Scheduling/Leveling Report - 14-Mar-17 - PM.

exe
===============================================
Default Project..................................................HoganPr
oject
Projects:
HoganProject....................................................
.Hogan Building Project
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................Yes
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................Yes
Recalculate assignment costs after scheduling ...................Yes
When scheduling progressed activities use .......................Retaine
d Logic
Calculate start-to-start lag from ...............................Early S
tart
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish
Float
Calculate float based on finish date of .........................Each pr
oject
Calendar for scheduling Relationship Lag ........................Predece
ssor Activity Calendar
Preserve scheduled early and late dates..........................Yes
Level resources only within activity Total Float.................No
Level Priority 1.................................................Activit
y Leveling Priority - Ascending
Level all resources..............................................Yes
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................30
# Not Started....................................................1
# In Progress....................................................28
# Completed......................................................1
# Relationships..................................................39
# Activities with Constraint.....................................0
Errors:
-------
Warnings:
---------
Activities without predecessors..................................1
Project: HoganProject Activity: A1000 Begin Co
nstruction
Activities without successors....................................1
Project: HoganProject Activity: A1290 Complete
Construction
Out-of-sequence activities.......................................26
Project: HoganProject Activity: A1010 Site Pre
paration
Project: HoganProject Activity: A1020 Excavati
on
Project: HoganProject Activity: A1030 Install
Underground Water Lines
Project: HoganProject Activity: A1040 Install
Electrical Underground Conduit
Project: HoganProject Activity: A1050 Form/Pou
r Concrete Footing
Project: HoganProject Activity: A1060 Form/Pou
r Concrete Walls
Project: HoganProject Activity: A1070 Form/Pou
r Concrete Slab
Project: HoganProject Activity: A1080 Backfill
& Compact Fills
Project: HoganProject Activity: A1090 Erect St
ructural Frame
Project: HoganProject Activity: A1100 Floor De
cking
Project: HoganProject Activity: A1110 Form/Pou
r Basement Slab
Project: HoganProject Activity: A1120 Erect St
airwall & Elevator Wall
Project: HoganProject Activity: A1150 Rough in
Plumbing, M/E
Project: HoganProject Activity: A1160 Install
Wiring & Cable
Project: HoganProject Activity: A1170 Install
elevator Equipment
Project: HoganProject Activity: A1180 Install
elevator cabinet
Project: HoganProject Activity: A1190 Brick ex
terior walls
Project: HoganProject Activity: A1210 Insulati
on Builtup roofing
Project: HoganProject Activity: A1220 Drywall
in office
Project: HoganProject Activity: A1230 Painting
Building Interior
Project: HoganProject Activity: A1240 Install
Plumbng Fixtures
Project: HoganProject Activity: A1250 Install
Lighting Fixtures
Project: HoganProject Activity: A1260 Install
Carpeting
Project: HoganProject Activity: A1270 Install
Floors
Project: HoganProject Activity: A1280 Punchlis
t Finish
Project: HoganProject Activity: A1290 Complete
Construction
Activities with Actual Dates > Data Date.........................29
Project: HoganProject Activity: A1010 Site Pre
paration
Project: HoganProject Activity: A1020 Excavati
on
Project: HoganProject Activity: A1030 Install
Underground Water Lines
Project: HoganProject Activity: A1040 Install
Electrical Underground Conduit
Project: HoganProject Activity: A1050 Form/Pou
r Concrete Footing
Project: HoganProject Activity: A1060 Form/Pou
r Concrete Walls
Project: HoganProject Activity: A1070 Form/Pou
r Concrete Slab
Project: HoganProject Activity: A1080 Backfill
& Compact Fills
Project: HoganProject Activity: A1090 Erect St
ructural Frame
Project: HoganProject Activity: A1100 Floor De
cking
Project: HoganProject Activity: A1110 Form/Pou
r Basement Slab
Project: HoganProject Activity: A1120 Erect St
airwall & Elevator Wall
Project: HoganProject Activity: A1130 Install
Interior Frame
Project: HoganProject Activity: A1140 Set M/E
Equipment
Project: HoganProject Activity: A1150 Rough in
Plumbing, M/E
Project: HoganProject Activity: A1160 Install
Wiring & Cable
Project: HoganProject Activity: A1170 Install
elevator Equipment
Project: HoganProject Activity: A1180 Install
elevator cabinet
Project: HoganProject Activity: A1190 Brick ex
terior walls
Project: HoganProject Activity: A1200 Install
ext. doors & windows
Project: HoganProject Activity: A1210 Insulati
on Builtup roofing
Project: HoganProject Activity: A1220 Drywall
in office
Project: HoganProject Activity: A1230 Painting
Building Interior
Project: HoganProject Activity: A1240 Install
Plumbng Fixtures
Project: HoganProject Activity: A1250 Install
Lighting Fixtures
Project: HoganProject Activity: A1260 Install
Carpeting
Project: HoganProject Activity: A1270 Install
Floors
Project: HoganProject Activity: A1280 Punchlis
t Finish
Project: HoganProject Activity: A1290 Complete
Construction
Milestone Activities with invalid relationships..................0
Finish milestone and predecessors have different calendars.......0
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................30
# Relationships with other projects..............................0
Data Date........................................................14-Mar-
17
Earliest Early Start Date........................................14-Mar-
17
Latest Early Finish Date.........................................02-Oct-
17
Exceptions:
-----------
Critical Activities..............................................19
Project: HoganProject Activity: A1000 Begin Co
nstruction
Project: HoganProject Activity: A1010 Site Pre
paration
Project: HoganProject Activity: A1020 Excavati
on
Project: HoganProject Activity: A1030 Install
Underground Water Lines
Project: HoganProject Activity: A1050 Form/Pou
r Concrete Footing
Project: HoganProject Activity: A1060 Form/Pou
r Concrete Walls
Project: HoganProject Activity: A1070 Form/Pou
r Concrete Slab
Project: HoganProject Activity: A1080 Backfill
& Compact Fills
Project: HoganProject Activity: A1090 Erect St
ructural Frame
Project: HoganProject Activity: A1100 Floor De
cking
Project: HoganProject Activity: A1110 Form/Pou
r Basement Slab
Project: HoganProject Activity: A1130 Install
Interior Frame
Project: HoganProject Activity: A1150 Rough in
Plumbing, M/E
Project: HoganProject Activity: A1160 Install
Wiring & Cable
Project: HoganProject Activity: A1180 Install
elevator cabinet
Project: HoganProject Activity: A1220 Drywall
in office
Project: HoganProject Activity: A1230 Painting
Building Interior
Project: HoganProject Activity: A1250 Install
Lighting Fixtures
Project: HoganProject Activity: A1280 Punchlis
t Finish
Activities with unsatisfied constraints..........................0
Activities with unsatisfied relationships........................0
Activities with external dates...................................0
Activities delayed due to predecessor delay......................0
Activities delayed due to resource leveling......................0
Activities that cannot be leveled................................1
Project: HoganProject Activity: A1010 Site Pre
paration