CLCULO DE FLETES
FLETE = (A+BxDv)xf/1000 0
UNI-FIC
Puente Caynarachi
PRECIO
EN OBRA
2.85
3.59
6.35
14.10
4.50
3.08
4.00
100.64
9.19
25.70
4.50
100.45
21.50
67.41
6.20
0.60
2.50
0.25
13.25
0.60
7.65
151.83
35.00
130.13
47.50
36.77
18.00
13.22
7.27
90.00
20.98
32.57
642.40
174.99
3.94
UNI-FIC
Puente Caynarachi
UNI-FIC
GASTOS GENERALES
PUENTE CAYNARACHI
(EJECUCIN POR CONTRATA)
1.04 SEGUROS
Personal Administrativo
Administrador 1.00 8.00 3,200.00 25,600.00
Asistente Administrativo 1.00 8.00 1,500.00 12,000.00
Contador 1.00 8.00 2,500.00 20,000.00
Logstico 1.00 8.00 1,400.00 11,200.00
Secretaria 1.00 8.00 1,500.00 12,000.00
Radio operador 1.00 8.00 900.00 7,200.00
Chofer 1.00 8.00 1,000.00 8,000.00
96,000.00
TOTAL GG - V1 576,243.53
INTERS DE RETENCIN
1) Tasa efectiva mercado anual TAMN a Ago 2001 (x) 22.45%
2) Tasa efectiva de ahorro a Ago 2001 (y) 8.38%
x / TR x RP x 12 = 0.009471
y / TR x RP x 12 = 0.003535
TOTAL 0.013006 (3)
Adelanto 20 %
Monto de Adelanto 20 %xN
Renovavin de Carta Fianza cada 3 meses
Tiempo de Retencin 8 meses
Nmero de trimestres 2.7 trimentre
PRIMER TRIMESTRE
2/2 (0.040 x 0.20 N x 3/12) = 0.002000
SEGUNDO TRIMESTRE
2/1 (0.040 x 0.20 N x 3/12) = 0.004000
0.006000 (4)
NOTA:SEASUMI20%
ESTRUCTURA DE COSTOS DE MANO DE OBRA
(VIGENTE DEL 01.06.04 AL 31.05.05)
PROYECTO : CARRETERA PONGO DE CAYNARACHI - BARRANQUITA - PELEJO
OBRA : CONSTRUCCIN PUENTE CAYNARACHI
FECHA : ABRIL 2005
PEON
25.63
7.69
29.23
0.92
7.20
0.40
71.07
8.88
14.26
14.26
10.97
10.97