1 TRIP Description
1 Manual trip from control room
2 Manual trip from local
3 Mechanical over speed trip
3 no. electrical over speed sensors other then speed governing
4
sensors
5 Thrust bearing excess wear trip (with triple sensors)
6 Condenser very low vacuum trip (with triple sensors)
7 Lube oil pressure very low trip (with triple sensors)
8 Control oil pressure very low trip (with triple sensors)
11 Generator trip
22 DCS trip
24 Generator Vibration HI HI
25 Hot well Level HI HI
26 Bearing Lube oil return temperature HI HI
27 MOT level LO LO
28 Main steam pressure LO LO
Turbovisory Equipment
1 Turbine Stress Evaluator
Consider by Thermax
Yes
Yes
Yes
Yes
covered in MFT
Noted
Noted
Noted
Noted
Required, TL to provide 3- sensor looped with STG
Noted
Required
Required
Noted
Noted
Noted
Noted
Noted
Noted
Noted
noted
noted
noted
noted
noted
noted
please refer point No. 9 b, MOM dated 18-02-11 at
Evonik office Noida. We request to TL kindly submit the
document as discussed. As per standard practice kindly
provide all the points taken from turbine side with
detailed logic of TSE. Also TL to confirm that TSE system
is interlocked with turbine governing system for initial
rolling, loading , unloading.