You are on page 1of 88

PEMERINTAH KABUPATEN BATANG HARI

DINAS PEKERJAAN UMUM


JALAN SULTAN THAHA NO. TELP. 0743 - 21041
MUARA BULIAN
Kode Pos 36613

DAFTAR HARGA SATUAN UPAH, BAHAN DAN PERALATAN


DINAS : PEKERJAAN UMUM ( BIDANG CIPTA KARYA )
KABUPATEN : BATANG HARI
TAHUN ANGGARAN : 2016
DEKAT
Harga Satuan
No. Uraian Satuan Ket.
(Rp.)
1 2 3 4 5

I HARGA TENAGA KERJA Harga tidak


termasuk PPN
1 Pekerja Org/hr 65,000.00
2 Tukang Org/hr 90,000.00
3 Kepala tukang Org/hr 110,000.00
4 Mandor Org/hr 100,000.00
5 Geolistrik Org/hr 110,000.00
6 Bor Master Org/hr 90,000.00
7 Driller Org/hr 65,000.00
8 Mekanik Org/hr 65,000.00
9 Welder Org/hr 65,000.00
10 Crow Org/hr 65,000.00
Org/hr 65,000.00
II HARGA BAHAN

BAHAN PASANGAN DAN URUGAN


1 Pasir beton M3 85,000.00
2 Pasir pasang M3 85,000.00
3 Pasir urug M3 75,000.00
4 Kerikil M3 300,000.00
5 Tanah urug biasa M3 45,000.00
6 Tanah urug pilihan M3 55,000.00
7 Semen PC ( 50 Kg ) Zak 72,000.00
8 Semen PC ( 50 Kg ) Kg 1,440.00
9 Semen putih Zak 105,000.00
10 Semen putih Kg 2,625.00
11 Semen warna Kg 13,500.00
12 Air Ltr 50.00
13 Batu kali/batu belah/batu gunung M3 330,000.00
14 Split 2/3 & 3/4 M3 350,000.00

BAHAN LANTAI
1 Keramik 30x30 cm polos Ktk 56,000.00
2 Keramik 30x30 cm motif/warna Ktk 62,000.00
3 Keramik 30x30 cm anti slip / motif kulit jeruk Ktk 67,000.00
4 Keramik 10x20 cm warna Ktk 66,000.00
5 Keramik 20x20 cm polos Ktk 60,000.00
6 Keramik 20x20 cm warna Ktk 66,000.00
7 Keramik 20x25 cm polos Ktk 60,000.00
8 Keramik 20x25 cm warna Ktk 66,000.00
9 Keramik 40x40 cm motif Ktk 67,000.00
10 Keramik 40x40 cm polos Ktk 60,000.00
11 Granit 30 x 30 cm Ktk -
12 Granit 40 x 40 cm Ktk -
13 Teralux Marmer 40 x 40 cm M2 -
14 Teralux Marmer 30 x 30 cm M2 -
15 Teralux Marmer 60 x 60 cm M2 -
16 Marmer 100 x 100 cm M2 234,000.00
17 Plint keramik 10x20 cm warna Bh 12,000.00
18 Plint keramik 10x30 cm polos Bh 1,800.00
19 Plint keramik 10x30 cm Warna Bh 2,000.00
20 Plint keramik 10x40 cm polos Bh 2,600.00
21 Plint keramik 10x40 cm Warna Bh 2,900.00
22 Plint keramik 10x20 KM/WC Bh 13,000.00
23 Plint granit 10x30 cm Bh -
24 Plint granit 10x40 cm Bh -
25 Plint teralux marmer 10x30 cm Bh -
26 Plint teralux marmer 10x40 cm Bh -
27 Plint teralux marmer 10x60 cm Bh -
28 Paving block/Conblock t = 6 cm Bh 1,450.00
30 Batu Teraso Kg -
31 Porselen (11 x 11) Cm Bh -
32 Cincin keramik Biasa Bh 625.00
33 Cincin keramik Kualitas Bh 1,100.00

1 Bahan 2016
BAHAN DINDING
1 Batu bata kecil Bh 500.00
2 Batu bata bolong besar Bh 650.00
3 Conblock HB 20 Bh -
4 Conblock HB 15 Bh -
5 Conblock HB 10 Bh -
6 Beton roster 12 x 10 x 24 Cm Bh -
7 Beton roster 20 x 20 Cm Bh 10,300.00
8 Beton roster 3 0 x 30 Cm Bh 20,500.00
9 Glassblock Bh 25,000.00
10 Batu muka berwarna M2 -
11 Batu palimanan M2 200,000.00
12 Batako Bh 5,000.00
13 Batu tempel hitam M2 200,000.00

BAHAN PENUTUP LANGIT-LANGIT


1 Triplek 3.6 mm Lbr 72,000.00
2 Triplek 2.7 mm Lbr 60,000.00
3 Plywood 6 mm Lbr 105,000.00
4 Plywood 9 mm Lbr 135,000.00
5 GRC 3.6 mm Lbr 74,000.00
6 Lisplank GRC 8 mm L=10 cm Lbr 27,000.00
7 Lisplank GRC 8 mm L=20 cm Lbr 45,000.00
8 Lisplank GRC 8 mm L=30 cm Lbr 60,000.00
9 Teakwood 4 mm Lbr 110,000.00
10 Lis profil no. 7 Btg 22,500.00
11 Formika 4' x 8' Lbr 142,000.00
12 Softboard 4' x 8' x 4 mm Lbr 61,000.00
14 Gypsum board 9 mm Lbr 125,000.00
15 Ukiran Jambi ( lisplank ) M1 73,000.00
16 Tepung gipsum Kg 5,600.00
17 List propil gipsum M1 45,000.00

BAHAN PENUTUP ATAP


1 Genteng beton Bh 6,200.00
2 Genteng mantili Bh 2,250.00
3 Genteng keramik Bh 5,650.00
4 Genteng metal zincalume KW II M2 55,000.00
5 Genteng metal zincalume KW I M2 65,000.00
6 Bubungan genteng beton Bh 6,200.00
7 Bubungan genteng mantili Bh 6,000.00
8 Bubungan genteng keramik Bh -
9 Bubungan genteng metal Bh 33,000.00
10 Seng plat Lbr 43,000.00
11 Seng gelombang BJLS 20, 6' Kodi 780,000.00
12 Seng gelombang BJLS 20, 7" Kodi 870,000.00
13 Seng Metal Asoka Kodi 1,200,000.00
14 Atap aluminium Lbr -
15 Atap sirap Bh 4,000.00
16 Karpet talang hitam M' 9,000.00
17 Karpet talang merah M' 9,000.00
18 Aluminium foil M2 -
19 Talang paralon (4 m') Btg 65,000.00

BAHAN KAYU
1 Kayu balok klas I M3 6,000,000.00
2 Kayu balok klas II M3 2,150,000.00
3 Kayu reng klas II M3 2,550,000.00
4 Kayu balok klas III M3 1,935,000.00
5 Kayu papan klas I ( lisplank ) M3 8,000,000.00
6 Kayu papan klas I M3 6,000,000.00
7 Kayu papan tembesu M3 5,200,000.00
8 Kayu papan klas II M3 2,150,000.00
9 Kayu papan klas III M3 1,935,000.00
10 Kayu papan klas IV M3 1,700,000.00
11 Dolken kayu 8-10/400 Cm Btg 6,200.00
12 Kayu gelam 12/400 Cm Btg 20,500.00
13 Formtie/penjaga jarak bekisting/spacer Btg 6,200.00

BAHAN BESI / BAJA


1 Besi beton ulir kg 13,500.00
2 Besi beton polos kg 12,000.00
4 Kawat ikat beton kg 19,000.00
5 Besi baja IWF kg 16,500.00
6 Besi baja siku kg 16,500.00
7 Besi Plat Baja kg 16,500.00
8 Besi Hollo metal furing 40.40.2 Btg 155,000.00
9 Besi angker diameter 8 kg -
10 Baja profil kg 16,500.00
11 Besi Jaring Kawat Baja Kg 13,000.00
12 Besi Strip 2 x 3 Kg 13,000.00
13 Folding door M2 565,000.00
14 Jendela nako Unit -

2 Bahan 2016
15 Jaring Kawat Baja (dilas) kg -
16 Kawat bronjong kg 12,500.00
18 Kawat duri Kg 12,500.00
19 Kabel Presstressed Polos/Strands Kg 12,500.00
20 Kawat nyamuk M2 16,500.00
21 Kawat kassa M2 16,500.00
22 Kawat Burung M2 16,500.00
23 Kawat las listrik Kg 26,000.00
24 Mour dan baut 10 mm x 12 " Bh 6,750.00
25 Mour dan baut 12 mm x 12 ' Bh 7,750.00
27 Paku biasa Kg 17,000.00
28 Paku triplek Kg 21,000.00
29 Paku sekrup fixer Bh 3,200.00
30 Paku sekrup Kg 28,000.00
31 Paku beton Kg 31,000.00
32 Paku seng Kg 28,000.00
33 Paku genteng Kg 33,000.00
34 Paku GRC Kg 28,000.00
35 Pagar besi biasa M2 460,000.00
36 Pagar besi kombinasi plat lengkap M2 540,000.00
37 Pagar Besi Holo M2 485,000.00
38 Pintu pagar besi hollo M2 585,000.00
39 Teralis pintu besi ulir M2 500,000.00
40 Teralis pintu besi polos M2 450,000.00
41 Teralis jendela besi ulir M2 450,000.00
42 Teralis jendela besi polos M2 385,000.00
43 Rolling door besi M2 -

BAHAN ALMUNIUM
1 Profil Aluminium M1 77,000.00
2 Aluminium Strip M1 7,500.00
2 Rangka Pintu Alluminium M1 150,000.00
4 Sealant Tube 20,000.00
5 Pagar BRC 60x240 Cm M2 200,000.00
6 Pagar BRC 90x240 Cm M2 230,000.00
7 Pagar BRC 120x240 Cm M2 265,000.00
8 Profil kaca M1 -
9 Rangka atap baja ringan M2 130,000.00
10 Rolling door aluminium M2 385,000.00
11 Skrup Fixer Kg 28,000.00
12 Sunscreen alluminium M2 170,000.00
13 Kusen dan Pintu kamar mandi PVC Bh 850,000.00
14 Kunci pintu 2 slaag kualitas Bh 195,000.00
15 Kunci pintu 2 slaag biasa Bh 110,000.00
16 Kunci Tanam Kamar mandi Bh 65,000.00
17 Kunci Silinder Bh 55,000.00
18 Kunci selot Bh 55,000.00
19 Kunci tanam antik Bh 90,000.00
20 Kunci tanam biasa Bh 65,000.00
21 Engsel pintu Bh 13,500.00
22 Engsel jendela Bh 10,000.00
23 Tarikan pintu kualitas Bh 105,000.00
24 Tarikan pintu biasa Bh 20,000.00
25 Hak angin kualitas Bh 15,000.00
26 Hak angin biasa Bh 6,700.00
27 Tarikan jendela Bh 6,300.00
28 Grendel pintu Bh 15,300.00
29 Grendel jendela Bh 7,500.00
30 Grendel pintu Espanolete Psg -
31 Door closer Bh 160,000.00
32 Pegangan Pintu/Door Holder Bh 160,000.00
33 Door stop Bh 27,000.00
34 Door holder Bh -
35 Rel pintu dorong Bh -
36 Rolling door plastik (PVC) M2 -
37 Kunci lemari Bh 13,500.00

BAHAN SALURAN AIR


1 Pipa gip dia. 1/2" (6 m') Btg 67,000.00
2 Pipa gip dia. 3/4" (6 m') Btg 85,000.00
3 Pipa gip dia. 1" (6 m') Btg 125,000.00
4 Pipa gip dia. 1 1/2" (6 m') Btg 180,000.00
5 Pipa gip dia. 2" (6 m') Btg 225,000.00
6 Pipa gip dia. 3" (6 m') Btg 450,000.00
7 Pipa gip dia. 4" (6 m') Btg 620,000.00
8 Pipa PVC dia. 1/2" AW 1 (4 m') Btg 21,500.00
9 Pipa PVC dia. 3/4" AW 1 (4 m') Btg 28,000.00
10 Pipa PVC dia. 1" AW 1 (4 m') Btg 38,000.00
11 Pipa PVC dia. 1 1/2" AW 1 (4 m') Btg 67,500.00
12 Pipa PVC dia. 2" AW 1 (4 m') Btg 83,000.00
13 Pipa PVC dia. 2 1/2" AW 1 (4 m') Btg 120,000.00
14 Pipa PVC dia. 3" AW 1 (4 m') Btg 165,000.00
15 Pipa PVC dia. 4" AW 1 (4 m') Btg 270,000.00

3 Bahan 2016
16 Bak mandi fibre glass ( 0.3 M3 ) Bh 350,000.00
17 Tangki air fibre glass 1100 ltr Bh 1,400,000.00
18 Elbow 1/2" Bh 4,000.00
19 Elbow 3/4" Bh 4,000.00
20 Elbow 1" Bh 6,000.00
21 Elbow 1 1/2" Bh 7,000.00
22 Elbow 2" Bh 10,000.00
23 Elbow 2 1/2" Bh 10,000.00
24 Elbow 3" Bh 15,000.00
25 Elbow 4" Bh 20,000.00
26 Shock 1/2" Bh 4,000.00
27 Shock 3/4" Bh 4,000.00
28 Shock/T 1" Bh 6,000.00
29 Shock 2 1/2" Bh 8,500.00
30 Shock 2" Bh 11,000.00
31 Shock 3" Bh 14,500.00
32 Shock 4" Bh 18,000.00
33 Shockdrat 3/4" Bh 5,500.00
34 Shockdrat 1/2" Bh 4,000.00
36 Selotip paralon / seal tape Bh 4,500.00
37 Pompa air Bh 450,000.00

BAHAN SANITARI
1 Closed duduk keramik (otomatis) Bh 1,800,000.00
2 Closed jongkok biasa Bh 135,000.00
3 Closed jongkok keramik standar Bh 250,000.00
4 Wastafel lengkap Unit 400,000.00
5 Kran biasa, uk. 1/2 & 3/4 Bh 15,000.00
6 Kran stainless, uk. 1/2 & 3/4 Bh 38,000.00
7 Floor drain Bh 16,000.00
8 Bak cuci piring aluminium Bh 250,000.00
9 Water drain + acsesories Bh 58,000.00
10 Urinoir Bh 1,025,000.00
11 Bak teraso Bh -
12 Badkip Porselen Bh -

BAHAN PERALATAN ELEKTRIKAL


1 Box zekering (panel box + MCB ) Unit 215,000.00
2 Instalasi listrik titik 115,000.00
3 Saklar tunggal Bh 20,000.00
4 Saklar ganda Bh 25,000.00
5 Saklar tripel Bh 25,000.00
6 Stop kontak Bh 23,000.00
7 Lampu TL 20 watt Bh 46,000.00
8 Lampu XL 20 Watt Bh 52,000.00
9 Lampu pijar 40 watt + fitting Bh 8,000.00

BAHAN FINISHING
1 Cat besi Kg 57,000.00
2 Cat genteng Kg 36,000.00
3 Cat tembok Kg 22,500.00
4 Cat tembok (weathershield) Kg 135,000.00
5 Cat kayu Kg 56,500.00
6 Cat dasar tembok Kg 18,000.00
6 Cat dasar kayu Kg 34,000.00
7 Minyak cat Ltr 11,500.00
8 Minyak bekisting Ltr 8,500.00
9 Dempul kayu Kg 23,500.00
10 Meni Kg 36,000.00
11 Kapur Kg 7,200.00
12 Plamir tembok Kg 8,500.00
13 Ter/residu Ltr 12,000.00
14 Plitur Ltr 62,000.00
15 Vernis Ltr 55,000.00
16 Tiner Ltr 24,000.00
17 Batu apung Kg 24,000.00
18 Teak oil Ltr 12,000.00
19 Wall Paper M2 20,000.00
20 Lem aibon Kg 60,000.00
21 Lem vinyl Kg 45,000.00
22 Amplas Lbr 4,000.00
23 Lem kayu ( fox ) Kg 27,000.00
24 Soda api Kg 22,000.00
25 Sabun Kg 27,000.00
26 Kuas Bh 25,000.00

BAHAN KACA
1 Kaca bening 3 mm M2 92,000.00
2 Kaca bening 5 mm M2 108,000.00
3 Kaca bening 8 mm M2 155,000.00
4 Kaca bening 10 mm M2 220,000.00
5 Kaca rayban 3 mm M2 77,000.00
6 Kaca rayban 5 mm M2 91,000.00
7 Kaca rayban 8 mm M2 140,000.00
8 Kaca rayban 10 mm M2 238,000.00
9 Kaca biru 5 mm M2 115,000.00
10 Kaca Cermin, Tebal 5 mm M2 135,000.00
4 Bahan 2016
11 Kaca Cermin, Tebal 6 mm M2 140,000.00
12 Kaca Cermin, Tebal 8 mm M2 155,000.00
13 Kaca buram tebal 12 mm -
14 Kaca "Wireglass", Tebal 5 mm M2 112,000.00
15 Kaca Patri, Tebal 5 mm M2 113,000.00

BAHAN PERALATAN SEWA


1 Mesin gilas ( 4-6 Ton ) Jam 190,000.00
2 DumpTruk Jam 175,000.00
3 Stemper Hari 100,000.00
4 Molen Hari 140,000.00
5 Sewa tripot/trakel & handle crane 2 T Hari 20,000.00
6 Sewa alat pengelasan Jam 20,000.00

BAHAN JALAN LINGKUNGAN


1 Aspal Kg 12,000.00
2 Batu keduk M3 225,000.00
3 Sirtu M3 235,000.00
4 Kayu bakar M3 175,000.00
5 Minyak tanah Ltr 10,300.00
6 Solar Ltr 10,500.00
7 Pertamax Ltr 10,500.00
8 Minyak pelumas Ltr 33,500.00
9 Alat bantu Ls 500.00
10 Alat bantu aspal Ls 3,500.00
11 Gorong-gorong dia 20 cm panjang 100 cm Bh 82,000.00
12 Gorong-gorong dia 30 cm panjang 100 cm Bh 120,000.00
13 Gorong-gorong dia 40 cm panjang 100 cm Bh 166,000.00
14 Gorong-gorong dia 60 cm panjang 100 cm Bh 215,000.00
15 Gorong-gorong dia 80 cm panjang 100 cm Bh 460,000.00
16 Gorong-gorong dia 80 cm panjang 50 cm (Sumur) Bh 125,000.00
17 Gorong-gorong dia 100 cm panjang 100 cm Bh 650,000.00

BAHAN LAIN-LAIN
1 Jendela Nako Bh 130,000.00
2 Ijuk M3 -
3 Rapidrant Gln -
4 Puzzdith-100 XR Ltr -
5 Strorox-100 Ltr -
6 Spring knip Bh -
7 Papan nama proyek Unit 225,000.00
8 Barak kerja Unit 1,800,000.00
9 Sewa barak kerja Unit 700,000.00
10 Panel beton pracetak Lbr 140,000.00
11 Kolom beton pracetak Btg 335,000.00
12 Wall papper M2 -

N BAHAN SARANA AIR BERSIH


1 Pipa PVC 63 mm panjang 6 m Btg 185,000.00
2 Pipa PVC 90 mm panjang 6 m Btg 410,000.00
3 Pipa PVC 110 mm panjang 6 m Btg 520,000.00
4 Pipa PVC 150 mm panjang 6 m Btg 1,320,000.00
5 Pipa PVC 200 mm panjang 6 m Btg 2,000,000.00
6 Pipa GIP 100 mm panjang 6 m Btg 180,000.00
7 Pipa GIP 125 mm panjang 6 m Btg 400,000.00
8 Pipa GIP 150 mm panjang 6 m Btg 420,000.00
9 Pipa GIP 200 mm panjang 6 m Btg 675,000.00
10 Depresiasi Mesin Bor Hari 108,000.00
11 Depresiasi Pompa Air Hari 76,000.00
12 Lumpur M3 540.00
13 Creasae Kg 22,500.00
15 Welld Head Unit 63,000.00
16 Samplink Unit 59,000.00
17 Tangki Filter Buah 1,620,000.00
18 Water Moer dia 1" Buah 54,500.00
19 Saringan Filter Buah 225,000.00
20 Pasir Aktif Kg 27,000.00
21 Pasir Mangan Kg 29,000.00
22 Karbon Kg 25,000.00
23 Tee dia 1 x 1" Buah 720,000.00
24 Keni dia 1" 5,400.00
25 Pipa 4" + pipa saringan yang dibalut dengan ijuk 110,000.00
26 Mobilisasi dan demobilisasi peralatan alat bor Unit -
27 Kap. 1 ltr/dtk head 60 M Unit -
28 Kap. 2.5 ltr/dtk head 60 M Unit -
29 Kap. 5 ltr/dtk head 60 M Unit -
30 Kap. 2.5 ltr/dtk Unit -
31 Kap. 5 ltr/dtk Unit -
32 Kap. 10 ltr/dtk Unit -

5 Bahan 2016
PEMERINTAH KABUPATEN BATANG HARI
DINAS PEKERJAAN UMUM
JALAN SULTAN THAHA NO. TELP. 0743 - 21041
MUARA BULIAN
Kode Pos 36613

ANALISA HARGA SATUAN PEKERJAAN (AHSP)


BIDANG CIPTA KARYA
TAHUN 2016

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN (DEKAT)

A. 2.2.1.2 Pembuatan 1 M2 Pagar Sementara dari Seng gelombang Tinggi 2 meter


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.4000 65,000.00 26,000.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 48,200.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.2500 6,200.00 7,750.00
Semen Portlant Kg 2.5000 1,440.00 3,600.00
Seng Gelombang Lembar 1.2000 39,000.00 46,800.00
Pasir Beton M3 0.0050 85,000.00 425.00
Kerikil M3 0.0090 300,000.00 2,700.00
Kayu balok M3 0.0720 2,150,000.00 154,800.00
Paku Biasa Kg 0.0600 17,000.00 1,020.00
Meni besi Kg 0.4500 36,000.00 16,200.00
JUMLAH HARGA BAHAN 233,295.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 281,495.00


E Overhead & Profit 10% x D 28,149.50
F Harga Satuan Pekerjaan (D+E) 309,644.50

A. 2.2.1.3 Pembuatan 1 M2 pagar sementara dari kawat duri tinggi 1,8 meter
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 41,700.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.0000 6,200.00 6,200.00
Semen Portlant Kg 2.0000 1,440.00 2,880.00
Kawat Duri M1 25.0000 12,500.00 312,500.00
Pasir Beton M3 0.0050 85,000.00 425.00
Kerikil M3 0.0090 300,000.00 2,700.00
Paku Biasa Kg 0.0600 17,000.00 1,020.00
JUMLAH HARGA BAHAN 325,725.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 367,425.00


E Overhead & Profit 10% x D 36,742.50
F Harga Satuan Pekerjaan (D+E) 404,167.50

A. 2.2.1.4 Pengukuran dan pemasangan 1 M' Bouwplank


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,100.00
B BAHAN
Kayu Balok M3 0.0120 2,150,000.00 25,800.00
Paku Biasa Kg 0.0200 17,000.00 340.00
Kayu Papan M3 0.0070 2,150,000.00 15,050.00
JUMLAH HARGA BAHAN 41,190.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 58,290.00


E Overhead & Profit 10% x D 5,829.00
6 Analisa 2016
F Harga Satuan Pekerjaan (D+E) 64,119.00

7 Analisa 2016
A. 2.2.1.5 Pembuatan 1 M2 kantor sementara lantai plesteran
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 2.0000 65,000.00 130,000.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Tukang Batu OH 1.0000 90,000.00 90,000.00
Kepala Tukang OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 438,000.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.2500 6,200.00 7,750.00
Kayu M3 0.1800 2,150,000.00 387,000.00
Paku Biasa Kg 0.0800 17,000.00 1,360.00
Besi Strip Kg 1.1000 13,000.00 14,300.00
Semen Portlant Kg 35.0000 1,440.00 50,400.00
Pasir Pasang M3 0.1500 85,000.00 12,750.00
Pasir Beton M3 0.1000 85,000.00 8,500.00
Kerikil M3 0.1500 300,000.00 45,000.00
Bata Merah Buah 30.0000 500.00 15,000.00
Seng Gelombang Lbr 1.5000 39,000.00 58,500.00
Jendela nako Buah 0.2000 130,000.00 26,000.00
Kaca Polos 5 mm M2 0.0800 108,000.00 8,640.00
Kunci Tanam Buah 0.1500 65,000.00 9,750.00
Triplek 4 mm Lbr 0.0600 72,000.00 4,320.00
JUMLAH HARGA BAHAN 649,270.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,087,270.00


E Overhead & Profit 10% x D 108,727.00
F Harga Satuan Pekerjaan (D+E) 1,195,997.00

A. 2.2.1.7 Pembuatan 1 M2 gudang semen dan peralatan


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Kepala Tukang OH 0.2000 110,000.00 22,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 272,000.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.7000 6,200.00 10,540.00
Kayu balok kelas II M3 0.2100 2,150,000.00 451,500.00
Paku Biasa Kg 0.3000 17,000.00 5,100.00
Semen Portlant Kg 10.5000 1,440.00 15,120.00
Pasir Beton M3 0.0300 85,000.00 2,550.00
Kerikil M3 0.0500 300,000.00 15,000.00
Seng Gelombang Lbr 1.5000 39,000.00 58,500.00
Seng Plat Lbr 0.2500 43,000.00 10,750.00
JUMLAH HARGA BAHAN 569,060.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 841,060.00


E Overhead & Profit 10% x D 84,106.00
F Harga Satuan Pekerjaan (D+E) 925,166.00

A. 2.2.1.8 Pembuatan 1 M2 Bedeng Pekerja


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Kepala Tukang OH 0.2000 110,000.00 22,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 272,000.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.2500 6,200.00 7,750.00
Kayu balok kelas II M3 0.1860 2,150,000.00 399,900.00
Paku Biasa Kg 0.3000 17,000.00 5,100.00
Semen Portlant Kg 18.0000 1,440.00 25,920.00
Pasir Beton M3 0.0300 85,000.00 2,550.00
Kerikil M3 0.0500 300,000.00 15,000.00
Seng Gelombang Lbr 1.5000 39,000.00 58,500.00
Triplek 4 mm Lbr 1.3500 72,000.00 97,200.00
JUMLAH HARGA BAHAN 611,920.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 883,920.00


E Overhead & Profit 10% x D 88,392.00
F Harga Satuan Pekerjaan (D+E) 972,312.00

8 Analisa 2016
A. 2.2.1.9 Pembersihan 1 M2 lapangan dan perataan
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 11,500.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,500.00


E Overhead & Profit 10% x D 1,150.00
F Harga Satuan Pekerjaan (D+E) 12,650.00

A. 2.2.1.9a Pembersihan 1 M2 lokasi


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0500 65,000.00 3,250.00
Mandor OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 5,750.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,750.00


E Overhead & Profit 10% x D 575.00
F Harga Satuan Pekerjaan (D+E) 6,325.00

A. 2.2.1.10.a Pembuatan 1 M2 steger/perancah dari kayu


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Kepala Tukang OH 0.2000 110,000.00 22,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 272,000.00
B BAHAN
Dolken Kayu 8-10 / 400 cm Batang 1.2500 6,200.00 7,750.00
Paku Biasa Kg 0.0100 17,000.00 170.00

JUMLAH HARGA BAHAN 7,920.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 279,920.00


E Overhead & Profit 10% x D 27,992.00
F Harga Satuan Pekerjaan (D+E) 307,912.00

A. 2.2.1.13 Pembongkaran 1 M3 Beton bertulang


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 13.3340 65,000.00 866,710.00
Mandor OH 0.6660 100,000.00 66,600.00
JUMLAH TENAGA KERJA 933,310.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 933,310.00


E Overhead & Profit 10% x D 93,331.00
F Harga Satuan Pekerjaan (D+E) 1,026,641.00

A. 2.2.1.16 Pembongkaran 1 M3 Dinding tembok bata


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.6667 65,000.00 433,335.50
Mandor OH 0.3333 100,000.00 33,330.00
JUMLAH TENAGA KERJA 466,665.50
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 466,665.50


E Overhead & Profit 10% x D 46,666.55
9 Analisa 2016
F Harga Satuan Pekerjaan (D+E) 513,332.05

10 Analisa 2016
A. 2.2.1.16. Pemasangan 1 M2 panel beton pracetak 5x50x213 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3750 65,000.00 24,375.00
Tukang Kayu OH 0.1250 90,000.00 11,250.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 38,845.00
B BAHAN
Panel beton pracetak Lbr 0.9860 140,000.00 138,040.00
Kolom beton pracetak Btg 0.5250 335,000.00 175,875.00
Semen PC Kg 45.0000 1,440.00 64,800.00
Pasir beton M3 0.0740 85,000.00 6,290.00
Kerikil M3 0.1460 300,000.00 43,800.00
JUMLAH HARGA BAHAN 428,805.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 467,650.00


E Overhead & Profit 10% x D 46,765.00
F Harga Satuan Pekerjaan (D+E) 514,415.00

A.2.3.1 PEKERJAAN TANAH

A. 2.3.1.1 Penggalian 1 M3 Tanah biasa sedalam 1 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7500 65,000.00 48,750.00
Mandor OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 51,250.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 51,250.00


E Overhead & Profit 10% x D 5,125.00
F Harga Satuan Pekerjaan (D+E) 56,375.00

A. 2.3.1.2 Penggalian 1 M3 Tanah biasa sedalam 2 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.9000 65,000.00 58,500.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 63,000.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 63,000.00


E Overhead & Profit 10% x D 6,300.00
F Harga Satuan Pekerjaan (D+E) 69,300.00

A. 2.3.1.3 Penggalian 1 M3 Tanah biasa sedalam 3 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0500 65,000.00 68,250.00
Mandor OH 0.0667 100,000.00 6,666.70
JUMLAH TENAGA KERJA 74,916.70
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 74,916.70


E Overhead & Profit 10% x D 7,491.67
F Harga Satuan Pekerjaan (D+E) 82,408.37

11 Analisa 2016
A. 2.3.1.4 Menggali 1 M3 Tanah keras sedalam 1 M
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Mandor OH 0.0320 100,000.00 3,200.00
JUMLAH TENAGA KERJA 68,200.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 68,200.00


E Overhead & Profit 10% x D 6,820.00
F Harga Satuan Pekerjaan (D+E) 75,020.00

A. 2.3.1.5 Menggali 1 M3 Tanah cadas sedalam 1 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.5000 65,000.00 97,500.00
Mandor OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 103,500.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 103,500.00


E Overhead & Profit 10% x D 10,350.00
F Harga Satuan Pekerjaan (D+E) 113,850.00

A. 2.3.1.6 Menggali 1 M3 Tanah lumpur sedalam 1 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 65,000.00 78,000.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 82,500.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 82,500.00


E Overhead & Profit 10% x D 8,250.00
F Harga Satuan Pekerjaan (D+E) 90,750.00

A. 2.3.1.7 Pekerjaa stripping 1 M2 tanah tebing setinggi 1 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0500 65,000.00 3,250.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 3,750.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 3,750.00


E Overhead & Profit 10% x D 375.00
F Harga Satuan Pekerjaan (D+E) 4,125.00

A. 2.3.1.8 Pembuangan 1 M3 tanah sejauh 30 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3300 65,000.00 21,450.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 22,450.00
B BAHAN

JUMLAH HARGA BAHAN 0.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 22,450.00


E Overhead & Profit 10% x D 2,245.00
F Harga Satuan Pekerjaan (D+E) 24,695.00

12 Analisa 2016
A. 2.3.1.9 Pengurugan kembali 1 M3 galian tanah
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Mandor OH 0.0083 100,000.00 830.00
JUMLAH TENAGA KERJA 17,080.00
B BAHAN
0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 17,080.00


E Overhead & Profit 10% x D 1,708.00
F Harga Satuan Pekerjaan (D+E) 18,788.00

A. 2.3.1.10 Pemadatan tanah 1 M3 tanah (per 20 Cm)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5000 65,000.00 32,500.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 37,500.00
B BAHAN
0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 37,500.00


E Overhead & Profit 10% x D 3,750.00
F Harga Satuan Pekerjaan (D+E) 41,250.00

A. 2.3.1.10a Pemadatan tanah 1 M3 (analisa BM)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5000 65,000.00 32,500.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 37,500.00
B BAHAN
0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
Pemadat timbunan ( Stemper) Hari 0.050 100,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 42,500.00


E Overhead & Profit 10% x D 4,250.00
F Harga Satuan Pekerjaan (D+E) 46,750.00

A. 2.3.1.10b Pengurugan 1 M3 tanah dipadatkan


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8300 65,000.00 53,950.00
Mandor OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 59,950.00
B BAHAN
Tanah Urug M3 1.2000 60,000.00 72,000.00
JUMLAH HARGA BAHAN 72,000.00
C PERALATAN
Pemadat timbunan ( Stemper) Hari 0.0500 100,000.00 5,000.00
JUMLAH HARGA ALAT 5,000.00

D Jumlah (A+B+C) 136,950.00


E Overhead & Profit 10% x D 13,695.00
F Harga Satuan Pekerjaan (D+E) 150,645.00

A. 2.3.1.11 Pengurugan 1 M3 dengan pasir urug


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 20,500.00
B BAHAN
Pasir Urug M3 1.2000 75,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 110,500.00


E Overhead & Profit 10% x D 11,050.00
F Harga Satuan Pekerjaan (D+E) 121,550.00

13 Analisa 2016
A. 2.3.1.13 Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 11,250.00
B BAHAN
Ijuk M3 6.0000 0.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,250.00


E Overhead & Profit 10% x D 1,125.00
F Harga Satuan Pekerjaan (D+E) 12,375.00

A. 2.3.1.14 Pengurugan 1 m3 sirtu padat


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Mandor OH 0.0250 100,000.00 2,500.00
JUMLAH TENAGA KERJA 18,750.00
B BAHAN
Sirtu M3 1.2000 235,000.00 282,000.00
JUMLAH HARGA BAHAN 282,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 300,750.00


E Overhead & Profit 10% x D 30,075.00
F Harga Satuan Pekerjaan (D+E) 330,825.00

A.3.2.1 PEKERJAAN PONDASI

A. 3.2.1.1 Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 3 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.500 65,000.00 97,500.00
Tukang Batu OH 0.750 90,000.00 67,500.00
Kepala Tukang OH 0.075 110,000.00 8,250.00
Mandor OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 180,750.00
B BAHAN
Batu Belah/Batu Kali M3 1.200 330,000.00 396,000.00
Semen Portlant Kg 202.000 1,440.00 290,880.00
Pasir Pasang M3 0.485 85,000.00 41,225.00
JUMLAH HARGA BAHAN 728,105.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 908,855.00


E Overhead & Profit 10% x D 90,885.50
F Harga Satuan Pekerjaan (D+E) 999,740.50

A. 3.2.1.2 Pemasangan 1 M3 pondasi batu belah campuran 1 SP : 4 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.500 65,000.00 97,500.00
Tukang Batu OH 0.750 90,000.00 67,500.00
Kepala Tukang OH 0.075 110,000.00 8,250.00
Mandor OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 180,750.00
B BAHAN
Batu Belah/Batu Kali M3 1.200 330,000.00 396,000.00
Semen Portlant Kg 163.000 1,440.00 234,720.00
Pasir Pasang M3 0.520 85,000.00 44,200.00
JUMLAH HARGA BAHAN 674,920.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 855,670.00


E Overhead & Profit 10% x D 85,567.00
F Harga Satuan Pekerjaan (D+E) 941,237.00

14 Analisa 2016
A. 3.2.1.9 Pemasangan 1 M3 Batu Kosong (Aanstamping)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.780 65,000.00 50,700.00
Tukang Batu OH 0.390 90,000.00 35,100.00
Kepala Tukang OH 0.039 110,000.00 4,290.00
Mandor OH 0.039 100,000.00 3,900.00
JUMLAH TENAGA KERJA 93,990.00
B BAHAN
Batu Belah/Batu Kali M3 1.200 330,000.00 396,000.00
Pasir Urug M3 0.432 75,000.00 32,400.00
JUMLAH HARGA BAHAN 428,400.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 522,390.00


E Overhead & Profit 10% x D 52,239.00
F Harga Satuan Pekerjaan (D+E) 574,629.00

A.4.1.1 PEKERJAAN BETON


A.4.1.1.1 Membuat 1 M3 Beton mutu f'c = 7,4 Mpa (K.100), Slump 12 2, w/c=0,87
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.650 65,000.00 107,250.00
Tukang Batu OH 0.275 90,000.00 24,750.00
Kepala Tukang OH 0.028 110,000.00 3,080.00
Mandor OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 247.000 1,440.00 355,680.00
Pasir Beton M3 0.620 85,000.00 52,700.00
Kerikil (Maks. 30 mm) M3 0.740 300,000.00 222,000.00
Air Liter 215.000 50.00 10,750.00
JUMLAH HARGA BAHAN 641,130.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 784,510.00


E Overhead & Profit 10% x D 78,451.00
F Harga Satuan Pekerjaan (D+E) 862,961.00

A.4.1.1.2 Membuat 1 M3 Beton mutu f'c = 9,8 Mpa (K.125), Slump 12 2, w/c=0,78
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 276.0000 1,440.00 397,440.00
Pasir Beton M3 0.5910 85,000.00 50,235.00
Kerikil (Maks. 30 mm) M3 0.7496 300,000.00 224,880.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 683,305.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 826,685.00


E Overhead & Profit 10% x D 82,668.50
F Harga Satuan Pekerjaan (D+E) 909,353.50

A.4.1.1.3 Membuat 1 M3 Beton mutu f'c = 12,2 Mpa (K 150), Slump 12 2, w/c=0,72
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 299.0000 1,440.00 430,560.00
Pasir Beton M3 0.5707 85,000.00 48,509.50
Kerikil (Maks. 30 mm) M3 0.7533 300,000.00 225,990.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 715,809.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 859,189.50


E Overhead & Profit 10% x D 85,918.95

15 Analisa 2016
F Harga Satuan Pekerjaan (D+E) 945,108.45

16 Analisa 2016
A.4.1.1.3a Membuat 1 M3 Beton mutu f'c = 12,2 Mpa (K 150), Slump 12 2, w/c=0,72
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 299.0000 1,440.00 430,560.00
Pasir Beton M3 0.5707 85,000.00 48,509.50
Kerikil (Maks. 30 mm) M3 0.7533 300,000.00 225,990.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 715,809.50
C PERALATAN
Molen 0,35 M3 Hari 0.200 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 887,189.50


E Overhead & Profit 10% x D 88,718.95
F Harga Satuan Pekerjaan (D+E) 975,908.45

A.4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 Mpa (K.100), Slump (3-6) cm, w/c=0,87
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 65,000.00 78,000.00
Tukang Batu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 104,200.00
B BAHAN
Semen Portlant Kg 230.0000 1,440.00 331,200.00
Pasir Beton M3 0.6379 85,000.00 54,221.50
Kerikil (Maks. 30 mm) M3 0.7607 300,000.00 228,210.00
Air Liter 200.0000 50.00 10,000.00
JUMLAH HARGA BAHAN 623,631.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 727,831.50


E Overhead & Profit 10% x D 72,783.15
F Harga Satuan Pekerjaan (D+E) 800,614.65

A.4.1.1.5 Membuat 1 M3 Beton mutu f'c = 14,5 Mpa (K.175), Slump (12 2) cm, w/c=0,66
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 326.0000 1,440.00 469,440.00
Pasir Beton M3 0.5429 85,000.00 46,146.50
Kerikil (Maks. 30 mm) M3 0.7622 300,000.00 228,660.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 754,996.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 898,376.50


E Overhead & Profit 10% x D 89,837.65
F Harga Satuan Pekerjaan (D+E) 988,214.15

A.4.1.1.5a Membuat 1 M3 Beton mutu f'c = 14,5 Mpa (K.175), Slump (12 2) cm, w/c=0,66
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 326.0000 1,440.00 469,440.00
Pasir Beton M3 0.5429 85,000.00 46,146.50
Kerikil (Maks. 30 mm) M3 0.7622 300,000.00 228,660.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 754,996.50
C PERALATAN
Molen 0,35 M3 Hari 0.200 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 926,376.50


E Overhead & Profit 10% x D 92,637.65
F Harga Satuan Pekerjaan (D+E) 1,019,014.15

17 Analisa 2016
18 Analisa 2016
A.4.1.1.6 Membuat 1 M3 Beton mutu f'c = 16,9 Mpa (K 200), Slump (12 2) cm, w/c=0,61
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 352.0000 1,440.00 506,880.00
Pasir Beton M3 0.5221 85,000.00 44,378.50
Kerikil (Maks. 30 mm) M3 0.7637 300,000.00 229,110.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 791,118.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 934,498.50


E Overhead & Profit 10% x D 93,449.85
F Harga Satuan Pekerjaan (D+E) 1,027,948.35

A.4.1.1.6a Membuat 1 M3 Beton mutu f'c = 16,9 Mpa (K 200), Slump (12 2) cm, w/c=0,61
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 352.0000 1,440.00 506,880.00
Pasir Beton M3 0.5221 85,000.00 44,378.50
Kerikil (Maks. 30 mm) M3 0.7637 300,000.00 229,110.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 791,118.50
C PERALATAN
Molen 0,35 M3 Hari 0.2000 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 962,498.50


E Overhead & Profit 10% x D 96,249.85
F Harga Satuan Pekerjaan (D+E) 1,058,748.35

A.4.1.1.7 Membuat 1 M3 Beton mutu f'c = 19,3 Mpa (K.225), Slump (12 2) cm, w/c=0,58
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 371.0000 1,440.00 534,240.00
Pasir Beton M3 0.4986 85,000.00 42,381.00
Kerikil (Maks. 30 mm) M3 0.7756 300,000.00 232,680.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 820,051.00
C PERALATAN
Molen 0,35 M3 Hari 0.200 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 991,431.00


E Overhead & Profit 10% x D 99,143.10
F Harga Satuan Pekerjaan (D+E) 1,090,574.10

A.4.1.1.8 Membuat 1 M3 Beton mutu f'c = 21,7 Mpa (K.250), Slump (12 2) cm, w/c=0,56
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Kepala Tukang OH 0.0280 110,000.00 3,080.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 143,380.00
B BAHAN
Semen Portlant Kg 384.0000 1,440.00 552,960.00
Pasir Beton M3 0.4943 85,000.00 42,015.50
Kerikil (Maks. 30 mm) M3 0.7696 300,000.00 230,880.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 836,605.50
C PERALATAN
Molen 0,35 M3 Hari 0.2000 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 1,007,985.50


E Overhead & Profit 10% x D 100,798.55
F Harga Satuan Pekerjaan (D+E) 1,108,784.05

19 Analisa 2016
20 Analisa 2016
1 M3 membuat Beton adukan 1 Pc : 3 Ps : 5 Krl (SNI- 2002)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0800 100,000.00 8,000.00
JUMLAH TENAGA KERJA 140,500.00
B BAHAN
Semen Portlant Kg 218.0000 1,440.00 313,920.00
Pasir Beton M3 0.5200 85,000.00 44,200.00
Kerikil (Maks. 30 mm) M3 0.8700 300,000.00 261,000.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 629,870.00
C PERALATAN
Molen 0,35 M3 Hari 0.2000 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 798,370.00


E Overhead & Profit 10% x D 79,837.00
F Harga Satuan Pekerjaan (D+E) 878,207.00

1 M3 membuat Beton adukan 1 Pc : 2 Ps : 3 Krl (SNI- 2002)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6500 65,000.00 107,250.00
Tukang Batu OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0800 100,000.00 8,000.00
JUMLAH TENAGA KERJA 140,500.00
B BAHAN
Semen Portlant Kg 323.0000 1,440.00 465,120.00
Pasir Beton M3 0.5200 85,000.00 44,200.00
Kerikil (Maks. 30 mm) M3 0.7800 300,000.00 234,000.00
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 754,070.00
C PERALATAN
Molen 0,35 M3 Hari 0.2000 140,000.00 28,000.00
JUMLAH HARGA ALAT 28,000.00

D Jumlah (A+B+C) 922,570.00


E Overhead & Profit 10% x D 92,257.00
F Harga Satuan Pekerjaan (D+E) 1,014,827.00

A.4.1.1.17a Pembesian 10 Kg dengan Besi polos


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 65,000.00 4,550.00
Tukang Besi OH 0.0700 90,000.00 6,300.00
Kepala Tukang OH 0.0070 110,000.00 770.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 12,020.00
B BAHAN
Besi Beton (Polos/Ulir) Kg 10.5000 12,000.00 126,000.00
Kawat Beton Kg 0.1500 19,000.00 2,850.00
JUMLAH HARGA BAHAN 128,850.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 140,870.00


E Overhead & Profit 10% x D 14,087.00
F Harga Satuan Pekerjaan (D+E) 154,957.00

A.4.1.1.17b Pembesian 10 Kg dengan Besi Ulir


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 65,000.00 4,550.00
Tukang Besi OH 0.0700 90,000.00 6,300.00
Kepala Tukang OH 0.0070 110,000.00 770.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 12,020.00
B BAHAN
Besi Beton (Polos/Ulir) Kg 10.5000 13,500.00 141,750.00
Kawat Beton Kg 0.1500 19,000.00 2,850.00
JUMLAH HARGA BAHAN 144,600.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 156,620.00


E Overhead & Profit 10% x D 15,662.00
F Harga Satuan Pekerjaan (D+E) 172,282.00

21 Analisa 2016
A.4.1.1.19 Pemasangan 10 Kg kawat baja (Wiremesh)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0250 65,000.00 1,625.00
Tukang Besi OH 0.0250 90,000.00 2,250.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 6,725.00
B BAHAN
Jaring Kawat Baja (dilas) Kg 10.2000 0.00 0.00
Kawat Beton Kg 0.0500 19,000.00 950.00
JUMLAH HARGA BAHAN 950.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 7,675.00


E Overhead & Profit 10% x D 767.50
F Harga Satuan Pekerjaan (D+E) 8,442.50

A.4.1.1.20 Pemasangan 1 M2 Bekisting untuk pondasi


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5200 65,000.00 33,800.00
Tukang Kayu OH 0.2600 90,000.00 23,400.00
Kepala Tukang OH 0.0260 110,000.00 2,860.00
Mandor OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 62,660.00
B BAHAN
Kayu Klas III M3 0.0400 1,935,000.00 77,400.00
Paku Biasa 2"-5" Kg 0.3000 17,000.00 5,100.00
Minyak Bekisting Kg 0.1000 8,500.00 850.00
JUMLAH HARGA BAHAN 83,350.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 146,010.00


E Overhead & Profit 10% x D 14,601.00
F Harga Satuan Pekerjaan (D+E) 160,611.00

A.4.1.1.21 Pemasangan 1 M2 Bekisting untuk sloof


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5200 65,000.00 33,800.00
Tukang Kayu OH 0.2600 90,000.00 23,400.00
Kepala Tukang OH 0.0260 110,000.00 2,860.00
Mandor OH 0.0260 100,000.00 2,600.00
JUMLAH TENAGA KERJA 62,660.00
B BAHAN
Kayu Klas III M3 0.0450 1,935,000.00 87,075.00
Paku Biasa 2"-5" Kg 0.3000 17,000.00 5,100.00
Minyak Bekisting Kg 0.1000 8,500.00 850.00
JUMLAH HARGA BAHAN 93,025.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 155,685.00


E Overhead & Profit 10% x D 15,568.50
F Harga Satuan Pekerjaan (D+E) 171,253.50

A.4.1.1.22 Pemasangan 1 M2 Bekisting untuk kolom


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 65,000.00 42,900.00
Tukang Kayu OH 0.3300 90,000.00 29,700.00
Kepala Tukang OH 0.0330 110,000.00 3,630.00
Mandor OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 79,530.00
B BAHAN
Kayu Klas III M3 0.0400 1,935,000.00 77,400.00
Paku Biasa 2"-5" Kg 0.4000 17,000.00 6,800.00
Minyak Bekisting Kg 0.2000 8,500.00 1,700.00
Balok Kayu Klas II M3 0.0150 2,150,000.00 32,250.00
Plywood Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Kayu Dolken 8-10 cm, P=400 cm Batang 2.0000 6,200.00 12,400.00
JUMLAH HARGA BAHAN 177,800.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 257,330.00


E Overhead & Profit 10% x D 25,733.00
F Harga Satuan Pekerjaan (D+E) 283,063.00

22 Analisa 2016
A.4.1.1.23 Pemasangan 1 M2 Bekisting untuk balok
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 65,000.00 42,900.00
Tukang Kayu OH 0.3300 90,000.00 29,700.00
Kepala Tukang OH 0.0330 110,000.00 3,630.00
Mandor OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 79,530.00
B BAHAN
Kayu Klas III M3 0.0400 1,935,000.00 77,400.00
Paku Biasa 2"-5" Kg 0.4000 17,000.00 6,800.00
Minyak Bekisting Kg 0.2000 8,500.00 1,700.00
Balok Kayu Klas II M3 0.0180 2,150,000.00 38,700.00
Plywood Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Kayu Dolken 8-10 cm, P=400 cm Batang 2.0000 6,200.00 12,400.00
JUMLAH HARGA BAHAN 184,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 263,780.00


E Overhead & Profit 10% x D 26,378.00
F Harga Satuan Pekerjaan (D+E) 290,158.00

A.4.1.1.24 Pemasangan 1 M2 Bekisting untuk lantai


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 65,000.00 42,900.00
Tukang Kayu OH 0.3300 90,000.00 29,700.00
Kepala Tukang OH 0.0330 110,000.00 3,630.00
Mandor OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 79,530.00
B BAHAN
Kayu Klas III M3 0.0400 1,935,000.00 77,400.00
Paku Biasa 2"-5" Kg 0.4000 17,000.00 6,800.00
Minyak Bekisting Kg 0.2000 8,500.00 1,700.00
Balok Kayu Klas II M3 0.0150 2,150,000.00 32,250.00
Plywood Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Kayu Dolken 8-10 cm, P=400 cm Batang 6.0000 6,200.00 37,200.00
JUMLAH HARGA BAHAN 202,600.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 282,130.00


E Overhead & Profit 10% x D 28,213.00
F Harga Satuan Pekerjaan (D+E) 310,343.00

A.4.1.1.25 Pemasangan 1 M2 Bekisting untuk dinding


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 65,000.00 42,900.00
Tukang Kayu OH 0.3300 90,000.00 29,700.00
Kepala Tukang OH 0.0330 110,000.00 3,630.00
Mandor OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 79,530.00
B BAHAN
Kayu Klas III M3 0.0300 1,935,000.00 58,050.00
Paku Biasa 2"-5" Kg 0.4000 17,000.00 6,800.00
Minyak Bekisting Kg 0.2000 8,500.00 1,700.00
Balok Kayu Klas II M3 0.0200 2,150,000.00 43,000.00
Plywood Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Kayu Dolken 8-10 cm, P=400 cm Batang 3.0000 6,200.00 18,600.00
Penjaga Jarak Bekisting/spacer Batang 4.0000 6,200.00 24,800.00
JUMLAH HARGA BAHAN 200,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 279,730.00


E Overhead & Profit 10% x D 27,973.00
F Harga Satuan Pekerjaan (D+E) 307,703.00

23 Analisa 2016
A.4.1.1.26 Pemasangan 1 M2 Bekisting untuk Tangga
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6600 65,000.00 42,900.00
Tukang Kayu OH 0.3300 90,000.00 29,700.00
Kepala Tukang OH 0.0330 110,000.00 3,630.00
Mandor OH 0.0330 100,000.00 3,300.00
JUMLAH TENAGA KERJA 79,530.00
B BAHAN
Kayu Klas III M3 0.0300 1,935,000.00 58,050.00
Paku Biasa 2"-5" Kg 0.4000 17,000.00 6,800.00
Minyak Bekisting Kg 0.1500 8,500.00 1,275.00
Balok Kayu Klas II M3 0.0150 2,150,000.00 32,250.00
Plywood Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Kayu Dolken 8-10 cm, P=400 cm Batang 2.0000 6,200.00 12,400.00
JUMLAH HARGA BAHAN 158,025.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 237,555.00


E Overhead & Profit 10% x D 23,755.50
F Harga Satuan Pekerjaan (D+E) 261,310.50

A.4.1.1.28 Membuat 1 M3 pondasi beton bertulang (150 kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.3000 65,000.00 344,500.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Tukang Kayu OH 1.3000 90,000.00 117,000.00
Tukang Besi OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.2620 110,000.00 28,820.00
Mandor OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 636,070.00
B BAHAN
Kayu Klas III M3 0.2000 1,935,000.00 387,000.00
Paku Biasa 2"-5" Kg 1.5000 17,000.00 25,500.00
Minyak Bekisting Liter 0.4000 8,500.00 3,400.00
Besi Beton Polos Kg 157.5000 12,000.00 1,890,000.00
Kawat Beton Kg 2.2500 19,000.00 42,750.00
Semen Portlant Kg 336.0000 1,440.00 483,840.00
Pasir Beton M3 0.5400 85,000.00 45,900.00
Kerikil M3 0.8100 300,000.00 243,000.00
JUMLAH HARGA BAHAN 3,121,390.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 3,757,460.00


E Overhead & Profit 10% x D 375,746.00
F Harga Satuan Pekerjaan (D+E) 4,133,206.00

A.4.1.1.29 Membuat 1 M3 sloof beton bertulang (200 kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.6500 65,000.00 367,250.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Tukang Kayu OH 1.5600 90,000.00 140,400.00
Tukang Besi OH 1.4000 90,000.00 126,000.00
Kepala Tukang OH 0.3230 110,000.00 35,530.00
Mandor OH 0.2830 100,000.00 28,300.00
JUMLAH TENAGA KERJA 722,230.00
B BAHAN
Kayu Klas III M3 0.2700 1,935,000.00 522,450.00
Paku Biasa 2"-5" Kg 2.0000 17,000.00 34,000.00
Minyak Bekisting Liter 0.6000 8,500.00 5,100.00
Besi Beton Polos Kg 210.0000 12,000.00 2,520,000.00
Kawat Beton Kg 3.0000 19,000.00 57,000.00
Semen Portlant Kg 336.0000 1,440.00 483,840.00
Pasir Beton M3 0.5400 85,000.00 45,900.00
Kerikil M3 0.8100 300,000.00 243,000.00
JUMLAH HARGA BAHAN 3,911,290.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,633,520.00


E Overhead & Profit 10% x D 463,352.00
F Harga Satuan Pekerjaan (D+E) 5,096,872.00

24 Analisa 2016
A.4.1.1.31 Membuat 1 M3 balok beton bertulang (200 kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.350 65,000.00 412,750.00
Tukang Batu OH 0.275 90,000.00 24,750.00
Tukang Kayu OH 1.650 90,000.00 148,500.00
Tukang Besi OH 1.400 90,000.00 126,000.00
Kepala Tukang OH 0.333 110,000.00 36,630.00
Mandor OH 0.318 100,000.00 31,800.00
JUMLAH TENAGA KERJA 780,430.00
B BAHAN
Kayu Klas III M3 0.3200 1,935,000.00 619,200.00
Paku Biasa 2"-5" Kg 3.2000 17,000.00 54,400.00
Minyak Bekisting Liter 1.6000 8,500.00 13,600.00
Besi Beton Polos Kg 210.0000 12,000.00 2,520,000.00
Kawat Beton Kg 3.0000 19,000.00 57,000.00
Semen Portlant Kg 336.0000 1,440.00 483,840.00
Pasir Beton M3 0.5400 85,000.00 45,900.00
Kerikil M3 0.8100 300,000.00 243,000.00
Kayu kelas II balok M3 0.1400 2,150,000.00 301,000.00
Plywood 9 mm M3 2.8000 135,000.00 378,000.00
Dolken kayu M3 16.0000 6,200.00 99,200.00
JUMLAH HARGA BAHAN 4,036,940.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,817,370.00


E Overhead & Profit 10% x D 481,737.00
F Harga Satuan Pekerjaan (D+E) 5,299,107.00

A.4.1.1.32 Membuat 1 M3 kolom beton bertulang (150 kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.3000 65,000.00 344,500.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Tukang Kayu OH 1.3000 90,000.00 117,000.00
Tukang Besi OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.2650 110,000.00 29,150.00
Mandor OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 636,400.00
B BAHAN
Kayu Klas III M3 0.3200 1,935,000.00 619,200.00
Paku Biasa 2"-5" Kg 3.2000 17,000.00 54,400.00
Minyak Bekisting Liter 1.6000 8,500.00 13,600.00
Besi Beton Polos Kg 157.5000 12,000.00 1,890,000.00
Kawat Beton Kg 2.2500 19,000.00 42,750.00
Semen Portlant Kg 336.0000 1,440.00 483,840.00
Pasir Beton M3 0.5400 85,000.00 45,900.00
Kerikil M3 0.8100 300,000.00 243,000.00
Kayu kelas II balok M3 0.1200 2,150,000.00 258,000.00
Plywood 9 mm M3 2.8000 135,000.00 378,000.00
Dolken kayu M3 32.0000 6,200.00 198,400.00
JUMLAH HARGA BAHAN 3,392,690.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,029,090.00


E Overhead & Profit 10% x D 402,909.00
F Harga Satuan Pekerjaan (D+E) 4,431,999.00

25 Analisa 2016
A.4.1.1.33 Membuat 1 M3 dinding beton bertulang (150 kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.3000 65,000.00 344,500.00
Tukang Batu OH 0.2750 90,000.00 24,750.00
Tukang Kayu OH 1.3000 90,000.00 117,000.00
Tukang Besi OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.2620 110,000.00 28,820.00
Mandor OH 0.2650 100,000.00 26,500.00
JUMLAH TENAGA KERJA 636,070.00
B BAHAN
Kayu Klas III M3 0.2400 1,935,000.00 464,400.00
Paku Biasa 2"-5" Kg 3.2000 17,000.00 54,400.00
Minyak Bekisting Liter 1.6000 8,500.00 13,600.00
Besi Beton Polos Kg 157.5000 12,000.00 1,890,000.00
Kawat Beton Kg 2.2500 19,000.00 42,750.00
Semen Portlant Kg 336.0000 1,440.00 483,840.00
Pasir Beton M3 0.5400 85,000.00 45,900.00
Kerikil M3 0.8100 300,000.00 243,000.00
Kayu kelas II balok M3 0.1600 2,150,000.00 344,000.00
Plywood 9 mm M3 2.8000 135,000.00 378,000.00
Dolken kayu M3 24.0000 6,200.00 148,800.00
JUMLAH HARGA BAHAN 3,237,890.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 3,873,960.00


E Overhead & Profit 10% x D 387,396.00
F Harga Satuan Pekerjaan (D+E) 4,261,356.00

A.4.1.1.35 Membuat 1 M' kolom praktis beton bertulang (11 x 11) cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1800 65,000.00 11,700.00
Tukang Batu OH 0.0200 90,000.00 1,800.00
Tukang Kayu OH 0.0200 90,000.00 1,800.00
Tukang Besi OH 0.0200 90,000.00 1,800.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 18,660.00
B BAHAN
Kayu Klas III M3 0.0020 1,935,000.00 3,870.00
Paku Biasa 2"-5" Kg 0.0100 17,000.00 170.00
Minyak Bekisting Liter - 8,500.00 0.00
Besi Beton Polos Kg 3.0000 12,000.00 36,000.00
Kawat Beton Kg 0.4500 19,000.00 8,550.00
Semen Portlant Kg 4.0000 1,440.00 5,760.00
Pasir Beton M3 0.0060 85,000.00 510.00
Kerikil M3 0.0090 300,000.00 2,700.00
JUMLAH HARGA BAHAN 57,560.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 76,220.00


E Overhead & Profit 10% x D 7,622.00
F Harga Satuan Pekerjaan (D+E) 83,842.00

A.4.1.1.36 Membuat 1 M' ring balok beton bertulang (10 x 15) cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2970 65,000.00 19,305.00
Tukang Batu OH 0.0330 90,000.00 2,970.00
Tukang Kayu OH 0.0330 90,000.00 2,970.00
Tukang Besi OH 0.0330 90,000.00 2,970.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 30,815.00
B BAHAN
Kayu Klas III M3 0.0030 1,935,000.00 5,805.00
Paku Biasa 2"-5" Kg 0.0200 17,000.00 340.00
Minyak Bekisting Liter - 8,500.00 0.00
Besi Beton Polos Kg 3.6000 12,000.00 43,200.00
Kawat Beton Kg 0.0500 19,000.00 950.00
Semen Portlant Kg 5.5000 1,440.00 7,920.00
Pasir Beton M3 0.0090 85,000.00 765.00
Kerikil M3 0.0150 300,000.00 4,500.00
JUMLAH HARGA BAHAN 63,480.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 94,295.00


E Overhead & Profit 10% x D 9,429.50
F Harga Satuan Pekerjaan (D+E) 103,724.50

26 Analisa 2016
Membuat 1 M3 Pondasi Tapak Beton Bertulang ( 150 Kg besi + bekisting)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk pondasi M2 5.0000 160,611.00 803,055.00
Harga Satuan Pekerjaan 4,115,624.15

Membuat 1 M3 Sloof Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk sloof M2 6.0000 171,253.50 1,027,521.00
Harga Satuan Pekerjaan 4,340,090.15

Membuat 1 M3 Kolom praktis Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk sloof M2 6.0000 171,253.50 1,027,521.00
Harga Satuan Pekerjaan 4,340,090.15

Membuat 1 M3 Kolom Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk kolom M2 10.0000 171,253.50 1,712,535.00
Harga Satuan Pekerjaan 5,025,104.15

Membuat 1 M3 Balok Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk balok M2 8.0000 290,158.00 2,321,264.00
Harga Satuan Pekerjaan 5,633,833.15

Membuat 1 M3 Ring Balok Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk balok M2 6.0000 290,158.00 1,740,948.00
Harga Satuan Pekerjaan 5,053,517.15

Membuat 1 M3 Plat Lantai Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk lantai M2 8.0000 310,343.00 2,482,744.00
Harga Satuan Pekerjaan 5,795,313.15

Membuat 1 M3 Dinding Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk dinding M2 8.0000 307,703.00 2,461,624.00
Harga Satuan Pekerjaan 5,774,193.15

Membuat 1 M3 Tangga Beton Bertulang ( 150 Kg besi + bekisting)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
Beton K 175 M3 1.0000 988,214.15 988,214.15
Pembesian Kg 150.0000 15,495.70 2,324,355.00
Bekisting untuk tangga M2 8.0000 261,310.50 2,090,484.00
Harga Satuan Pekerjaan 5,403,053.15

A.4.2.1. PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1 Pemasangan 1 Kg besi profil


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0600 65,000.00 3,900.00
Tukang Las Konstruksi OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,260.00
B BAHAN
Besi Profil Kg 1.1500 16,500.00 18,975.00

JUMLAH HARGA BAHAN 18,975.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 29,235.00


E Overhead & Profit 10% x D 2,923.50
F Harga Satuan Pekerjaan (D+E) 32,158.50

27 Analisa 2016
A.4.2.1.2 Pemasangan 1 Kg Rangka kuda-kuda baja IWF
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0600 65,000.00 3,900.00
Tukang Las Konstruksi OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,260.00
B BAHAN
Besi Profil Kg 1.1500 16,500.00 18,975.00

JUMLAH HARGA BAHAN 18,975.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 29,235.00


E Overhead & Profit 10% x D 2,923.50
F Harga Satuan Pekerjaan (D+E) 32,158.50

A.4.2.1.4 Pembuatan 1 M2 Pintu besi plat baja tebal 2mm rangkap, rangka baja siku
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0500 65,000.00 68,250.00
Tukang Las Biasa OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.1050 110,000.00 11,550.00
Mandor OH 0.0520 100,000.00 5,200.00
JUMLAH TENAGA KERJA 179,500.00
B BAHAN
Besi Siku 30.30.3 Kg 15.0000 16,500.00 247,500.00
Besi Plat Baja Kg 32.8000 16,500.00 541,200.00
Kawat Las Kg 0.0500 26,000.00 1,300.00

JUMLAH HARGA BAHAN 790,000.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 969,500.00


E Overhead & Profit 10% x D 96,950.00
F Harga Satuan Pekerjaan (D+E) 1,066,450.00

A.4.2.1.5 Pengerjaan 10 Cm pengelasan dengan las listrik


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0400 65,000.00 2,600.00
Tukang Besi Konstruksi OH 0.0200 90,000.00 1,800.00
Kepala Tukang OH 0.0020 110,000.00 220.00
Mandor OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 4,820.00
B BAHAN
Kawat las listrik Kg 0.4000 26,000.00 10,400.00
Solar Ltr 0.3000 10,500.00 3,150.00
Minyak pelumas Ltr 0.0400 33,500.00 1,340.00
JUMLAH HARGA BAHAN 14,890.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 19,710.00


E Overhead & Profit 10% x D 1,971.00
F Harga Satuan Pekerjaan (D+E) 21,681.00

A.4.2.1.7 Pemasangan 1 m2 pintu rolling door besi


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 65,000.00 78,000.00
Tukang Las Biasa OH 1.2000 90,000.00 108,000.00
Kepala Tukang OH 0.1200 110,000.00 13,200.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 199,800.00
B BAHAN
Pintu gulung besi M2 1.0000 0.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 199,800.00


E Overhead & Profit 10% x D 19,980.00
F Harga Satuan Pekerjaan (D+E) 219,780.00

28 Analisa 2016
A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.4400 65,000.00 28,600.00
Tukang OH 0.4400 90,000.00 39,600.00
Kepala Tukang OH 0.0440 110,000.00 4,840.00
Mandor OH 0.0220 100,000.00 2,200.00
JUMLAH TENAGA KERJA 75,240.00
B BAHAN
Pintu lipat M2 1.0000 0.00 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 75,240.00


E Overhead & Profit 10% x D 7,524.00
F Harga Satuan Pekerjaan (D+E) 82,764.00

A.4.2.1.9 Pemasangan 1 m2 sunscreen alluminium


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0800 65,000.00 5,200.00
Tukang OH 0.8000 90,000.00 72,000.00
Kepala Tukang OH 0.0800 110,000.00 8,800.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 86,400.00
B BAHAN
Sunscreen alluminium M2 1.000 170,000.00 170,000.00
JUMLAH HARGA BAHAN 170,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 256,400.00


E Overhead & Profit 10% x D 25,640.00
F Harga Satuan Pekerjaan (D+E) 282,040.00

A.4.2.1.10 Pemasangan 1 m2 rolling door alluminium


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang OH 1.0000 90,000.00 90,000.00
Kepala Tukang OH 0.1000 110,000.00 11,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 171,000.00
B BAHAN
Rolling door M2 1.0000 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 171,000.00


E Overhead & Profit 10% x D 17,100.00
F Harga Satuan Pekerjaan (D+E) 188,100.00

A.4.2.1.11 Pemasangan 1 M Kuzen Pintu Alumunium


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0430 65,000.00 2,795.00
Tukang Khusus Alumunium OH 0.0430 90,000.00 3,870.00
Kepala Tukang OH 0.0043 110,000.00 473.00
Mandor OH 0.0021 100,000.00 210.00
JUMLAH TENAGA KERJA 7,348.00
B BAHAN
Profil Alumunium M 1.1000 77,000.00 84,700.00
Sekrup Fixer Buah 2.0000 3,200.00 6,400.00
Sealant Tube 0.0600 20,000.00 1,200.00
JUMLAH HARGA BAHAN 92,300.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 99,648.00


E Overhead & Profit 10% x D 9,964.80
F Harga Satuan Pekerjaan (D+E) 109,612.80

29 Analisa 2016
A.4.2.1.12 Pemasangan 1 M2 Pintu Alumunium Strip lebar 8 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0850 65,000.00 5,525.00
Tukang Khusus Alumunium OH 0.0850 90,000.00 7,650.00
Kepala Tukang OH 0.0085 110,000.00 935.00
Mandor OH 0.0042 100,000.00 420.00
JUMLAH TENAGA KERJA 14,530.00
B BAHAN
Profil Alumunium M 4.4000 77,000.00 338,800.00
Allumunium Strip M 14.6000 7,500.00 109,500.00
JUMLAH HARGA BAHAN 448,300.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 462,830.00


E Overhead & Profit 10% x D 46,283.00
F Harga Satuan Pekerjaan (D+E) 509,113.00

A.4.2.1.13 Pemasangan 1 M2 Pintu Kaca Rangka Alumunium


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0850 65,000.00 5,525.00
Tukang Khusus Alumunium/kaca OH 0.0850 90,000.00 7,650.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 14,665.00
B BAHAN
Profil Alumunium M 4.4000 77,000.00 338,800.00
Profil Kaca M 4.5000 0.00 0.00
Sealant Tube 0.2700 20,000.00 5,400.00
JUMLAH HARGA BAHAN 344,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 358,865.00


E Overhead & Profit 10% x D 35,886.50
F Harga Satuan Pekerjaan (D+E) 394,751.50

A.4.2.1.15 Pemasangan 1 M2 Terali Besi Strip (2 x 3) mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.6700 65,000.00 108,550.00
Tukang las OH 1.6700 90,000.00 150,300.00
Kepala Tukang OH 0.1670 110,000.00 18,370.00
Mandor OH 0.0830 100,000.00 8,300.00
JUMLAH TENAGA KERJA 285,520.00
B BAHAN
Besi strip Kg 6.1770 13,000.00 80,301.00
Pengelasan Cm 27.0800 2,168.10 58,712.15
JUMLAH HARGA BAHAN 139,013.15
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 424,533.15


E Overhead & Profit 10% x D 42,453.31
F Harga Satuan Pekerjaan (D+E) 466,986.46

A.4.2.1.16 Pemasangan 1 M2 Kawat Nyamuk


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,100.00
B BAHAN
Kawat Nyamuk M2 1.1000 16,500.00 18,150.00
Pengelasan CM 11.1100 2,168.10 24,087.59
Baja Strip (0,2x2) cm Kg 1.7160 13,000.00 22,308.00
JUMLAH HARGA BAHAN 64,545.59
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 81,645.59


E Overhead & Profit 10% x D 8,164.56
F Harga Satuan Pekerjaan (D+E) 89,810.15

30 Analisa 2016
A.4.2.1.18 Pemasangan 1 M Talang Datar/jurai Seng BJLS 28 lebar 90 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 33,300.00
B BAHAN
Seng plat M1 1.0500 43,000.00 45,150.00
Paku Kg 0.0150 21,000.00 315.00
Papan kayu klas II M3 0.0190 2,150,000.00 40,850.00
JUMLAH HARGA BAHAN 86,315.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 119,615.00


E Overhead & Profit 10% x D 11,961.50
F Harga Satuan Pekerjaan (D+E) 131,576.50

A.4.2.1.19 Pemasangan 1 M Talang 1/2 Lingkaran 15 cm, Seng BJLS 30 lebar 45 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang OH 0.3000 90,000.00 27,000.00
Kepala Tukang OH 0.0300 110,000.00 3,300.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 40,850.00
B BAHAN
Seng plat M1 1.0500 43,000.00 45,150.00
Paku Kg 0.0100 21,000.00 210.00
Papan kayu klas II M3 0.5000 2,150,000.00 1,075,000.00
JUMLAH HARGA BAHAN 1,120,360.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,161,210.00


E Overhead & Profit 10% x D 116,121.00
F Harga Satuan Pekerjaan (D+E) 1,277,331.00

A.4.2.1.20 Pemasangan 1 M2 Rangka Besi Hollow 1x40.40.2mm, modul 60x120 cm, Dinding Partisi
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Tukang Besi OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 42,800.00
B BAHAN
Rangka Metal Hollow 40.40.2mm M1 3.5000 25,833.33 90,416.67
Accessories (perkuatan, las, dll) Ls 10%x Rangka 9,041.67 9,041.67
JUMLAH HARGA BAHAN 99,458.33
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 142,258.33


E Overhead & Profit 10% x D 14,225.83
F Harga Satuan Pekerjaan (D+E) 156,484.17

A.4.2.1.21 Pemasangan 1 M2 Rangka Besi Hollow 1x40.40.2mm, Modul 60x60 cm, Plafond
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3500 65,000.00 22,750.00
Tukang Besi OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 59,900.00
B BAHAN
Rangka Metal Hollow 40.40.2mm M1 4.0000 25,833.33 103,333.33
Accessories (perkuatan, las, dll) Ls 10%x Rangka 10,333.33 10,333.33
JUMLAH HARGA BAHAN 113,666.67
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 173,566.67


E Overhead & Profit 10% x D 17,356.67
F Harga Satuan Pekerjaan (D+E) 190,923.33

31 Analisa 2016
A.4.4.1. PEKERJAAN PASANGAN DINDING

A.4.4.1.1 Pemasangan 1 M2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP : 2 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6000 65,000.00 39,000.00
Tukang Batu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 62,200.00
B BAHAN
Bata Merah Buah 140.0000 500.00 70,000.00
Semen Portlant Kg 43.5000 1,440.00 62,640.00
Pasir Pasang M3 0.0800 85,000.00 6,800.00
JUMLAH HARGA BAHAN 139,440.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 201,640.00


E Overhead & Profit 10% x D 20,164.00
F Harga Satuan Pekerjaan (D+E) 221,804.00

A.4.4.1.2 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 3 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6000 65,000.00 39,000.00
Tukang Batu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 62,200.00
B BAHAN
Bata Merah Buah 140.0000 500.00 70,000.00
Semen Portlant Kg 32.9500 1,440.00 47,448.00
Pasir Pasang M3 0.0910 85,000.00 7,735.00
JUMLAH HARGA BAHAN 125,183.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 187,383.00


E Overhead & Profit 10% x D 18,738.30
F Harga Satuan Pekerjaan (D+E) 206,121.30

A.4.4.1.3 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 4 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6000 65,000.00 39,000.00
Tukang Batu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 62,200.00
B BAHAN
Bata Merah Buah 140.0000 500.00 70,000.00
Semen Portlant Kg 26.5500 1,440.00 38,232.00
Pasir Pasang M3 0.0930 85,000.00 7,905.00
JUMLAH HARGA BAHAN 116,137.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 178,337.00


E Overhead & Profit 10% x D 17,833.70
F Harga Satuan Pekerjaan (D+E) 196,170.70

A.4.4.1.7 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 2 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portlant Kg 18.9500 1,440.00 27,288.00
Pasir Pasang M3 0.0380 85,000.00 3,230.00
JUMLAH HARGA BAHAN 65,518.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 96,618.00


E Overhead & Profit 10% x D 9,661.80
F Harga Satuan Pekerjaan (D+E) 106,279.80

32 Analisa 2016
A.4.4.1.8 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 3 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portlant Kg 14.3700 1,440.00 20,692.80
Pasir Pasang M3 0.0400 85,000.00 3,400.00
JUMLAH HARGA BAHAN 59,092.80
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 90,192.80


E Overhead & Profit 10% x D 9,019.28
F Harga Satuan Pekerjaan (D+E) 99,212.08

A.4.4.1.9 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 4 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
Bata Merah Buah 70.0000 500.00 35,000.00
Semen Portlant Kg 11.5000 1,440.00 16,560.00
Pasir Pasang M3 0.0430 85,000.00 3,655.00
JUMLAH HARGA BAHAN 55,215.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 86,315.00


E Overhead & Profit 10% x D 8,631.50
F Harga Satuan Pekerjaan (D+E) 94,946.50

A.4.4.1.16 Pemasangan 1 M2 Dinding conblock HB20 campuran 1 SP : 3 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3500 65,000.00 22,750.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 39,700.00
B BAHAN
HB-20 Buah 12.5000 0.00 0.00
Semen Portlant Kg 30.3200 1,440.00 43,660.80
Pasir Pasang M3 0.7280 85,000.00 61,880.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 105,540.80
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.1.17 Pemasangan 1 M2 Dinding conblock HB20 campuran 1 SP : 4 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3500 65,000.00 22,750.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 39,700.00
B BAHAN
HB-20 Buah 12.5000 0.00 0.00
Semen Portlant Kg 24.2600 1,440.00 34,934.40
Pasir Pasang M3 0.7720 85,000.00 65,620.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 100,554.40
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

33 Analisa 2016
A.4.4.1.18 Pemasangan 1 M2 Dinding conblock HB15 campuran 1 SP : 3 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3200 65,000.00 20,800.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 34,520.00
B BAHAN
HB-15 Buah 12.5000 0.00 0.00
Semen Portlant Kg 22.7400 1,440.00 32,745.60
Pasir Pasang M3 0.5500 85,000.00 46,750.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 79,495.60
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.1.19 Pemasangan 1 M2 Dinding conblock HB15 campuran 1 SP : 4 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3200 65,000.00 20,800.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0160 100,000.00 1,600.00
JUMLAH TENAGA KERJA 34,520.00
B BAHAN
HB-15 Buah 12.5000 0.00 0.00
Semen Portlant Kg 18.2000 1,440.00 26,208.00
Pasir Pasang M3 0.5820 85,000.00 49,470.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 75,678.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.1.20 Pemasangan 1 M2 Dinding conblock HB10 campuran 1 SP : 3 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
HB-10 Buah 12.5000 0.00 0.00
Semen Portlant Kg 15.5000 1,440.00 22,320.00
Pasir Pasang M3 0.3640 85,000.00 30,940.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 53,260.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.1.21 Pemasangan 1 M2 Dinding conblock HB10 campuran 1 SP : 4 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
HB-10 Buah 12.5000 0.00 0.00
Semen Portlant Kg 12.1300 1,440.00 17,467.20
Pasir Pasang M3 0.3880 85,000.00 32,980.00
Besi angker diameter 8 Kg 0.2800 0.00 0.00
JUMLAH HARGA BAHAN 50,447.20
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

34 Analisa 2016
35 Analisa 2016
A.4.4.1.23 Pemasangan 1 M2 Dinding terawang (rooster) 12x11x24 cm Campuran 1 SP : 4 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
Bata Berongga Bh 30.0000 0.00 0.00
Semen Portlant Kg 11.0000 1,440.00 15,840.00
Pasir Pasang M3 0.0350 85,000.00 2,975.00
JUMLAH HARGA BAHAN 18,815.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 49,915.00


E Overhead & Profit 10% x D 4,991.50
F Harga Satuan Pekerjaan (D+E) 54,906.50

A.4.4.2 PEKERJAAN PLESTERAN

A.4.4.2.2 Pemasangan 1 M2 Plesteran dinding 1 SP : 2 PP tebal 15 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,150.00
B BAHAN
Semen Portlant Kg 10.2240 1,440.00 14,722.56
Pasir Pasang M3 0.0200 85,000.00 1,700.00
JUMLAH HARGA BAHAN 16,422.56
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 52,572.56


E Overhead & Profit 10% x D 5,257.26
F Harga Satuan Pekerjaan (D+E) 57,829.82

A.4.4.2.3 Pemasangan 1 M2 Plesteran dinding 1 SP : 3 PP tebal 15 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,150.00
B BAHAN
Semen Portlant Kg 7.7760 1,440.00 11,197.44
Pasir Pasang M3 0.0230 85,000.00 1,955.00
JUMLAH HARGA BAHAN 13,152.44
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 49,302.44


E Overhead & Profit 10% x D 4,930.24
F Harga Satuan Pekerjaan (D+E) 54,232.68

A.4.4.2.4 Pemasangan 1 M2 Plesteran dinding 1 SP : 4 PP tebal 15 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,150.00
B BAHAN
Semen Portlant Kg 6.2400 1,440.00 8,985.60
Pasir Pasang M3 0.0240 85,000.00 2,040.00
JUMLAH HARGA BAHAN 11,025.60
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 47,175.60


E Overhead & Profit 10% x D 4,717.56
F Harga Satuan Pekerjaan (D+E) 51,893.16

36 Analisa 2016
A.4.4.2.23 Pemasangan 1 M2 Plesteran ciprat 1 SP : 2 PP
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,100.00
B BAHAN
Semen Portlant Kg 4.320 1,440.00 6,220.80
Pasir Pasang M3 0.006 85,000.00 510.00
JUMLAH HARGA BAHAN 6,730.80
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 37,830.80


E Overhead & Profit 10% x D 3,783.08
F Harga Satuan Pekerjaan (D+E) 41,613.88

A.4.4.2.24 Pemasangan 1 M2 finishing siar pasangan batu merah


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Batu OH 0.0750 90,000.00 6,750.00
Kepala Tukang OH 0.0080 110,000.00 880.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 18,180.00
B BAHAN
Semen Portlant Kg 3.1080 1,440.00 4,475.52
JUMLAH HARGA BAHAN 4,475.52
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 22,655.52


E Overhead & Profit 10% x D 2,265.55
F Harga Satuan Pekerjaan (D+E) 24,921.07

A.4.4.2.25 Pemasangan 1 M2 finishing siar pasangan conblock ekspose


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 65,000.00 4,550.00
Tukang Batu OH 0.0350 90,000.00 3,150.00
Kepala Tukang OH 0.0040 110,000.00 440.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 8,540.00
B BAHAN
Semen Portlant Kg 1.6000 1,440.00 2,304.00
JUMLAH HARGA BAHAN 2,304.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 10,844.00


E Overhead & Profit 10% x D 1,084.40
F Harga Satuan Pekerjaan (D+E) 11,928.40

A.4.4.2.26 Pemasangan 1 M2 finishing siar pasangan batu kali, campuran 1 SP : 2 PP


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 36,150.00
B BAHAN
Semen Portlant Kg 6.3400 1,440.00 9,129.60
Pasir Pasang M3 0.0120 85,000.00 1,020.00
JUMLAH HARGA BAHAN 9,129.60
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 45,279.60


E Overhead & Profit 10% x D 4,527.96
F Harga Satuan Pekerjaan (D+E) 49,807.56

37 Analisa 2016
A.4.4.2.27 Pemasangan 1 M2 Acian
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 24,100.00
B BAHAN
Semen Portlant Kg 3.2500 1,440.00 4,680.00
JUMLAH HARGA BAHAN 4,680.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 28,780.00


E Overhead & Profit 10% x D 2,878.00
F Harga Satuan Pekerjaan (D+E) 31,658.00

A.4.4.3 PEKERJAAN PENUTUP LANTAI DAN DINDING

A.4.4.3.9 Pemasangan 1 M2 Ubin granit ukuran 40x40 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Tukang Batu OH 0.1250 90,000.00 11,250.00
Kepala Tukang OH 0.0130 110,000.00 1,430.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 30,230.00
B BAHAN
Ubin Granit Bh 6.6300 #REF! #REF!
Semen Portlant Kg 9.8000 1,440.00 14,112.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.3000 2,625.00 3,412.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.10 Pemasangan 1 M2 Ubin granit ukuran 30x30 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2600 65,000.00 16,900.00
Tukang Batu OH 0.1300 90,000.00 11,700.00
Kepala Tukang OH 0.0130 110,000.00 1,430.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 31,330.00
B BAHAN
Ubin Granit Bh 11.8700 #REF! #REF!
Semen Portlant Kg 10.0000 1,440.00 14,400.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.11 Pemasangan 1 M2 Ubin teralux marmer ukuran 40x40 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Tukang Batu OH 0.1250 90,000.00 11,250.00
Kepala Tukang OH 0.0130 110,000.00 1,430.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 30,230.00
B BAHAN
Ubin teralux marmer Bh 6.6300 #REF! #REF!
Semen Portlant Kg 9.8000 1,440.00 14,112.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
38 Analisa 2016
39 Analisa 2016
A.4.4.3.12 Pemasangan 1 M2 Ubin teralux marmer ukuran 30x30 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2600 65,000.00 16,900.00
Tukang Batu OH 0.1300 90,000.00 11,700.00
Kepala Tukang OH 0.0130 110,000.00 1,430.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 31,330.00
B BAHAN
Ubin teralux marmer Bh 11.8700 #REF! #REF!
Semen Portlant Kg 10.0000 1,440.00 14,400.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.13 Pemasangan 1 M2 Ubin teralux marmer ukuran 60x60 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2400 65,000.00 15,600.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0120 100,000.00 1,200.00
JUMLAH TENAGA KERJA 28,920.00
B BAHAN
Ubin teralux marmer Bh 3.1000 #REF! #REF!
Semen Portlant Kg 9.6000 1,440.00 13,824.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.24 Pemasangan 1 M' Plint ubin granit ukuran 10x40 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 2.6500 #REF! #REF!
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.1000 2,625.00 262.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.25 Pemasangan 1 M' Plint ubin granit ukuran 10x30 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 3.5300 #REF! #REF!
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.1000 2,625.00 262.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

40 Analisa 2016
41 Analisa 2016
A.4.4.3.28 Pemasangan 1 M' Plint ubin teralux marmer ukuran 10x60 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 1.7000 #REF! #REF!
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.1000 2,625.00 262.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.29 Pemasangan 1 M' Plint ubin teralux marmer ukuran 10x40 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 2.6500 #REF! #REF!
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.1000 2,625.00 262.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.30 Pemasangan 1 M' Plint ubin teralux marmer ukuran 10x30 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 3.5300 #REF! #REF!
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.1000 2,625.00 262.50
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.35 Pemasangan 1 M2 Lantai keramik ukuran 30x30 cm (warna)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Keramik Bh 11.8700 6,272.73 66,903.64
Semen Portlant Kg 10.0000 1,440.00 14,400.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN 89,066.14
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 173,416.14


E Overhead & Profit 10% x D 17,341.61
F Harga Satuan Pekerjaan (D+E) 190,757.75

42 Analisa 2016
43 Analisa 2016
A.4.4.3.35a Pemasangan 1 M2 Lantai keramik ukuran 30x30 cm (polos)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Ubin Keramik Bh 11.8700 5,727.27 60,429.09
Semen Portlant Kg 10.0000 1,440.00 14,400.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.5000 2,625.00 3,937.50
JUMLAH HARGA BAHAN 82,591.59
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 166,941.59


E Overhead & Profit 10% x D 16,694.16
F Harga Satuan Pekerjaan (D+E) 183,635.75

A.4.4.3.36 Pemasangan 1 M2 Lantai keramik ukuran 20x20 cm (warna)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Ubin Keramik Bh 26.5000 2,920.00 69,960.00
Semen Portlant Kg 10.4000 1,440.00 14,976.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.6200 2,625.00 4,252.50
JUMLAH HARGA BAHAN 93,013.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 177,363.50


E Overhead & Profit 10% x D 17,736.35
F Harga Satuan Pekerjaan (D+E) 195,099.85

A.4.4.3.36a Pemasangan 1 M2 Lantai keramik ukuran 20x20 cm (polos)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Ubin Keramik Bh 26.5000 2,640.00 63,600.00
Semen Portlant Kg 10.4000 1,440.00 14,976.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.6200 2,625.00 4,252.50
JUMLAH HARGA BAHAN 86,653.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 171,003.50


E Overhead & Profit 10% x D 17,100.35
F Harga Satuan Pekerjaan (D+E) 188,103.85

A.4.4.3.36b Pemasangan 1 M2 Lantai keramik ukuran 40x40 cm (warna)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Ubin Keramik Bh 6.6300 12,333.33 81,769.98
Semen Portlant Kg 9.8000 1,440.00 14,112.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.3000 2,625.00 3,412.50
JUMLAH HARGA BAHAN 103,119.48
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 187,469.48


E Overhead & Profit 10% x D 18,746.95
F Harga Satuan Pekerjaan (D+E) 206,216.43

44 Analisa 2016
45 Analisa 2016
A.4.4.3.36c Pemasangan 1 M2 Lantai keramik ukuran 40x40 cm (polos)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Ubin Keramik Bh 6.6300 11,000.00 72,930.00
Semen Portlant Kg 9.8000 1,440.00 14,112.00
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 1.3000 2,625.00 3,412.50
JUMLAH HARGA BAHAN 94,279.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 178,629.50


E Overhead & Profit 10% x D 17,862.95
F Harga Satuan Pekerjaan (D+E) 196,492.45

A.4.4.3.39 Pemasangan 1 M' Plint keramik ukuran 10x20 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 18,300.00
B BAHAN
Plint keramik Bh 5.3000 12,000.00 63,600.00
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.0250 2,625.00 65.63
JUMLAH HARGA BAHAN 65,562.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 83,862.23


E Overhead & Profit 10% x D 8,386.22
F Harga Satuan Pekerjaan (D+E) 92,248.45

A.4.4.3.39.1 Pemasangan 1 M' Plint keramik ukuran 10x30 cm (warna)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 3.5300 2,000.00 7,060.00
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.0250 2,625.00 65.63
JUMLAH HARGA BAHAN 9,022.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 24,462.23


E Overhead & Profit 10% x D 2,446.22
F Harga Satuan Pekerjaan (D+E) 26,908.45

A.4.4.3.39.1a Pemasangan 1 M' Plint keramik ukuran 10x30 cm (polos)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 3.5300 1,800.00 6,354.00
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.0250 2,625.00 65.63
JUMLAH HARGA BAHAN 8,316.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 23,756.23


E Overhead & Profit 10% x D 2,375.62
F Harga Satuan Pekerjaan (D+E) 26,131.85

46 Analisa 2016
47 Analisa 2016
A.4.4.3.39.2 Pemasangan 1 M' Plint keramik ukuran 10x40 cm (warna)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 2.6500 2,900.00 7,685.00
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.0250 2,625.00 65.63
JUMLAH HARGA BAHAN 9,647.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 25,087.23


E Overhead & Profit 10% x D 2,508.72
F Harga Satuan Pekerjaan (D+E) 27,595.95

A.4.4.3.39.2a Pemasangan 1 M' Plint keramik ukuran 10x40 cm (polos)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0900 65,000.00 5,850.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 15,440.00
B BAHAN
Plint Ubin Granit Bh 2.6500 2,600.00 6,890.00
Semen Portlant Kg 1.1400 1,440.00 1,641.60
Pasir Pasang M3 0.0030 85,000.00 255.00
Semen Warna Kg 0.0250 2,625.00 65.63
JUMLAH HARGA BAHAN 8,852.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 24,292.23


E Overhead & Profit 10% x D 2,429.22
F Harga Satuan Pekerjaan (D+E) 26,721.45

A.4.4.3.43 Pemasangan 1 M2 Lantai marmer ukuran 100 cm x 100 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Marmer Bh 1.0600 234,000.00 248,040.00
Semen Portlant Kg 8.1900 1,440.00 11,793.60
Pasir Pasang M3 0.0450 85,000.00 3,825.00
Semen Warna Kg 0.6500 2,625.00 1,706.25
JUMLAH HARGA BAHAN 265,364.85
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 349,714.85


E Overhead & Profit 10% x D 34,971.49
F Harga Satuan Pekerjaan (D+E) 384,686.34

A.4.4.3.44 Pemasangan 1 M2 Lantai karpet


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1700 65,000.00 11,050.00
Tukang Batu OH 0.1700 90,000.00 15,300.00
Kepala Tukang OH 0.0170 110,000.00 1,870.00
Mandor OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 29,120.00
B BAHAN
Karpet m2 1.0500 #REF! #REF!
Lem Kg 0.3500 45,000.00 15,750.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

48 Analisa 2016
A.4.4.3.45 Pemasangan 1 M2 underlayer (pelapis bawah karpet)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 65,000.00 7,800.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 20,520.00
B BAHAN
Underlayer m2 1.0500 #REF! #REF!
Lem Kg 0.3500 45,000.00 15,750.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.47 Pemasangan 1 M2 lantai kayu gymfloor


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Parquet m2 1.0500 #REF! #REF!
Lem Kg 0.6000 27,000.00 16,200.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.4.3.54 Pemasangan 1 M2 Dinding keramik ukuran 20x20 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.9000 65,000.00 58,500.00
Tukang Batu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 108,450.00
B BAHAN
Ubin Keramik Bh 26.5000 2,640.00 69,960.00
Semen Portlant Kg 9.3000 1,440.00 13,392.00
Pasir Pasang M3 0.0180 85,000.00 1,530.00
Semen Warna Kg 1.9400 2,625.00 5,092.50
JUMLAH HARGA BAHAN 89,974.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 198,424.50


E Overhead & Profit 10% x D 19,842.45
F Harga Satuan Pekerjaan (D+E) 218,266.95

A.4.4.3.54a Pemasangan 1 M2 Dinding keramik ukuran 20x25 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.9000 65,000.00 58,500.00
Tukang Batu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 108,450.00
B BAHAN
Ubin Keramik Bh 21.0000 66,000.00 1,386,000.00
Semen Portlant Kg 9.3000 1,440.00 13,392.00
Pasir Pasang M3 0.0180 85,000.00 1,530.00
Semen Warna Kg 1.9400 2,625.00 5,092.50
JUMLAH HARGA BAHAN 1,406,014.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,514,464.50


E Overhead & Profit 10% x D 151,446.45
F Harga Satuan Pekerjaan (D+E) 1,665,910.95

49 Analisa 2016
A.4.4.3.54b Pemasangan 1 M2 Dinding keramik ukuran 30x30 cm (warna)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.9000 65,000.00 58,500.00
Tukang Batu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 108,450.00
B BAHAN
Ubin Keramik Bh 11.8700 6,272.72 66,903.64
Semen Portlant Kg 9.3000 1,440.00 13,392.00
Pasir Pasang M3 0.0180 85,000.00 1,530.00
Semen Warna Kg 1.9400 2,625.00 5,092.50
JUMLAH HARGA BAHAN 86,918.14
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 195,368.14


E Overhead & Profit 10% x D 19,536.81
F Harga Satuan Pekerjaan (D+E) 214,904.95

A.4.4.3.54c Pemasangan 1 M2 Dinding keramik ukuran 40x40 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.9000 65,000.00 58,500.00
Tukang Batu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 108,450.00
B BAHAN
Ubin Keramik Bh 6.6300 6,727.27 40,382.73
Semen Portlant Kg 9.3000 1,440.00 13,392.00
Pasir Pasang M3 0.0180 85,000.00 1,530.00
Semen Warna Kg 1.9400 2,625.00 5,092.50
JUMLAH HARGA BAHAN 60,397.23
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 168,847.23


E Overhead & Profit 10% x D 16,884.72
F Harga Satuan Pekerjaan (D+E) 185,731.95

A.4.4.3.55 Pemasangan 1 M2 dinding marmer 100 cm x 100 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.3000 65,000.00 84,500.00
Tukang Batu OH 0.6500 90,000.00 58,500.00
Kepala Tukang OH 0.0650 110,000.00 7,150.00
Mandor OH 0.0650 100,000.00 6,500.00
JUMLAH TENAGA KERJA 156,650.00
B BAHAN
Ubin Keramik Bh 1.0600 234,000.00 248,040.00
Semen Portlant Kg 12.4400 1,440.00 17,913.60
Pasir Pasang M3 0.0250 85,000.00 2,125.00
Semen Warna Kg 0.6500 2,625.00 1,706.25
Paku 12 cm bh 3.0300 0.00 0.00
JUMLAH HARGA BAHAN 269,784.85
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 426,434.85


E Overhead & Profit 10% x D 42,643.49
F Harga Satuan Pekerjaan (D+E) 469,078.34

A.4.4.3.58 Pemasangan 1 M2 dinding batu tempel hitam


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Batu OH 0.3500 90,000.00 31,500.00
Kepala Tukang OH 0.0350 110,000.00 3,850.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 84,350.00
B BAHAN
Batu tempel hitam Bh 1.1000 200,000.00 220,000.00
Semen Portlant Kg 11.7500 1,440.00 16,920.00
Semen warna Kg 0.0350 2,625.00 91.88
JUMLAH HARGA BAHAN 237,011.88
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 321,361.88


E Overhead & Profit 10% x D 32,136.19
F Harga Satuan Pekerjaan (D+E) 353,498.06

50 Analisa 2016
51 Analisa 2016
A.4.4.3.61 Pemasangan 1 M2 Floor hardener
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 65,000.00 7,800.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 20,520.00
B BAHAN
Floor Hardener Kg 5.0000 0.00
JUMLAH HARGA BAHAN 0.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C)
E Overhead & Profit 10% x D 0.00
F Harga Satuan Pekerjaan (D+E) 0.00

A.4.4.3.63 Pemasangan 1 M' plint kayu tebal 2 cm lebar 10 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 65,000.00 7,800.00
Tukang Batu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 20,520.00
B BAHAN
Papan kayu kelas I M3 0.0030 6,000,000.00 18,000.00
Paku/sekrup 5 cm Kg 0.0500 28,000.00 1,400.00
JUMLAH HARGA BAHAN 19,400.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 39,920.00


E Overhead & Profit 10% x D 3,992.00
F Harga Satuan Pekerjaan (D+E) 43,912.00

1 M2 Pasangan Conblock (Analisa BOW)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3000 65,000.00 19,500.00
Tukang Batu OH 0.1054 90,000.00 9,486.00
Mandor OH 0.0550 100,000.00 5,500.00
JUMLAH TENAGA KERJA 34,486.00
B BAHAN
Conblock Bh 40.0000 1,450.00 58,000.00
Pasir urug M3 0.0450 75,000.00 3,375.00
Stemper Jam 0.0330 14,285.71 471.43
Alat bantu Ls 1.0000 500.00 500.00
JUMLAH HARGA BAHAN 62,346.43
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 96,832.43


E Overhead & Profit 10% x D 9,683.24
F Harga Satuan Pekerjaan (D+E) 106,515.67

A.4.5.1 PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.5 Pemasangan 1 M2 langit-langit tripleks ukuran (120x240) cm, tebal 4mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,100.00
B BAHAN
Tripleks Lbr 0.3750 72,000.00 27,000.00
Paku Tripleks Kg 0.0300 21,000.00 630.00
JUMLAH HARGA BAHAN 27,630.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 44,730.00


E Overhead & Profit 10% x D 4,473.00
F Harga Satuan Pekerjaan (D+E) 49,203.00

52 Analisa 2016
A.4.5.1.6 Pemasangan 1 M2 langit-langit lambrisering kayu, tebal 9 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8000 65,000.00 52,000.00
Tukang Kayu OH 0.8000 90,000.00 72,000.00
Kepala Tukang OH 0.0800 110,000.00 8,800.00
Mandor OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 136,800.00
B BAHAN
Kayu papan M3 0.0150 2,150,000.00 32,250.00
Paku Tripleks Kg 0.0100 21,000.00 210.00
JUMLAH HARGA BAHAN 32,460.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 169,260.00


E Overhead & Profit 10% x D 16,926.00
F Harga Satuan Pekerjaan (D+E) 186,186.00

A.4.5.1.7 Pemasangan 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.0500 90,000.00 4,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 12,050.00
B BAHAN
Gypsum Board Lbr 0.3640 125,000.00 45,500.00
Paku Skrup Kg 0.1100 28,000.00 3,080.00
JUMLAH HARGA BAHAN 48,580.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 60,630.00


E Overhead & Profit 10% x D 6,063.00
F Harga Satuan Pekerjaan (D+E) 66,693.00

A.4.5.1.9 Pemasangan 1 M' List langit-langit kayu profil


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0500 65,000.00 3,250.00
Tukang Kayu OH 0.0500 90,000.00 4,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 8,600.00
B BAHAN
List Kayu Profil M 1.0500 5,625.00 5,906.25
Paku Kg 0.0100 17,000.00 170.00
JUMLAH HARGA BAHAN 6,076.25
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 14,676.25


E Overhead & Profit 10% x D 1,467.63
F Harga Satuan Pekerjaan (D+E) 16,143.88

A.4.5.2 PEKERJAAN PENUTUP ATAP

A.4.5.2.30 Pemasangan 1 M2 Genteng Beton


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 24,100.00
B BAHAN
Genteng Beton Bh 11.0000 6,200.00 68,200.00
Paku Seng Kg 0.0030 0.00
JUMLAH HARGA BAHAN 68,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 92,300.00


E Overhead & Profit 10% x D 9,230.00
F Harga Satuan Pekerjaan (D+E) 101,530.00

53 Analisa 2016
A.4.5.2.32 Pemasangan 1 M2 Genteng Metal
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 23,200.00
B BAHAN
Genteng Metal M2 1.0200 65,000.00 66,300.00
Paku genteng Kg 0.2000 33,000.00 6,600.00
JUMLAH HARGA BAHAN 72,900.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 96,100.00


E Overhead & Profit 10% x D 9,610.00
F Harga Satuan Pekerjaan (D+E) 105,710.00

A.4.5.2.33 Pemasangan 1 M2 Atap Sirap kayu


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.16600 65,000.00 10,790.00
Tukang Kayu OH 0.25000 90,000.00 22,500.00
Kepala Tukang OH 0.02500 110,000.00 2,750.00
Mandor OH 0.00800 100,000.00 800.00
JUMLAH TENAGA KERJA 36,840.00
B BAHAN
Sirap kayu Bh 30.0000 4,000.00 120,000.00
Paku Kg 0.2000 21,000.00 4,200.00
JUMLAH HARGA BAHAN 124,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 161,040.00


E Overhead & Profit 10% x D 16,104.00
F Harga Satuan Pekerjaan (D+E) 177,144.00

A.4.5.2.34 Pemasangan 1 M' Nok Genteng Beton


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.4000 65,000.00 26,000.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0200 100,000.00 2,000.00
JUMLAH TENAGA KERJA 48,200.00
B BAHAN
Nok Genteng Beton Bh 3.5000 6,200.00 21,700.00
Paku 1/2-1" Kg 0.0500 21,000.00 1,050.00
Semen Kg 10.8000 1,440.00 15,552.00
Pasir Pasang M3 0.0320 85,000.00 2,720.00
Semen Warna Kg 1.0000 2,625.00 2,625.00
JUMLAH HARGA BAHAN 43,647.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 91,847.00


E Overhead & Profit 10% x D 9,184.70
F Harga Satuan Pekerjaan (D+E) 101,031.70

A.4.5.2.36 Pemasangan 1 M' Nok Genteng Metal


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2500 65,000.00 16,250.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0130 100,000.00 1,300.00
JUMLAH TENAGA KERJA 32,700.00
B BAHAN
Nok Genteng Metal Bh 1.1000 33,000.00 36,300.00
Paku Genteng Kg 0.0500 33,000.00 1,650.00
JUMLAH HARGA BAHAN 37,950.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 70,650.00


E Overhead & Profit 10% x D 7,065.00
F Harga Satuan Pekerjaan (D+E) 77,715.00

54 Analisa 2016
A.4.5.2.37 Pemasangan 1 M' Nok Sirap
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1250 65,000.00 8,125.00
Tukang Kayu OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 33,975.00
B BAHAN
Seng plat 3 x 6" Lbr 0.4000 43,000.00 17,200.00
Paku 1/2-1" Kg 0.0500 21,000.00 1,050.00
Paku biasa Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 19,100.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 53,075.00


E Overhead & Profit 10% x D 5,307.50
F Harga Satuan Pekerjaan (D+E) 58,382.50

A.4.5.2.38 Pemasangan 1 M2 Seng Gelombang


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 65,000.00 7,800.00
Tukang Kayu OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 14,460.00
B BAHAN
Seng Gelombang 3"x6" Lbr 0.7000 39,000.00 27,300.00
Paku Seng Kg 0.0200 28,000.00 560.00
JUMLAH HARGA BAHAN 27,860.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 42,320.00


E Overhead & Profit 10% x D 4,232.00
F Harga Satuan Pekerjaan (D+E) 46,552.00

A.4.5.2.39 Pemasangan 1 M' Nok Atap Seng


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.0700 90,000.00 6,300.00
Kepala Tukang OH 0.0070 110,000.00 770.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 17,420.00
B BAHAN
Seng Plat 3"x6' Lbr 0.3000 43,000.00 12,900.00
Paku Seng Kg 0.0400 28,000.00 1,120.00
JUMLAH HARGA BAHAN 14,020.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 31,440.00


E Overhead & Profit (Contoh 15%) 15% x D 4,716.00
F Harga Satuan Pekerjaan (D+E) 36,156.00

A.4.5.2.40 Pemasangan 1 M2 Atap Aluminium


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.7500 90,000.00 67,500.00
Kepala Tukang OH 0.0800 110,000.00 8,800.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 86,650.00
B BAHAN
Aluminium tebal 0,55 Lbr 1.0500 #REF! #REF!
Paku hak panjang 15 cm Kg 0.0200 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

55 Analisa 2016
A.4.5.2.41 Pemasangan 1 M' Nok Aluminium
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 1.0000 90,000.00 90,000.00
Kepala Tukang OH 0.1000 110,000.00 11,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 112,500.00
B BAHAN
Nok standar 40x18 Bh 1.2000 #REF! #REF!
Paku hak panjang 15 cm Kg 0.0400 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.5.2.42 Pemasangan 1 M' Aluminium Foil/sisalation


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.0500 90,000.00 4,500.00
Kepala Tukang OH 0.0050 110,000.00 550.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 15,600.00
B BAHAN
Aluminium Foil Bh 1.0500 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.1 PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 7.0000 65,000.00 455,000.00
Tukang Kayu OH 21.0000 90,000.00 1,890,000.00
Kepala Tukang OH 2.1000 110,000.00 231,000.00
Mandor OH 0.3500 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,611,000.00
B BAHAN
Balok Kayu M3 1.1000 6,000,000.00 6,600,000.00
Paku 10 cm Kg 1.2500 17,000.00 21,250.00
Lem Kayu Kg 1.0000 27,000.00 27,000.00
JUMLAH HARGA BAHAN 6,648,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 9,259,250.00


E Overhead & Profit 10% x D 925,925.00
F Harga Satuan Pekerjaan (D+E) 10,185,175.00

A.4.6.1.2 Pembuatan dan pemasangan 1 M3 kusen pintu dan kusen jendela kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.0000 65,000.00 390,000.00
Tukang Kayu OH 18.0000 90,000.00 1,620,000.00
Kepala Tukang OH 1.8000 110,000.00 198,000.00
Mandor OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,238,000.00
B BAHAN
Balok Kayu M3 1.2000 2,150,000.00 2,580,000.00
Paku 10 cm Kg 1.2500 17,000.00 21,250.00
Lem Kayu Kg 1.0000 27,000.00 27,000.00
JUMLAH HARGA BAHAN 2,628,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,866,250.00


E Overhead & Profit 10% x D 486,625.00
F Harga Satuan Pekerjaan (D+E) 5,352,875.00

56 Analisa 2016
A.4.6.1.3 Pembuatan dan pemasangan 1 M2 pintu pintu klamp standar, kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3500 65,000.00 22,750.00
Tukang Kayu OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.1050 110,000.00 11,550.00
Mandor OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 130,600.00
B BAHAN
Papan Kayu kelas II M3 0.0400 2,150,000.00 86,000.00
Paku Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 86,850.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 217,450.00


E Overhead & Profit 10% x D 21,745.00
F Harga Satuan Pekerjaan (D+E) 239,195.00

A.4.6.1.4 Pembuatan dan pemasangan 1 M2 pintu pintu klamp sederhana, kayu klas III
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3500 65,000.00 22,750.00
Tukang Kayu OH 1.0500 90,000.00 94,500.00
Kepala Tukang OH 0.1050 110,000.00 11,550.00
Mandor OH 0.0180 100,000.00 1,800.00
JUMLAH TENAGA KERJA 130,600.00
B BAHAN
Papan Kayu kelas III M3 0.0400 2,150,000.00 86,000.00
Paku Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 86,850.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 217,450.00


E Overhead & Profit 10% x D 21,745.00
F Harga Satuan Pekerjaan (D+E) 239,195.00

A.4.6.1.5 Pembuatan dan pemasangan 1 M2 daun pintu panel kayu klas I


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 3.0000 90,000.00 270,000.00
Kepala Tukang OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 373,000.00
B BAHAN
Papan Kayu kelas I M3 0.0400 6,000,000.00 240,000.00
Lem Kayu Kg 0.5000 27,000.00 13,500.00
JUMLAH HARGA BAHAN 253,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 626,500.00


E Overhead & Profit 10% x D 62,650.00
F Harga Satuan Pekerjaan (D+E) 689,150.00

A.4.6.1.6 Pembuatan dan pemasangan 1 M2 pintu dan jendela kaca, kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8000 65,000.00 52,000.00
Tukang Kayu OH 2.4000 90,000.00 216,000.00
Kepala Tukang OH 0.2400 110,000.00 26,400.00
Mandor OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 298,400.00
B BAHAN
Papan Kayu kelas II M3 0.0240 2,150,000.00 51,600.00
Lem Kayu Kg 0.3000 27,000.00 8,100.00
JUMLAH HARGA BAHAN 59,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 358,100.00


E Overhead & Profit 10% x D 35,810.00
F Harga Satuan Pekerjaan (D+E) 393,910.00

57 Analisa 2016
A.4.6.1.7 Pembuatan dan pemasangan 1 M2 pintu dan jendela Jalusi, kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 3.0000 90,000.00 270,000.00
Kepala Tukang OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 373,000.00
B BAHAN
Papan Kayu kelas I M3 0.0640 6,000,000.00 384,000.00
Lem Kayu Kg 0.5000 27,000.00 13,500.00
JUMLAH HARGA BAHAN 397,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 770,500.00


E Overhead & Profit 10% x D 77,050.00
F Harga Satuan Pekerjaan (D+E) 847,550.00

A.4.6.1.7a Pembuatan dan pemasangan 1 M2 pintu dan jendela Jalusi, kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Kayu OH 3.0000 90,000.00 270,000.00
Kepala Tukang OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 373,000.00
B BAHAN
Papan Kayu kelas II M3 0.0640 2,150,000.00 137,600.00
Lem Kayu Kg 0.5000 27,000.00 13,500.00
JUMLAH HARGA BAHAN 151,100.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 524,100.00


E Overhead & Profit 10% x D 52,410.00
F Harga Satuan Pekerjaan (D+E) 576,510.00

A.4.6.1.8 Pembuatan 1 M2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7000 65,000.00 45,500.00
Tukang Kayu OH 2.1000 90,000.00 189,000.00
Kepala Tukang OH 0.2100 110,000.00 23,100.00
Mandor OH 0.0350 100,000.00 3,500.00
JUMLAH TENAGA KERJA 261,100.00
B BAHAN
Papan Kayu kelas II M3 0.0250 2,150,000.00 53,750.00
Paku halus Kg 0.0300 21,000.00 630.00
Lem Kayu Kg 0.5000 27,000.00 13,500.00
Plywood tebal 4 mm Lbr 1.0000 72,000.00 72,000.00
JUMLAH HARGA BAHAN 139,880.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 400,980.00


E Overhead & Profit 10% x D 40,098.00
F Harga Satuan Pekerjaan (D+E) 441,078.00

A.4.6.1.9 Pembuatan 1 M2 pintu plywood rangkap, rangka expose kayu kelas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8000 65,000.00 52,000.00
Tukang Kayu OH 2.4000 90,000.00 216,000.00
Kepala Tukang OH 0.2400 110,000.00 26,400.00
Mandor OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 298,400.00
B BAHAN
Papan Kayu kelas II M3 0.0256 2,150,000.00 55,040.00
Paku halus Kg 0.0300 21,000.00 630.00
Lem Kayu Kg 0.5000 27,000.00 13,500.00
Plywood tebal 4 mm Kg 1.0000 72,000.00 72,000.00
JUMLAH HARGA BAHAN 141,170.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 439,570.00


E Overhead & Profit 10% x D 43,957.00
F Harga Satuan Pekerjaan (D+E) 483,527.00

58 Analisa 2016
A.4.6.1.10 Pemasangan 1 M2 Jalusi kusen, kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6700 65,000.00 43,550.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Kepala Tukang OH 0.2000 110,000.00 22,000.00
Mandor OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 279,050.00
B BAHAN
Papan Kayu kelas I M3 0.0600 6,000,000.00 360,000.00
Lem Kayu Kg 0.1500 27,000.00 4,050.00
JUMLAH HARGA BAHAN 364,050.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 643,100.00


E Overhead & Profit 10% x D 64,310.00
F Harga Satuan Pekerjaan (D+E) 707,410.00

A.4.6.1.10a Pemasangan 1 M2 Jalusi kusen, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6700 65,000.00 43,550.00
Tukang Kayu OH 2.0000 90,000.00 180,000.00
Kepala Tukang OH 0.2000 110,000.00 22,000.00
Mandor OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 279,050.00
B BAHAN
Papan Kayu kelas II M3 0.0600 2,150,000.00 129,000.00
Lem Kayu Kg 0.1500 27,000.00 4,050.00
JUMLAH HARGA BAHAN 133,050.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 412,100.00


E Overhead & Profit 10% x D 41,210.00
F Harga Satuan Pekerjaan (D+E) 453,310.00

A.4.6.1.11 Pemasangan 1 M2 teakwood rangkap, rangka expose kayu kelas I


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8000 65,000.00 52,000.00
Tukang Kayu OH 2.4000 90,000.00 216,000.00
Kepala Tukang OH 0.2400 110,000.00 26,400.00
Mandor OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 298,400.00
B BAHAN
Papan Kayu kelas I M3 0.0250 6,000,000.00 150,000.00
Paku halus Kg 0.0300 21,000.00 630.00
Lem Kayu Kg 0.3000 27,000.00 8,100.00
Teakwood tebal 4 mm Lbr 1.0000 110,000.00 110,000.00
JUMLAH HARGA BAHAN 268,730.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 567,130.00


E Overhead & Profit 10% x D 56,713.00
F Harga Satuan Pekerjaan (D+E) 623,843.00

A.4.6.1.12 Pemasangan 1 M2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8500 65,000.00 55,250.00
Tukang Kayu OH 2.5500 90,000.00 229,500.00
Kepala Tukang OH 0.2550 110,000.00 28,050.00
Mandor OH 0.0430 100,000.00 4,300.00
JUMLAH TENAGA KERJA 317,100.00
B BAHAN
Papan Kayu kelas II M3 0.0250 2,150,000.00 53,750.00
Paku halus Kg 0.0300 21,000.00 630.00
Lem Kayu Kg 0.8000 27,000.00 21,600.00
Teakwood tebal 4 mm Lbr 1.0000 110,000.00 110,000.00
Formika Lbr 0.5000 142,000.00 71,000.00
JUMLAH HARGA BAHAN 256,980.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 574,080.00


E Overhead & Profit 10% x D 57,408.00
F Harga Satuan Pekerjaan (D+E) 631,488.00

59 Analisa 2016
A.4.6.1.13 Pemasangan 1 M3 Konstruksi kuda-kuda konvensional, kayu klas II bentang 6 m
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 4.0000 65,000.00 260,000.00
Tukang Kayu OH 12.0000 90,000.00 1,080,000.00
Kepala Tukang OH 1.2000 110,000.00 132,000.00
Mandor OH 0.2000 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,492,000.00
B BAHAN
Balok Kayu M3 1.1000 2,150,000.00 2,365,000.00
Besi Strip tebal 5mm Kg 15.0000 13,000.00 195,000.00
Paku 12 cm Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 2,655,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,147,200.00


E Overhead & Profit 10% x D 414,720.00
F Harga Satuan Pekerjaan (D+E) 4,561,920.00

A.4.6.1.14 Pemasangan 1 M3 Konstruksi kuda-kuda expose, kayu klas I


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.7000 65,000.00 435,500.00
Tukang Kayu OH 20.1000 90,000.00 1,809,000.00
Kepala Tukang OH 2.0100 110,000.00 221,100.00
Mandor OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 2,499,100.00
B BAHAN
Balok Kayu kelas I M3 1.2000 6,000,000.00 7,200,000.00
Besi Strip tebal 5mm Kg 15.0000 13,000.00 195,000.00
Paku 12 cm Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 7,490,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 9,989,300.00


E Overhead & Profit 10% x D 998,930.00
F Harga Satuan Pekerjaan (D+E) 10,988,230.00

A.4.6.1.15 Pemasangan 1 M3 Konstruksi Gording, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.7000 65,000.00 435,500.00
Tukang Kayu OH 20.1000 90,000.00 1,809,000.00
Kepala Tukang OH 2.0100 110,000.00 221,100.00
Mandor OH 0.3350 100,000.00 33,500.00
JUMLAH TENAGA KERJA 2,499,100.00
B BAHAN
Balok Kayu M3 1.1000 2,150,000.00 2,365,000.00
Besi Strip tebal 5mm Kg 15.0000 13,000.00 195,000.00
Paku 12 cm Kg 3.0000 17,000.00 51,000.00
JUMLAH HARGA BAHAN 2,611,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,110,100.00


E Overhead & Profit 10% x D 511,010.00
F Harga Satuan Pekerjaan (D+E) 5,621,110.00

A.4.6.1.17 Pemasangan 1 M2 rangka atap genteng beton, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 17,100.00
B BAHAN
Kayu Kaso-kaso M3 0.0140 2,150,000.00 30,100.00
Kayu Reng M3 0.0570 2,550,000.00 145,350.00
Paku biasa Kg 0.2500 17,000.00 4,250.00
JUMLAH HARGA BAHAN 179,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 196,800.00


E Overhead & Profit 10% x D 19,680.00
F Harga Satuan Pekerjaan (D+E) 216,480.00

60 Analisa 2016
A.4.6.1.18 Pemasangan 1 M2 rangka atap sirap, kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1200 65,000.00 7,800.00
Tukang Kayu OH 0.1200 90,000.00 10,800.00
Kepala Tukang OH 0.0120 110,000.00 1,320.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 20,520.00
B BAHAN
Kayu kelas II M3 0.0140 2,150,000.00 30,100.00
Paku biasa Kg 0.0570 17,000.00 969.00
JUMLAH HARGA BAHAN 31,069.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 51,589.00


E Overhead & Profit 10% x D 5,158.90
F Harga Satuan Pekerjaan (D+E) 56,747.90

A.4.6.1.19 Pemasangan 1 M2 rangka langit-langit (50 x 100) cm, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.3000 90,000.00 27,000.00
Kepala Tukang OH 0.0300 110,000.00 3,300.00
Mandor OH 0.0750 100,000.00 7,500.00
JUMLAH TENAGA KERJA 47,550.00
B BAHAN
Kayu kelas II M3 0.0154 2,150,000.00 33,110.00
Paku biasa Kg 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 36,510.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 84,060.00


E Overhead & Profit 10% x D 8,406.00
F Harga Satuan Pekerjaan (D+E) 92,466.00

A.4.6.1.20 Pemasangan 1 M2 Rangka langit-langit (60x60) cm, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.3000 90,000.00 27,000.00
Kepala Tukang OH 0.0300 110,000.00 3,300.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 44,300.00
B BAHAN
Kayu kelas II M3 0.0163 2,150,000.00 35,045.00
Paku biasa Kg 0.2500 17,000.00 4,250.00
JUMLAH HARGA BAHAN 39,295.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 83,595.00


E Overhead & Profit 10% x D 8,359.50
F Harga Satuan Pekerjaan (D+E) 91,954.50

A.4.6.1.21 Pemasangan 1 M' Lisplank ukuran (3x20) cm, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
Papan kayu M3 0.0108 2,150,000.00 23,220.00
Paku biasa Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 24,070.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 51,270.00


E Overhead & Profit 10% x D 5,127.00
F Harga Satuan Pekerjaan (D+E) 56,397.00

61 Analisa 2016
A.4.6.1.21a Pemasangan 1 M' Lisplank ukuran (2x20) cm, kayu klas I
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
Papan kayu M3 0.0063 8,000,000.00 50,400.00
Paku biasa Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 51,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 78,450.00


E Overhead & Profit 10% x D 7,845.00
F Harga Satuan Pekerjaan (D+E) 86,295.00

A.4.6.1.22 Pemasangan 1 M' Lisplank ukuran (3x30) cm, kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
Papan kayu M3 0.011 2,150,000.00 23,650.00
Paku biasa Kg 0.050 17,000.00 850.00
JUMLAH HARGA BAHAN 24,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 51,700.00


E Overhead & Profit 10% x D 5,170.00
F Harga Satuan Pekerjaan (D+E) 56,870.00

A.4.6.1.22a Pemasangan 1 M' Lisplank ukuran (2x30) cm, kayu klas I


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
Papan kayu M3 0.0078 8,000,000.00 62,400.00
Paku biasa Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 63,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 90,450.00


E Overhead & Profit 10% x D 9,045.00
F Harga Satuan Pekerjaan (D+E) 99,495.00

A.4.6.1.22b Pemasangan 1 M' Lisplank GRC 8 mm (L=30 cm)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Tukang Kayu OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 27,200.00
B BAHAN
GRC Kpg 0.4500 60,000.00 27,000.00
Paku Kg 0.0500 17,000.00 850.00
JUMLAH HARGA BAHAN 27,850.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 55,050.00


E Overhead & Profit 10% x D 5,505.00
F Harga Satuan Pekerjaan (D+E) 60,555.00

62 Analisa 2016
A.4.6.1.23 Pemasangan 1 M2 Dinding pemisah (60 x 120) cm kayu klas II
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,000.00
B BAHAN
Balok Kayu M3 0.0280 2,150,000.00 60,200.00
Paku 5-10 cm Kg 0.1500 17,000.00 2,550.00
JUMLAH HARGA BAHAN 62,750.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 118,750.00


E Overhead & Profit 10% x D 11,875.00
F Harga Satuan Pekerjaan (D+E) 130,625.00

A.4.6.1.24 Pemasangan 1 M2 Dinding pemisah Teakwood rangkap, rangka kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Tukang Kayu OH 0.4500 90,000.00 40,500.00
Kepala Tukang OH 0.0450 110,000.00 4,950.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 56,000.00
B BAHAN
Balok Kayu 6x12 M3 0.0280 2,150,000.00 60,200.00
Paku 5-10 cm Kg 0.1500 17,000.00 2,550.00
Teakwood 4mm (120x240) cm Lembar 0.8600 110,000.00 94,600.00
Lem Kayu Kg 0.5600 27,000.00 15,120.00
JUMLAH HARGA BAHAN 172,470.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 228,470.00


E Overhead & Profit 10% x D 22,847.00
F Harga Satuan Pekerjaan (D+E) 251,317.00

A.4.6.1.25 Pemasangan 1 M2 Dinding pemisah Plywood rangkap, rangka kayu klas II


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.6000 90,000.00 54,000.00
Kepala Tukang OH 0.0600 110,000.00 6,600.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 74,600.00
B BAHAN
Balok Kayu 6x12 M3 0.0280 2,150,000.00 60,200.00
Paku 5-10 cm Kg 0.1500 17,000.00 2,550.00
Plywood 4mm (120x240) cm Lembar 0.8600 72,000.00 61,920.00
Lem Kayu Kg 0.5600 27,000.00 15,120.00
JUMLAH HARGA BAHAN 139,790.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 214,390.00


E Overhead & Profit 10% x D 21,439.00
F Harga Satuan Pekerjaan (D+E) 235,829.00

A.4.6.1.26 Pemasangan 1 M2 Dinding lambrisering dari papan kayu klas I


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.6000 65,000.00 39,000.00
Tukang Kayu OH 1.8000 90,000.00 162,000.00
Kepala Tukang OH 0.1800 110,000.00 19,800.00
Mandor OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 223,800.00
B BAHAN
Papan kayu M3 0.0070 6,000,000.00 42,000.00
Paku biasa Kg 0.1000 17,000.00 1,700.00
Paku skrup 10 cm Kg 0.1500 28,000.00 4,200.00
JUMLAH HARGA BAHAN 47,900.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 271,700.00


E Overhead & Profit 10% x D 27,170.00
F Harga Satuan Pekerjaan (D+E) 298,870.00

63 Analisa 2016
A.4.6.1.27 Pemasangan 1 M2 Dinding lambrisering dari plywood ukuran (120 x 240) cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0250 65,000.00 1,625.00
Tukang Kayu OH 0.0750 90,000.00 6,750.00
Kepala Tukang OH 0.0080 110,000.00 880.00
Mandor OH 0.0010 100,000.00 100.00
JUMLAH TENAGA KERJA 9,355.00
B BAHAN
Plywood 4 mm Lbr 0.4000 72,000.00 28,800.00
Paku triplek Kg 0.0500 21,000.00 1,050.00
JUMLAH HARGA BAHAN 29,850.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 39,205.00


E Overhead & Profit 10% x D 3,920.50
F Harga Satuan Pekerjaan (D+E) 43,125.50

1 M3 Pemasangan balok-balok, balok loteng dan konstruksi kuda-kuda sederhana, kayu kelas II (Analisa B
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 8.0000 65,000.00 520,000.00
Tukang Kayu OH 24.0000 90,000.00 2,160,000.00
Kepala Tukang OH 2.4000 110,000.00 264,000.00
Mandor OH 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA 2,984,000.00
B BAHAN
Balok kayu kelas II M3 1.1000 2,150,000.00 2,365,000.00
Paku Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 2,460,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,444,200.00


E Overhead & Profit 10% x D 544,420.00
F Harga Satuan Pekerjaan (D+E) 5,988,620.00

1 M3 Pasang Balok Pemikul, kayu kelas II (Analisa BOW)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.0000 65,000.00 390,000.00
Tukang Kayu OH 18.0000 90,000.00 1,620,000.00
Kepala Tukang OH 1.8000 110,000.00 198,000.00
Mandor OH 0.3000 100,000.00 30,000.00
JUMLAH TENAGA KERJA 2,238,000.00
B BAHAN
Balok kayu kelas II M3 1.1000 2,150,000.00 2,365,000.00
Paku Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 2,460,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,698,200.00


E Overhead & Profit 10% x D 469,820.00
F Harga Satuan Pekerjaan (D+E) 5,168,020.00

1 M3 Pasang Balok Gelegar, kayu kelas II (Analisa BOW)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 5.0000 65,000.00 325,000.00
Tukang Kayu OH 15.0000 90,000.00 1,350,000.00
Kepala Tukang OH 1.5000 110,000.00 165,000.00
Mandor OH 0.2500 100,000.00 25,000.00
JUMLAH TENAGA KERJA 1,865,000.00
B BAHAN
Balok kayu kelas II M3 1.1000 2,150,000.00 2,365,000.00
Paku Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 2,460,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 4,325,200.00


E Overhead & Profit 10% x D 432,520.00
F Harga Satuan Pekerjaan (D+E) 4,757,720.00

64 Analisa 2016
1 M3 Pasang Sandaran (loneng), kayu kelas II (Analisa BOW)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 8.0000 65,000.00 520,000.00
Tukang Kayu OH 24.0000 90,000.00 2,160,000.00
Kepala Tukang OH 2.4000 110,000.00 264,000.00
Mandor OH 0.4000 100,000.00 40,000.00
JUMLAH TENAGA KERJA 2,984,000.00
B BAHAN
Balok kayu kelas II M3 1.1000 2,150,000.00 2,365,000.00
Paku Kg 5.6000 17,000.00 95,200.00
JUMLAH HARGA BAHAN 2,460,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 5,444,200.00


E Overhead & Profit 10% x D 544,420.00
F Harga Satuan Pekerjaan (D+E) 5,988,620.00

1 M2 Memasang dinding papan kayu kelas II (Analisa BOW)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 64,500.00
B BAHAN
Kayu kelas II, papan T=2cm M3 0.0220 2,150,000.00 47,300.00
Paku Kg 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 50,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 115,200.00


E Overhead & Profit 10% x D 11,520.00
F Harga Satuan Pekerjaan (D+E) 126,720.00

1 M2 Pasang dinding/loteng papan disugu kedua belah pihak dengan sambungan lidah (Analisa BOW)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2800 65,000.00 18,200.00
Tukang Kayu OH 0.8000 90,000.00 72,000.00
Kepala Tukang OH 0.0800 110,000.00 8,800.00
Mandor OH 0.0140 100,000.00 1,400.00
JUMLAH TENAGA KERJA 100,400.00
B BAHAN
Kayu kelas II, papan T=2cm M3 0.0220 2,150,000.00 47,300.00
Paku Kg 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 50,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 151,100.00


E Overhead & Profit 10% x D 15,110.00
F Harga Satuan Pekerjaan (D+E) 166,210.00

1 M2 Memasang lantai papan kayu kelas II (Analisa BOW)


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 64,500.00
B BAHAN
Kayu kelas II, papan T=2cm M3 0.0220 2,150,000.00 47,300.00
Paku Kg 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 50,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 115,200.00


E Overhead & Profit 10% x D 11,520.00
F Harga Satuan Pekerjaan (D+E) 126,720.00

65 Analisa 2016
1 M2 Memasang lantai papan kayu kelas II (Analisa BOW)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.2000 65,000.00 13,000.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0100 100,000.00 1,000.00
JUMLAH TENAGA KERJA 64,500.00
B BAHAN
Kayu kelas II, papan T=3cm M3 0.0350 2,150,000.00 75,250.00
Paku Kg 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 78,650.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 143,150.00


E Overhead & Profit 10% x D 14,315.00
F Harga Satuan Pekerjaan (D+E) 157,465.00

A.4.6.2 PEKERJAAN KUNCI DAN KACA

A.4.6.2.1 pemasangan 1 buah kunci tanam antik


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0600 65,000.00 3,900.00
Tukang Kayu OH 0.6000 90,000.00 54,000.00
Kepala Tukang OH 0.0600 110,000.00 6,600.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 64,800.00
B BAHAN
Kunci Tanam Antik Bh 1.0000 90,000.00 90,000.00
JUMLAH HARGA BAHAN 90,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 154,800.00


E Overhead & Profit 10% x D 15,480.00
F Harga Satuan Pekerjaan (D+E) 170,280.00

A.4.6.2.2 pemasangan 1 buah kunci tanam biasa


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 65,000.00 650.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 51,650.00
B BAHAN
Kunci Tanam Biasa Bh 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 116,650.00


E Overhead & Profit 10% x D 11,665.00
F Harga Satuan Pekerjaan (D+E) 128,315.00

A.4.6.2.3 pemasangan 1 buah kunci Kamar Mandi


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0050 65,000.00 325.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 51,125.00
B BAHAN
Kunci Tanam KM Bh 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 116,125.00


E Overhead & Profit 10% x D 11,612.50
F Harga Satuan Pekerjaan (D+E) 127,737.50

66 Analisa 2016
A.4.6.2.4 pemasangan 1 buah kunci Silinder
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0050 65,000.00 325.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 51,125.00
B BAHAN
Kunci Silinder Bh 1.0000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 116,125.00


E Overhead & Profit 10% x D 11,612.50
F Harga Satuan Pekerjaan (D+E) 127,737.50

A.4.6.2.5 pemasangan 1 buah Engsel pintu


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0150 65,000.00 975.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 16,205.00
B BAHAN
Engsel Pintu Bh 1.0000 13,500.00 13,500.00
JUMLAH HARGA BAHAN 13,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 29,705.00


E Overhead & Profit 10% x D 2,970.50
F Harga Satuan Pekerjaan (D+E) 32,675.50

A.4.6.2.6 pemasangan 1 buah Engsel jendela


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 65,000.00 650.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0005 100,000.00 50.00
JUMLAH TENAGA KERJA 10,800.00
B BAHAN
Engsel Jendela Bh 1.0000 10,000.00 10,000.00
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 20,800.00


E Overhead & Profit 10% x D 2,080.00
F Harga Satuan Pekerjaan (D+E) 22,880.00

A.4.6.2.9 pemasangan 1 buah kait angin


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0150 65,000.00 975.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 16,205.00
B BAHAN
Kait Angin Bh 1.0000 6,700.00 6,700.00
JUMLAH HARGA BAHAN 6,700.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 22,905.00


E Overhead & Profit 10% x D 2,290.50
F Harga Satuan Pekerjaan (D+E) 25,195.50

67 Analisa 2016
A.4.6.2.10 pemasangan 1 buah door closer
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0500 65,000.00 3,250.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 54,050.00
B BAHAN
Door closer Bh 1.0000 160,000.00 160,000.00
JUMLAH HARGA BAHAN 160,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 214,050.00


E Overhead & Profit 10% x D 21,405.00
F Harga Satuan Pekerjaan (D+E) 235,455.00

A.4.6.2.12 pemasangan 1 buah door holder


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0500 65,000.00 3,250.00
Tukang Kayu OH 0.5000 90,000.00 45,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 54,050.00
B BAHAN
Door holder Bh 1.0000 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.6.2.13 pemasangan 1 buah door stop


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 65,000.00 650.00
Tukang Kayu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 11,250.00
B BAHAN
Door stop Bh 1.0000 27,000.00 27,000.00
JUMLAH HARGA BAHAN 27,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 38,250.00


E Overhead & Profit 10% x D 3,825.00
F Harga Satuan Pekerjaan (D+E) 42,075.00

A.4.6.2.15 Pemasangan 1 buah Kunci Lemari


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0250 65,000.00 1,625.00
Tukang Kayu OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 27,005.00
B BAHAN
Kunci Lemari Bh 1.0000 13,500.00 13,500.00
JUMLAH HARGA BAHAN 13,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 40,505.00


E Overhead & Profit 10% x D 4,050.50
F Harga Satuan Pekerjaan (D+E) 44,555.50

68 Analisa 2016
A.4.6.2.16 Pemasangan 1 M2 kaca 3 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0150 65,000.00 975.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 16,205.00
B BAHAN
Kaca 3 mm M2 1.1000 92,000.00 101,200.00
Sealant Kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 102,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 118,405.00


E Overhead & Profit 10% x D 11,840.50
F Harga Satuan Pekerjaan (D+E) 130,245.50

A.4.6.2.17 pemasangan 1 M2 kaca 5 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0150 65,000.00 975.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 16,205.00
B BAHAN
Kaca 5 mm M2 1.1000 108,000.00 118,800.00
Sealant Kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 119,800.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 136,005.00


E Overhead & Profit 10% x D 13,600.50
F Harga Satuan Pekerjaan (D+E) 149,605.50

A.4.6.2.18 pemasangan 1 M2 kaca 8 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0170 65,000.00 1,105.00
Tukang Kayu OH 0.1700 90,000.00 15,300.00
Kepala Tukang OH 0.0170 110,000.00 1,870.00
Mandor OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 19,175.00
B BAHAN
Kaca 8 mm M2 1.1000 155,000.00 170,500.00
Sealant Kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 171,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 190,675.00


E Overhead & Profit 10% x D 19,067.50
F Harga Satuan Pekerjaan (D+E) 209,742.50

A.4.6.2.19 Pemasangan 1 M2 kaca buran tebal 12 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0250 65,000.00 1,625.00
Tukang Kayu OH 0.2500 90,000.00 22,500.00
Kepala Tukang OH 0.0250 110,000.00 2,750.00
Mandor OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 27,005.00
B BAHAN
Kaca buram 12 mm M2 1.1000 #REF! #REF!
Sealant Kg 0.0700 20,000.00 1,400.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

69 Analisa 2016
A.4.6.2.20 Pemasangan 1 M2 Kaca Cermin tebal 5 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0150 65,000.00 975.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 16,205.00
B BAHAN
Kaca cermin 5 mm M2 1.1000 135,000.00 148,500.00
JUMLAH HARGA BAHAN 148,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 164,705.00


E Overhead & Profit 10% x D 16,470.50
F Harga Satuan Pekerjaan (D+E) 181,175.50

A.4.6.2.23 Pemasangan 1 M2 Kaca Patri tebal 5 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0750 65,000.00 4,875.00
Tukang Kayu OH 0.1500 90,000.00 13,500.00
Kepala Tukang OH 0.0150 110,000.00 1,650.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 20,425.00
B BAHAN
Kaca Patri 5 mm M2 1.1000 113,000.00 124,300.00
Sealant Kg 0.0500 20,000.00 1,000.00
JUMLAH HARGA BAHAN 125,300.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 145,725.00


E Overhead & Profit 10% x D 14,572.50
F Harga Satuan Pekerjaan (D+E) 160,297.50

A.4.7.1 PEKERJAAN PENGECATAN

A.4.7.1.1 1 M2 Pengikisan/pengerokan permukaan cat lama


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,050.00
B BAHAN
Soda Api Kg 0.0500 22,000.00 1,100.00
JUMLAH HARGA BAHAN 1,100.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,150.00


E Overhead & Profit 10% x D 1,115.00
F Harga Satuan Pekerjaan (D+E) 12,265.00

A.4.7.1.2 1 M2 Pencucian bidang permukaan tembok yang pernah dicat


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1500 65,000.00 9,750.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,050.00
B BAHAN
Sabun Kg 0.0500 27,000.00 1,350.00
JUMLAH HARGA BAHAN 1,350.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,400.00


E Overhead & Profit 10% x D 1,140.00
F Harga Satuan Pekerjaan (D+E) 12,540.00

70 Analisa 2016
A.4.7.1.4 Pengecatan 1 M2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 65,000.00 4,550.00
Tukang Cat OH 0.0090 90,000.00 810.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,320.00
B BAHAN
Cat Menie Kg 0.2000 36,000.00 7,200.00
Plamuur Kg 0.1500 23,500.00 3,525.00
Cat Dasar Kg 0.1700 34,000.00 5,780.00
Cat Penutup Kg 0.2600 56,500.00 14,690.00
Kuas Bh 0.0100 25,000.00 250.00
Pengencer Kg 0.0300 11,500.00 345.00
Amplas Lbr 0.2000 4,000.00 800.00
JUMLAH HARGA BAHAN 32,590.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 38,910.00


E Overhead & Profit 10% x D 3,891.00
F Harga Satuan Pekerjaan (D+E) 42,801.00

A.4.7.1.5 Pengecatan 1 M2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0700 65,000.00 4,550.00
Tukang Cat OH 0.1050 90,000.00 9,450.00
Kepala Tukang OH 0.0040 110,000.00 440.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 14,740.00
B BAHAN
Cat Menie Kg 0.2000 36,000.00 7,200.00
Plamuur Kg 0.1500 23,500.00 3,525.00
Cat Dasar Kg 0.1700 34,000.00 5,780.00
Cat Penutup Kg 0.3500 56,500.00 19,775.00
Kuas Bh 0.0100 25,000.00 250.00
Pengencer Kg 0.0300 11,500.00 345.00
Amplas Lbr 0.2000 4,000.00 800.00
JUMLAH HARGA BAHAN 37,675.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 52,415.00


E Overhead & Profit 10% x D 5,241.50
F Harga Satuan Pekerjaan (D+E) 57,656.50

A.4.7.1.7 Pelaburan 1 M2 bidang kayu dengan politur


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0400 65,000.00 2,600.00
Tukang Cat OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0160 110,000.00 1,760.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 10,060.00
B BAHAN
Politur Ltr 0.1500 62,000.00 9,300.00
Politur jadi Ltr 0.3720 62,000.00 23,064.00
Amplas Lbr 2.0000 4,000.00 8,000.00
JUMLAH HARGA BAHAN 40,364.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 50,424.00


E Overhead & Profit 10% x D 5,042.40
F Harga Satuan Pekerjaan (D+E) 55,466.40

71 Analisa 2016
A.4.7.1.8 Pelaburan 1 M2 bidang kayu dengan cat residu atau ter
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1000 65,000.00 6,500.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 7,100.00
B BAHAN
Residu atau ter Ltr 0.3500 12,000.00 4,200.00
JUMLAH HARGA BAHAN 4,200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 11,300.00


E Overhead & Profit 10% x D 1,130.00
F Harga Satuan Pekerjaan (D+E) 12,430.00

A.4.7.1.9 Pelaburan 1 M2 bidang kayu dengan vernis


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1600 65,000.00 10,400.00
Tukang Cat OH 0.1600 90,000.00 14,400.00
Kepala Tukang OH 0.0160 110,000.00 1,760.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 26,860.00
B BAHAN
Vernis Ltr 0.1500 55,000.00 8,250.00
Dempul Kg 0.0500 23,500.00 1,175.00
Amplas Lbr 0.1000 4,000.00 400.00
JUMLAH HARGA BAHAN 8,250.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 35,110.00


E Overhead & Profit 10% x D 3,511.00
F Harga Satuan Pekerjaan (D+E) 38,621.00

A.4.7.1.10 Pengecatan 1 M2 Tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0200 65,000.00 1,300.00
Tukang Cat OH 0.0630 90,000.00 5,670.00
Kepala Tukang OH 0.0063 110,000.00 693.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 7,963.00
B BAHAN
Plamuur Kg 0.1000 8,500.00 850.00
Cat Dasar Kg 0.1000 18,000.00 1,800.00
Cat Penutup Kg 0.2600 22,500.00 5,850.00
JUMLAH HARGA BAHAN 8,500.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 16,463.00


E Overhead & Profit 10% x D 1,646.30
F Harga Satuan Pekerjaan (D+E) 18,109.30

A.4.7.1.11 Pengecatan 1 M2 Tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0280 65,000.00 1,820.00
Tukang Cat OH 0.0420 90,000.00 3,780.00
Kepala Tukang OH 0.0042 110,000.00 462.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 6,362.00
B BAHAN

Cat Dasar Kg 0.1200 18,000.00 2,160.00


Cat Penutup Kg 0.1800 22,500.00 4,050.00
JUMLAH HARGA BAHAN 6,210.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 12,572.00


E Overhead & Profit 10% x D 1,257.20
F Harga Satuan Pekerjaan (D+E) 13,829.20

72 Analisa 2016
A.4.7.1.15 Pemasangan 1 M2 wallpaper
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0200 65,000.00 1,300.00
Tukang Cat OH 0.2000 90,000.00 18,000.00
Kepala Tukang OH 0.0200 110,000.00 2,200.00
Mandor OH 0.0025 100,000.00 250.00
JUMLAH TENAGA KERJA 21,750.00
B BAHAN
Wall papper M2 0.1200 #REF! #REF!
Lem Kg 0.2000 27,000.00 5,400.00
JUMLAH HARGA BAHAN #REF!
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.5.1.1 PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 Pemasangan 1 buah closet duduk/monoblock


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 3.3000 65,000.00 214,500.00
Tukang Batu OH 1.1000 90,000.00 99,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 330,600.00
B BAHAN
Closet Duduk Unit 1.0000 1,800,000.00 1,800,000.00
Perlengkapan Ls 6%x closet 108,000.00 108,000.00

JUMLAH HARGA BAHAN 1,908,000.00


C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 2,238,600.00


E Overhead & Profit 10% x D 223,860.00
F Harga Satuan Pekerjaan (D+E) 2,462,460.00

A.5.1.1.2 Pemasangan 1 buah closet jongkok porselin


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Batu OH 1.5000 90,000.00 135,000.00
Kepala Tukang OH 0.1500 110,000.00 16,500.00
Mandor OH 0.1600 100,000.00 16,000.00
JUMLAH TENAGA KERJA 232,500.00
B BAHAN
Closet jongkok Unit 1.0000 250,000.00 250,000.00
Semen Portlant Kg 6.0000 1,440.00 1,440.00
Pasir Pasang M3 0.0100 85,000.00 85,000.00
JUMLAH HARGA BAHAN 336,440.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 568,940.00


E Overhead & Profit 10% x D 56,894.00
F Harga Satuan Pekerjaan (D+E) 625,834.00

A.5.1.1.4 Pemasangan 1 buah urinoir


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 65,000.00 65,000.00
Tukang Batu OH 1.0000 90,000.00 90,000.00
Kepala Tukang OH 0.1000 110,000.00 11,000.00
Mandor OH 0.0500 100,000.00 5,000.00
JUMLAH TENAGA KERJA 171,000.00
B BAHAN
Urinoir Unit 1.0000 1,025,000.00 1,025,000.00
Semen Portlant Kg 6.0000 1,440.00 1,440.00
Pasir Pasang M3 0.0100 85,000.00 85,000.00
Perlengkapan Ls 30%xurinoir 307,500.00 307,500.00
JUMLAH HARGA BAHAN 1,418,940.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,589,940.00


E Overhead & Profit 10% x D 158,994.00
F Harga Satuan Pekerjaan (D+E) 1,748,934.00

73 Analisa 2016
A.5.1.1.5 Pemasangan 1 buah wastafel
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.2000 65,000.00 78,000.00
Tukang Batu OH 1.4500 90,000.00 130,500.00
Kepala Tukang OH 0.1500 110,000.00 16,500.00
Mandor OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 231,000.00
B BAHAN
Wastafel Unit 1.2000 400,000.00 480,000.00
Semen Portlant Kg 6.0000 1,440.00 1,440.00
Pasir Pasang M3 0.0100 85,000.00 85,000.00
Perlengkapan Ls 12%xwastafel 48,000.00 48,000.00
JUMLAH HARGA BAHAN 614,440.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 845,440.00


E Overhead & Profit 10% x D 84,544.00
F Harga Satuan Pekerjaan (D+E) 929,984.00

A.5.1.1.8 Pemasangan 1 buah bak mandi batu bata vol. 0.3 M3


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 6.0000 65,000.00 390,000.00
Tukang Batu OH 3.0000 90,000.00 270,000.00
Kepala Tukang OH 0.3000 110,000.00 33,000.00
Mandor OH 0.0300 100,000.00 3,000.00
JUMLAH TENAGA KERJA 696,000.00
B BAHAN
Bata Merah Bh 150.0000 500.00 75,000.00
Semen Portlant Kg 120.0000 1,440.00 172,800.00
Pasir Pasang M3 0.3000 85,000.00 25,500.00
Keramik 20 x 20 Bh 109.0000 2,920.00 318,280.00
Semen Warna Kg 6.0000 2,625.00 15,750.00
JUMLAH HARGA BAHAN 607,330.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,303,330.00


E Overhead & Profit 10% x D 130,333.00
F Harga Satuan Pekerjaan (D+E) 1,433,663.00

A.5.1.1.9 Pemasangan 1 buah bak fiberglass vol. 0,30 M3


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 3.0000 65,000.00 195,000.00
Tukang Batu OH 4.5000 90,000.00 405,000.00
Kepala Tukang OH 0.0500 110,000.00 5,500.00
Mandor OH 0.9000 100,000.00 90,000.00
JUMLAH TENAGA KERJA 695,500.00
B BAHAN
Bak Fiberglass Unit 1.0000 350,000.00 350,000.00
Perlengkapan Ls 12%xbak 42,000.00 42,000.00
JUMLAH HARGA BAHAN 392,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 1,087,500.00


E Overhead & Profit 10% x D 108,750.00
F Harga Satuan Pekerjaan (D+E) 1,196,250.00

A.5.1.1.12 Pemasangan 1 buah bak cuci piring stainlessteel


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0300 65,000.00 1,950.00
Tukang Batu OH 0.3000 90,000.00 27,000.00
Kepala Tukang OH 0.0300 110,000.00 3,300.00
Mandor OH 0.0150 100,000.00 1,500.00
JUMLAH TENAGA KERJA 33,750.00
B BAHAN
Bak cuci piring Unit 1.0000 250,000.00 250,000.00
Water Drain Bh 1.0000 58,000.00 58,000.00
JUMLAH HARGA BAHAN 308,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 341,750.00


E Overhead & Profit 10% x D 34,175.00
F Harga Satuan Pekerjaan (D+E) 375,925.00

74 Analisa 2016
A.5.1.1.14 Pemasangan 1 buah floor drain
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 65,000.00 650.00
Tukang Batu OH 0.1000 90,000.00 9,000.00
Kepala Tukang OH 0.0100 110,000.00 1,100.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 11,250.00
B BAHAN
Floor Drain Unit 1.0000 16,000.00 16,000.00
JUMLAH HARGA BAHAN 16,000.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 27,250.00


E Overhead & Profit 10% x D 2,725.00
F Harga Satuan Pekerjaan (D+E) 29,975.00

A.5.1.1.15 Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 2.1600 65,000.00 140,400.00
Tukang Batu OH 0.7200 90,000.00 64,800.00
Kepala Tukang OH 0.0720 110,000.00 7,920.00
Mandor OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 214,220.00
B BAHAN
Bata Merah Bh 40.0000 500.00 20,000.00
Semen Portlant Kg 44.0000 1,440.00 63,360.00
Pasir Pasang M3 0.0700 85,000.00 5,950.00
Pasir Beton M3 0.0600 85,000.00 5,100.00
Kerikil M3 0.0700 300,000.00 21,000.00
Baja Tulangan Kg 1.6000 15,495.70 24,793.12
JUMLAH HARGA BAHAN 140,203.12
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 354,423.12


E Overhead & Profit 10% x D 35,442.31
F Harga Satuan Pekerjaan (D+E) 389,865.43

A.5.1.1.19 Pemasangan 1 buah kran diameter 1/2" atau 3/4"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0100 65,000.00 650.00
Tukang Batu OH 0.4000 90,000.00 36,000.00
Kepala Tukang OH 0.0400 110,000.00 4,400.00
Mandor OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 41,550.00
B BAHAN
Kran Air Bh 1.0000 15,000.00 15,000.00
Sealtape Bh 0.0250 4,500.00 112.50
JUMLAH HARGA BAHAN 15,112.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 56,662.50


E Overhead & Profit 10% x D 5,666.25
F Harga Satuan Pekerjaan (D+E) 62,328.75

A.5.1.1.25 Pemasangan 1 M' Pipa PVC tipe AW diameter 1/2"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0360 65,000.00 2,340.00
Tukang Batu OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 8,600.00
B BAHAN
Pipa PVC 1/2" M 1.2000 5,375.00 6,450.00
Perlengkapan Ls 35%xPVC 1/2" 2,257.50 2,257.50
JUMLAH HARGA BAHAN 8,707.50
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 17,307.50


E Overhead & Profit 10% x D 1,730.75
F Harga Satuan Pekerjaan (D+E) 19,038.25

75 Analisa 2016
A.5.1.1.26 Pemasangan 1 M' Pipa PVC tipe AW diameter 3/4"
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0360 65,000.00 2,340.00
Tukang Batu OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 8,600.00
B BAHAN
Pipa PVC 3/4" M 1.2000 7,000.00 8,400.00
Perlengkapan Ls 35%xPVC 1/2" 2,940.00 2,940.00
JUMLAH HARGA BAHAN 11,340.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 19,940.00


E Overhead & Profit 10% x D 1,994.00
F Harga Satuan Pekerjaan (D+E) 21,934.00

A.5.1.1.27 Pemasangan 1 M' Pipa PVC tipe AW diameter 1"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0360 65,000.00 2,340.00
Tukang Batu OH 0.0600 90,000.00 5,400.00
Kepala Tukang OH 0.0060 110,000.00 660.00
Mandor OH 0.0020 100,000.00 200.00
JUMLAH TENAGA KERJA 8,600.00
B BAHAN
Pipa PVC 1" M 1.2000 9,500.00 11,400.00
Perlengkapan Ls 35%xPVC 1" 3,990.00 3,990.00
JUMLAH HARGA BAHAN 15,390.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 23,990.00


E Overhead & Profit 10% x D 2,399.00
F Harga Satuan Pekerjaan (D+E) 26,389.00

A.5.1.1.29 Pemasangan 1 M' Pipa PVC tipe AW diameter 2"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0540 65,000.00 3,510.00
Tukang Batu OH 0.0900 90,000.00 8,100.00
Kepala Tukang OH 0.0090 110,000.00 990.00
Mandor OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 12,900.00
B BAHAN
Pipa PVC 2" M 1.2000 20,750.00 24,900.00
Perlengkapan Ls 35%xPVC 2" 8,715.00 8,715.00
JUMLAH HARGA BAHAN 33,615.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 46,515.00


E Overhead & Profit 10% x D 4,651.50
F Harga Satuan Pekerjaan (D+E) 51,166.50

A.5.1.1.31 Pemasangan 1 M' Pipa PVC tipe AW diameter 3"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0810 65,000.00 5,265.00
Tukang Batu OH 0.1350 90,000.00 12,150.00
Kepala Tukang OH 0.0135 110,000.00 1,485.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 19,300.00
B BAHAN
Pipa PVC 3" M 1.2000 41,250.00 49,500.00
Perlengkapan Ls 35%xPVC 3" 17,325.00 17,325.00
JUMLAH HARGA BAHAN 66,825.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 86,125.00


E Overhead & Profit 10% x D 8,612.50
F Harga Satuan Pekerjaan (D+E) 94,737.50

76 Analisa 2016
A.5.1.1.32 Pemasangan 1 M' Pipa PVC tipe AW diameter 4"
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0810 65,000.00 5,265.00
Tukang Batu OH 0.1350 90,000.00 12,150.00
Kepala Tukang OH 0.0135 110,000.00 1,485.00
Mandor OH 0.0040 100,000.00 400.00
JUMLAH TENAGA KERJA 19,300.00
B BAHAN
Pipa PVC 4" M 1.2000 67,500.00 81,000.00
Perlengkapan Ls 35%xPVC 4" 28,350.00 28,350.00
JUMLAH HARGA BAHAN 109,350.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 128,650.00


E Overhead & Profit 10% x D 12,865.00
F Harga Satuan Pekerjaan (D+E) 141,515.00

A.5.1.1.35 Pemasangan 1 M' Pipa beton diameter 20 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1400 65,000.00 9,100.00
Tukang Batu OH 0.0700 90,000.00 6,300.00
Kepala Tukang OH 0.0070 110,000.00 770.00
Mandor OH 0.0070 100,000.00 700.00
JUMLAH TENAGA KERJA 16,870.00
B BAHAN
Pipa beton/gorong-gorong Bh 1.1000 82,000.00 90,200.00
Bata merah M3 0.0270 0.00
Semen portland Kg 3.9200 1,440.00 5,644.80
Pasir pasang M3 0.0560 85,000.00 4,760.00
Pasir urug M3 0.0240 75,000.00 1,800.00
JUMLAH HARGA BAHAN 102,404.80
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 119,274.80


E Overhead & Profit 10% x D 11,927.48
F Harga Satuan Pekerjaan (D+E) 131,202.28

A.5.1.1.36 Pemasangan 1 M' Pipa beton diameter 30 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3800 65,000.00 24,700.00
Tukang Batu OH 0.1900 90,000.00 17,100.00
Kepala Tukang OH 0.0190 110,000.00 2,090.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 45,790.00
B BAHAN
Pipa beton/gorong-gorong Bh 1.1000 120,000.00 132,000.00
Bata merah M3 0.5500 0.00
Semen portland Kg 10.3000 1,440.00 14,832.00
Pasir pasang M3 0.0610 85,000.00 5,185.00
Pasir urug M3 0.0690 75,000.00 5,175.00
JUMLAH HARGA BAHAN 157,192.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 202,982.00


E Overhead & Profit 10% x D 20,298.20
F Harga Satuan Pekerjaan (D+E) 223,280.20

77 Analisa 2016
A.5.1.1.36a Pemasangan 1 M' Pipa beton diameter 40 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3800 65,000.00 24,700.00
Tukang Batu OH 0.1900 90,000.00 17,100.00
Kepala Tukang OH 0.0190 110,000.00 2,090.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 45,790.00
B BAHAN
Pipa beton/gorong-gorong Bh 1.1000 166,000.00 182,600.00
Bata merah M3 0.5500 0.00
Semen portland Kg 10.3000 1,440.00 14,832.00
Pasir pasang M3 0.0610 85,000.00 5,185.00
Pasir urug M3 0.0690 75,000.00 5,175.00
JUMLAH HARGA BAHAN 207,792.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 253,582.00


E Overhead & Profit 10% x D 25,358.20
F Harga Satuan Pekerjaan (D+E) 278,940.20

A.5.1.1.36b Pemasangan 1 M' Pipa beton diameter 60 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3800 65,000.00 24,700.00
Tukang Batu OH 0.1900 90,000.00 17,100.00
Kepala Tukang OH 0.0190 110,000.00 2,090.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 45,790.00
B BAHAN
Pipa beton/gorong-gorong Bh 1.1000 215,000.00 236,500.00
Bata merah M3 0.5500 0.00
Semen portland Kg 10.3000 1,440.00 14,832.00
Pasir pasang M3 0.0610 85,000.00 5,185.00
Pasir urug M3 0.0690 75,000.00 5,175.00
JUMLAH HARGA BAHAN 261,692.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 307,482.00


E Overhead & Profit 10% x D 30,748.20
F Harga Satuan Pekerjaan (D+E) 338,230.20

A.5.1.1.36c Pemasangan 1 M' Pipa beton diameter 80 cm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.3800 65,000.00 24,700.00
Tukang Batu OH 0.1900 90,000.00 17,100.00
Kepala Tukang OH 0.0190 110,000.00 2,090.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 45,790.00
B BAHAN
Pipa beton/gorong-gorong Bh 1.1000 460,000.00 506,000.00
Bata merah M3 0.5500 0.00
Semen portland Kg 10.3000 1,440.00 14,832.00
Pasir pasang M3 0.0610 85,000.00 5,185.00
Pasir urug M3 0.0690 75,000.00 5,175.00
JUMLAH HARGA BAHAN 531,192.00
C PERALATAN
0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 576,982.00


E Overhead & Profit 10% x D 57,698.20
F Harga Satuan Pekerjaan (D+E) 634,680.20

78 Analisa 2016
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A.8.4.1.1 Pemasangan 1 M' Pipa PVC 63 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0810 65,000.00 5,265.00
Tukang Pipa OH 0.0410 90,000.00 3,690.00
Mandor OH 0.0080 100,000.00 800.00
JUMLAH TENAGA KERJA 9,755.00
B BAHAN
Pipa PVC 63 mm M' 1.0000 30,833.33 30,833.33
JUMLAH HARGA BAHAN 30,833.33
C PERALATAN
Sewa tripot/trakel & handle crane 2 T Hari 0.0060 20,000.00 120.00
JUMLAH HARGA ALAT 120.00

D Jumlah (A+B+C) 40,708.33


E Overhead & Profit 10% x D 4,070.83
F Harga Satuan Pekerjaan (D+E) 44,779.17

A.8.4.1.2 Pemasangan 1 M' Pipa PVC 90 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0940 65,000.00 6,110.00
Tukang Pipa OH 0.0470 90,000.00 4,230.00
Mandor OH 0.0090 100,000.00 900.00
JUMLAH TENAGA KERJA 11,240.00
B BAHAN
Pipa PVC 90 mm M' 1.000 68,333.33 68,333.33
JUMLAH HARGA BAHAN 68,333.33
C PERALATAN
Sewa tripot/trakel & handle crane 2 T Hari 0.0080 20,000.00 160.00
JUMLAH HARGA ALAT 160.00

D Jumlah (A+B+C) 79,733.33


E Overhead & Profit 10% x D 7,973.33
F Harga Satuan Pekerjaan (D+E) 87,706.67

A.8.4.1.3 Pemasangan 1 M' Pipa PVC 110 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1050 65,000.00 6,825.00
Tukang Pipa OH 0.0530 90,000.00 4,770.00
Mandor OH 0.0110 100,000.00 1,100.00
JUMLAH TENAGA KERJA 12,695.00
B BAHAN
Pipa PVC 110 mm M' 1.0000 86,666.67 86,666.67
JUMLAH HARGA BAHAN 86,666.67
C PERALATAN
Sewa tripot/trakel & handle crane 2 T Hari 0.0100 20,000.00 200.00
JUMLAH HARGA ALAT 200.00

D Jumlah (A+B+C) 99,561.67


E Overhead & Profit 10% x D 9,956.17
F Harga Satuan Pekerjaan (D+E) 109,517.83

A.8.4.1.4 Pemasangan 1 M' Pipa PVC 150 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1180 65,000.00 7,670.00
Tukang Pipa OH 0.0590 90,000.00 5,310.00
Mandor OH 0.0120 100,000.00 1,200.00
JUMLAH TENAGA KERJA 14,180.00
B BAHAN
Pipa PVC 150 mm M' 1.0000 220,000.00 220,000.00
JUMLAH HARGA BAHAN 220,000.00
C PERALATAN
Sewa tripot/trakel & handle crane 2 T Hari 0.0120 20,000.00 240.00
JUMLAH HARGA ALAT 240.00

D Jumlah (A+B+C) 234,420.00


E Overhead & Profit 10% x D 23,442.00
F Harga Satuan Pekerjaan (D+E) 257,862.00

79 Analisa 2016
A.8.4.1.5 Pemasangan 1 M' Pipa PVC 200 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.1890 65,000.00 12,285.00
Tukang Pipa OH 0.0950 90,000.00 8,550.00
Mandor OH 0.0190 100,000.00 1,900.00
JUMLAH TENAGA KERJA 22,735.00
B BAHAN
Pipa PVC 200 mm M' 1.0000 333,333.33 333,333.33
JUMLAH HARGA BAHAN 333,333.33
C PERALATAN
Sewa tripot/trakel & handle crane 2 T Hari 0.0240 20,000.00 480.00
JUMLAH HARGA ALAT 480.00

D Jumlah (A+B+C) 356,548.33


E Overhead & Profit 10% x D 35,654.83
F Harga Satuan Pekerjaan (D+E) 392,203.17

A.8.4.1.34 Pemasangan 1 M' Pipa GIP 100 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.4000 65,000.00 26,000.00
Tukang Pipa OH 0.2000 90,000.00 18,000.00
Mandor OH 0.0400 100,000.00 4,000.00
JUMLAH TENAGA KERJA 48,000.00
B BAHAN
Pipa GIP 100 mm M' 1.0000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN
Sewa tripot/trakel & handle crane 2 T 20,000.00 0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 78,000.00


E Overhead & Profit 10% x D 7,800.00
F Harga Satuan Pekerjaan (D+E) 85,800.00

A.8.4.1.35 Pemasangan 1 M' Pipa GIP 125 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.4480 65,000.00 29,120.00
Tukang Pipa OH 0.2240 90,000.00 20,160.00
Mandor OH 0.0450 100,000.00 4,500.00
JUMLAH TENAGA KERJA 53,780.00
B BAHAN
Pipa GIP 125 mm M' 1.0000 66,666.67 66,666.67
JUMLAH HARGA BAHAN 66,666.67
C PERALATAN
Sewa tripot/trakel & handle crane 2 T 0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 120,446.67


E Overhead & Profit 10% x D 12,044.67
F Harga Satuan Pekerjaan (D+E) 132,491.33

A.8.4.1.36 Pemasangan 1 M' Pipa GIP 150 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.5060 65,000.00 32,890.00
Tukang Pipa OH 0.2530 90,000.00 22,770.00
Mandor OH 0.0510 100,000.00 5,100.00
JUMLAH TENAGA KERJA 60,760.00
B BAHAN
Pipa GIP 150 mm M' 1.0000 70,000.00 70,000.00
JUMLAH HARGA BAHAN 70,000.00
C PERALATAN
Sewa tripot/trakel & handle crane 2 T 0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 130,760.00


E Overhead & Profit 10% x D 13,076.00
F Harga Satuan Pekerjaan (D+E) 143,836.00

80 Analisa 2016
A.8.4.1.37 Pemasangan 1 M' Pipa GIP 200 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.7960 65,000.00 51,740.00
Tukang Pipa OH 0.3980 90,000.00 35,820.00
Mandor OH 0.0800 100,000.00 8,000.00
JUMLAH TENAGA KERJA 95,560.00
B BAHAN
Pipa GIP 200 mm M' 1.0000 112,500.00 112,500.00
JUMLAH HARGA BAHAN 112,500.00
C PERALATAN
Sewa tripot/trakel & handle crane 2 T 0.00
JUMLAH HARGA ALAT 0.00

D Jumlah (A+B+C) 208,060.00


E Overhead & Profit 10% x D 20,806.00
F Harga Satuan Pekerjaan (D+E) 228,866.00

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A.8.4.5.1 Pengetesan 1 M' Pipa 50 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0080 65,000.00 520.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 600.00
B BAHAN
Air Test (air bersih) M3 0.0020 50,000.00 100.00
Bahan bakar Ltr 0.0600 10,500.00 630.00
Oli Ltr 0.0020 33,500.00 67.00
JUMLAH HARGA BAHAN 100.00
C PERALATAN
0.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 700.00


E Overhead & Profit 10% x D 70.00
F Harga Satuan Pekerjaan (D+E) 770.00

A.8.4.5.2 Pengetesan 1 M' Pipa 75 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0080 65,000.00 520.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 600.00
B BAHAN
Air Test (air bersih) M3 0.0040 50,000.00 200.00
Bahan bakar Ltr 0.0600 10,500.00 630.00
Oli Ltr 0.0020 33,500.00 67.00
JUMLAH HARGA BAHAN 200.00
C PERALATAN
0.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 800.00


E Overhead & Profit 10% x D 80.00
F Harga Satuan Pekerjaan (D+E) 880.00

A.8.4.5.3 Pengetesan 1 M' Pipa 100 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0080 65,000.00 520.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 600.00
B BAHAN
Air Test (air bersih) M3 0.0080 50,000.00 400.00
Bahan bakar Ltr 0.0600 10,500.00 630.00
Oli Ltr 0.0020 33,500.00 67.00
JUMLAH HARGA BAHAN 400.00
C PERALATAN
0.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,000.00


E Overhead & Profit 10% x D 100.00
F Harga Satuan Pekerjaan (D+E) 1,100.00

81 Analisa 2016
A.8.4.5.4 Pengetesan 1 M' Pipa 150 mm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0080 65,000.00 520.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 600.00
B BAHAN
Air Test (air bersih) M3 0.0180 50,000.00 900.00
Bahan bakar Ltr 0.0600 10,500.00 630.00
Oli Ltr 0.0020 33,500.00 67.00
JUMLAH HARGA BAHAN 900.00
C PERALATAN
0.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,500.00


E Overhead & Profit 10% x D 150.00
F Harga Satuan Pekerjaan (D+E) 1,650.00

A.8.4.5.5 Pengetesan 1 M' Pipa 200 mm


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0080 65,000.00 520.00
Mandor OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 600.00
B BAHAN
Air Test (air bersih) M3 0.0310 50,000.00 1,550.00
Bahan bakar Ltr 0.0600 10,500.00 630.00
Oli Ltr 0.0020 33,500.00 67.00
JUMLAH HARGA BAHAN 1,550.00
C PERALATAN
0.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,150.00


E Overhead & Profit 10% x D 215.00
F Harga Satuan Pekerjaan (D+E) 2,365.00

Pekerjaan Pemboran Pilot Hole dari 2" s/d 4" panjang 0-50 M
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Geolistrik OH 3.0000 110,000.00 330,000.00
Bor Master OH 3.0000 90,000.00 270,000.00
Driller OH 3.0000 65,000.00 195,000.00
Mekanik OH 3.0000 65,000.00 195,000.00
Welder OH 3.0000 65,000.00 195,000.00
Crow OH 6.0000 65,000.00 390,000.00
JUMLAH TENAGA KERJA 1,575,000.00
B BAHAN
Oli Ltr 3.0000 33,500.00 100,500.00
Solar Ltr 630.0000 10,500.00 6,615,000.00
Pertamax Ltr 30.0000 10,500.00 315,000.00
Crease Kg 1.5000 22,500.00 33,750.00
Lumpur Kg 15.0000 540.00 8,100.00
JUMLAH HARGA BAHAN 100,500.00
C PERALATAN
Depresiasi mesin bor Hari 3.0000 108,000.00
Depresiasi pompa air Hari 3.0000 76,000.00 228,000.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,675,500.00


E Overhead & Profit 10% x D 167,550.00
F Harga Satuan Pekerjaan (D+E) 1,843,050.00

Pekerjaan Pemboran Pilot Hole dari 2" s/d 4" panjang 50-80 M
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Geolistrik OH 4.0000 110,000.00 440,000.00
Bor Master OH 4.0000 90,000.00 360,000.00
Driller OH 4.0000 65,000.00 260,000.00
Mekanik OH 4.0000 65,000.00 260,000.00
Welder OH 4.0000 65,000.00 260,000.00
Crow OH 8.0000 65,000.00 520,000.00
JUMLAH TENAGA KERJA 2,100,000.00
B BAHAN
Solar Ltr 480.0000 10,500.00 5,040,000.00
Pertamax Ltr 60.0000 10,500.00 630,000.00
Lumpur Kg 20.0000 540.00 10,800.00
JUMLAH HARGA BAHAN 5,680,800.00
C PERALATAN
Depresiasi mesin bor Hari 4.000 108,000.00 432,000.00
Depresiasi pompa air Hari 4.000 76,000.00 304,000.00
JUMLAH HARGA ALAT 736,000.00

D Jumlah (A+B+C) 8,516,800.00


E Overhead & Profit 10% x D 851,680.00
F Harga Satuan Pekerjaan (D+E) 9,368,480.00

82 Analisa 2016
83 Analisa 2016
Pekerjaan Pembesaran Lubang Bor 4" s/d 6" panjang 0-50 M
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Geolistrik OH 2.0000 110,000.00 220,000.00
Bor Master OH 2.0000 90,000.00 180,000.00
Driller OH 2.0000 65,000.00 130,000.00
Mekanik OH 2.0000 65,000.00 130,000.00
Welder OH 2.0000 65,000.00 130,000.00
Crow OH 4.0000 65,000.00 260,000.00
JUMLAH TENAGA KERJA 1,050,000.00
B BAHAN
Oli Ltr 3.0000 33,500.00 100,500.00
Solar Ltr 240.0000 10,500.00 2,520,000.00
Pertamax Ltr 30.0000 10,500.00 315,000.00
Crease Kg 1.5000 22,500.00 33,750.00
Lumpur Kg 15.0000 540.00 8,100.00
JUMLAH HARGA BAHAN 2,977,350.00
C PERALATAN
Depresiasi mesin bor Hari 2.0000 108,000.00 216,000.00
Depresiasi pompa air Hari 2.0000 76,000.00 152,000.00
JUMLAH HARGA ALAT 368,000.00

D Jumlah (A+B+C) 4,395,350.00


E Overhead & Profit 10% x D 439,535.00
F Harga Satuan Pekerjaan (D+E) 4,834,885.00

Pekerjaan Pembesaran Lubang Bor 4" s/d 6" panjang 50-80 M


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Geolistrik OH 2.0000 110,000.00 220,000.00
Bor Master OH 2.0000 90,000.00 180,000.00
Driller OH 2.0000 65,000.00 130,000.00
Mekanik OH 2.0000 65,000.00 130,000.00
Welder OH 2.0000 65,000.00 130,000.00
Crow OH 4.0000 65,000.00 260,000.00
JUMLAH TENAGA KERJA 1,050,000.00
B BAHAN
Solar Ltr 110.0000 10,500.00 1,155,000.00
Pertamax Ltr 20.0000 10,500.00 210,000.00
Lumpur Kg 10.0000 540.00 5,400.00
JUMLAH HARGA BAHAN 1,370,400.00
C PERALATAN
Depresiasi mesin bor Hari 3.0000 108,000.00 324,000.00
Depresiasi pompa air Hari 3.0000 76,000.00 228,000.00
JUMLAH HARGA ALAT 552,000.00

D Jumlah (A+B+C) 2,972,400.00


E Overhead & Profit 10% x D 297,240.00
F Harga Satuan Pekerjaan (D+E) 3,269,640.00

1 M' Pengadaan dan Pemasangan Pipa Jambang 4"


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Driller OH 0.0400 65,000.00 2,600.00
Mekanik OH 0.0400 65,000.00 2,600.00
Welder OH 0.0400 65,000.00 2,600.00
Tukang pipa OH 0.0400 90,000.00 3,600.00
Crow OH 0.1200 65,000.00 7,800.00
JUMLAH TENAGA KERJA 19,200.00
B BAHAN
Pipa 4" + pipa saringan yang dibalut dengan ijuk M' 1.0000 110,000.00 110,000.00
JUMLAH HARGA BAHAN 110,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 129,200.00


E Overhead & Profit 10% x D 12,920.00
F Harga Satuan Pekerjaan (D+E) 142,120.00

84 Analisa 2016
Pekerjaan Samplink Weld Head dan Groting Semen/Unit Sumur
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Bor Master OH 1.0000 90,000.00 90,000.00
Mekanik OH 1.0000 65,000.00 65,000.00
Welder OH 1.0000 65,000.00 65,000.00
Crow OH 3.0000 65,000.00 195,000.00
JUMLAH TENAGA KERJA 415,000.00
B BAHAN
Solar Ltr 60.0000 10,500.00 630,000.00
Pasir M3 2.0000 85,000.00 170,000.00
Weld head Unit 1.0000 63,000.00 63,000.00
Samplink Unit 1.0000 59,000.00 59,000.00
Semen Kg 250.0000 1,440.00 360,000.00
JUMLAH HARGA BAHAN 1,282,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,697,000.00


E Overhead & Profit 10% x D 169,700.00
F Harga Satuan Pekerjaan (D+E) 1,866,700.00

Pekerjaan Pengadaan dan Pemasangan Filter / Unit


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang OH 1.0000 90,000.00 90,000.00
Pekerja OH 3.0000 65,000.00 195,000.00
JUMLAH TENAGA KERJA 285,000.00
B BAHAN
Tangki filter Unit 1.0000 1,620,000.00 1,620,000.00
Keni 1" Bh 6.0000 5,400.00 32,400.00
Water moer 1 " Bh 4.0000 54,500.00 218,000.00
Tea 1x1" Bh 1.0000 720,000.00 720,000.00
Pipa PVC 1" M 8.0000 9,500.00 76,000.00
Saringan filter Bh 1.0000 225,000.00 225,000.00
Pasir aktif Kg 50.0000 27,000.00 1,350,000.00
Pasir Mangan Kg 40.0000 29,000.00 1,160,000.00
Karbon Kg 50.0000 25,000.00 1,250,000.00
JUMLAH HARGA BAHAN 6,651,400.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 6,936,400.00


E Overhead & Profit 10% x D 693,640.00
F Harga Satuan Pekerjaan (D+E) 7,630,040.00

HARGA SATUAN PEKERJAAN JALAN LINGKUNGAN

1 M3 Pondasi Badan Jalan Batu keduk


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.8300 65,000.00 53,950.00
Mandor OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 59,950.00
B BAHAN
Batu keduk M3 1.2000 225,000.00 270,000.00
JUMLAH HARGA BAHAN 270,000.00
C PERALATAN
Mesin Gilas (4-6 ton ) Jam 0.1500 190,000.00 28,500.00
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 329,950.00


E Overhead & Profit 10% x D 32,995.00
F Harga Satuan Pekerjaan (D+E) 362,945.00

1 M2 Pekerjaan Resap Pengikat


No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0090 65,000.00 585.00
Mandor OH 0.0060 100,000.00 600.00
JUMLAH TENAGA KERJA 1,185.00
B BAHAN
Aspal Kg 0.6800 12,000.00 8,160.00
Minyak tanah Ltr 0.4500 10,300.00 4,635.00
JUMLAH HARGA BAHAN 12,795.00
C PERALATAN
Alat bantu Ls 1.0000 500.00 500.00
JUMLAH HARGA ALAT 500.00

D Jumlah (A+B+C) 14,480.00


E Overhead & Profit 10% x D 1,448.00
F Harga Satuan Pekerjaan (D+E) 15,928.00

85 Analisa 2016
1 M2 Pekerjaan Aspal Goreng Tebal 4 cm
No. Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 0.0217 65,000.00 1,410.50
Mandor OH 0.0022 100,000.00 220.00
JUMLAH TENAGA KERJA 1,630.50
B BAHAN
Aspal Kg 5.5000 12,000.00 66,000.00
Kerikil M3 0.0300 300,000.00 9,000.00
Pasir beton M3 0.0475 85,000.00 4,037.50
Minyak tanah Ltr 0.4900 10,300.00 5,047.00
Kayu bakar M3 0.0800 175,000.00 14,000.00
JUMLAH HARGA BAHAN 98,084.50
C PERALATAN
Truk Jam 0.0100 175,000.00 1,750.00
Mesin Gilas (4-6 ton ) Jam 0.0144 190,000.00 2,736.00
Alat bantu Ls 1.0000 3,500.00 3,500.00
JUMLAH HARGA ALAT 7,986.00

D Jumlah (A+B+C) 107,701.00


E Overhead & Profit 10% x D 10,770.10
F Harga Satuan Pekerjaan (D+E) 118,471.10

86 Analisa 2016
Pasir 1,400
Kerikil 1,350

tap metal

48,000 1.63 78,240


35,000 1.63 57,050

52,000 1.63 84,760


35,000 1.63 57,050

34,100 1.63 55,583 31,000 10 3,100


31,900 1.63 51,997 29,000 10 2,900

10 18,000 7 1,260 19,260


20 34,000 7 2,380 36,380
30 51,000 7 3,570 54,570

Besi hollow 150,000 7 10,500 160,500


160,000 26,667
25,000
34,100
31,900