINED


AASTHO T, 27 - 82

AGGREGATE BASE CLASS A


Original Gradation
Seive Designation Specification
CA I CA II MA FA FA
Combined
20-30 mm 10-20 mm 05-10 mm 0-5 mm 0-5 mm
No. Size Lower
40% 18% 10% 32% 30%

1 1/2in 38.100 40.00 18.00 10.00 32.00 0.00 100.00 100


1 in 25.400 24.31 18.00 10.00 32.00 0.00 84.31 79
3/8 in 9.520 0.27 6.58 10.00 32.00 0.00 48.85 44
No. 4 4.760 0.22 0.01 0.88 31.88 0.00 32.98 29
No. 10 2.000 0.18 0.01 0.08 24.76 0.00 25.02 17
No. 40 0.425 0.17 0.01 0.06 11.37 0.00 11.61 7
No. 200 0.075 0.08 0.01 0.02 3.06 0.00 3.17 2

100

80

60
Pass ing ( % )
Control Point (Upper)

40

Control Point (Lower)


20

0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10 25.4

Sieve Size ( m m )

REMARK :

Checked by the Engineer Submitted by the Contract


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Constructio
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persada Angk

Syefria Indra, ST Ahmad Najib M.


Quality Engineer Quality Control Manager
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

ALYSIS COMBINED
AASTHO T, 27 - 82

GATE BASE CLASS A

Specification
Center
Upper

100 100
85 82
58 51
44 36.5
30 23.5
17 12
8 5

(Upper)

Control Point (Lower)

1 10 25.4 38.1 100


Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Quality Control Manager


REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


- Province : West Sumatera DOHWA Engineering,
- Contractor : KYERYONG - YALA, JO. PT. Perentjana Djaya

CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014
Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

SIEVE ANALYSIS
LOCATION : Laboratorium Project DATE
MATERIAL : Aggregate Base Class A TESTED BY
: PT. Persada Raya Kembar CHECKED BY
WEIGHT OF SAMPLE I : 5,678.8 Gr WEIGHT OF SAMPLE II :
US Sieve Individu Spec Individu
Cumulative
Standart Opening Weight Ret Average Aggregat Weight Ret
Sieve (in) mm Grams Retained % Ret % Passing Grams
3 in 76.2
2 in 50.8
1 1/2 in 38,1 0.0 0.0 0.00 100.00 100.00 100 0.0
1 in 25,4 1,105.0 1,105.7 19.47 80.53 79.37 79 - 85 1,239.8
3/4 in 19,1
1/2 in 12,7
3/8 in 9,52 1,906.0 3,011.0 53.02 46.98 44.27 44 - 58 2,085.1
No. 4 4,76 277.9 3,288.9 57.92 42.08 39.61 29 - 44 252.3
No. 8 2.38
No. 10 2,00 616.5 3,905.4 68.77 31.23 29.47 17 - 30 535.4
No. 16 1.181
No. 30 0.59
No. 40 0,425 855.8 4,761.2 83.84 16.16 14.93 7 - 17 797.7
No. 50 0.300
No. 100 0.150
No. 200 0,074 596.1 5,357.3 94.34 5.66 5.14 2-8 515.9
PASS. NO.200

100

80

60
Pass ing ( % )
Control Point (Upper)

40

20 Control Point (Lowe

0
0.01 0.1 1 10
Sieve Size ( m m )
0
0.01 0.074 0.1 0.425 1 2.00 4.76 9.52
10
Sieve Size ( m m )

Remark :

Checked by the Engineer Submitted


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyery
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Ya

Rozian Zainal Siswanto


Quality Engineer Quality C
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan

CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

VE ANALYSIS
: September, 19th 2015
: Kanif Setiady
: Siswanto
WEIGHT OF SAMPLE II : 5,689.5 Gr

Cumulative

Retained % Ret % Passing

0.0 0.00 100.00


1,239.8 21.79 78.21

3,324.9 58.44 41.56


3,577.2 62.87 37.13

4,112.6 72.28 27.72

4,910.3 86.30 13.70

5,426.2 95.37 4.63

Upper)

Control Point (Lower)

1 10 100
Sieve Size ( m m )
1 10 25.4 38.1 100
Sieve Size ( m m )

Submitted by the Contractor


PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Siswanto
Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CON


DOHWA Engineering
- Province : West Sumatera PT. Perentjana Djaya a
- Contractor : KYERYONG - YALA, JO.
CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 Kyeryong Constructio
- Date : April 29th 2014 PT. Yala Persada Angk

LOS ANGELES ABRASION LOSS TEST

Location : Laboratorium of Project Date Testing


Material : Aggregate Base Class A Tested by
: PT. Persada Raya Kembar Checked by

GRADING : TYPE A

SAMPLE
PASSED RETAINED I
Before (A) After (B) Befo
3" 2 1/2 "
2 1/2 " 1 1/2 "
1 1/2 " 1" 1,251.2 1,2
1" 3/4 " 1,250.0 1,2
3/4 " 1/2 " 1,251.5 1,2
1/2 " 3/8 " 1,250.1 1,2
3/8 " 1/4 "
1/4 " No. 4
No. 4 No. 8
TOTAL WEIGHT 5,002.8 5,0
TOTAL WEIGHT SIEVE No. 12 RETAINED 3,537.1

I Before Weight (A) = 5,002.8 gram II Before Weight (A) =


After Weight (B) = 3,537.1 gram After Weight (B) =
Abrasion Weight = 1,465.7 gram Abrasion Weight =
A - B A -
% Abrasion = x 100% % Abrasion =
A A

5,002.8 - 3,537.1 5,005.6 -


% Abrasion = x 100% % Abrasion =
5,002.8 5,005.6
= 29.30 % = 36.48 %
29.30 + 36.48
Average % Abrasion =
2
= 30.90 %
Remark : Stone from Quarry Kayu Tanam III

Checked by the Engineer Submitted by the C


DOHWA Engineering Co. Ltd., in Assosiation with PT. Kyeryong Con
PT. Perentjana Djaja and Hasfarm Dian Konsultan JO PT. Yala Persad

Andespa Hedison
Lab. Technician Quality Control
SUPERVISION CONSULTANT
DOHWA Engineering, Co.Ltd in Assosiation With
PT. Perentjana Djaya and Hasfarm Dian Konsultan
CONTRACTOR
Kyeryong Construction Industrial Co., Ltd. (JO)
PT. Yala Persada Angkasa

ES ABRASION LOSS TEST

: February, 3rd 2015


: Kanif setiady
: Kanif setiady

SAMPLE
II
Before (A) After (B)

1,252.7
1,251.2
1,251.1
1,250.6

5,005.6
3,179.6

5,005.6 gram
3,179.6 gram
1,826.0 gram
B
x 100%

3,179.6
x 100%
5,005.6
Submitted by the Contractor
PT. Kyeryong Construction Industrial Co. Ltd.
JO PT. Yala Persada Angkasa

Andespa Hedison, ST
Quality Control
REPUBLIC OF INDONESIA
MINISTRY OF PUBLIC WORKS
DIRECTORATE GENERAL OF HIGHWAYS

- Project : Padang Bypass Capacity Expansion Project SUPERVISION CONSULTA


DOHWA Engineering, Co.Ltd i
- Province : West Sumatera PT. Perentjana Djaya and Hasfa
- Contractor : KYERYONG - YALA, JO.
CONTRACTOR
- Contract No. : Ku.08.08/KTR.06.PPK/12/PJNJI/V/2014 Kyeryong Construction Industri
- Date : April 29th 2014 PT. Yala Persada Angkasa

COMPOSITION PER PART OF AGGREGATE CLASS 'A'

A. VOLUME of COMPOSITION

CA ( 20 -- 30 ) mm = 0.40 x 1.000 Ton : 1.299 = 0.308

CA ( 10 -- 20 ) mm = 0.18 x 1.000 Ton : 1.324 = 0.136

MA ( 05 -- 10 ) mm = 0.10 x 1.000 Ton : 1.273 = 0.079

Fine Aggregate = 0.32 x 1.000 Ton : 1.493 = 0.214

B. COMPOSITION PER PART

CA ( 20 -- 30 ) mm = 0.308 M3 = 1 PART = 10

CA ( 10 -- 20 ) mm = 0.136 M3 = 0.4 PART = 4

MA ( 05 -- 10 ) mm = 0.079 M3 = 0.3 PART = 3

Fine Aggregate = 0.214 M3 = 0.7 PART = 7


Disetujui Oleh : Diperiksa Oleh : Debuat Oleh
Konsultan Konsultan Kontraktor

( SYEFRIA INDRA, ST ) ( IR. SUPRIADI ) ( AHMAD NAJIB M


Quality Engineer Quality Engineer Quality Control Ma
VISION CONSULTANT
A Engineering, Co.Ltd in Assosiation With
ntjana Djaya and Hasfarm Dian Konsultan
ACTOR
g Construction Industrial Co., Ltd. (JO)
Persada Angkasa

M3 1.675 1200.000

M3 1.971 540.000

M3 0.981 300.000

M3 2040.000

960

Bucket

Bucket

Bucket

Bucket
Debuat Oleh :
Kontraktor

( AHMAD NAJIB M, ST )
Quality Control Manager