2349 CASES OF ASME BOILER AND PRESSURE VESSEL CODE
Approval Date: February 26, 2001
See Numeric Index for expiration and any reaffirmation dates.
Case 2349 forged in the same manner. The through-thickness
Alternative Rules for Corner Joint Fabrication properties shall be greater than or equal to the specified Section VIII, Division 1 minimum tensile properties of the material specification. (d) Welding shall be qualified in accordance with the requirements of Section IX. Inquiry: For Section VIII, Division 1 what alternative (e) In addition to the requirements in subpara. (d), rules can be applied to fabricate a corner joint to the a sample vessel shall be prepared for the weld procedure geometry of Fig. UW-13.2(d) when a + b is less than and each welding operator. The manufacturer shall 2ts when using autogenous laser welding? prepare the sample vessel with thickness and configura- tion matching the design. The corner joint shall be examined to the requirements of subpara. (f). Reply: It is the opinion of the Committee that Section (f) Corner joint welds from sample vessels shall be VIII, Division 1 flat heads can be joined to pressure shown to meet the requirements of UW-51 by 100% parts when using the following rules in lieu of meeting volumetric examination. In addition, the corner joint the a + b not less than 2ts dimensional requirement welds from sample vessels shall be cross-sectioned in when using autogenous laser welding. at least four locations including the stop-start area, (a) The weld shall be full penetration and the a etched and visually examined at a minimum 10X magni- dimension shall not be less than ts. fication. The weld and the heat-affected-zone shall be (b) The head shall be fabricated from disks cut from examined to ensure complete penetration of the joint, a forged bar product form. and show no evidence of cracks or lack of fusion. (c) In addition to the requirements of the material (g) All production welds shall be 100% visually specification, the through-thickness tensile strength and examined on the exterior per UW-35. elongation of the forged head shall be measured and (h) During production welding at least every twenty- recorded on the material test report. The testing shall fifth vessel shall be a sample vessel and evaluated to be performed to SA-370. One test specimen may repre- the requirements of subpara. (f) above. sent a group of forgings provided they are of the same (i) This Case number shall be shown on the Manufac- design, are from the same heat of material, and are turers Data Report.
529
COPYRIGHT American Society of Mechanical Engineers
Licensed by Information Handling Services COPYRIGHT American Society of Mechanical Engineers Licensed by Information Handling Services