Professional Documents
Culture Documents
Activities
Consultancy in Inspection of different sites, within construction and after
construction.
Consultancy in Analysis of Sites works Progress with respect to Quality.
Propose to have QMS ISO 9001-2015 Certification and Implementation for
company growth.
Propose for making Standard Procedures for working respective to QMS ISO 9001-
2015.
Assistant Quality Manager 5-jan-2014 to 10 Oct 2016
Business & Engineering Trends Lahore
QMS Activities
Involvement in making Quality Policy, Quality Plan and other documents
regarding to ISO audit.
Customer Complaint evaluation and Take proper Actions to resolve problem.
Coordinate with customers for pre & post audit preparation &documentation
review.
Resolves quality issues reported and coordinate with clients through sales
team.
Preparation of audit plans, schedules and reports.
Develops, maintains, monitors, audit and distributes all documentation
associated with quality control records, plan, procedures and polices
Developing specific goals and plans to prioritize organize and accomplish
desired outcomes including high levels of customer satisfaction.
Observing, receiving and otherwise obtaining information from all relevant
sources.
Focus on evidence based thinking for development.
Implementing new policy and documents through department wise of 2015
Standard.
Improve Infrastructure for facility for quality testing.
Prepares a variety of reports and related information for decision making
purpose, including monitoring quality objectives.
Coordinate with Management to ensure internal and external audits are
successful.
Keep the Quality Manager informed and updated of all QMS matters.
Prepares daily, monthly, quarterly, and yearly reports as requested. See that
they are printed and distribute for common or to be noted.
QMS documentation and implementation in charge of BET composites.
Internal calibration of used equipment
Focus on lean Management in plant for making zero defects environment.
Arrange customer meeting for development of Quality product with help of
sales team.
Maintain Training Plans and give proper training to staff for implanting ISO
and other relevant standards.
Give training of 5S to operational personals for housekeeping.
Technical Activities
GRP GRE GRV pipes Manufacturing and Quality Control.
Tanks and Boats of Fiber Glass material.
Prepared and Expertize in making Quality formulates using ASTM/ASME/BS
standards
Prepared All Work Instruction of experiments using by Quality Lab engineer
Prepared Quality formats in process inspection of GRP pipes
Fill and retain all documents using in lab or in plant by Quality departments.
Lab testing and Reports.
o Gel time, Viscosity, Loss Ignition, UTM tests and Hydrostatic test.
Inspection on daily basis
Propose Lean Management system for GRP and GRE section. Design full
system with all formats and quality inspection plan.
Give training to workers and higher staff about lean mgmt. system proposed
by me.
Got zero defects within 6 months using my proposed lean management
system.
Physical Testing
o Surface Inspection of Liner and Pipe, diameter and grove inspection.
Heading Quality department.
Design new experiments and procedure recommended by new clients.
Prepare ITP when client require inspection.
Leading in inspection of plant and product to new customers.
Leading role in inspection to customer when they visited plant for their
material inspection before dispatch.
Leading role when customer audited for supplier assurance audit.
Visiting customers at their head offices and sites when they require technical
help or having technical issues.
Visits sites for checking Quality of projects.
Meetings within plant about technical awareness to new customers.
Presentations to new customers about core process and products to new
customers.
Brain storming with higher management in getting customer satisfaction.
Appear in weakly meeting about progress and issues
Do Planning of GRE section about daily production.
Training to new appointed employees about quality policy and process
description.
Training of 5S to plant workers.
Departmental head.
Plant job and Labour communication.
Holding GRE Piping Section from last 9 months.
CNC Winding Machine Training from Chinese Delegations of 2 months.
Installation New Plant and 2 month duty as Plant in-charge then handover to
sub-ordinate.
Night Shift In-charge of Production and Quality for 3 months.
Budget of projects which is given by higher management.
Controlling, issuing material to sites and complete projects with in budget.
Project of Tank linning of Shahtaj Shugar Mills.
Project of Tank linning of Arco Plastics.
Project of Pipe Laying of Patoki Site.
Project of Tank linning of Pure chem.
Trainee 1-july-2012 to 1-aug-2012
One Month Training
Skills Set
Presentation Skills
Communication skills
Training the People
Root Cause Investigation (Brainstorming, why why analysis)
Project management
References
Will be furnished on request.