You are on page 1of 6

ROAD PROJECT : FOUR LANING OF JETPUR-GONDAL-RAJKOT SECTION OF NH-8B

BETWEEN KM 117 TO KM 185.

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


INDEPENDENT CONSULTANT : SAI CONSULTING ENGINEERS PVT. LTD.
CONCESSIONAIRE : WEST GUJARAT EXPRESSWAY LTD.
CONTRACTOR :Dineshchandra R. Agrawall Infracon Pvt. Ltd.

SIEVE ANALYSIS OF FINE AGGREGATE FOR CONCRETE (AS PER IS 383 - 1970)

LOCATION : AT OUR LAB AT KM 142.500


SOURCE OF SAND - BHOGAVA RIVER
DATE OF SAMPLING & TESTING - 24/03/06
WT. OF SAMPLE - 1550 g
I.D. No.- C-23

CUMM.
WEIGHT (%)
IS SIEVE SIZE WEIGHT (%) PASSING ZONE -I ZONE -II ZONE -III
RETAINED RETAINED
RETAINED
10MM 0 0 0.00 100.00 100 100 100

4.75MM 64 64 4.13 95.87 90-100 90-100 90-100

2.36MM 49 113 7.29 92.71 60-95 75-100 85-100

1.18MM 187 300 19.35 80.65 30-70 55-90 75-100

0.60MM 523 823 53.10 46.90 15-34 35-59 60-79

0.30MM 620 1443 93.10 6.90 20-30 .8-30 .12-40

0.15MM 80 1523 98.26 1.74 .1-10 .1-10 .1-10

275.23
FM = 2.75

Test confirms Zone II.

Contractor Representative PMC Representative IC Representative


ROAD PROJECT : FOUR LANING OF JETPUR-GONDAL-RAJKOT SECTION OF
NH-8B BETWEEN KM 117 TO KM 185.

CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA


INDEPENDENT CONSULTANT : SAI CONSULTING ENGINEERS PVT. LTD.
CONCESSIONAIRE : WEST GUJARAT EXPRESSWAY LTD.
CONTRACTOR :Dineshchandra R. Agrawall Infracon Pvt. Ltd.

SPECIFIC GRAVITY OF FINE AGGREGATE

LOCATION : AT OUR LAB AT KM 142.500


SOURCE OF SAND - BHOGAVA RIVER
DATE OF SAMPLING & TESTING - 25/03/06
WT. OF SAMPLE - 1550 g
I.D. No.- C-23

TYPE OF AGGREGATE : SAND

Description of sample Test I Test II Test III Average


C = Weight of pyconometer (gms) 700.00 700.00 700.0

D = Weight of SSD sample (gms) 312.00 307.00 401.00

E = Weight of oven dry sample (gms) 308.00 302.00 398.0

F = Weight of pyconometer + water (gms) 1489.00 1489.00 1489.0

H = Weight of pyconometer + SSD sample + water (gms) 1680.00 1678.00 1734.0

I = D + F - H (gms) 121.000 118.0 156.0

L = Ovendry Bulk Specific Gravity, E/I 2.545 2.559 2.551 2.552

M = SSD Bulk Specific Gravity, D/I 2.579 2.602 2.571 2.584

N = Apparent Specific Gravity, E/I - (D - E) 2.632 2.673 2.601 2.635

O = Effective Specific Gravity, (L + N)/2 2.589 2.616 2.576 2.594

P = Water absorption, percentage, 100 X (D - E)/E 1.30 1.66 0.75 1.236

Contractor representative Consultant representative


ROAD PROJECT : FOUR LANING OF JETPUR-GONDAL-RAJKOT SECTION OF NH-8B
BETWEEN KM 117 TO KM 185.
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
INDEPENDENT CONSULTANT : SAI CONSULTING ENGINEERS PVT. LTD.
CONCESSIONAIRE : WEST GUJARAT EXPRESSWAY LTD.
CONTRACTOR :Dineshchandra R. Agrawall Infracon Pvt. Ltd.

SIEVE ANALYSIS OF COARSE AGGREGATE FOR CONCRETE (AS PER IS 383 - 1970)

LOCATION : AT OURCAMP AT KM 137


SOURCE - D.R.A. CRUSHER
DATE OF SAMPLING & TESTING - 24/03/06
MATERIAL TYPE : 20 MM
I.D. No.- C-22
SAMPLE - 1
WT. OF SAMPLE - 23762 GM
CUMM.
WEIGHT (%) AS PER IS
IS SIEVE SIZE WEIGHT (%) PASSING
RETAINED RETAINED 383
RETAINED
40MM 0 0 0.00 100.00 100
20MM 3065 3065 12.90 87.10 85-100
10MM 20365 23430 98.60 1.40 0-20
4.75MM 237 23667 99.60 0.40 0-5

SAMPLE - 2
WT. OF SAMPLE - 23485 GM
CUMM.
WEIGHT (%) AS PER IS
IS SIEVE SIZE WEIGHT (%) PASSING
RETAINED RETAINED 383
RETAINED
40MM 0 0 0.00 100.00 100
20MM 3003 3003 12.79 87.21 85-100
10MM 20372 23375 99.53 0.47 0-20
4.75MM 110 23485 100.00 0.00 0-5

AVERAGE OF 1 & 2
AVG. OF 1 (%) PASSING
IS SIEVE SIZE SAMPLE -1 SAMPLE -2
&2 LIMIT
40MM 100.00 100.00 100.00 100.00

20MM 87.10 87.21 87.16 85-100

10MM 1.40 0.47 0.93 0-20

4.75MM 0.40 0.00 0.20 0-5


Contractor Representative PMC Representative IC Representative
ROAD PROJECT : FOUR LANING OF JETPUR-GONDAL-RAJKOT SECTION OF NH-8B
BETWEEN KM 117 TO KM 185.
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
INDEPENDENT CONSULTANT : SAI CONSULTING ENGINEERS PVT. LTD.
CONCESSIONAIRE : WEST GUJARAT EXPRESSWAY LTD.
CONTRACTOR :Dineshchandra R. Agrawall Infracon Pvt. Ltd.

SIEVE ANALYSIS OF COARSE AGGREGATE FOR CONCRETE (AS PER IS 383 - 1970)

LOCATION : AT OURCAMP AT KM 137


SOURCE - D.R.A. CRUSHER
DATE OF SAMPLING & TESTING - 24/03/06
MATERIAL TYPE : 10MM
I.D. No.- C-24
SAMPLE - 1
WT. OF SAMPLE - 24042GM
CUMM.
WEIGHT (%) AS PER IS
IS SIEVE SIZE WEIGHT (%) PASSING
RETAINED RETAINED 383
RETAINED
20MM 0 0 0.00 100.00 100
10MM 3322 3322 13.82 86.18 85-100
4.75MM 18224 21546 89.62 10.38 0-20

2.36MM 1995 23541 97.92 2.08 0-5

SAMPLE - 2
WT. OF SAMPLE - 18282GM
CUMM.
WEIGHT (%) AS PER IS
IS SIEVE SIZE WEIGHT (%) PASSING
RETAINED RETAINED 383
RETAINED
20MM 0 0 0.00 100.00 100
10MM 2546 2546 13.93 86.07 85-100
4.75MM 13832 16378 89.59 10.41 0-20

2.36MM 1623 18001 98.46 1.54 0-5

AVERAGE OF 1 & 2
AVG. OF 1 (%) PASSING
IS SIEVE SIZE SAMPLE -1 SAMPLE -2
&2 LIMIT
20MM 100.00 100 100.00 100.00

10MM 86.18 86.07 86.13 85-100

4.75MM 10.38 10.41 10.40 0-20

2.36MM 2.08 1.54 1.81 0-5

Contractor Representative PMC Representative IC Representative


ROAD PROJECT : FOUR LANING OF JETPUR-GONDAL-RAJKOT SECTION
OF NH-8B BETWEEN KM 117 TO KM 185.
CLIENT : NATIONAL HIGHWAYS AUTHORITY OF INDIA
INDEPENDENT CONSULTANT : SAI CONSULTING ENGINEERS PVT. LTD.
CONCESSIONAIRE : WEST GUJARAT EXPRESSWAY LTD.
CONTRACTOR :Dineshchandra R. Agrawall Infracon Pvt. Ltd.

All in AGGREGATE FOR CONCRETE (AS PER IS 383 - 1970)

LOCATION : AT OURCAMP AT KM 137


SOURCE - D.R.A. CRUSHER & Bhogava River
DATE OF SAMPLING & TESTING - 24/03/06
MATERIAL TYPE : 10mm, 20 mm, Sand

AS PER
IS SIEVE
20 mm 10 mm SAND 20 mm 10 mm SAND IS
SIZE TOTAL 383
15% 45% 40%
40MM 100.00 100.00 100.00 15 45 40 100 100.00
20MM 100.00 100.00 100 15 45 40 100 95 - 100
4.75MM 0.93 10.40 95.87 0.14 4.68 38.35 43.17 30 - 50
0.600MM 0.00 0.00 46.9 0.00 0.00 18.76 18.76 10--30
0.150 MM 0.00 0.00 1.74 0.00 0.00 0.70 0.70 0-6

Contractor Representative PMC Representative IC Representative