M01: OBRAS PRELIMINARES

1 INSTALACIN DE FAENAS GLB


Total 1.00

M02: OBRA DE TOMA

2 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2


Azud 1 4 2
Muros laterales 2 1 4.96
Obra de toma sector aye
muro dique central 1 1 4
Muro de contencin lateral 1 1.6 6
Muro de proteccin lateral 1 0.6 4
Cmara de captacin 1 0.8 2
Cmara desarenador y transicin
Desarenador transicin 1 1.4 3
Cmara de llaves 1 0.9 1.05
Total
3 EXCAVACION EN ROCA M3
Muro de Proteccion tramo 1 (Izquierda) 1 4.96
Muro de Proteccion tramo 1 (Derecha) 1 6.06
Sector aye aye
Desarenador transicin 1 0.50 1.40 3.00
Cmara de llaves 1 0.50 0.90 1.05

sistema de aduccion 8" 1 0.40 0.60 415.00

4 EXCAVACION CON AGOTAMIENTO M3


MURO (autocad) 1 4.00
Obra de toma sector aye
Muro dique central 1 0.50 1.00 4.00
Muro de contencin lateral 1 0.50 1.60 6.00
Muro de proteccin lateral 1 0.50 0.60 4.00
Cmara de captacin 1 0.80 0.80 2.00
Total
5 MEJORAMIENTO BASE DE FUNDACIN HC 60% P.D. TIPO "E" M3
Obra de toma sector aye 1 0.30 3.00 4.00
Cmara desarenador y transicin sector aye
Desarenador transicin 1 0.50 1.40 3.00
Cmara de llaves 1 0.50 0.90 1.05
N Alto Ancho Largo Long.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml)

6 FUNDACIONES DE HC 50% P.D. TIPO DE "B" M3


Cuerpo azud 1 0.20 2.00 4.00
Fundacion azud 1 0.40 0.25 4.00
Fundacion Azud 1 0.80 0.50 4.00
Muro de Proteccion I ZQUIERDA 1 0.20 1.00 4.92
Muro de Proteccion DERECHA 1 0.20 1.00 6.06
Obra de toma sector aye
Muro de contencin lateral derecho 1 0.30 1.60 6.00
Muro de proteccin lateral izquierda 1 0.30 0.60 4.00
Cmara de captacin 1 0.20 0.80 2.00
Cmara desarenador y transicin sector aye
Desarenador transicin 1 0.20 1.40 3.00
Cmara de llaves 1 0.15 0.90 1.05
Total
7 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3
Cuerpo azud 1 4.00 CAD
Elevevacion muro lado izquierdo 1 4.96 CAD
Elevevacion muro lado derecho 1 6.06 CAD
Obra de toma sector aye
Muro de contencin lateral derecho 1 6.00
Muro de proteccin lateral izquierdo 1 1.70 0.30 4.00
Cmara de captacin 1 0.80 0.10 2.60
Cua cmara de captacin 1 0.80
Cmara desarenador y transicin sector aye
Desarenador transicin 1 1.20 0.20 8.00
Cmara de llaves 1 0.70 0.15 2.55
Pantalla central 1 0.80 0.10 1.00
Total
8 DIQUE TOMA TRANSVERSAL DE HA TIPO "A" M3
Obra de toma sector aye
Muro dique central 1 0.50 1.00 4.00
Muro dique central 1 0.50 0.50 4.00

9 TAPA DE HA TIPO "A" M3


Obra de toma sector aye
Tapa cmara de captacin 1 0.05 0.80 1.40
Cmara desarenador y transicin
Desarenador transicin 1 0.05 1.40 3.00
Ventana de ingreso -1 0.05 0.60 0.60

10 PROVICION Y COLOCADO ACCESORIOS CAMARA DE TRANSICION GLB


SECTOR AYE 1
1.00
11 REVOQUE DE MORTERO IMPERMEABILIZANTE M2
Cuerpo de azud 1 2.54 4
Muros de hc 2 2.00 1.4 -0.67
Total
12 PROVICION Y COLOCADO DE ACCESORIOS OBRA DE TOMA PZA
1
1.00
13 PROV. Y COLOC. GRAVA PARA PREFILTRO (10-15 MM) M3
N Alto Ancho Largo Long.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml)

1 4.00 0.50 1.00

M03: DESARENADOR
14 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2
CANAL DESARENADOR 1.00 0.50 3.00
ENTRADA AL DESARENADOR 2.00 0.70 0.60
DESARENADOR 1.00 1.95 1.85

Total
15 EXCAVACION MANUAL TERRENO SEMI DURO M3
Cuerpo azud 1 4.00 CAD
Elevevacion muros 1 4.92 CAD
Elevevacion muros 1 6.06 CAD
Total
16 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3
CANAL 1 0.5 0.1 4.17
ENTRADA AL DESARENADOR 2 0.7 0.1 0.6
DESARENADOR 1 1.4 0.15 1.85

Total
17 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3
CANAL 2 0.1 0.3 4.17
ENTRADA AL DESARENADOR 4 0.1 0.53 0.6
DESARENADOR 2 0.15 0.62 1.85

18 ACCESORIOS CMARA DESARENADORA GLB


1
1.00

M04: CAMARA ROMPE PRESION

19 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2


CAMARA 2.00 1.70 1.15

Total
20 EXCAVACION MANUAL TERRENO SEMI DURO M3
CAMARA ROMPE PRESION ramal 1 2.00
CAMARA ROMPE PRESION ramal 2 2.00
Total
21 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3
CAMA ROMPE PRESION 2 1.7 1.15 0.2

Total
22 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3
Paredes transversales 4 0.2 0.9 1.15
Paredes longitudinales 4 0.2 0.9 1.3

Total
23 ELEMENTOS DE H A M3
N Alto Ancho Largo Long.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml)

TAPA CAMARA ROMPE PRESION 2 1.5 0.06 1.15


PANTALLA CENTRAL 2 0.05 0.7 0.75

24 REVOQUE DE MORTERO + IMPERMEBILIZANTE M2


PARED INTERIOR TRANSVERSAL 4 0.75 0.9
PARED INTERIOR LONGITUDINAL 4 1.3 0.9

25 PROV.COLOC. ACCES. CMARA ROMPE PRESION GLB


2
Total 2.00

M05: ADUCCION

26 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML


TUBERIA OBRA DE TOMA - TANQUE D=3 1 432.00
TANQUE DE ALMACENAMIENTO- CAMARA DE DISTRIBUCION 1 50.00
RAMAL 1 1 1430.00
RAMAL 2 1 1340.00
RAMAL 3 1 352.00
Sistema de aduccion sector aye 3604.00 415.00
Total 4019.00
27 EXCAVACION MANUAL TERRENO SEMI DURO M3
TUBERIA OBRA DE TOMA - TANQUE D=3 1 0.60 0.40 432.00
TANQUE DE ALMACENAMIENTO- CAMARA DE DISTRIBUCION 1 0.60 0.40 50.00
RAMAL 1 1 0.60 0.40 1430.00
RAMAL 2 1 0.60 0.40 1340.00
RAMAL 3 1 0.60 0.40 352.00
PUENTE PASARELA 1 0.60 0.40 -25.00
Total 3579.00
28 CAMA DE TIERRA CERNIDA M3
LONGITUD DE EXCAVACION 1.00 0.40 0.10 3579.00
PUENTE PASARELA 25 M -1.00 0.40 0.10 25.00
TUBERIA SECTOR AYE 1.00 0.40 0.10 415.00
Total
29 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=3" (ESP-CAMP) ML
LONGITUD DE EXCAVACION 1 3579.00 3579.00
Total 3579.00
30 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=8" ML
SISTEMA ADUCCION AYE 415.00

Total 415.00
31 ANCLAJES DE HORMIGON M3
20 0.50

32 RELLENO DE TIERRA CERNIDA M3


TUBERIA DE 3" 1 0.40 0.10 3579.00
TUBERIA DE 8" SECTOR AYE 1 0.40 0.10 415.00
Total
33 RELLENO Y COMPACTADO MANUAL C/TIERRA COMUN M3
TUBERIA DE 3" 0.40 0.40 3579.00
TUBERIA DE 8" SECTOR AYE 0.40 0.40 415.00
N Alto Ancho Largo Long.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml)

Total
34 PRUEBA HIDRAULICA ML
TUBERIA DE 3" 3579.00
TUBERIA DE 8" SECTOR AYE 415.00
Total 3994.00
35 CAMARA DE DISTRIBUCION TIPO 1 PZA
2
Total 2.00
36 CAMARA DE DISTRIBUCION TIPO 2 PZA
5
Total 5.00

M06: ESTRUCTURAS ESPECIALES

37 PUENTE COLGANTE ACUEDUCTO L=25+/-5M D=3" PZA


1
Total 1.00
M07: TANQUE DE ALMACENAMIENTO
38 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2
Tanque 10.10 10.10
Camara de entrada 0.90 0.90
Camara de salida 1.95 1.05

39 EXCAVACION MANUAL TERRENO SEMI DURO M3


Tanque 0.50 10.10 10.10
Camara de entrada 0.30 0.90 0.90
Camara de salida 0.30 1.30 1.05

40 FUNDACIONES DE H C 50% P. D. TIPO "B" M3


Zapata tanque (T. Largo) 2 0.30 1.60 10.10
Zapata tanque (T. Corto) 2 0.30 1.60 7.50
Camara de entrada 1 0.10 0.90 0.90
Camara de salida 1 0.15 1.30 1.05

41 ELEVACIONES DE H C 50% P. D. TIPO "B" M3


Elevacion rectangular (T. Largo) 2 2.15 0.30 8.10
Elevacion rectangular (T. Corto) 2 2.15 0.30 7.50
Elevacion triangular 4 8.80
Camara de entrada 4 0.65 0.10 0.80
Camara de salida 1 0.60 0.15 4.10

42 SOLADURA DE PIEDRA M2
zampeado de piedra 6.90 6.90

43 LOSA DE FONDO DE H A TIPO A P/TANQUE M3


0.15 7.50 7.50

44 REVOQUE Y ENLUCIDO DE MORTERO CON IMPERMEABILIZANTE M2


Pared interna tanque 4 2.00 7.50
Losa fondo 1 7.50 7.50

45 REVOQUE EXTERIOR DE CEMENTO M2


Pared externa tanque 4 2.26 8.80
N Alto Ancho Largo Long.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml)

46 PINTURA LATEX EXTERIOR M2


Pared externa tanque 4 2.26 8.80

47 PROV. Y COLOC. ACCESORIOS TANQUE DE ALMACENAMIENTO GLB


1
1.00
GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

FATURA DE ESTUDIOS Y PROYECTOS

COMPUTOS METRICOS

MARZO, 2016

Sup. Vol.
Total
(m2) (m3)

M01: OBRAS PRELIMINARES

1.00

M02: OBRA DE TOMA

35.71
8.00
4.96

4.00
9.60
2.40
1.60

4.20
0.95
35.71
112.71
0.39 1.93
1.42 8.61

2.10
0.47

99.60

112.71
13.12
0.96 3.84

2.00
4.80
1.20
1.28
13.12
6.17
3.60

2.10
0.47
Sup. Vol.
Total
(m2) (m3)

6.17
10.70
1.60
0.40
1.60
0.98
1.21

2.88
0.72
0.32

0.84
0.14
10.70
23.44
0.67 2.68
0.64 3.17
0.64 3.88

1.50 9.00
2.04
0.21
0.24 0.19

1.92
0.27
0.08
23.44
3.00

2.00
1.00
3.00
0.25

0.06

0.21
-0.02
0.25
1.00

14.42
10.16
4.26
14.42
1.00

2.00
Sup. Vol.
Total
(m2) (m3)

2.00
2.00
M03: DESARENADOR
8.52
4.07
0.84
3.61

8.52
9.71
0.67 2.68
0.64 3.15
0.64 3.88
9.71
0.68
0.21
0.08
0.39

0.68
0.72
0.25
0.13
0.34
0.72
1.00

M04: CAMARA ROMPE PRESION

1.96
1.96

1.96
6.30
1.56 3.12
1.59 3.18
6.30
0.78
0.78

0.00
0.78
1.76
0.83
0.94

1.76
0.26
Sup. Vol.
Total
(m2) (m3)

0.21
0.05

0.26
7.38
2.7
4.68

7.38
2.00

M05: ADUCCION

4,019.00

858.96
103.68
12.00
343.20
321.60
84.48
-6.00
858.96
158.76
143.16
-1.00
16.60
158.76
3,579.00

415.00

1.00
0.1 1
1.00
159.76
143.16
16.60
159.76
639.04
572.64
66.40
Sup. Vol.
Total
(m2) (m3)

639.04
3,994.00

2.00

5.00

M06: ESTRUCTURAS ESPECIALES

1.00

07: TANQUE DE ALMACENAMIENTO


104.87
102.01
0.81
2.05
104.87
51.66
51.01
0.24
0.41
51.66
17.18
9.70
7.20
0.08
0.20
17.18
47.10
10.45
9.68
0.75 26.40
0.21
0.37
47.10
47.61
47.61
47.61
8.44
8.44
8.44
116.25
60.00
56.25
116.25
79.55
79.55
79.55
Sup. Vol.
Total
(m2) (m3)

79.55
79.55
79.55
1.00
GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

JEFATURA DE PROYECTOS MUNICIPALES

PRESUPUESTO GENERAL

PROYECTO: "CONSTRUCCION MICRORIEGO AMOTENGO"


UBICACIN: AMOTENGO
DISTRITO: 8
PROYECTISTA: ING. NEIVA PAMELA BALDIVIEZO P.
FECHA: MARZO, 2016

PRECIO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO

M01: OBRAS PRELIMINARES

1 INSTALACIN DE FAENAS GLB 1.00 794.94

M02: OBRA DE TOMA

2 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 35.71 13.07


3 EXCAVACION EN ROCA M3 112.71 163.91
4 EXCAVACION CON AGOTAMIENTO M3 13.12 166.97
5 MEJORAMIENTO BASE DE FUNDACIN HC 60% P.D. TIPO "E" M3 6.17 569.61
6 FUNDACIONES DE HC 50% P.D. TIPO DE "B" M3 10.70 680.56
7 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 23.44 967.15
8 DIQUE TOMA TRANSVERSAL DE HA TIPO "A" M3 3.00 1,863.98
9 TAPA DE HA TIPO "A" M3 0.25 2,909.65
10 PROVICION Y COLOCADO ACCESORIOS CAMARA DE TRANSICION GLB 1.00 5,876.06
11 REVOQUE DE MORTERO IMPERMEABILIZANTE M2 14.42 173.04
12 PROVICION Y COLOCADO DE ACCESORIOS OBRA DE TOMA PZA 1.00 1,288.25
13 PROV. Y COLOC. GRAVA PARA PREFILTRO (10-15 MM) M3 2.00 295.46

M03: DESARENADOR

14 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 8.52 13.07


15 EXCAVACION MANUAL TERRENO SEMI DURO M3 9.71 111.05
16 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3 0.68 680.56
17 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 0.72 967.15
18 ACCESORIOS CMARA DESARENADORA GLB 1.00 1,016.78

M04: CAMARA ROMPE PRESION

19 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 1.96 13.07


20 EXCAVACION MANUAL TERRENO SEMI DURO M3 6.30 111.05
21 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3 0.78 680.56
22 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 1.76 967.15
23 ELEMENTOS DE H A M3 0.26 1,399.24
24 REVOQUE DE MORTERO + IMPERMEBILIZANTE M2 7.38 173.04
25 PROV.COLOC. ACCES. CMARA ROMPE PRESION GLB 2.00 2,110.23

M05: ADUCCION

26 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 4019.00 4.94


27 EXCAVACION MANUAL TERRENO SEMI DURO M3 858.96 111.05
28 CAMA DE TIERRA CERNIDA M3 158.76 69.41
29 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=3" (ESP-CAMP) ML 3579.00 67.47
GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

JEFATURA DE PROYECTOS MUNICIPALES

PRESUPUESTO GENERAL

PROYECTO: "CONSTRUCCION MICRORIEGO AMOTENGO"


UBICACIN: AMOTENGO
DISTRITO: 8
PROYECTISTA: ING. NEIVA PAMELA BALDIVIEZO P.
FECHA: MARZO, 2016

PRECIO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO
30 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=8" ML 415.00 247.47
31 ANCLAJES DE HORMIGON M3 1.00 1,113.97
32 RELLENO DE TIERRA CERNIDA M3 159.76 69.41
33 RELLENO Y COMPACTADO MANUAL C/TIERRA COMUN M3 639.04 111.05
34 PRUEBA HIDRAULICA ML 3994.00 3.50
35 CAMARA DE DISTRIBUCION TIPO 1 PZA 2.00 2,814.37
36 CAMARA DE DISTRIBUCION TIPO 2 PZA 5.00 1,812.31

M06: ESTRUCTURAS ESPECIALES

37 PUENTE COLGANTE ACUEDUCTO L=25+/-5M D=3" PZA 1.00 12,277.32

M07: TANQUE DE ALMACENAMIENTO

38 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 104.87 13.07


39 EXCAVACION MANUAL TERRENO SEMI DURO M3 51.66 111.05
40 FUNDACIONES DE H C 50% P. D. TIPO "B" M3 17.18 680.56
41 ELEVACIONES DE H C 50% P. D. TIPO "B" M3 47.10 1,346.90
42 SOLADURA DE PIEDRA M2 47.61 79.06
43 LOSA DE FONDO DE H A TIPO A P/TANQUE M3 8.44 2,183.38
44 REVOQUE Y ENLUCIDO DE MORTERO CON IMPERMEABILIZANTE M2 116.25 173.04
45 REVOQUE EXTERIOR DE CEMENTO M2 79.55 141.68
46 PINTURA LATEX EXTERIOR M2 79.55 53.26
47 PROV. Y COLOC. ACCESORIOS TANQUE DE ALMACENAMIENTO GLB 1.00 11,153.99

COSTO TOTAL DEL PROYECTO (Bs.)

Son: OCHOCIENTOS VEINTE Y NUEVEMILNOVECIENTOS SEIS 68/100 Bolivianos

Ing. Neiva Pamela Baldiviezo P.


PROFESIONAL DE DISEO G.A.M.S.
PLAZO
REFERENCIAL

153 DAS

COSTO
TOTAL

794.94

794.94

71,167.98

466.73
18,474.30
2,190.65
3,514.49
7,281.99
22,670.00
5,591.94
727.41
5,876.06
2,495.24
1,288.25
590.92

3,365.57

111.36
1,078.30
462.78
696.35
1,016.78

8,819.56

25.62
699.62
530.84
1,702.18
363.80
1,277.04
4,220.46

582,273.67

19,853.86
95,387.51
11,019.53
241,475.13
PLAZO
REFERENCIAL

153 DAS

COSTO
TOTAL
102,700.05
1,113.97
11,088.94
70,965.39
13,979.00
5,628.74
9,061.55

12,277.32

12,277.32

151,207.64

1,370.65
5,736.84
11,692.02
63,438.99
3,764.05
18,427.73
20,115.90
11,270.64
4,236.83
11,153.99

829,906.68
GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

JEFATURA DE PROYECTOS MUNICIPALES

CUADRO DE COTIZACION

PROYECTO: "CONSTRUCCION MICRORIEGO AMOTENGO" DISTRITO :


UBICACION: AMOTENGO FECHA:

DATOS DEL PROPONENTE PLAZO


Nombre y Apellidos: PROPONENTE

C.I.: NIT.: Fono:

PRECIO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO

M01: OBRAS PRELIMINARES

1 INSTALACIN DE FAENAS GLB 1.00

M02: OBRA DE TOMA

2 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 35.71


3 EXCAVACION EN ROCA M3 112.71
4 EXCAVACION CON AGOTAMIENTO M3 13.12
5 MEJORAMIENTO BASE DE FUNDACIN HC 60% P.D. TIPO "E" M3 6.17
6 FUNDACIONES DE HC 50% P.D. TIPO DE "B" M3 10.70
7 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 23.44
8 DIQUE TOMA TRANSVERSAL DE HA TIPO "A" M3 3.00
9 TAPA DE HA TIPO "A" M3 0.25
10 PROVICION Y COLOCADO ACCESORIOS CAMARA DE TRANSICION GLB 1.00
11 REVOQUE DE MORTERO IMPERMEABILIZANTE M2 14.42
12 PROVICION Y COLOCADO DE ACCESORIOS OBRA DE TOMA PZA 1.00
13 PROV. Y COLOC. GRAVA PARA PREFILTRO (10-15 MM) M3 2.00

M03: DESARENADOR

14 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 8.52


15 EXCAVACION MANUAL TERRENO SEMI DURO M3 9.71
16 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3 0.68
17 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 0.72
18 ACCESORIOS CMARA DESARENADORA GLB 1.00

M04: CAMARA ROMPE PRESION

19 REPLANTEO (EXTRUCTURAS Y EDIFICACIONES) M2 1.96


20 EXCAVACION MANUAL TERRENO SEMI DURO M3 6.30
21 FUNDACIONES DE HO CO 50% P.D. TIPO "B" M3 0.78
22 ELEVACIONES DE HO CO 50% P.D. TIPO "B" M3 1.76
23 ELEMENTOS DE H A M3 0.26
24 REVOQUE DE MORTERO + IMPERMEBILIZANTE M2 7.38
25 PROV.COLOC. ACCES. CMARA ROMPE PRESION GLB 2.00

M05: ADUCCION

26 REPLANTEO Y CONTROL DE LINEAS DE TUBERIA ML 4,019.00


27 EXCAVACION MANUAL TERRENO SEMI DURO M3 858.96
28 CAMA DE TIERRA CERNIDA M3 158.76
GOBIERNO AUTNOMO MUNICIPAL DE SUCRE

JEFATURA DE PROYECTOS MUNICIPALES

CUADRO DE COTIZACION

PROYECTO: "CONSTRUCCION MICRORIEGO AMOTENGO" DISTRITO :


UBICACION: AMOTENGO FECHA:

DATOS DEL PROPONENTE PLAZO


Nombre y Apellidos: PROPONENTE

C.I.: NIT.: Fono:

PRECIO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO

29 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=3" (ESP-CAMP) ML 3,579.00


30 PROVISION Y TENDIDO DE TUBERIA PVC E-40 D=8" ML 415.00
31 ANCLAJES DE HORMIGON M3 1.00
32 RELLENO DE TIERRA CERNIDA M3 159.76
33 RELLENO Y COMPACTADO MANUAL C/TIERRA COMUN M3 639.04
34 PRUEBA HIDRAULICA ML 3,994.00
35 CAMARA DE DISTRIBUCION TIPO 1 PZA 2.00
36 CAMARA DE DISTRIBUCION TIPO 2 PZA 5.00

M06: ESTRUCTURAS ESPECIALES

37 PUENTE COLGANTE ACUEDUCTO L=25+/-5M D=3" PZA 1.00

M07: TANQUE DE ALMACENAMIENTO

38 REPLANTEO (ESTRUCTURAS Y EDIFICACIONES) M2 104.87


39 EXCAVACION MANUAL TERRENO SEMI DURO M3 51.66
40 FUNDACIONES DE H C 50% P. D. TIPO "B" M3 17.18
41 ELEVACIONES DE H C 50% P. D. TIPO "B" M3 47.10
42 SOLADURA DE PIEDRA M2 47.61
43 LOSA DE FONDO DE H A TIPO A P/TANQUE M3 8.44
44 REVOQUE Y ENLUCIDO DE MORTERO CON IMPERMEABILIZANTE M2 116.25
45 REVOQUE EXTERIOR DE CEMENTO M2 79.55
46 PINTURA LATEX EXTERIOR M2 79.55
47 PROV. Y COLOC. ACCESORIOS TANQUE DE ALMACENAMIENTO GLB 1.00

COSTO PARCIAL DEL PROYECTO