Step 01- Start Transaction IW28 for viewing notification list for selecting any particular Defect.
02
Click Execute or press F8 after
entering required fields
OR
01
Scroll down till you see planning plant & Type
T002 for Chandrapur to see notification List of
Chandrapur Only
Step 3 Select from appeared list, required notification by double clicking on Notification No. or
Description. You can change the layout of the table/list to see the required fields on screen, further you
can filter the required field columns to get the notification only for your section(Mn. Wk. Ctr.), unit no.
wise(created by). You can also sort the notification date wise etc.
02 01
05
03
You can change the layout of the table/list to see
04
the required fields on screen, further you can
filter the required field columns to get the
Double Click on notification No. or Description to notification only for your section(Mn. Wk. Ctr.),
view the notification for further processing unit no. wise(created by). You can also sort the
notification date wise etc.
Step 4 Read the notification long text, if you plan to take permit Click on Put in process icon &
confirm that Notify. Status Changes to NOPR (Notification in Process) form OSNO.
02
Check after putting in Process the
notification Status Changes to NOPR
01
Click On Put in process Icon for
releasing notification for further processing
Step 5 Click on Create icon for creating maintenance Order for current Notification.
Step 6 Check Create Order Window details which created by default & if OK Click on Continue
icon .
Step 8 Create breakdown Order Screen opens, check whether all fields on Header Data tab are filled,
and go to Operations Tab.
Step 12 Select names of persons planned to work on permit from list & hours of work they expected to
work on permit.(Note this can be done just before cancellation of permit also). After completion click
on componants Tab to proceed further.
04
Click on
components Tab
for Step No.13
Step 14 After selecting component press enter. Then fill required quantity & storage location from
which material should get issued.
03
Click on save
01 02
icon to save
maintenance order Press Enter & then fill in material
Quantity required & storage location
from which material is to be issued.
Step 15 Save the maintenance order by clicking on save icon. You will be redirected to View
notification list screen note down notification & order no as shown at left bottom corner for further
reference.
Step 16 Release maintenance order by clicking on button & note status change to REL from CRTD.
Please note here the complete process of permit system as shown in the flow chart
Maintenance Engg. first reads Notification & put it in process from IW28 Then,
Creates maintenance order on released notification, Fill in the relevant data in headers data, Operation &
components TAB
Releases the order & go to permits.
Applying permits is designed in a loop in which maintenance has to create three documents namely work
approval, Work application & Operational WCD of which
Work approval & work application are to be set prepared by maintenance engg. & save Maintenance order
which completes the permit application process.
Here work approval No refers to Permit No which is to be noted maintenance engg. & inform to operation
person for getting it issued
When Operational WCD is set prepared by Operations person & isolation are Tag & Tagged permit gets issued.
Order
Work Application
Fill header data, Work Approval
operations and Fill Applicant
select application type
Notification working / isolation.
components tab, details
IW28
save, release and
Read notification Operational
and put it in go to permits For Working permit
Set status application WCD
process
WOCO, TECO
Work Approval Work Application
Set Prepared Set Prepared Fill isolations &
set status final
Confirmation
IW41
Permit Loop
Step 18 Type WCM in window that open when clicked on permits.
Step 19 Click on A new button Work approval created on change maintenance order
screen.
Click on Create
button.
Step 21 On Create Work Approval screen go to applicant details TAB & fill in applicant details as shown
06
Click Save button
01
This will get Printed on Permit print out
05
Enter expected time required
Note: Title of work approval which gets printed on Permit print out kindly mention Working permit
for. followed by Auxiliary Name or Work description, for easy understanding of operation person.
Step 22 Note down approval no. appearing on overlapping window (to be given to operations person)
as shown below. & double click on it open work approval in change mode.
Step 23 Click on Button & then click on Create from overlapping window.
01
Click on
Button
02
Step 24 Select Application Type i.e. Working permit application for Working permit or permit without
isolation & Isolation application for any other type of permit
Note: If permit is Working permit application then no operational WCD gets created & we should
directly go to Step 37 & For Isolation Application permit, follow steps below.
Step 25 Create Work application screen gets open click on Save button.
Click on Maintenance
Screen Button to add
isolations list
Step 29 On create operational WCD mode click on first box on option button as shown in screen
shot to Either select Functional location or equipment from tree structure which is to be isolated . If
equipment to be isolated does not exist in tree structure select N & you can Type name.
Step 31 Select desired equipment from list as in this case MOP COP.
Step 33 Check Isolation added against Equipment in last step MOT centrifuge electrically Isolated (E
Off) & MOP COP suction Valve Mech. Closed (M Closed). Then press Isolation status detail Button.
01
01 02
Step 37 On Change WC application Screen click on Prepare button & click yes on overlapping
window to change status to Prepared (PREP) from Created (CRTD)
02
Step 38 Press continue Button on the overlapping window.
Step 39 On Change Work Approval Screen click on Set prepared button & then click on Yes on
overlapping.
02
Step 40 On overlapping window click on continue button.
Note: For checking Maintenance order, Work approval, Work Application & Operational WCD Status at
once for particular approval (Permit) No., to be done in WCL9 Transaction.
Step 43 Type WCL9 in command field on initial or Session manager screen & Press Enter.or click on
Enter or Double click on WCL9 shortcut in Menu.
01
Select No Approval is Issued Option
Step 45 on this screen select approval no. & click Hierarchy icon to get Hierarchy view.
02