You are on page 1of 75

Small Cell Solution Overview

Industry Insights
01 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

MAIN Indoor Connection Digitalization


CONTENTS 02 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Outdoor Small Cell Contributes to Integrated Network


03 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Huawei Technologies Co. ,Ltd| 2


MBB is Changing , Because

more hotspots upgraded service shrink coverage

urbanization population 2K/4K video AR VR


changes changes

10 years
ago
2.1Gbps

0.3R R
~1.05Gbps Panoramic
5x 10x 3D VR
5.8GHz
Panoramic
175Mbps 2D VR

20Mbps
VR 2.6GHz
Screen

Now 4K
8Mbps
1.8GHz
2K

Source: Huawei MLAB

Huawei Technologies Co. ,Ltd| 3


MBB Changes Lead to Big Challenges of Network Construction

10 years ago now future

10x
@sites increase any more sites

inter-site distance in different city (Avg.<500m) @2016Q1 640

435 471
426
350 360
310

Tokyo Hongkong Guangzhou Singpore London Agentina Paris

Source : Huawei mLab

Huawei Technologies Co. ,Ltd| 4


HoweverSite Densification is Essential in 4.5G

demand of network for dual HD services network capacity dissatisfies the traffic demand

the capacity gap at cell edge

R
CS voice: 12.2K
data: 64K capacity

0.7R
voice: VoLTE LTE traffic density
video: 2Mbps/720P GU traffic density

Huawei Technologies Co. ,Ltd| 5


5G Needs Double Sites as 4.5G

more path loss in high band small cell constitutes ultra dense network

macro site
low band X Gbps
path loss(dB)

X Gbps
small cell
high band
39GHZ
30dB
28GHZ
25dB
bus station
2.6GHZ
pole site

1 high band deployment make BS spacing decreasing


3 6
10 20 30 40 50 60 70 80 90 GHz
2 various BS form make site resource acquisition easy

Huawei Technologies Co. ,Ltd| 6


Macro is Insufficient for Deep Indoor Coverage

low signal penetration due to path loss Macro is not enough for indoor coverage

16000 LTE Macro sites deployed, but there still have


66.5% in-building coverage is not ready for HD voice & video
glass brick concrete

66.5%
Weak coverage

-7~-15dB -10~-20 dB -12~-30 dB

Weak coverage (RSRP<-105dBm) Normal(RSRP>-105dBm)

Source : chengdu. China 2016

Huawei Technologies Co. ,Ltd| 7


DAS is the Past of Indoor MBB

DAS is good for voice but not for data DAS solution suppress indoor MBB demand

voice 1.5~5x gap between demand and supply


1938
traffic

data
capacity of DAS
1195

660
541
325 387
194 255 246
127

hospital hotel office mall college

time demand(MB/10000m2/day) supply(MB/10000m2/day)

Source : sichuan. China 2016

Huawei Technologies Co. ,Ltd| 8


Indoor Digitalization Drives MBB Industry Upgrade

excellent experience smooth evolution

on-demand D-MIMO
capacity
0 congestion unleash traffic 0 complaint

flexible CA 256QAM

easy O&M digital service enabler

pRRU OSS

positioning precision push


Cat5E/6

BBU
Fiber
RHUB
flow analysis marketing evaluation

Huawei Technologies Co. ,Ltd| 9


Network Openness Enables Digital Service for New Profit

digital service is the new profit network openness enables digital service
industry scale

green city
business location flow analysis
digital services
traffic regulation marketing insight

traffic &
connection

Data Center
Data Mining MEC
voice
Grid Level DB

2018 time

Huawei Technologies Co. ,Ltd| 10


Huawei Small Cell @ CloudRANTM Evolving to MBB Change

AOS O&M cloudization


O&M Aggregation
automatic service delivery enable
massive Small Cell deployment
3rd party cloud

Open API
service cloudization
Service Anchor
mobile edge computing (MEC)
L3/L2 NRT enable vertical industries
L1/L2 RT

equipment cloudization

LampSite3.0 LampSite Lite VillaRadio 2.0 AtomCell 2.0


centralized coordination for
pRRU5913 CDU5901B RRU5940E BTS3912E
integrated network

large & medium scenarios small enterprise scenarios outdoor hot spot scenarios
(area > 5000 m2) (area < 5000 m2) (coverage radius < 200 m)

Huawei Technologies Co. ,Ltd| 11


Industry Insights
01 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

MAIN Indoor Connection Digitalization


CONTENTS 02 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Outdoor Small Cell Contributes to Integrated Network


03 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Huawei Technologies Co. ,Ltd| 12


In-building System Needs to be Digitalized in MBB Era

Experience Drive Efficiency Drive Business Drive

Video sharing is driving mobile data growth Digitalization Enable

Coupler
pRRU New Services, New Market
10

positioning precision push


4.9 5.15 RF cable Antenna
2.5 RHUB
0.256 1 0.512 VS
Power
splitter

BBU Enterprise
Video
Throughput >5Mbps Expected!
Signal Source OSS passenger marketing
flow analysis evaluation

Explosive MBB traffic demand Simple network, easy deployment Open Platform With 3rd APP
Best user experience anywhere E2E, visualized O&M New market opportunity
pRRU3911 Unleashes Potential Traffic Demand

SDR support smooth evolution


any 3 bands D-MIMO
LAA compatibility
flexible combination

3 carrier CA
max 450 Mbps
pRRU3911 CA
Multi-RAT
GSM/UMTS/LTE/Wi-Fi/LAA best antenna in industry
Multi-Band: higher antenna gain
850/900/1.8/2.1/2.3/2.6 cell edge rate increase 30%
one cable support GUL
2x100mW per band, <2kg
one box for all 256QAM
3GPP+Wi-Fi+LAA

Huawei Technologies Co. ,Ltd| 14


pRRU3916: Outdoor LampSite for Excellent Experience in Stadium

The 1st Outdoor pRRU outdoor solution for stadium


IP65
square coverage
-20C~50C
shaped
antenna

internal combiner in
one box
pRRU3916 pRRU3916 better performance

@900M+1.8G+2.1G+2.6 win 2dB gain


@850M+PCS+AWS+2.6
@800M+1.8G+2.1G+2.6
simplify network RHUB
<5.2L, 7kg
EIRP: 28.5dBmTypical saving 2 hours for
EIRP=RF power + antenna gain + MIMO
engineering maintenance BBU
gain

Huawei Technologies Co. ,Ltd| 15


pRRU5913: the 1st Full Bandwidth LampSite for Multi-operator

beauty of nature 4 bands & full bandwidth


pRRU5913

G2 curve design 1.
2.
900M IBW= 35M
1.8G IBW= 75M
light and handy 3. 2.1G IBW= 60M
4. 2.6G IBW= 70M
easy deployment

LampSite 3.0 RHUB3918


CPRI-E: 10G
pRRU5913 operator A
smooth evolution to 5G
900M+1.8G+2.1G+2.6G
BBU
GSM/UMTS/LTE FDD 2*POE ports for 5G
typical: 4 operators
<2*50mW/20MHz
sharing
< 2*200mW/band one cable for GUL
<2L/2Kg
50% deployment cost saving operator B operator C operator D

Huawei Technologies Co. ,Ltd| 16


LampSite Lite, the 1st CloudRAN Based Solution

multi-cell coordination fast deployment

centralized RS power self optimization automatic parameter configuration


centralized uplink resource allocation manual operations not required at OMC
centralized cooperative power scheduling IPSec transmission auto negotiation

cell edge user gain improved 30% 10 mins on air


CDU5901B
LTE TDD/ LTE FDD
large capacity easy O&M
2*250mW
<2L, 2kg area-based and role-based custom O&M
2CC CA
GA: 17Q3 planning (TDD) public IP saved by O&M convergence
GA: 18Q4 planning (FDD) 256QAM : 30%+ peak throughput same O&M with Macro

Huawei Technologies Co. ,Ltd| 17


BTS3911B, the 1st UMTS & LTE Dual Mode PicoBTS
smooth evolution
UMTS + LTE + Wi-Fi LTE + LTE + Wi-Fi
software upgrade

50% TCO saving , double efficiency of network deployment


BTS3911B
dual mode, dual band, Wi-Fi
Wi-Fi hotspot mobilization
1.9G+AWS+WiFi
2.1G+2.6G+WiFi 3G 4G
site
2.1G+1.8G+WiFi
power
2*125mW each band
transmission
2.2L, 2kg
11ac Wi-Fi integrated Wi-Fi AP reuse Pico

monetization capability is enhanced by traffic controlled


Huawei Technologies Co. ,Ltd| 18
Benefits Brought by Indoor Digitalization

Huawei Technologies Co. ,Ltd| 19


key factors to reduce per-bit cost
multi band multi mode smooth evolution

software cell splitting expansion

innovative software features

innovative ICS tools


Traffic Model in Typical Scenarios

Avg. online user numbers in busy hour : 100


high total capacity demand: 100*5Mbps=500Mbps
capacity scenario
cell numbers demand: 500/30= 17

area : 30,000 m2

system: LTE middle


Avg. online user numbers in busy hour : 50
total capacity demand: 50*5Mbps=250Mbps
capacity scenario
Avg. user DL speed: 5Mbps cell numbers demand: 250/30= 9

Avg. cell throughput :30Mbps


Avg. online user numbers in busy hour : 20
small total capacity demand: 50*5Mbps=100Mbps
capacity scenario
cell numbers demand: 100/30= 4

Huawei Technologies Co. ,Ltd| 21


LampSite is the Best Economic Solution for Middle & High Capacity Scenarios
high
TCO (USD) capacity scenario
200000 194250
190000 DAS TCO(USD)
Not including software
180000
170000 LampSite TCO(USD)
Not including software
160000 151750
150000 middle
capacity scenario
140000
130000 121760
120010
120000 127010
123000 123510
110000 106250
100000 capacity
3U+3L 3U+4L 3U+5L 3U+6L 3U+7L 3U+8L 3U+9L 3U+10L 3U+17L 3U+18L 3U+30L

conditions : area 30,000 m2 ; system U+L ; *Source: Malaya


capacity : add new band = add new cell
software cost (the same capacity): LampSite=DAS

Huawei Technologies Co. ,Ltd| 22


Indoor Digitalization Enables Soft Capacity Expansion

today tomorrow

cell split

cell split for capacity expansion


cell 1

per-bit cost reduce by


SFN cell
cell 2 1~10% @ middle capacity scenario
RHUB
RHUB
>18% @ high capacity scenario
cell 3
pRRU
OSS pRRU OSS compared with DAS
cell 4

BBU
SFN Cell
BBU

conditions : area 30,000 m2 ; system U+L

Huawei Technologies Co. ,Ltd| 23


Virtual 4T4R Increases Indoor Network Capacity

virtual 4T4R convert interference to capacity


without hardware change

0 1 2 3 0 1 2 3 0 1 2 3 0 1 2 3

Virtual 4T4R for capacity expansion

per-bit cost reduce by


2~10% @ middle capacity scenario
cell throughput gain: 10%~40% 17~24% @ high capacity scenario

compared with DAS


2X2 4X4 2X2

2x2 MIMO 2x2 MIMO


Area 4x4 MIMO Area
Area

conditions : area 30,000 m2 ; system U+L

Huawei Technologies Co. ,Ltd| 24


D-MIMO Convert Interference to Capacity

D-MIMO

eNBs send joint D-MIMO for capacity expansion


signals to UE, thus
convert interference
per-bit cost reduce by
to D-MIMO capacity 2~7% @ middle capacity scenario
15~22% @ high capacity scenario
user throughput
compared with DAS
10~30% 5~25%

cell edge cell average

conditions : area 30,000 m2 ; system U+L

Huawei Technologies Co. ,Ltd| 25


UL CoMP for Fastest Uplink Cell Edge Speed

improve UL cell throughput

Cell0
15%~40%
Cell1

UL throughput

UL CoMP off UL CoMP on

Huawei Technologies Co. ,Ltd| 26


Better 256QAM Capacity Gain Than DAS

hardware ready for 256QAM on LampSite

Peak Tput
+30% 256QAM for capacity expansion

64QAM 256QAM per-bit cost reduce by


6bits/symbol
8bits/symbol
7% @ middle capacity scenario
LampSite system capacity gain than DAS 23% @ high capacity scenario
18%-6%=12%
60%
compared with DAS
20% 18%
6%

256QAM users ratio capacity gain


DAS LampSite
conditions : area 30,000 m2 ; system U+L

Huawei Technologies Co. ,Ltd| 27


Leading the Commercial Progress of LAA for Maximum Efficiency

Licensed-Assisted Access(LAA) for downlink LAA help VDF get high throughout gain

pRRU3911 330

1.8x
Unit: Mbps
182
LAA DL 3CC CA
4.8x
licensed LTE LAA(5GHz) licensed LTE LAA(5GHz)

37.5

primary secondary primary secondary


carrier carrier carrier carrier
LTE Only(5M) 1+15M+20M 1+25M+20M+20M

Source: VDF building in SA

DAS cannot support any technology above 3GHz


Huawei Technologies Co. ,Ltd| 28
LAA Industry Ecosystem Becoming Mature

standardization progress in 3GPP R13 LAA coexist with Wi-Fi

2014 Q3 2015Q1 2016Q1


cell on/off
R13 R13 R13 eCSAT)
LAA SI LAA WI LAA time
Wi-Fi works only in LBT scheme,
not having Cell ON/OFF scheme.

2016H2 2017H1

phase 1 LTE-U LAA (Rel-13)


(pp to 5x DL CA with (up to 5x DL CA with time
Listen Before Talk
max 80Mhz in max 80Mhz in (LBT)
unlicensed) unlicensed)
MSM89xx : MDM9x55 time
Oct 2016 MSM89xx
Listen Frame Wi-Fi data LAA Data
2017Q1

Huawei Technologies Co. ,Ltd| 29


E2E Toolkits Make Deployment Efficiency

scenario identification smart design easy deployment

indoor & outdoor


traffic identification IT system
site survey architecture
3D coverage
PRS WDT digitalization
3D traffic architecture

topology automatic
indoor site indoor network configuration
identification
design cell automatic
3D simulation ICS U2000 configuration
U-NET planning
designer

Huawei Technologies Co. ,Ltd| 30


Various Tools for Value Indoor Building Identification
exhibition
building center
3D Map
scenario identification traffic hub
identification scenario/areas
/floor number
indoor/outdoor
MR identification
evaluation hotel
with tool value building
coverage/capacity identification & sequencing
outdoor site /traffic density shopping
KPI mall
restore the
indoor site repressive traffic
KPI
stadium
value building
busy time value ue sequencing
identification network /end user
PCHR
/scenario office
building list college
hospital

Huawei Technologies Co. ,Ltd| 31


Smart Design: Help to Construct the Indoor Networks Precisely

intelligent
intelligent identification for building drawings
identification for 01 accurate 3D building modeling using the intelligent CAD
building drawings identification technique

precise design based on simulation verification


02 intelligent design

precise design 3D simulation verification

based on simulation
verification

Huawei Technologies Co. ,Ltd| 32


Simplified Networking Architecture Reduce Deployment Cost
traditional DAS LampSite

deployment cost reduce by 20%~50%

Coupler
pRRU

RF cable Antenna

RHUB

Power
splitter hard & heavy, challenges in soft & light, easy project

property coordination and implementation by taking


BBU

project implementation advantage of broadband

Signal Source network renovation


OSS
Easy Deployment: LampSite RF Auto-configuration as Wi-Fi AP

LampSite automatic configuration topology & cell automatic configuration


radio
hardware
transmission Cell 3
Automatic
switch Cell 1
create LampSite site Information Cell 2

open
automatic switch GUI
CME@U2000

topology & cell configuration


without man-made


easy configuration for LampSites complex tree structure
verify data and complete Site
configuration on CME keep the configuration accuracy with huge number of pRRU & RHUB

Huawei Technologies Co. ,Ltd| 34


key factors to reduce OPEX
remote & visible O&M

architecture ready for 5G


Digital O&M Make Maintenance Effectively

intelligent green
WDT O&M power

O&M as buildings level power-off of carriers


locate fault pRRU visually
adaptively adjust cell scale RF channel shutdown

Huawei Technologies Co. ,Ltd| 36


WDT for Efficient Construction of Indoor Network

determine the accurate NE associate survey photos with


location onsite the NEs in U2000

Huawei Technologies Co. ,Ltd| 37


Visible Indoor Fault for O&M Efficiency Improvement

end to end visible monitoring locate fault point visually for building level

pRRU
Coupler

RF cable Antenna
RHUB

Power splitter pRRU-1


pRRU-1

BBU

O&M of LampSite with building level


fault pRRU & RHUB with precise location
OSS promote the O&M capability and efficiency
Signal Source

Huawei Technologies Co. ,Ltd| 38


Green Site Reduces OPEX when Low Traffic Scenario

power mutual assistance adaptive power consumption


12%~15% electricity fees saving 12%~15% electricity fees saving
LTE FDD Only
intelligent power-off of carriers in the RF channel intelligent shutdown
same coverage
2T2R
06:00-24:00

carrier 1

carrier 2

low traffic Low Traffic

00:00-6:00 z
z
1T1R z

carrier 1

no traffic

Traffic model :8 busy hour, 10 middle hour, 6 idle hour, Only idle hour use
Huawei Technologies Co. ,Ltd| 39
Architecture of Indoor Digitalization is Future Approved

architecture of LampSite each element can individual evolution

pRRU bandwidth 60 MHz >240 MHz UWB

cable
transmission 1 Gbps x Gbps reusability

RHUB

BBU resource SingleRAN CloudRAN cloudization

Huawei Technologies Co. ,Ltd| 40


key factors for value add service
smart shopping mall

indoor big data based on location


Value-added Service Based on Small Cell is Huge

forecast revenue big data market to 2026 indoor LBS market

Big data market size revenue forecast worldwide 92.2


88.5 Indoor Locaiton Market(billion USD) 23.13
from 2011 to 2026 (in billion U.S. dollars) 84
78.7
72.4
65.2
18.15
57.3
49 13.7
40.8
33.5
27.3
8.55
19.6 18.3
22.6 6.56
12.25
4.72
7.6

2016 2017 2018 2019 2020 2021

Statista 2016 By: marketsandmarkets.com


Source: Wikibon Publishing Date: October 2016
Report Code: TC 2878

Huawei Technologies Co. ,Ltd| 42


Service Anchor Provide Digital Services Based on Small Cell

convergence openness aggregation


fast co-deployment indoor location based services reduce link shock to core network
easy co-maintenance local break out Pico region-based PnP deployment
innovative intra-RAT coordination

Service Anchor
ACAccess Wi-Fi Controller
AC AG AE AEAccess Openness Enabler
AGAccess Gateway

LampSite Lite/Pico LampSite Micro

Huawei Technologies Co. ,Ltd| 43


Indoor Location Ability for Value-added Digital Services

CN

SO API

transmission
indoor navigation
BBU

Service Anchor APP Server

LampSite pRRU LTE location

67% accuracy in 5 meters precise delivery

4G

mobile APP client traffic analysis

Huawei Technologies Co. ,Ltd| 44


Shopping Experience of Consumers is Enhanced with LBS

LBS
secure payment preferential data flow package
Judge if the customer is in right place Consumers get preferential data flow
when the transaction occurs based on indoor location

precise delivery store navigation


consumers will receive the preferential find a store in mobile app and get there
information from the store when they by indoor navigation
get close to it

Huawei Technologies Co. ,Ltd| 45


Big Data Based on Indoor Location Brings More Value

1 Real-time Monitoring 2 Consumer Behavior Analysis

Using real-time monitoring


Learning from consumer
interface to realize
visualized management. behaviors to guide business.

Big Data

3 Marketing Evaluation 4 Consumer identification

Evaluating the effectiveness Identifying the characteristics


of marketing methods. of different customers.

Huawei Technologies Co. ,Ltd| 46


Cases Study
Sichuan Small Cell City: Enable Revenue Harvest

efficiency drive
pRRU100K+ 1 1
0.8 LampSite
0.25 DAS

building2000+
Why
Acceptance rate Deployment effciency

Avg. DL speed increase >30% traffic per unit area increase 3.7x DOU increase 6.1x
UL&DL throughput(GB)/10k m2/month UL & DL throughput (MB)/user/month
Avg.DL SpeedMbps
182
75.05 820
56.17
40.31 43.42

50
134

Outdoor DAS(SISO) DAS(MIMO) LampSite


Macro DAS LampSite DAS LampSite

SourceSichuan mobile, including 51 LampSite sites, 2444 revenue increase 1000 USD /month/10k m2 ARPU increase 5 USD /user/month
DAS (SISO), 169 DAS (MIMO), 217 outdoor Macro cell

Huawei Technologies Co. ,Ltd| 48


Beijing Capital Airport: All of 3 Operators Choose LampSite

beijing capital airport, the biggest airport in Asia


1.7mi m2: 6500+pRRUs @ 3 operators

operator U: competition drive operator M: efficiency drive operator T: capacity drive


poor experience 2years only finish T2 terminal @ DAS traffic suppressed by outdoor Macro only

6 months deploy 1900 pRRUs T1&T3 Throughput (GB)


terminal
80 Mbps
485
8x 2
75% 2x
267
28
15 10 0.5

M(DAS) T(Macro) U(Macro) U(LampSite) DAS LampSite before after

2014.10 2016.01 2016.07


Huawei Technologies Co. ,Ltd| 49
16x Data Traffic on MWC 2016 Day1 Brings Higher ROI
3 weeks for 88km2 hall1/3/6 unleash potential traffic

2x Max. users/Cell
users/cell DAS@2015 172
LampSite@2016 350
DL traffic@Day1 (GB)
16x DAS@2015 43
DL traffic
LampSite@2016 679

UL traffic@Day1 (GB)
9x DAS@2015 17
UL traffic
LampSite@2016 149

revenue@1year (K)
avg. DL speed avg. UL speed 10x DAS@2015 37.8
revenue LampSite@2016 373
20Mbps 11Mbps
Huawei Technologies Co. ,Ltd| 50
LampSite Help Operator Increase User Experience & Build New Biz

china national stadium


the biggest stadium in china90000 seats capacity

challenges 0 congestion @ LampSite new business model

420,000 congestion connection success rate special package increase revenue


increase 1.5 $ = 1.5GB 1000 user *1.5 $=1500$/event
only in 1 concert with DAS
1500$*100 events=150000$/year
99.9%
2x
cultivate user behavior
49.5% Data traffic(GB)
346
5x
78.3
2014 wang feng concert DAS LampSite
DAS LampSite

Huawei Technologies Co. ,Ltd| 51


Where is a Big Event, There is a LampSite
MBB Era LampSite have deployed in
Reduce OPEX
big challenge in stadium 200+ stadiums

better experience :

emergency communications support 0 congestion

low OPEX : Avg. reduce 20000$


per emergency communication
ultra dense user: >1people/m2
support
ultra high traffic : hundreds GB/event 200+ stadiums
DAS capacity is insufficient
a large number of emergency 2000+ concerts & matches
communications support investment
Source : China

Huawei Technologies Co. ,Ltd| 52


BTS3911B Create More Value for Thailand Operator

scenario potential traffic is released revenue

operator shop average downlink rate 26 Mbps 2392$ per year


27.5
26.2 26.4
BTS3911B 25.9 25.9

24.4 24.6
23.2

12/30 12/31 1/1 1/2 1/3 1/4 1/5 1/6

average user number 450 per day

494
481
BTS3911B 465
432 440
429
400
374 one Pico
200 Gbits per week
12/30 12/31 1/1 1/2 1/3 1/4 1/5 1/6

Huawei Technologies Co. ,Ltd| 53


BTS3911B with CPE Backhaul Help Operator Fast Deployment

POE POWER

4G CPE

router
BTS3911B
Macro

fast deployment

site survey installation PnP


1~2 hours 20 minutes 10 minutes
Peru operator x
Huawei Technologies Co. ,Ltd| 54
Service Anchor Enable Smart Shopping Mall in Wuxi Coastal City
business mode

applications

LampSite & Service Anchor

APP
operator

customers smart mall


offline to online shopping solution
experience

Mall

coastal city
easy security monitoring
consumer behavior analysis operators
X00,000 slotting fee saved
X00,000 service fee from Mall

Huawei Technologies Co. ,Ltd| 55


Big Data from Indoor Location Brings New Revenue in Sichuan

operator CRM company terminal business


consulting
Data Streaming report

collect analysis openness

1. server rent fee 1. consumer behavior analysis


2. revenue sharing 2. marketing effectiveness evaluation
3. store advise suggestion

200+ indoor buildings in 2 years


Service Anchor

school shopping mall metro station

Huawei Technologies Co. ,Ltd| 56


Industry Insights
01 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

MAIN Indoor Connection Digitalization


CONTENTS 02 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Outdoor Small Cell Contributes to Integrated Network


03 Building a Better Connected World ; Mobile is the Future ; Small Cell Big Business

Huawei Technologies Co. ,Ltd| 57


More and More Difficult to Deploy Tradition Macro in Density Area

difficult to deploy tradition Macro site

40% 32% 28%

limited space private area no no no space &


environment fusion transmission load bearing

increase site density in urban area is the


top challenges for operator

health concerns difficult negotiation

Huawei mLab
Pole Site is The Trend for Site Densification

50% 82% 90%

China Thailand Canada

*Huawei mLab

Huawei Technologies Co. ,Ltd| 59


BTS3912E: 0 Footprint Pole Site

BTS3912E for pole site scenario

vband backhaul

BTS3912E
pole site solution for more scenarios

2x10W 8L

single band
FDD LTE: 1.8G
UMTS&FDD LTE: 2.1G

Huawei Technologies Co. ,Ltd| 60


Where There is a Pole, There can be a Site

pole site solution for multi-sector CPRI out to maximize pole site value

RRU cascading for hotspots


2-sector site solution commercial Street L1.8G BTS3912E L2.1G Book RRU

Cell 1 Cell 2

New frequency for capacity


3-sector site solution square / suburb RRU cascading for coverage
L1.8G BTS3912E L1.8G Book RRU L1.8G Book RRU

Cell 1 Cell 2 Cell 3

SFN for high network quality

Huawei Technologies Co. ,Ltd| 61


BTS3911E: the 1st Multi-band & Multi-mode Micro BTS in Industry

BTS3911E
multi mode multi band High integration
2*2*5W
multi mode: UMTS&LTE One box with 2 built-in optical ports
<10L/11Kg multi band: 1.8+2.1/PCS+AWS/900M and electrical ports

RRU cascade for


capacity & coverage extension

BTS3911E Wi-Fi Large capacity


Book RRU-1 Book RRU-2
External Wi-Fi for expansion LTE only: 3 carriers
802.11 ac/b/g/n, 2.4GHZ&5GHZ UMTS only: 4 carriers
3*3 MIMO UMTS&LTE: 4U+2L
CA: 3*20MHz

Huawei Technologies Co. ,Ltd| 62


Smooth Evolution Design, 50% TCO Saving

UMTS/LTE
+
Wi-Fi
LTE 2.1G extend Wi-Fi
+ module
UMTS 2.1G LTE 1.8G
+
LTE 1.8G software
hardware upgrade
UMTS 2.1G/ ready
LTE1.8G
Wi-Fi
802.11 ac/b/g/n
3*3 MIMO
2.4Ghz&5Ghz

capacity

UMTS only/LTE only UMTS+LTE LTE+LTE UMTS/LTE + Wi-Fi

Huawei Technologies Co. ,Ltd| 63


Flexible Power Backup for Small Cell Power Supply

flexible support AC/DC &AC/AC


blade power
Micro Micro Micro
Li-Battery :
IBBS20L-E
2-6 H* power backup
AC/DC Unit :
OPM30M

AC Input
natural cooling low failure

* 2 hours for 3 Micro, 6 hours for 1 BTS

Huawei Technologies Co. ,Ltd| 64


Rich Backhaul Solution for Diversified Scenario

wired backhaul full-band wireless backhaul

LTE relay
LTE TDD
LTE FDD
NLOS,P2MP,out-band

OPT1
CPRI OPT0 unlicensed NLOS,PTP/PMP microwave
Abundant
DBG
EXT- ETH1 Backhaul 450Mbps 4.9-6 GHz
ALM ETH0 xDSL/xPON/FTTX Solution <2Km
unlicensed LOS V-Band microwave
600Mbps
60GHz
300m
rich transmission Interface
lite licensed E-Band microwave
xPON SFP Electrical FE/GE(PoE)
xDSL 4Gbps 80GHz
Optical FE/GE CPRI 3km
2Gbps 6~42GHz

Huawei Technologies Co. ,Ltd| 65


V-band: High QoS Wireless Backhaul Solution

the high QoS backhaul solution V-band


V-band: unlicensed
working band

v-band
Small cell link distance: 300m
v-band
large capacity
small cell
small cell high QoS
v-band

v-band microwave
macro bts
v-band RTN 360
unlicensed wideband: 59~64GHz,
small cell
800Mbps
installation in 15 min
zero touch, easy to use

Huawei Technologies Co. ,Ltd| 66


Multi-band & Mode for Smooth Evolution in Thailand

dense area, Thailand smooth evolution with 30% TCO saving

multi-mode & multi-band


single-mode/band
UMTS 2.1G + LTE 1.8G
UMTS 2.1G

commercial street CBD tourist spot


2015 2016
lamp / electrical pole site BTS3911E for UMTS hotspot 1.8G LTE will be deployed
and weak coverage for CA

better experience with UMTS Micro

DL peak speed

17.28Mbps

UP peak speed

multi-sector optical backhaul reuse power 4.81Mbps

Huawei Technologies Co. ,Ltd| 67


More Traffic Improving, More Revenue Increasing

rural area, Kuwait 25%+ traffic improvement & 20%+ on-load

capacity demand gain: 26%


on-load: 23%
6m-tall on lamp pole gain: 25%
microwave for backhaul on-load: 25% gain: 50%
on-load: 21%
sharing electrical power

with pole

total traffic
capacity Site VIP Site coverage Site
L1800 co-carrier and middle-far point deployment Macro Macro+Micro Micro

Huawei Technologies Co. ,Ltd| 68


Strict Requirement for Radio Unite in Residential Area

hard to installation 5 Months negotiation time of new site


acquisition @China.

100,000+ USD fee of rooftop site


hard to acquisition acquisition @Abuja, Nigeria.

5%+ rate of site losses for residents


complaint and resisting @Worldwide
hard to approach
No radiation in the
residential district

Huawei Technologies Co. ,Ltd| 69


VillaRadio: Breakthrough for Deep Residential Coverage

solution 1 solution 2
Book RRU Book RRU
GSM UMTS&LTE
Book RRU optical fiber
BBU With -48V Power
RHUB & DCDU

DCU
Book RRU Cluster RF cable
power back-up
GSM RRU
one CPRI port for Book RRUs cascading Macro RRU

precise coverage for weak coverage economic deep coverage for residential
01 02
flexible deployment with slim size Co-BBU with Macro and VillaRadio
HetNet coordination centralize power & GSM supported

Huawei Technologies Co. ,Ltd| 70


Book RRU: Global First Invisible RRU for Residential Area

new product for hot zone coverage slimmest and highest integrated RRU

RRU3230E RRU3930E
easy saving
frequency: 1.8G frequency: 2.1G installation expense
mode: FDD LTE / GSM modeUMTS & LTE

no external antenna needed no indoor site room needed


RRU3936E
transmit power : 2*5 W no external cable needed no tower needed
Frequency: 2.6G
antenna modebuilt-in
Mode: TDD LTE Only
(11dBi) / external

fast hetNet
deployment collaboration
small size 32 vertical beam light weight
easy for site acquisition SFN and Co-BB features with
32
less time for construction Macro site for best user experience

Huawei Technologies Co. ,Ltd| 71


Boost Deep Coverage for Residential Area

33 buildings of 7 average floors

6 Book RRUs for coverage

150m

simple deploy, easy disguise the weak coverage is improved dramatically

average average
RSRP speed rate

-93dBm 2.3X 75Mbps


20%
-112dBm
32Mbps

on pole on wall Before After Before After

Huawei Technologies Co. ,Ltd| 72


Unleash Urban Village Potential User Demand

Bangladesh, urban village unleashed user potential demand


daily Erl(one site)

Erl
186

167

11.2%
Before After

installation position coverage area


daily DL traffic

Mbytes
RSCP> -95dBm Area Ratio 37,257

31,496

5.05% 98.97%
18.3%
Before After

Huawei Technologies Co. ,Ltd| 73


Outdoor Small Cell Top 5 Hot Scenarios

residential area tourist spot

commercial street CBD suburb

x Mbps
hotspot anytime, anywhere
weak hotspot
coverage

Huawei Technologies Co. ,Ltd| 74


MANY THANKS !
Varmus quam dolor, tempura ac gravid a sit amen, Porte fermented magna.
Aliquot euismod. Varmus quam dolor, tempura ac gravid a sit amen, ported
fermented magna. Aliquot euismod.

Huawei Technologies Co. ,Ltd| 75

You might also like