12mm @ 250mm O.C.

EACH WAY 12mm 600mm LONG


TRIMMER BARS
12mm @ 250mm O.C. EACH WAY
2.400

12mm @ 250mm EXTERNAL WALL 12mm @ 250mm EXTERNAL WALL


E HORIZONTAL BARS HORIZONTAL BARS
8/11
0.600
12mm @ 250mm EXTERNAL WALL 16mm @ 250mm INTERNAL 12mm @ 250mm EXTERNAL WALL
0.600

VERTICAL BARS WALL VERTICAL BARS VERTICAL BARS


12mm @ 300mm INTERNAL
WALL HORIZONTAL BARS
3.600

0.300

0.300
0.450

0.450
ROOF SLAB REINFORCEMENT
SCALE: 1 : 80 M.
12mm @ 250mm EXTERNAL WALL 12mm @ 250mm EXTERNAL WALL
VERTICAL BARS VERTICAL BARS
12mm @ 250mm O.C. EACH
WAY BARS
12mm @ 250mm O.C. EACH WAY SECTION E-E : REINFORCEMENT DETAIL
SCALE: 1 : 80 M.
tf
NIPPLE WEIR BOX
WEIR OVERFLOW PIPE
BOX 0.05
2.400

E 0.200
ELBOW 0.05 0.200
0.05
OVERFLOW PIPE
10mm RSB FIXED IN POSITION 0.05
0.25 0.05
tw
tw
3.600
BASE SLAB REINFORCEMENT DETAIL OF OVERFLOW PIPE FOR RESERVOIR
SCALE: 1 : 80 M. SCALE: N.T.S.
PREPARED BY: CHECKED BY: APPROVED BY: PROJECT TITLE / LOCATION: SHEET CONTENT/SHEET NO.: SHEET NO.
PROVINCE OF NORTHERN SAMAR
MUNICIPALITY OF CATUBIG MAURICIO R. PUJANTE RAYMUNDO J. GIRAY, JR. CE, M.ASCE HON. GALAHAD O. VICENCIO
PROPOSED REHABILITATION OF POTABLE
WATER SYSTEM LEVEL II
RESERVOIR REINFORCEMENT
DETAIL
8
Engineering Assistant Municipal Engineer Municipal Mayor Brgy Osang, Catubig, Northern Samar
MEO-CAT-PWS-DWG-OSA-0008
11