Professional Documents
Culture Documents
Energy
September 2016 Service
COmpany
CORE BUSINESS DI AURA ENERGY
Nuova mission
Aura Energy installed and distributed in Italy and abroad energy power products
for many different applications.
Aura Energy has been operating in the photovoltaic sector since 2009, working in
many Italian regions and realizing in the 2010 the 80% of the photovoltaic plants
above 100Kw of Liguria.
AURA ENERGYS CORE BUSINESS
A new mission
Since 2011 Aura Energy, following the changes of renewal energy market, has been
offering to its customers several integrated services targeted to energy saving
An E.S.Co offers an Integrated Service which endure the Whole Life of the
intervention, not only operating in the part of technical realization, but also for the
part concerning the economic and financial sphere.
Example of EPC
Contract
Fonte: Enea
Example Hotel
Possible Intervention of energy efficiency that could be realized in an Hotel, with a prospect of the
timing of the intervention and a cost-benefit analysis.
Timing an cost-
benefit analysis
Ordinary activity
Installation of a monitoring system Monitoring consumptions is the only way to record and verify their tendency to
that records consumptions of electric increase or decrease. This action in allows also to identify inefficency of the energy
energy , natural gas, and water system of the company.
Specific training of the employees According to Aura Energy is extremely important proceed to a specific training of
the personnel of the company targeted to modify his behavior in a more efficient
and green way. During the training period is important to introduce some
moments where the new behavior are clarified and suggestions analyzed.
Switch off of the lights and Where is not possible to install a domotic system, it would be necessary to institute
acclimatization once the room is left a procedure of the switching off of the lights and acclimatization systems once
rooms are empty.
Periodical test of the electrical energy The power factor of the electrical installations is realized when reaches a value such
system efficiency as to introduce low performance disadvantages for the energy supplier and the
user.
Periodical test of the UTA efficiency The non perfect cleaning of batteries and heat exchangers could compromise the
system efficiency
.
Extraordinary activity
Lighting system;
Identification of savings Heating system;
Water depuration system;
Pool cover
Cogeneration system;
Identification of Photovoltaic plant;
production system Solar Plant.
Photovoltaic Plant
234.000kWh/year energy produced;
Savings in electrical energy purchase
Cogeneration System
145.400kWh/year of electrical energy produced;
345.400kWh/year of heat energy produced;
Savings in energy purchase
THANK YOU FOR YOUR ATTENTION
CONTACT:
m.dagna@auraenergy.it
www.auraenergy.it