PROJECT : LEBUHRAYA PERSISIRAN PANTAI BARAT: KERJA-KERJA

MENAIKTARAF JALAN PERSEKUTUAN Ft 005 (TELUK INTAN-KG LEKIR) PERAK


DARUL RIDZUAN
PROVISIONAL BILL OF QUANTITIES

Item Description Page Amount (RM)

SUMMARY

A OPB 6- PEDESTRIAN BRIDGE 6 of 6

1) OPB 1
2) OPB 2
3) OPB 3
4) OPB 4
5) OPB 5
6) OPB 6

SUBCONTRACT SUM -

AGREED & ACCEPTED BY : WITNESSED BY

-------------------------------------------------- ------------------------------------------------------
AUTHORISED SIGNATORY WITNESS SIGNATORY

NAME : .. NAME : ..

NRIC NO : NRIC NO :

DESIGNATION : ..

DATE : ..
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

8.1 BRIDGE WORKS

8.1A TEMPORARY CROSSING NA

8.1A.1 TEMPORARY BRIDGE ** NA

8.1A.2 TEMPORARY CULVERT ** NA

8.1B PILING WORKS NA

8.1B.1 ... mm Diameter Prestress Concrete Spun Pile NA


( Class: C ) *

8.1B.2 .... x .... mm Precast Reinforced Concrete Pile NA

8.1B.3 Pressure Treated Timber Pile NA

8.1B.4 Steel H-Pile NA

8.1B.5 Steel Pipe Pile NA

8.1B.6 Micropile NA

8.1B.7 .... mm Diameter Bored Pile NA

8.1C SUBSTRUCTURE NA
(abutments and piers)

8.1C.1 TEMPORARY WORKS NA

8.1C.2 ABUTMENTS NA

8.1C.3 PIERS NA

8.1D SUPERSTRUCTURE NA

8.1D.1 STEEL BEAM NA

8.1D.2 PRE-TENSIONED PRESTRESSED BEAMS NA

8.1D.3 POST-TENSIONED PRESTRESSED BEAMS NA

8.1D.4 VOIDED SLAB NA

8.1D.5 PRECAST BOX GIRDER - INCREMENTAL LAUNCHING NA

8.1D.6 CAST IN-SITU BOX-GIRDER - BALANCE CANTILEVER NA

8.1D.7 PRECAST SEGMENTAL BOX-GIRDER - BALANCE NA


CANTILEVER

Page 2 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

Carried to Collection

Page 3 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

8.1E APPROACH ROAD AND PAVEMENT NA

8.1E.6 RETAINING SYSTEM FOR APPROACH ROAD NA

8.1E.6.1 REINFORCED SOIL WALLS NA

8.1E.6.2 REINFORCED SOIL SLOPES NA

8.1E.6.3 REINFORCED CONCRETE RETAINING WALL NA

8.1F MISCELLANEOUS WORKS NA

8.1F.1 Expansion Joints NA

8.1F.2 Brass Plaque NA

8.1F.3 Guardrails NA

8.1F.4 Road Marking NA

8.1F.5 Protective Coating NA

8.2 CULVERT (3.0m and above) & VEHICULAR UNDERPASS NA

8.2.1 TEMPORARY CROSSING** NA

8.2.2 TEMPORARY WORKS NA

8.2.3 IN-SITU BOX CULVERT NA

8.2.4 PRECAST BOX CULVERT NA

8.2.5 IN-SITU VEHICULAR BOX CULVERT NA

Page 4 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)
Carried to Collection

Page 5 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

8.3 PEDESTRIAN BRIDGE

8.3.1 24m PRESTRESSED BOX GIRDER PEDESTRIAN BRIDGE

8.3.1.1 Earthwork

8.3.1.1.1 Excavate, load, haul and stockpile for reuse any material m3
except rock at piers.

8.3.1.1.2 - ditto - for rock m3

8.3.1.1.3 Excavate, load, haul and dispose to Contractor's dump site m3 385
as approved by S.O/P.D* any material except rock at piers.

8.3.1.1.4 - ditto - for rock m3

8.3.1.1.5 Fill, spread, grade and compact suitable material from m3


common excavation.

8.3.1.1.6 Fill, spread, grade and compact imported suitable material m3 198
from Contractor's own source.

8.3.1.2 200 x 200mm Precast Reinforced Concrete Pile**

8.3.1.2.1 sum
Allow for mobilization and demobilization of all labour, plants,
piling equipments, etc. on site, for the proposed piling works.

8.3.1.2.2 Supply and deliver to site 12.m length initial piles. nr 48

8.3.1.2.3 Supply and deliver to site extension piles.


i) 12.0m length nr 96
ii) 15.0m length 48

8.3.1.2.4 Handle, pitch and drive vertical piles. m 1824

8.3.1.2.5 Lengthening of piles by jointing to detail. nr 96

8.3.1.2.6 Cutting off piles head to required length including stripping off nr 48
to expose main reinforcements to detail.

8.3.1.2.7 Provide all labour, plants, temporary staging, kentledge, nr 2


testing equipments etc. and test load to the maximum load
test 300kN (twice working load) include complete set of static
load test records.

8.3.1.2.8 Carry out pile driving analyser (PDA) in accordance with the nr 15
Specification.

Page 6 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

Carried to Collection

Page 7 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

8.3.1.2 ... mm Diameter Micropile** NA

8.3.1.3 In- situ Reinforced Concrete

8.3.1.3.1 50.mm thick Grade 15/20 lean concrete. m2 31

8.3.1.3.2 Concrete Grade 40/20 at piers, cross beam, staircase and/or m3 124.53
ramp*.

8.3.1.3.3 Formwork for:-


i) Class F2 for pile cap, head wall and pier head m2 363.3
ii) Class F3 for pier column m2 61.2

8.3.1.3.4 High Yield Steel Reinforcement:


i) Up to 12mm diameter. t 8.37
ii) 16mm diameter. t 2.23
iii) 20mm diameter. t 13.07
iv) 25mm diameter. t 17.16
v) 32mm diameter. t

8.3.1.4 Precast Prestressed Beam**. NA

8.3.1.5 Precast Prestressed Box Girder**.

8.3.1.5.1 Pre-tensioned Prestressed box girder including strands,


prestressing, lifting, transporting, temporary support for box
and launching all in accordance with the Specification and
as shown in the Drawing.

a) Ramp
i) Type S1,S3,S7 and S9 nr 6
b) Bridge
i) Type S4, S6 - 6.74m long, 3.0m width nr 2
ii) Type S5 -26.5m long, 3.0m width nr 1
c) Landing
i) Type L1, L3 - 6.5m long, 2.5m width nr 2
ii) Type L2, L4 - 2.5m long, 2.5m width nr 2

8.3.1.6 Post-Tension Prestressed Beam**. NA

8.3.1.7 Precast staircase and/or ramp**

8.3.1.7.1 Precast staircase and/or ramp* including lifting, transporting,


temporary support, launching and placing in position all in
accordance with the Specification and as shown in the
Drawing.
i) Type F2 & F4 nr 2
ii) Type F1 & F3 nr 2

8.3.1.7.2 Provide 6mm thick x 50mm wide x 3.0m length rubber nr 8


bearing strips and epoxy bedding.

Page 8 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

Carried to Collection

Page 9 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

8.3.1.8 Miscellaneous

8.3.1.8.1 Cut off lifting hook and fill recess with non-shrink grout.
i. Single span precast box* nr 4
ii. Precast staircase* nr 8
iii. Precast box girder ramp* nr 24

8.3.1.8.2 300mm x 230mm x 24mm thick Laminated Elastomeric


bearings on 18.mm thick grout bedding.
i. Single span precast box* nr 4
ii. Precast box grider ramp* nr 22

8.3.1.8.3 Form Expansion joints as to detail.


i. Single span precast box* m 6
ii. Precast staircase* m 2
iii. Precast box grider ramp* m 10

8.3.1.8.4 Provide 25mm diameter dowel bars including rubber dowel nr 20


cap, compressible joint filler and epoxy resin mortar.

8.3.1.8.5 Galvanised mild steel handrail as shown in the Drawings m 400


including the ...mm spaced galvanised mild steel
supporting columns and beam for roof cover and 2 layers of
approved paints.

8.3.1.8.6 Metal cladding roof cover including roof truss, frame and m 40
necessary fixtures as shown in the drawing.

8.3.1.8.7 Non-skid granolithic paving floor tiles m2 355

8.3.3 STEEL TRUSS NA

8.3.4 PEDESTRIAN UNDERPASS NA

Page 10 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)
Carried to Collection

Page 11 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

COLLECTION PAGE

BQ 8: (OPB 6) - 1/6

BQ 8: (OPB 6) - 2/6

BQ 8: (OPB 6) - 3/6

BQ 8: (OPB 6) - 4/6

BQ 8: (OPB 6) - 5/6

Page 12 of 25
LEBUHRAYA PERSISIRAN PANTAI BARAT
KERJA-KERJA MEANIKTARAF JALAN PERSEKUTUAN FT005 (TELUK INTAN - KG. LEKIR, PERAK)
BILL NO. 8 STRUCTURES
OPB 6- PEDESTRIAN BRIDGE

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

TOTAL CARRIED TO SUMMARY

Page 13 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 14 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 15 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 16 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 17 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 18 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 19 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 20 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 21 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 22 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 23 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 24 of 25
EKIR, PERAK)

AMOUNT
(RM)

Page 25 of 25