1. Installation of Feeder Breakers, ratings as per drawing with corresponding conductor size.
2. Guard House, Staff House 1 and Staff house 2 will be tapped at 200A breaker.
Transformer
3 x 100KVA
3. Canteen and tool room will be tapped at a source near the area, as per actual.
Oil Filled
4. Machine shop, Machine Repair area, Industrial and truck parts and upholstery feeders
can be modified as per actual condition. These feeders can be grouped by area to
E

minimize/lessen circuit breaker and conductor. (example, Machine shop and industrial
2x500mm2
parts feeder can be combined or grouped as one circuit. Machine Repair Area and
Upholstery can be combined or grouped as one circuit)
G
Main breaker
800A
5. To branch out from Production breaker to feeders, feeder tapping is permissible.
3Pole CB
2x500mm2
D

Pull Box/Junction box


Production Breaker
MTS
300mm2 500mm2
200A 200A 600A
3Pole CB 3Pole CB 3Pole CB
C

500mm2
Pull Box/Junction box
185mm2
Guard House Staff House 1 Staff House 2 Admin
B

200A 100A 80A 120A


3Pole CB 3Pole CB 3Pole CB 3Pole CB
185mm2 120mm2 35mm2 120mm2
Machine Shop Machine Repair Area Industrial and Truck Upholstery Canteen Tool Room
Parts
A

SHEET:
CLIENT PROJECTS: CONTENTS: 01 CAD: SCALE:

REVISION
C ONE Electrical Modification 02
PROJECT MANAGER: DESIGNED:
03 OF SHEET:
APPROVED: DWG. NO.
04
QR-DSN-002 EFFECTIVITY: 01/20/14 LOR/ RFQ:
LOCATION: 05 DATE: