SL. ACTIVITY CONTROLLING NATURE & EXTENT ACCEPTANCE CRITERIA PERSON RESP.
No. DOCUMENT OF INSP./TEST AT LOCATION
1 Pre- errection check Drawings, Visual / Physical - Wet civil works to be Engineer /
contract verification, 100% completed prior to errection of Foremen/
specification. equipment Quality Engineer

2 Equipment Manufacturer Physical, 100% - The supplied equipment shall Engineer /


Identification instruction and be as per Contract Foremen/
contract specifications and equipment Quality Engineer
specification Schedule

3 Check for completion Specificaton, Physical and visual - All works like Ducting, Piping Engineer /
of associated works Drawings, verification 100% and drain points to be completed Foremen/
Manufacturer - till the connecting piece Quality Engineer
recommendation
and ASHRAE
standard.
4 Equipment errection Contract Specs. Physical verification, - The supports should be able to Engineer /
supports & vibration Manufacturer - 100% withstand the load of the equipment Foremen/
isolators recommendation - The necessary vibration isolators Quality Engineer
and ASHRAE are to be provided as per Contract
standard. specifications/ Manufacturer's
recommendations

Work Location: Quality Engineer: Engineer / Foremen:


Remarks: Date: Date:

349620071.xls Date: January 26, 2001


XYZ Page 2 of 4

349620071.xls Date: January 26, 2001


XYZ Page 3 of 4

QC~PLAN.
Equipment Errection
Doc. No.M & E QC~Plan- 036/ REV. 0
RECORD

Inspection report
M & E QC~Form- 036-01/ REV. 0

Inspection report
M & E QC~Form- 036-01/ REV. 0

Inspection report
M & E QC~Form- 036-01/ REV. 0

Inspection report
M & E QC~Form- 036-01/ REV. 0

349620071.xls Date: January 26, 2001


XYZ Page 4 of 4

349620071.xls Date: January 26, 2001

You might also like