Form No.

: 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours

I. INDIRECT COST
1. MOBILIZATION & DEMOBILIZATION LS 1.00
2. TEMPORARY FACILITY LS 1.00
3. UTILITY FACILITY LS 1.00

Total of Indirect Works 0.00 0.00

II. PERMANENT WORKS


2.1. Mechanical Insulation

Material Specification : see Appendix - 1

A. TURBINE AREA
1. DEAERATOR CHAMBER & STORAGE HOT 75 M2 265.00
2. FLASH TANK HOT 100 M2 28.00
3. BLOWDOWN TANK HOT 125 M2 32.00
4. STEAM TURBINE HOT 175 M2 69.80
5. BFW PUMP HOT 75 M2 68.90
6. LP HEATER 1 HOT 75 M2 638.00
7. LP HEATER 2 HOT 75 M2 537.00
8. TURBINE INSULATION (VALVE)
8.1. VALVE 25 EA 1.00
8.2. VALVE 40 EA 55.00
8.3. VALVE 50 EA 3.00
8.4. VALVE 65 EA 33.00
8.5. VALVE 75 EA 4.00
8.6. VALVE 100 EA 2.00
8.7. VALVE 40 EA 35.00
8.8. VALVE 50 EA 31.00
8.9. VALVE 65 EA 13.00

Total of Insulation for Turbine Area

B. BOILER AREA
1. STACK HOT 75 M2 #VALUE! #VALUE! #VALUE! #VALUE! DELETED
2. ESP HOT 75 M2 3,000.00
3. ELECTRIC AIR HEATER SILO HOT 40 M2 4.00
4. FLASH TANK HOT 100 M2 28.00
5. BLOWDOWN TANK HOT 125 M2 32.00
6. STEAM AIR TURBINE *) HOT 75 M2 2,107.60
7. GAS AIR HEATER *) HOT 75 M2 560.00
8. FORCED DRAFT FAN HOT 75 M2 300.00
SP 75 M2 300.00
9. INDUCED DRAFT FAN HOT 75 M2 410.00
SP 25 M2 410.00
10. PRIMARY AIR FAN HOT 75 M2 70.00
SP 25 M2 70.00
11. MILL SEAL AIR FAN HOT 75 M2 40.00
SP 25 M2 40.00

12. BOILER PROPER (REFER TO DOC. NO. 23047-A0F205-R0)


12.1. INSULATION OF EQUIPMENT
12.1.1. BOILER FURNACE WALL HOT 100 M2 1,760.00
12.1.2. BOILER 2ND PASS WALL HOT 100 M2 240.00
12.1.3. BOTTOM CASING HOT 100 M2 460.00
12.1.4. DITTO MANHOLE DOOR HOT 100 M2 2.00
12.1.5. BOILER 2ND PASS CASING HOT 100 M2 200.00
12.1.6. BOILER NOZE INNER CASING HOT 100 M2 70.00
12.1.7. PENTHOUSE CASING (1) HOT 100 M2 790.00
12.1.8. DITTO MANHOLE DOOR HOT 100 M2 2.00
12.1.9. PENTHOUSE CASING (2) HOT 100 M2 300.00
12.1.10. STEAM DRUM HOT 100 M2 32.00
12.1.11. DITTO MANHOLE DOOR HOT 100 M2 2.00
12.1.12. 1SH OUTLET HEADER HOT 100 M2 70.00
12.1.13. ECO OUTLET HEADER BOX HOT 85 M2 50.00
12.1.14. 2ND PASS EVA HEADER BOX HOT 75 M2 32.00
12.1.15. 2ND PASS EVA HEADER BOX HOT 75 M2 32.00
12.1.16. 2SH INLET HEADER & TUBE HOT 75 M2 82.00
12.1.17. 2SH OUTLET HEADER & TUBE HOT 75 M2 92.00
12.1.18. 3SH INLET HEADER & TUBE HOT 75 M2 106.00
12.1.19. 3SH OUTLET HEADER & TUBE HOT 75 M2 112.00

12.2. INSULATION OF CONNECTING PIPE


12.2.1. ECO OUTLET CONNECTING PIPE
PIPE 10.00 HOT 75 M 60.00
BEND 10.00 HOT 75 EA 4.00
ELBOW 10.00 HOT 75 EA 2.00
12.2.2. DOWNCOMER (FURNACE EVA)
PIPE 14.00 HOT 100 M 82.00
BEND 14.00 HOT 100 EA 8.00
ELBOW 14.00 HOT 100 EA 2.00
REDUCER 14.00 HOT 100 EA 2.00
12.2.3. DOWNCOMER (FURNACE EVA)
PIPE 14.00 HOT 100 M 80.00
BEND 14.00 HOT 100 EA 8.00
ELBOW 14.00 HOT 100 EA 2.00
TEE 14.00 HOT 100 EA 2.00
REDUCER 14.00 HOT 100 EA 2.00
12.2.4. DOWNCOMER (2ND PASS EVA - 1)
PIPE 8.00 HOT 75 M 56.00
ELBOW 8.00 HOT 75 EA 8.00
TEE 8.00 HOT 75 EA 4.00
12.2.5. DOWNCOMER (2ND PASS EVA - 2)
PIPE 6.00 HOT 75 M 8.00
ELBOW 6.00 HOT 75 EA 4.00
12.2.6. 1SH OUTLET CONNECTING PIPE
PIPE 14.00 HOT 100 M 28.00
BEND 14.00 HOT 100 EA 2.00
ELBOW 14.00 HOT 100 EA 2.00
12.2.7. 1ST ATTEMPERATOR
PIPE 14.00 HOT 100 M 10.00
12.2.8. 2SH INLET CONNECTING PIPE
PIPE 14.00 HOT 100 M 16.00
BEND 14.00 HOT 100 EA 2.00
ELBOW 14.00 HOT 100 EA 2.00
12.2.9. 2SH OUTLET CONNECTING PIPE
PIPE 14.00 HOT 100 M 12.00
ELBOW 14.00 HOT 100 EA 4.00

347558168.xls\Form2B\03/08/2017 1 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
12.2.10. 2ND ATTEMPERATOR
PIPE 14.00 HOT 100 M 10.00
12.2.11. 3SH INLET CONNECTING PIPE
PIPE 14.00 HOT 100 M 20.00
BEND 14.00 HOT 100 EA 2.00
ELBOW 14.00 HOT 100 EA 2.00

13. BOILER PIPING (REFER TO DOC. NO. 23047-A0F419-R0)


13.1. THICKNESS INSULATION 25 MM
13.1.1. DR-2"-1616-A1A21B-P25
PIPE 2.00 P 25 M 123.30
90 ELBOW 2.00 P 25 EA 42.00
13.1.2. DR-1"-1604-A1A21B-P25
PIPE 1.00 P 25 M 1.40
90 ELBOW 1.00 P 25 EA 2.00
FLANGE 1.00 P 25 EA 2.00
GLOBE VALVE 1.00 P 25 EA 2.00

13.2. THICKNESS INSULATION 40 MM


13.2.1. BFW-3"-1106-E2A2B-H40
PIPE 3.00 H 40 M 0.70
PIPE 2.00 H 40 M 6.10
PIPE 3.00 H 40 M 7.10
90 ELBOW 2.00 H 40 EA 2.00
90 ELBOW 3.00 H 40 EA 4.00
RED. TEE 3.00 H 40 EA 2.00
TEE 3.00 H 40 EA 2.00
CON REDUCER 3.00 H 40 EA 2.00
ECC REDUCER 3.00 H 40 EA 2.00
ECC REDUCER 3.00 H 40 EA 2.00
SOCKOLET 3.00 H 40 EA 2.00
GATE VALVE 3.00 H 40 EA 4.00
GLOBE VALVE 2.00 H 40 EA 2.00
6P-TV-1122 CL.900 BW 2.00 H 40 EA 2.00
13.2.2. BFW-3"-1107-E3A11B-H40
PIPE 3.00 H 40 M 5.10
90 ELBOW 3.00 H 40 EA 2.00
ECC REDUCER 3.00 H 40 EA 2.00
CHECK VALVE 3.00 H 40 EA 2.00
13.2.3. BFW-3"-1108-E2A2B-H40
PIPE 3.00 H 40 M 1.10
PIPE 2.00 H 40 M 2.20
PIPE 3.00 H 40 M 18.80
90 ELBOW 3.00 H 40 EA 6.00
RED. TEE 3.00 H 40 EA 2.00
TEE 3.00 H 40 EA 2.00
CON REDUCER 3.00 H 40 EA 2.00
ECC REDUCER 3.00 H 40 EA 2.00
ECC REDUCER 3.00 H 40 EA 2.00
SOCKOLET 3.00 H 40 EA 2.00
GATE VALVE 3.00 H 40 EA 4.00
GLOBE VALVE 2.00 H 40 EA 2.00
6P-TV-1124 CL.900 BW 2.00 H 40 EA 2.00
13.2.4. BFW-3"-1109-E3A12B-H40
PIPE 3.00 H 40 M 4.10
90 ELBOW 3.00 H 40 EA 4.00
ECC REDUCER 3.00 H 40 EA 2.00
CHECK VALVE 3.00 H 40 EA 2.00
13.2.5. DM-3"-1102-E2A2B-H40
PIPE 3.00 H 40 M 1.50
FLANGE 3.00 H 40 EA 2.00
CHECK VALVE 3.00 H 40 EA 2.00
GATE VALVE 3.00 H 40 EA 2.00
13.2.6. DR-6"-1602-A1A21B-P40
PIPE 6.00 P 40 M 2.00
90 ELBOW 6.00 P 40 EA 2.00
FLANGE 6.00 P 40 EA 2.00
13.2.7. SA-4"-1722-A1A23B-H40
PIPE 4.00 H 40 M 28.50
90 ELBOW 4.00 H 40 EA 10.00
FLANGE 4.00 H 40 EA 10.00
BUTTERFLY VALVE 4.00 H 40 EA 2.00
WAFER CHECK VALVE 4.00 H 40 EA 2.00
13.2.8. SA-4"-1723-A1A23B-H40
PIPE 4.00 H 40 M 1.40
TEE 4.00 H 40 EA 2.00
13.2.9. BFW-34"-1110-E2A2B-H40
PIPE 0.75 H 40 M 0.70
FLANGE 0.75 H 40 EA 2.00
BLIND FLANGE 0.75 H 40 EA 2.00
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.10. BFW-34"-FE-1101-E2A2B-H40-1
PIPE 0.75 H 40 M 0.70
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.11. BFW-34"-FE-1101-E2A2B-H40-2
PIPE 0.75 H 40 M 0.70
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.12. BFW-34"-FE-1101-E2A2B-H40-3
PIPE 0.75 H 40 M 0.70
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.13. BFW-34"-FE-1101-E2A2B-H40-4
PIPE 0.75 H 40 M 0.70
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.14. BFW-34"-FE-1106-E2A2B-H40-1
PIPE 0.75 H 40 M 0.60
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.15. BFW-34"-FE-1106-E2A2B-H40-2
PIPE 0.75 H 40 M 0.60
GLOBE VALVE 0.75 H 40 EA 4.00
13.2.16. DR-1"-1221-A1A21B-P40
PIPE 1.00 P 40 M 4.30
90 ELBOW 1.00 P 40 EA 4.00
13.2.17. DR-1"-1222-A1A21B-P40
PIPE 1.00 P 40 M 4.30
90 ELBOW 1.00 P 40 EA 4.00
13.2.18. DR-1"-1223-A1A21B-P40
PIPE 1.00 P 40 M 3.90
90 ELBOW 1.00 P 40 EA 2.00
13.2.19. DR-1"-1224-A1A21B-P40
PIPE 1.00 P 40 M 3.90
90 ELBOW 1.00 P 40 EA 2.00
13.2.20. DR-1"-1101-E2A2B-H40
PIPE 2.00 H 40 M 36.40
PIPE 1.00 H 40 M 0.50
PIPE 1.00 H 40 M 1.80
90 ELBOW 1.00 H 40 EA 4.00
90 ELBOW 2.00 H 40 EA 18.00

347558168.xls\Form2B\03/08/2017 2 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
ECC REDUCER 2.00 H 40 EA 2.00
SOCKOLET 2.00 H 40 EA 2.00
GLOBE VALVE 1.00 H 40 EA 4.00
13.2.21. DR-2"-1611-A1A21B-P40
PIPE 2.00 P 40 M 61.80
PIPE 1.00 P 40 M 42.10
FULL COUPLING 1.00 P 40 EA 4.00
90 ELBOW 1.00 P 40 EA 10.00
90 ELBOW 2.00 P 40 EA 18.00
TEE 2.00 P 40 EA 2.00
ECC REDUCER 2.00 P 40 EA 2.00
SOCKOLET 2.00 P 40 EA 2.00

13.2.22. DR-1"-1104-E2A2B-H40
PIPE 1.00 H 40 M 2.00
PIPE 1.00 H 40 M 14.90
90 ELBOW 1.00 H 40 EA 14.00
GLOBE VALVE 1.00 H 40 EA 4.00
13.2.23. DR-1"-1105-E2A2B-H40
PIPE 1.00 H 40 M 2.20
PIPE 1.00 H 40 M 35.50
FULL COUPLING 1.00 H 40 EA 2.00
90 ELBOW 1.00 H 40 EA 14.00
13.2.24. DR-1"-1102-E2E2B-H40
GLOBE VALVE 1.00 H 40 EA 4.00
PIPE 1.00 H 40 M 1.00
CAP 1.00 H 40 EA 2.00
PIPE NIPPLE 1.00 H 40 EA 2.00
90 ELBOW 1.00 H 40 EA 2.00

13.2.25. DR-1"-1225-A1A21B-P40
GLOBE VALVE 1.00 H 40 EA 4.00
PIPE 1.00 H 40 M 2.00
13.2.26. DR-1"-1262-B2A2B-H40
CAP 1.00 H 40 EA 2.00
PIPE NIPPLE 1.00 H 40 EA 2.00
90 ELBOW 1.00 H 40 EA 4.00
GLOBE VALVE 1.00 H 40 EA 4.00
PIPE 1.00 P 40 M 3.90
13.2.27. DR-1"-1629-A1A21B-P40
90 ELBOW 1.00 P 40 EA 2.00
PIPE 1.00 H 40 M 4.70
90 ELBOW 1.00 H 40 EA 6.00
13.2.28. DR-1"-1282-B2A2B-H40
TEE 1.00 H 40 EA 2.00
GLOBE VALVE 1.00 H 40 EA 6.00
INST SW HOLD 1.00 H 40 EA 2.00
PIPE 1.00 P 40 M 11.80
90 ELBOW 1.00 P 40 EA 8.00
TEE 1.00 P 40 EA 2.00
13.2.29. DR-1"-1630-A1A21B-P40
PIPE 1.00 H 40 M 3.70
CAP 1.00 H 40 EA 2.00
90 ELBOW 1.00 H 40 EA 4.00
TEE 1.00 H 40 EA 4.00
13.2.30. DR-1"-1107-E2A2B-H40
GLOBE VALVE 1.00 H 40 EA 8.00
INST SW HOLD 1.00 H 40 EA 2.00
PIPE 1.00 P 40 M 96.70
FULL COUPLING 1.00 P 40 EA 8.00
13.2.31. DR-1"-1106-E2A2B-H40
90 ELBOW 1.00 P 40 EA 32.00
TEE 1.00 P 40 EA 4.00
PIPE 1.00 H 40 M 18.40
PIPE 1.00 H 40 M 0.80

13.2.32. DR-1"-1283-B2A2B-H40
90 ELBOW 1.00 H 40 EA 10.00
GLOBE VALVE 1.00 H 40 EA 4.00
PIPE 1.00 H 40 M 10.40
PIPE 1.00 H 40 M 1.00
90 ELBOW 1.00 H 40 EA 6.00
GLOBE VALVE 1.00 H 40 EA 4.00
PIPE 1.00 H 40 M 14.90
13.2.33. V-34"-1101-E2A2B-H40
PIPE 1.00 H 40 M 6.90
CAP 1.00 H 40 EA 2.00
90 ELBOW 1.00 H 40 EA 16.00
TEE 1.00 H 40 EA 6.00
GLOBE VALVE 1.00 H 40 EA 8.00
INST SW HOLD 1.00 H 40 EA 2.00
PIPE 0.75 H 40 M 16.60
90 ELBOW 0.75 H 40 EA 16.00
TEE 0.75 H 40 EA 2.00
GLOBE VALVE 0.75 H 40 EA 4.00

13.3. THICKNESS INSULATION 50 MM


13.3.1. BFW-10"-1101-E2A2B-H50
PIPE 8.00 H 50 M 0.30
PIPE 10.00 H 50 M 0.80
PIPE 4.00 H 50 M 0.30
PIPE 6.00 H 50 M 0.90
PIPE 6.00 H 50 M 3.70
PIPE 10.00 H 50 M 37.60
PIPE 0.75 H 50 M 0.70
90 ELBOW 10.00 H 50 EA 10.00
RED. TEE 10.00 H 50 EA 2.00
CON REDUCER 6.00 H 50 EA 2.00
ECC REDUCER 10.00 H 50 EA 2.00
ECC REDUCER 6.00 H 50 EA 2.00
ECC REDUCER 10.00 H 50 EA 2.00
SOCKOLET 6.00 H 50 EA 2.00
SOCKOLET 10.00 H 50 EA 2.00
SOCKOLET 10.00 H 50 EA 4.00
THERMO. NOZZLE 10.00 H 50 EA 2.00
WELDOLET 10.00 H 50 EA 2.00
GATE VALVE 10.00 H 50 EA 2.00
GATE VALVE 6.00 H 50 EA 2.00
GLOBE VALVE 0.75 H 50 EA 4.00
6P-LV-1101 CL.900 BW 8.00 H 50 EA 2.00
6P-LV-1102 CL.900 BW 4.00 H 50 EA 2.00
INST SW HOLD 0.75 H 50 EA 2.00
TEMP. DETECTOR 0.50 H 50 EA 2.00
13.3.2. BFW-10"-1102-E2A2B-H50
PIPE 10.00 H 50 M 62.60
90 ELBOW 10.00 H 50 EA 16.00
RED. TEE 10.00 H 50 EA 2.00

347558168.xls\Form2B\03/08/2017 3 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
SOCKOLET 10.00 H 50 EA 2.00
WELDOLET 10.00 H 50 EA 2.00
GATE VALVE 10.00 H 50 EA 2.00
GATE VALVE 6.00 H 50 EA 2.00
13.3.3. BFW-10"-1103-E2A2B-H50
PIPE 10.00 H 50 M 22.60
90 ELBOW 10.00 H 50 EA 12.00
FLANGE 6.00 H 50 EA 2.00
BLIND FLANGE 6.00 H 50 EA 2.00
RED. TEE 10.00 H 50 EA 2.00
SOCKOLET 10.00 H 50 EA 2.00
SOCKOLET 10.00 H 50 EA 2.00
CHECK VALVE 10.00 H 50 EA 2.00
GATE VALVE 10.00 H 50 EA 2.00
13.3.4. BFW-4"-1105-E2A2B-H50
PIPE 4.00 H 50 M 122.80
90 ELBOW 4.00 H 50 EA 30.00
RED. TEE 4.00 H 50 EA 2.00
ECC REDUCER 4.00 H 50 EA 2.00
6P-FE-1106 SCH80 BW 4.00 H 50 EA 2.00
6P-MOV-1106 CL.900 BW 4.00 H 50 EA 2.00
13.3.5. DR-3"-1628-A1A21B-P50
PIPE 3.00 P 50 M 31.50
PIPE 1.00 P 50 M 0.50
CAP 1.00 P 50 EA 2.00
90 ELBOW 3.00 P 50 EA 16.00
FLANGE 3.00 P 50 EA 2.00
FLANGE 2.00 P 50 EA 2.00
FLANGE 3.00 P 50 EA 2.00
TEE 3.00 P 50 EA 2.00
ECC REDUCER 3.00 P 50 EA 2.00
SOCKOLET 3.00 P 50 EA 2.00
GLOBE VALVE 1.00 P 50 EA 2.00
13.3.6. BO-34"-1118-E2A2B-H50
PIPE 0.75 H 50 M 76.60
FULL COUPLING 0.75 H 50 EA 6.00
90 ELBOW 0.75 H 50 EA 34.00
GLOBE VALVE 0.75 H 50 EA 4.00
13.3.7. CH-34"-1112-E2A2B-H50
PIPE 0.75 H 50 M 4.50
90 ELBOW 0.75 H 50 EA 6.00
FLANGE 0.75 H 50 EA 2.00
CHECK VALVE 0.75 H 50 EA 2.00
GLOBE VALVE 0.75 H 50 EA 2.00

13.3.8. DR-1"-1618-A1A21B-P50
PIPE 1.00 P 50 M 3.10
PIPE 1.00 P 50 M 2.10
90 ELBOW 1.00 P 50 EA 6.00
GLOBE VALVE 1.00 P 50 EA 4.00
13.3.9. DR-1"-1617-A1A21B-P50
PIPE 0.75 P 50 M 12.00
PIPE 1.00 P 50 M 19.50
PIPE 0.75 P 50 M 0.20
PIPE 1.00 P 50 M 9.00
90 ELBOW 0.75 P 50 EA 8.00
90 ELBOW 1.00 P 50 EA 26.00
TEE 1.00 P 50 EA 4.00
REDUCING COUPLING 1.00 P 50 EA 4.00
GLOBE VALVE 0.75 P 50 EA 4.00
GLOBE VALVE 1.00 P 50 EA 8.00
13.3.10. DR-1"-1252-E2A2B-H50
PIPE 1.00 H 50 M 3.70
90 ELBOW 1.00 H 50 EA 6.00
TEE 1.00 H 50 EA 2.00
GLOBE VALVE 1.00 H 50 EA 8.00
INST SW HOLD 1.00 H 50 EA 2.00
13.3.11. DR-1"-1213-E3A11B-H50
PIPE 1.00 H 50 M 4.40
90 ELBOW 1.00 H 50 EA 6.00
TEE 1.00 H 50 EA 2.00
GLOBE VALVE 1.00 H 50 EA 8.00
INST SW HOLD 1.00 H 50 EA 2.00
13.3.12. DR-1"-1625-A1A21B-P50
PIPE 1.00 P 50 M 11.50
90 ELBOW 1.00 P 50 EA 6.00
TEE 1.00 P 50 EA 2.00

13.3.13. DR-1"-1624-A1A21B-P50
PIPE 1.00 P 50 M 7.20
90 ELBOW 1.00 P 50 EA 4.00
TEE 1.00 P 50 EA 2.00
13.3.14. DR-2"-1631-A1A21B-P50
PIPE 2.00 P 50 M 23.20
90 ELBOW 2.00 P 50 EA 6.00
ECC REDUCER 2.00 P 50 EA 2.00
SOCKOLET 2.00 P 50 EA 2.00
13.3.15. DR-1"-1622-A1A21B-P50
PIPE 1.00 P 50 M 79.80
FULL COUPLING 1.00 P 50 EA 4.00
90 ELBOW 1.00 P 50 EA 30.00
13.3.16. DR-1"-1623-A1A21B-P50
PIPE 1.00 P 50 M 92.50
FULL COUPLING 1.00 P 50 EA 2.00
90 ELBOW 1.00 P 50 EA 44.00
TEE 1.00 P 50 EA 2.00
13.3.17. LS-2"-1283-A1A23B-H50
PIPE 2.00 H 50 M 26.40
90 ELBOW 2.00 H 50 EA 14.00
FLANGE 2.00 H 50 EA 2.00
CON REDUCER 2.50 H 50 EA 2.00
13.3.18. LS-2"-1284-A1A23B-H50
PIPE 2.00 H 50 M 26.20
90 ELBOW 2.00 H 50 EA 14.00
FLANGE 2.00 H 50 EA 2.00
CON REDUCER 2.50 H 50 EA 2.00
13.3.19. SC-2"-1271-B2A2B-H50
PIPE 2.00 H 50 M 15.10
PIPE 3.00 H 50 M 0.80
PIPE 1.00 H 50 M 0.50
CAP 1.00 H 50 EA 2.00
90 ELBOW 2.00 H 50 EA 6.00
FLANGE 2.00 H 50 EA 10.00
FLANGE 3.00 H 50 EA 2.00
FLANGE 4.00 H 50 EA 2.00
TEE 2.00 H 50 EA 2.00
ECC REDUCER 3.00 H 50 EA 2.00

347558168.xls\Form2B\03/08/2017 4 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
ECC REDUCER 4.00 H 50 EA 2.00
SOCKOLET 2.00 H 50 EA 2.00
GATE VALVE 3.00 H 50 EA 2.00
GLOBE VALVE 2.00 H 50 EA 4.00
GLOBE VALVE 1.00 H 50 EA 2.00
INST RF WAFER HOLD 2.00 H 50 EA 2.00
13.3.20. V-34"-1121-E2A2B-H50
PIPE 0.75 H 50 M 31.20
FULL COUPLING 0.75 H 50 EA 2.00
90 ELBOW 0.75 H 50 EA 18.00
TEE 0.75 H 50 EA 2.00
GLOBE VALVE 0.75 H 50 EA 2.00
6P-MOV-1113 CL.1500 SW 0.75 H 50 EA 2.00
13.3.21. V-34"-1122-E2A2B-H50
PIPE 0.75 H 50 M 52.40
90 ELBOW 0.75 H 50 EA 30.00
TEE 0.75 H 50 EA 16.00
GLOBE VALVE 0.75 H 50 EA 4.00
13.3.22. V-34"-1123-E3A11B-H50
PIPE 0.75 H 50 M 40.20
90 ELBOW 0.75 H 50 EA 26.00
TEE 0.75 H 50 EA 2.00
GLOBE VALVE 0.75 H 50 EA 2.00
6P-MOV-1122 CL.1500 SW 0.75 H 50 EA 2.00
13.3.23. V-34"-1124-E3A12B-H50
PIPE 0.75 H 50 M 22.40
90 ELBOW 0.75 H 50 EA 14.00
TEE 0.75 H 50 EA 2.00
GLOBE VALVE 0.75 H 50 EA 2.00
6P-MOV-1124 CL.1500 SW 0.75 H 50 EA 2.00

13.4. THICKNESS INSULATION 65 MM


13.4.1. DR-3"-1117-E2A2B-H65
PIPE 3.00 H 65 M 53.90
PIPE 1.00 H 65 M 0.70
CAP 1.00 H 65 EA 2.00
90 ELBOW 3.00 H 65 EA 18.00
RED. TEE 3.00 H 65 EA 6.00
TEE 3.00 H 65 EA 2.00
CON REDUCER 3.00 H 65 EA 4.00
SOCKOLET 3.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 2.00
13.4.2. DR-12"-1603-A1A21B-P65
PIPE 12.00 P 65 M 43.50
45 ELBOW 12.00 P 65 EA 4.00
90 ELBOW 12.00 P 65 EA 10.00
FLANGE 12.00 P 65 EA 2.00
13.4.3. DR-3"-1612-A1A21B-P65
PIPE 3.00 P 65 M 0.70
90 ELBOW 3.00 P 65 EA 2.00
FLANGE 3.00 P 65 EA 2.00
13.4.4. DR-6"-1627-A1A21B-P65
PIPE 6.00 P 65 M 18.50
CAP 6.00 P 65 EA 2.00
90 ELBOW 6.00 P 65 EA 6.00
FLANGE 6.00 P 65 EA 2.00
SOCKOLET 6.00 P 65 EA 10.00
13.4.5. LS-3"-1281-B2A2B-H65
PIPE 3.00 H 65 M 97.20
90 ELBOW 3.00 H 65 EA 12.00
FLANGE 2.00 H 65 EA 2.00
FLANGE 3.00 H 65 EA 4.00
ECC REDUCER 3.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
6P-PV-1281 CL.300 RF 2.00 H 65 EA 2.00
13.4.6. LS-3"-1282-B2A2B-H65
PIPE 2.00 H 65 M 1.30
PIPE 3.00 H 65 M 12.80
PIPE 4.00 H 65 M 0.80
PIPE 0.50 H 65 M 0.40
90 ELBOW 2.00 H 65 EA 2.00
90 ELBOW 3.00 H 65 EA 8.00
FLANGE 2.00 H 65 EA 6.00
FLANGE 3.00 H 65 EA 4.00
RED. TEE 3.00 H 65 EA 2.00
CON REDUCER 3.00 H 65 EA 2.00
ECC REDUCER 3.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 4.00
SOCKOLET 3.00 H 65 EA 4.00
SOCKOLET 3.00 H 65 EA 2.00
SOCKOLET 4.00 H 65 EA 2.00
SOCKOLET 4.00 H 65 EA 2.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GLOBE VALVE 0.50 H 65 EA 2.00
6P-XV-1281A CL.300 RF 2.00 H 65 EA 2.00
6P-XV-1281B CL.300 RF 2.00 H 65 EA 2.00
INST RF WAFER HOLD 3.00 H 65 EA 2.00
TEMP. DETECTOR 0.50 H 65 EA 2.00
13.4.7. MLS-2"-1221-D2A1B-H65
PIPE 2.00 H 65 M 197.70
PIPE 3.00 H 65 M 9.40
PIPE 4.00 H 65 M 0.80
PIPE 1.00 H 65 M 3.20
90 ELBOW 1.00 H 65 EA 4.00
90 ELBOW 2.00 H 65 EA 98.00
90 ELBOW 3.00 H 65 EA 4.00
FLANGE 1.00 H 65 EA 4.00
TEE 1.00 H 65 EA 4.00
TEE 2.00 H 65 EA 12.00
CON REDUCER 2.50 H 65 EA 12.00
CON REDUCER 3.00 H 65 EA 2.00
ECC REDUCER 2.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 4.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
INST RTJ WAFER HOLD 1.00 H 65 EA 2.00
INST SCRD HOLD 0.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.8. MLS-2"-1222-D2A1B-H65
PIPE 2.00 H 65 M 167.80
PIPE 3.00 H 65 M 9.20
PIPE 4.00 H 65 M 0.80
PIPE 1.00 H 65 M 3.20
90 ELBOW 1.00 H 65 EA 4.00
90 ELBOW 2.00 H 65 EA 74.00

347558168.xls\Form2B\03/08/2017 5 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
90 ELBOW 3.00 H 65 EA 4.00
FLANGE 1.00 H 65 EA 4.00
TEE 1.00 H 65 EA 4.00
TEE 2.00 H 65 EA 8.00
CON REDUCER 2.50 H 65 EA 8.00
CON REDUCER 3.00 H 65 EA 2.00
ECC REDUCER 2.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 4.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
INST RTJ WAFER HOLD 1.00 H 65 EA 2.00
INST SW HOLD 0.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.9. MLS-2"-1223-D2A1B-H65
PIPE 2.00 H 65 M 154.30
PIPE 3.00 H 65 M 8.10
PIPE 4.00 H 65 M 0.80
PIPE 1.00 H 65 M 3.20
90 ELBOW 1.00 H 65 EA 4.00
90 ELBOW 2.00 H 65 EA 98.00
90 ELBOW 3.00 H 65 EA 4.00
FLANGE 1.00 H 65 EA 4.00
TEE 1.00 H 65 EA 4.00
TEE 2.00 H 65 EA 12.00
CON REDUCER 2.50 H 65 EA 12.00
CON REDUCER 3.00 H 65 EA 2.00
ECC REDUCER 2.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 4.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
INST RTJ WAFER HOLD 1.00 H 65 EA 2.00
INST SW HOLD 0.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.10. MLS-3"-1224-D2A1B-H65
PIPE 2.00 H 65 M 41.60
PIPE 3.00 H 65 M 124.50
PIPE 4.00 H 65 M 0.70
PIPE 1.00 H 65 M 3.20
90 ELBOW 1.00 H 65 EA 4.00
90 ELBOW 2.00 H 65 EA 48.00
90 ELBOW 3.00 H 65 EA 40.00
FLANGE 1.00 H 65 EA 4.00
RED. TEE 3.00 H 65 EA 12.00
TEE 1.00 H 65 EA 4.00
CON REDUCER 2.50 H 65 EA 12.00
ECC REDUCER 2.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 2.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GATE VALVE 3.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
INST RTJ WAFER HOLD 1.00 H 65 EA 2.00
INST SW HOLD 0.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.11. MLS-2"-1225-D2A1B-H65
PIPE 2.00 H 65 M 178.20
PIPE 4.00 H 65 M 0.80
PIPE 1.00 H 65 M 3.30
90 ELBOW 1.00 H 65 EA 4.00
90 ELBOW 2.00 H 65 EA 52.00
FLANGE 1.00 H 65 EA 4.00
FLANGE 2.00 H 65 EA 2.00
TEE 1.00 H 65 EA 4.00
TEE 2.00 H 65 EA 2.00
ECC REDUCER 2.00 H 65 EA 2.00
ECC REDUCER 4.00 H 65 EA 4.00
THERMO. NOZZLE 4.00 H 65 EA 2.00
GLOBE VALVE 2.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
INST RTJ WAFER HOLD 1.00 H 65 EA 2.00
INST SW HOLD 0.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00

13.4.12. MS-2"-1251-E2A2B-H65
PIPE 2.00 H 65 M 28.00
PIPE 6.00 H 65 M 0.40
90 ELBOW 2.00 H 65 EA 14.00
TEE 2.00 H 65 EA 2.00
CON REDUCER 4.00 H 65 EA 2.00
CON REDUCER 6.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 2.00
GATE VALVE 6.00 H 65 EA 2.00
GLOBE VALVE 2.00 H 65 EA 4.00
6P-PV-1251 CL.900 BW 2.00 H 65 EA 2.00
6P-RO-1251 CL.300 BW 4.00 H 65 EA 2.00
13.4.13. BO-2"-1111-E2A2B-H65
PIPE 2.00 H 65 M 125.70
90 ELBOW 2.00 H 65 EA 56.00
SOCKOLET 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 2.00
GATE VALVE 2.00 H 65 EA 2.00
6P-FT-1111 BW 2.00 H 65 EA 2.00
13.4.14. BO-2"-1112-E2A2B-H65
PIPE 2.00 H 65 M 147.60
90 ELBOW 2.00 H 65 EA 48.00
CON REDUCER 3.00 H 65 EA 2.00
GATE VALVE 2.00 H 65 EA 2.00

13.4.15. DR-2"-1615-A1A21B-P65
PIPE 2.00 P 65 M 108.00
PIPE 0.75 P 65 M 0.20
PIPE 1.00 P 65 M 14.00
PIPE 1.00 P 65 M 36.50
FULL COUPLING 1.00 P 65 EA 4.00
90 ELBOW 1.00 P 65 EA 22.00
90 ELBOW 2.00 P 65 EA 34.00
TEE 1.00 P 65 EA 2.00
ECC REDUCER 2.00 P 65 EA 2.00
REDUCING COUPLING 1.00 P 65 EA 2.00
SOCKOLET 2.00 P 65 EA 4.00
GLOBE VALVE 1.00 P 65 EA 8.00
13.4.16. DR-2"-1114-E2A2B-H65
PIPE 2.00 H 65 M 21.80
PIPE 1.00 H 65 M 32.60
90 ELBOW 1.00 H 65 EA 26.00

347558168.xls\Form2B\03/08/2017 6 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
90 ELBOW 2.00 H 65 EA 12.00
CON REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 6.00
GLOBE VALVE 1.00 H 65 EA 8.00
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.17. DR-2"-1115-E2A2B-H65
PIPE 2.00 H 65 M 14.00
PIPE 1.00 H 65 M 31.40
90 ELBOW 1.00 H 65 EA 28.00
90 ELBOW 2.00 H 65 EA 8.00
CON REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 6.00
GLOBE VALVE 1.00 H 65 EA 8.00
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.18. DR-2"-1116-E2A2B-H65
PIPE 2.00 H 65 M 4.60
PIPE 1.00 H 65 M 21.00
90 ELBOW 1.00 H 65 EA 22.00
90 ELBOW 2.00 H 65 EA 2.00
CON REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 4.00
GLOBE VALVE 1.00 H 65 EA 6.00
GLOBE VALVE 2.00 H 65 EA 2.00

13.4.19. DR-2"-1113-E2A2B-H65
PIPE 2.00 H 65 M 4.40
PIPE 1.00 H 65 M 22.70
90 ELBOW 1.00 H 65 EA 22.00
90 ELBOW 2.00 H 65 EA 2.00
CON REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 4.00
GLOBE VALVE 1.00 H 65 EA 6.00
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.20. DR-2"-1626-A1A21B-P65
PIPE 2.00 P 65 M 104.40
90 ELBOW 2.00 P 65 EA 30.00
ECC REDUCER 2.00 P 65 EA 2.00
SOCKOLET 2.00 P 65 EA 2.00
13.4.21. DR-1-12"-1131-E3A11B-H65
PIPE 1.00 H 65 M 2.50
PIPE 1.50 H 65 M 9.10
90 ELBOW 1.00 H 65 EA 2.00
90 ELBOW 1.50 H 65 EA 10.00
FLANGE 1.50 H 65 EA 2.00
RED. TEE 1.50 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
GLOBE VALVE 1.50 H 65 EA 2.00
6P-MOV-1132 CL.1500 SW 1.50 H 65 EA 2.00
INST RTJ WAFER HOLD 1.50 H 65 EA 2.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.22. DR-1"-1132-E3A11B-H65
PIPE 1.00 H 65 M 18.50
FULL COUPLING 1.00 H 65 EA 2.00
90 ELBOW 1.00 H 65 EA 16.00
TEE 1.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 8.00
INST SW HOLD 1.00 H 65 EA 2.00
13.4.23. DR-2"-1118-E2A2B-H65
PIPE 2.00 H 65 M 5.80
PIPE 1.00 H 65 M 21.20
45 ELBOW 2.00 H 65 EA 2.00
90 ELBOW 1.00 H 65 EA 16.00
90 ELBOW 2.00 H 65 EA 2.00
ECC REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.24. DR-2"-1119-E2A2B-H65
PIPE 2.00 H 65 M 25.80
PIPE 1.00 H 65 M 21.00
45 ELBOW 2.00 H 65 EA 2.00
90 ELBOW 1.00 H 65 EA 16.00
90 ELBOW 2.00 H 65 EA 4.00
ECC REDUCER 2.00 H 65 EA 2.00
SOCKOLET 2.00 H 65 EA 2.00
GLOBE VALVE 1.00 H 65 EA 4.00
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.25. DR-2"-1120-E2A2B-H65
PIPE 2.00 H 65 M 57.20
90 ELBOW 2.00 H 65 EA 26.00
TEE 2.00 H 65 EA 2.00
13.4.26. MS-2"-1201-E3A11B-H65
PIPE 2.00 H 65 M 0.90
GLOBE VALVE 2.00 H 65 EA 2.00
13.4.27. MS-2"-1202-E3A11B-H65
PIPE 2.00 H 65 M 10.70
90 ELBOW 2.00 H 65 EA 6.00
13.4.28. MS-2"-1211-E3A11B-H65
PIPE 2.00 H 65 M 18.00
90 ELBOW 2.00 H 65 EA 6.00
SOCKOLET 2.00 H 65 EA 2.00
GLOBE VALVE 2.00 H 65 EA 2.00
6P-MOV-1211 CL.900 BW 2.00 H 65 EA 2.00
6P-PV-1211 CL.900 BW 2.00 H 65 EA 2.00
13.4.29. MS-34"-1134-E3A11B-H65
PIPE 0.75 H 65 M 83.80
FULL COUPLING 0.75 H 65 EA 2.00
90 ELBOW 0.75 H 65 EA 40.00
GLOBE VALVE 0.75 H 65 EA 4.00
13.4.30. MS-34"-FE-1131-E3A11B-H65-1
PIPE 0.75 H 65 M 0.70
GLOBE VALVE 0.75 H 65 EA 4.00
13.4.31. MS-34"-FE-1131-E3A11B-H65-2
PIPE 0.75 H 65 M 0.70
GLOBE VALVE 0.75 H 65 EA 4.00
13.4.32. MS-34"-FE-1131-E3A11B-H65-3
PIPE 0.75 H 65 M 0.70
GLOBE VALVE 0.75 H 65 EA 4.00
13.4.33. MS-34"-FE-1131-E3A11B-H65-4
PIPE 0.75 H 65 M 0.70
GLOBE VALVE 0.75 H 65 EA 4.00
PIPE 0.75 H 65 M 15.10
90 ELBOW 0.75 H 65 EA 10.00
TEE 0.75 H 65 EA 2.00
GLOBE VALVE 0.75 H 65 EA 2.00
6P-MOV-1125 CL.1500 SW 0.75 H 65 EA 2.00

347558168.xls\Form2B\03/08/2017 7 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
13.5. THICKNESS INSULATION 75 MM
13.5.1. DR-8"-1601-A1A21B-P75
PIPE 8.00 P 75 M 4.30
CAP 8.00 P 75 EA 2.00
FLANGE 8.00 P 75 EA 2.00
SOCKOLET 8.00 P 75 EA 4.00
13.5.2. LS-6"-1253-B2A2B-H75
PIPE 2.00 H 75 M 4.70
PIPE 6.00 H 75 M 26.20
PIPE 0.50 H 75 M 0.80
90 ELBOW 2.00 H 75 EA 2.00
90 ELBOW 6.00 H 75 EA 6.00
FLANGE 3.00 H 75 EA 2.00
RED. TEE 6.00 H 75 EA 4.00
SOCKOLET 6.00 H 75 EA 4.00
WELDOLET 6.00 H 75 EA 2.00
GLOBE VALVE 0.50 H 75 EA 4.00
INST SW HOLD 0.50 H 75 EA 2.00
13.5.3. LS-6"-1261-B2A2B-H75
PIPE 4.00 H 75 M 5.90
PIPE 6.00 H 75 M 50.20
90 ELBOW 4.00 H 75 EA 4.00
90 ELBOW 6.00 H 75 EA 20.00
FLANGE 4.00 H 75 EA 4.00
FLANGE 6.00 H 75 EA 12.00
FLANGE 8.00 H 75 EA 2.00
RED. TEE 6.00 H 75 EA 4.00
ECC REDUCER 8.00 H 75 EA 2.00
SOCKOLET 6.00 H 75 EA 2.00
GATE VALVE 6.00 H 75 EA 4.00
GLOBE VALVE 4.00 H 75 EA 2.00
6P-TV-1402 CL.300 RF 6.00 H 75 EA 2.00
13.5.4. MLS-4"-1212-D2A1B-H75
PIPE 4.00 H 75 M 58.00
PIPE 0.50 H 75 M 0.70
90 ELBOW 4.00 H 75 EA 12.00
NOZZLE NECK 6P-PSV-1211 4.00 H 75 EA 2.00
RED. TEE 4.00 H 75 EA 2.00
RED. TEE 4.00 H 75 EA 6.00
ECC REDUCER 3.00 H 75 EA 2.00
ECC REDUCER 4.00 H 75 EA 4.00
SOCKOLET 4.00 H 75 EA 4.00
GLOBE VALVE 0.50 H 75 EA 4.00
6P-RO-1211 CL.600 BW 3.00 H 75 EA 2.00
INST SW HOLD 0.50 H 75 EA 2.00
13.5.5. V-14"-1111-A1A21B-P75
PIPE 14.00 P 75 M 5.90
45 ELBOW 14.00 P 75 EA 4.00
FLANGE 14.00 P 75 EA 2.00
13.5.6. V-14"-1112-A1A21B-P75
PIPE 14.00 P 75 M 5.50
45 ELBOW 14.00 P 75 EA 4.00
FLANGE 14.00 P 75 EA 2.00
13.5.7. V-8"-1253-A1A21B-P75
PIPE 8.00 P 75 M 45.20
90 ELBOW 8.00 P 75 EA 14.00
FLANGE 8.00 P 75 EA 2.00
13.5.8. DR-2"-1621-A3A1B-H75
PIPE 2.00 H 75 M 57.20
PIPE 1.50 H 75 M 0.20
45 ELBOW 2.00 H 75 EA 2.00
90 ELBOW 2.00 H 75 EA 18.00
FLANGE 2.00 H 75 EA 2.00
FLANGE 1.50 H 75 EA 2.00
CON REDUCER 2.00 H 75 EA 2.00

13.6. THICKNESS INSULATION 100 MM


13.6.1. MS-8"-1132-E3A11B-H100
PIPE 8.00 H 100 M 3.30
90 ELBOW 8.00 H 100 EA 2.00
GATE VALVE 8.00 H 100 EA 2.00
6P-MOV-1131 CL.900 BW 8.00 H 100 EA 2.00
13.6.2. V-8"-1213-A1A21B-P100
PIPE 8.00 P 100 M 28.40
45 ELBOW 8.00 P 100 EA 4.00
90 ELBOW 8.00 P 100 EA 10.00
FLANGE 8.00 P 100 EA 2.00

13.7. THICKNESS INSULATION 140 MM


13.7.1. V-14"-1131-A1A21B-P140
PIPE 14.00 P 140 M 29.30
45 ELBOW 14.00 P 140 EA 4.00
90 ELBOW 14.00 P 140 EA 6.00
FLANGE 14.00 P 140 EA 2.00
13.7.2. V-16"-1133-A3A1B-P140
PIPE 16.00 P 140 M 46.40
PIPE 1.00 P 140 M 0.80
90 ELBOW 16.00 P 140 EA 18.00
FLANGE 16.00 P 140 EA 2.00
FLANGE 1.00 P 140 EA 4.00
CON REDUCER 16.00 P 140 EA 2.00
SOCKOLET 16.00 P 140 EA 2.00
INST RF WAFER HOLD 1.00 P 140 EA 2.00

14. BOILER DUCT


14.1. TOTAL AIR / FDF to SAH HOT 150 M2 79.50
SP 75 M2
14.2. TOTAL AIR / SAH to GAH HOT 75 M2 332.14
14.3. 1st AIR / PAF INLET AIR HOT 100 M2 94.32
SP 50 M2
14.4. 1st AIR / PAF - GAH HOT 100 M2 224.74
HOT 50 M2
14.5. 2nd AIR / GAH to BRANCH HOT 125 M2 137.00
14.6. 2nd AIR / BRANCH - OVER FA HOT 125 M2 192.20
14.7. 2nd AIR / OVER FIRE AIR - PORT HOT 125 M2 291.19

14.8. 2nd Air / Branch - Venturi 6P-#403A HOT 125 M2 149.52


14.9. 2nd Air / Branch - Venturi 6P-#403B HOT 125 M2 194.24

14.10. 2nd AIR / VENTURI - BURNER HOT 125 M2 183.79


14.11. 2nd AIR / VENTURI - BURNER HOT 125 M2 45.64
14.12. 2nd AIR / VENTURI - BURNER HOT 125 M2 235.76
14.13. 1st HOT AIR / GAH MIX POINT HOT 125 M2 784.15
14.14. 1st HOT AIR / GAH MIX POINT HOT 125 M2 107.38
14.15. 1st HOT AIR / GAH MIX POINT HOT 125 M2 107.38
14.16. 1st HOT AIR / BRANCH MIX POINT HOT 60 M2 289.88
14.17. 1st HOT AIR / BRANCH MIX POINT HOT 60 M2 34.67

347558168.xls\Form2B\03/08/2017 8 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
14.18. 1st HOT AIR / BRANCH MIX POINT HOT 60 M2 34.67
14.19. 1st HOT AIR / MIX POINT MILL HOT 125 M2 129.83
14.20. 1st HOT AIR / MIX POINT MILL HOT 125 M2 129.83
14.21. FLUE GAS / ECO BYPASS MIX POINT HOT 175 M2 156.11
14.22. FLUE GAS / ECO BYPASS MIX POINT HOT 175 M2 152.68
14.23. FLUE GAS / BOILER - GAH HOT 150 M2 525.11
14.24. FLUE GAS / GAH - ESP HOT 75 M2 590.18
14.25. FLUE GAS / ESP - IDF HOT 125 M2 477.43
HOT 50 M2
14.26. FLUE GAS / IDF-STACK HOT 125 M2 378.09
HOT 50 M2

15. REFRACTORY FOR BOILER


15.1 SOOT BLOWER (1) C-16 EX. IP M3 0.32
15.2 SOOT BLOWER (2) C-16 EX. IP M3 1.58
15.3 OBSERVATION HOLE C-16 EX. IP M3 1.54
15.4 MANHOLE (1) C-16 EX. IP M3 1.20
15.5 DRAFT NOZZLE C-16 EX. IP M3 0.24
15.6 ITV PEDESTAL C-16 EX. IP M3 0.08
15.7 TS PORT C-16 EX. IP M3 2.48
15.8 COAL BURNER C-16 EX. IP M3 9.16
15.9 SOOT BLOWER (3) TAICAST M3 0.16
15.10 MANHOLE (2) KN-1300 S M3 0.90
15.11 PROTECTOR OF SREEN (EX. IP) M3 0.02
15.12 MANHOLE COVER C-16 EX. IP M3 0.62
15.13 OBSERVATION HOLE COVER C-16 EX. IP M3 0.04
15.14 CEILING WALL INSIDE CASING C-16 EX. IP M3 19.34

Note : *) the insulation thickness for this equipment is not available, the above thickness is only assumption.

Total of Insulation for Boiler Area

Total of Insulation for Mechanical

2.2. Piping Insulation

Material Specification : see Appendix - 1

1. PIPE 0.50 HOT 40 M 2.00


2. PIPE 0.75 HOT 40 M 4.00
3. PIPE 1.00 HOT 40 M 69.00
4. PIPE 1.50 HOT 40 M 2.00
5. PIPE 2.00 HOT 40 M 33.00
6. PIPE 3.00 HOT 40 M 32.00
7. PIPE 4.00 HOT 40 M 1.00
8. 90 ELBOW 0.50 HOT 40 EA 4.00
9. 90 ELBOW 0.75 HOT 40 EA 7.00
10. 90 ELBOW 1.00 HOT 40 EA 17.00
11. 90 ELBOW 2.00 HOT 40 EA 14.00
12. 90 ELBOW 3.00 HOT 40 EA 19.00
13. TEE 0.75 HOT 40 EA 3.00
14. TEE 1.00 HOT 40 EA 3.00
15. TEE 3.00 HOT 40 EA 3.00
16. REDUCER TEE 1.00 HOT 40 EA 2.00
17. REDUCER TEE 2.00 HOT 40 EA 2.00
18. CON. REDUCER 4.00 HOT 40 EA 1.00
19. ECC. REDUCER 2.00 HOT 40 EA 2.00
20. ECC. REDUCER 3.00 HOT 40 EA 2.00
21. ECC. REDUCER 4.00 HOT 40 EA 2.00
22. CAP 0.75 HOT 40 EA 10.00
23. COUPLING 0.50 HOT 40 EA 5.00
24. COUPLING 0.75 HOT 40 EA 3.00
25. SOCKOLET 3.00 HOT 40 EA 1.00
26. SOCKOLET 3.00 HOT 40 EA 2.00
27. SOCKOLET 4.00 HOT 40 EA 1.00
28. SOCKOLET 8.00 HOT 40 EA 3.00
29. SOCKOLET 8.00 HOT 40 EA 7.00
30. SOCKOLET 12.00 HOT 40 EA 1.00
31. SOCKOLET 12.00 HOT 40 EA 1.00
32. SOCKOLET 16.00 HOT 40 EA 1.00
33. SOCKOLET 16.00 HOT 40 EA 1.00
34. FLANGE 1.50 HOT 40 EA 4.00
35. FLANGE 1.00 HOT 40 EA 4.00
36. FLANGE 3.00 HOT 40 EA 10.00
37. FLANGE 4.00 HOT 40 EA 1.00
38. GATE VALVE 0.50 HOT 40 EA 5.00
39. GATE VALVE 0.75 HOT 40 EA 15.00
40. GATE VALVE 2.00 HOT 40 EA 2.00
41. GATE VALVE 3.00 HOT 40 EA 4.00
42. GLOBE VALVE 1.00 HOT 40 EA 1.00
43. GLOBE VALVE 1.50 HOT 40 EA 1.00
44. GLOBE VALVE 3.00 HOT 40 EA 1.00
45. CHECK VALVE 2.00 HOT 40 EA 1.00
46. CHECK VALVE 3.00 HOT 40 EA 1.00
47. PIPE 0.50 HOT 50 M 57.00
48. PIPE 0.75 HOT 50 M 9.00
49. PIPE 1.00 HOT 50 M 89.00
50. PIPE 1.50 HOT 50 M 11.00
51. PIPE 2.00 HOT 50 M 147.00
52. PIPE 4.00 HOT 50 M 533.00
53. PIPE 6.00 HOT 50 M 35.00
54. PIPE 8.00 HOT 50 M 162.00
55. PIPE 10.00 HOT 50 M 14.00
56. 45 ELBOW 2.00 HOT 50 EA 7.00
57. 45 ELBOW 6.00 HOT 50 EA 5.00
58. 90 ELBOW 0.50 HOT 50 EA 11.00
59. 90 ELBOW 0.75 HOT 50 EA 9.00
60. 90 ELBOW 1.00 HOT 50 EA 35.00
61. 90 ELBOW 1.50 HOT 50 EA 8.00
62. 90 ELBOW 2.00 HOT 50 EA 48.00
63. 90 ELBOW 4.00 HOT 50 EA 35.00
64. 90 ELBOW 6.00 HOT 50 EA 6.00
65. 90 ELBOW 8.00 HOT 50 EA 40.00
66. 90 ELBOW 10.00 HOT 50 EA 4.00
67. TEE 0.75 HOT 50 EA 2.00
68. TEE 1.00 HOT 50 EA 4.00
69. TEE 1.50 HOT 50 EA 2.00
70. TEE 2.00 HOT 50 EA 1.00
71. TEE 4.00 HOT 50 EA 1.00
72. REDUCER TEE 1.00 HOT 50 EA 1.00
73. REDUCER TEE 1.00 HOT 50 EA 1.00
74. REDUCER TEE 1.50 HOT 50 EA 1.00
75. REDUCER TEE 8.00 HOT 50 EA 2.00
76. REDUCER TEE 4.00 HOT 50 EA 2.00
77. REDUCER TEE 4.00 HOT 50 EA 1.00
78. CON. REDUCER 8.00 HOT 50 EA 3.00

347558168.xls\Form2B\03/08/2017 9 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
79. CON. REDUCER 10.00 HOT 50 EA 2.00
80. ECC. REDUCER 4.00 HOT 50 EA 2.00
81. ECC. REDUCER 4.00 HOT 50 EA 1.00
82. ECC. REDUCER 8.00 HOT 50 EA 1.00
83. ECC. REDUCER 12.00 HOT 50 EA 2.00
84. RED. COUPLING 0.75 HOT 50 EA 1.00
85. RED. COUPLING 1.00 HOT 50 EA 1.00
86. SOCKOLET 8.00 HOT 50 EA 2.00
87. SOCKOLET 12.00 HOT 50 EA 1.00
88. SOCKOLET 12.00 HOT 50 EA 1.00
89. SOCKOLET 16.00 HOT 50 EA 1.00
90. WELDOLET 12.00 HOT 50 EA 2.00
91. BLIND FLANGE 0.75 HOT 50 EA 1.00
92. FLANGE 0.50 HOT 50 EA 3.00
93. FLANGE 0.75 HOT 50 EA 1.00
94. FLANGE 1.00 HOT 50 EA 6.00
95. FLANGE 1.50 HOT 50 EA 6.00
96. FLANGE 6.00 HOT 50 EA 10.00
97. FLANGE 2.00 HOT 50 EA 10.00
98. FLANGE 8.00 HOT 50 EA 13.00
99. FLANGE 4.00 HOT 50 EA 2.00
100. GATE VALVE 0.75 HOT 50 EA 3.00
101. GATE VALVE 1.00 HOT 50 EA 5.00
102. GATE VALVE 1.50 HOT 50 EA 2.00
103. GATE VALVE 2.00 HOT 50 EA 2.00
104. GATE VALVE 8.00 HOT 50 EA 4.00
105. GLOBE VALVE 0.50 HOT 50 EA 1.00
106. GLOBE VALVE 0.75 HOT 50 EA 1.00
107. GLOBE VALVE 1.00 HOT 50 EA 1.00
108. GLOBE VALVE 1.50 HOT 50 EA 1.00
109. CHECK VALVE 6.00 HOT 50 EA 3.00
110. CHECK VALVE 2.00 HOT 50 EA 1.00
111. ARC VALVE 8.00 HOT 50 EA 3.00
112. TRAP 0.75 HOT 50 EA 1.00
113. PIPE 0.50 HOT 65 M 3.00
114. PIPE 1.00 HOT 65 M 54.00
115. PIPE 1.50 HOT 65 M 1.00
116. PIPE 4.00 HOT 65 M 1.00
117. PIPE 6.00 HOT 65 M 93.00
118. PIPE 8.00 HOT 65 M 94.00
119. PIPE 10.00 HOT 65 M 4.00
120. PIPE 12.00 HOT 65 M 142.00
121. 45 ELBOW 8.00 HOT 65 EA 3.00
122. 45 ELBOW 12.00 HOT 65 EA 4.00
123. 90 ELBOW 0.50 HOT 65 EA 4.00
124. 90 ELBOW 1.00 HOT 65 EA 29.00
125. 90 ELBOW 6.00 HOT 65 EA 11.00
126. 90 ELBOW 8.00 HOT 65 EA 19.00
127. 90 ELBOW 10.00 HOT 65 EA 2.00
128. 90 ELBOW 12.00 HOT 65 EA 43.00
129. TEE 1.00 HOT 65 EA 4.00
130. TEE 12.00 HOT 65 EA 3.00
131. REDUCER TEE 1.00 HOT 65 EA 4.00
132. REDUCER TEE 6.00 HOT 65 EA 2.00
133. REDUCER TEE 8.00 HOT 65 EA 2.00
134. REDUCER TEE 12.00 HOT 65 EA 3.00
135. CON. REDUCER 12.00 HOT 65 EA 3.00
136. CON. REDUCER 12.00 HOT 65 EA 2.00
137. CON. REDUCER 16.00 HOT 65 EA 1.00
138. CON. REDUCER 24.00 HOT 65 EA 2.00
139. ECC. REDUCER 2.00 HOT 65 EA 2.00
140. ECC. REDUCER 4.00 HOT 65 EA 2.00
141. SOCKOLET 4.00 HOT 65 EA 1.00
142. SOCKOLET 10.00 HOT 65 EA 1.00
143. SOCKOLET 10.00 HOT 65 EA 1.00
144. SOCKOLET 12.00 HOT 65 EA 1.00
145. SOCKOLET 16.00 HOT 65 EA 3.00
146. SOCKOLET 24.00 HOT 65 EA 1.00
147. FLANGE 1.50 HOT 65 EA 2.00
148. FLANGE 6.00 HOT 65 EA 8.00
149. FLANGE 8.00 HOT 65 EA 9.00
150. FLANGE 10.00 HOT 65 EA 6.00
151. FLANGE 12.00 HOT 65 EA 45.00
152. GATE VALVE 0.50 HOT 65 EA 1.00
153. GATE VALVE 1.00 HOT 65 EA 2.00
154. GATE VALVE 6.00 HOT 65 EA 2.00
155. GATE VALVE 12.00 HOT 65 EA 3.00
156. GLOBE VALVE 1.00 HOT 65 EA 1.00
157. CHECK VALVE 6.00 HOT 65 EA 1.00
158. CHECK VALVE 12.00 HOT 65 EA 1.00
159. BUTTERFLY VALVE 12.00 HOT 65 EA 3.00
160. NEEDLE 0.50 HOT 65 EA 2.00
161. NEEDLE 1.00 HOT 65 EA 1.00
162. T-STRAINER 12.00 HOT 65 EA 3.00
163. TRAP 1.00 HOT 65 EA 1.00
164. PIPE 0.75 HOT 75 M 1.00
165. PIPE 1.00 HOT 75 M 12.00
166. PIPE 10.00 HOT 75 M 7.00
167. PIPE 16.00 HOT 75 M 52.00
168. PIPE 18.00 HOT 75 M 4.00
169. PIPE 24.00 HOT 75 M 43.00
170. PIPE 38.00 HOT 75 M 1.00
171. 45 ELBOW 1.00 HOT 75 EA 1.00
172. 45 ELBOW 24.00 HOT 75 EA 1.00
173. 90 ELBOW 0.75 HOT 75 EA 1.00
174. 90 ELBOW 1.00 HOT 75 EA 10.00
175. 90 ELBOW 10.00 HOT 75 EA 4.00
176. 90 ELBOW 16.00 HOT 75 EA 4.00
177. 90 ELBOW 18.00 HOT 75 EA 2.00
178. 90 ELBOW 24.00 HOT 75 EA 8.00
179. TEE 1.00 HOT 75 EA 1.00
180. TEE 24.00 HOT 75 EA 1.00
181. REDUCER TEE 16.00 HOT 75 EA 3.00
182. CON. REDUCER 10.00 HOT 75 EA 1.00
183. CON. REDUCER 24.00 HOT 75 EA 2.00
184. CON. REDUCER 38.00 HOT 75 EA 2.00
185. CAP 0.75 HOT 75 EA 1.00
186. SOCKOLET 6.00 HOT 75 EA 1.00
187. SOCKOLET 8.00 HOT 75 EA 1.00
188. SOCKOLET 16.00 HOT 75 EA 1.00
189. BLIND FLANGE 0.75 HOT 75 EA 1.00
190. BLIND FLANGE 16.00 HOT 75 EA 1.00
191. FLANGE 0.75 HOT 75 EA 1.00
192. FLANGE 8.00 HOT 75 EA 1.00
193. FLANGE 16.00 HOT 75 EA 2.00
194. FLANGE 18.00 HOT 75 EA 6.00
195. FLANGE 24.00 HOT 75 EA 1.00

347558168.xls\Form2B\03/08/2017 10 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
196. FLANGE 38.00 HOT 75 EA 1.00
197. GATE VALVE 0.75 HOT 75 EA 2.00
198. GATE VALVE 1.00 HOT 75 EA 2.00
199. GATE VALVE 10.00 HOT 75 EA 1.00
200. GLOBE VALVE 1.00 HOT 75 EA 2.00
201. TRAP 1.00 HOT 75 EA 1.00
202. PIPE 6.00 HOT 100 M 13.00
203. PIPE 8.00 HOT 100 M 1.00
204. PIPE 10.00 HOT 100 M 23.00
205. PIPE 16.00 HOT 100 M 69.00
206. 45 ELBOW 16.00 HOT 100 EA 3.00
207. 90 ELBOW 6.00 HOT 100 EA 4.00
208. 90 ELBOW 10.00 HOT 100 EA 4.00
209. 90 ELBOW 16.00 HOT 100 EA 19.00
210. TEE 6.00 HOT 100 EA 1.00
211. REDUCER TEE 10.00 HOT 100 EA 1.00
212. REDUCER TEE 16.00 HOT 100 EA 1.00
213. CON. REDUCER 10.00 HOT 100 EA 1.00
214. CON. REDUCER 16.00 HOT 100 EA 3.00
215. ECC. REDUCER 10.00 HOT 100 EA 1.00
216. WELDOLET 24.00 HOT 100 EA 1.00
217. BLIND FLANGE 8.00 HOT 100 EA 1.00
218. FLANGE 6.00 HOT 100 EA 4.00
219. FLANGE 8.00 HOT 100 EA 1.00
220. FLANGE 10.00 HOT 100 EA 8.00
221. FLANGE 16.00 HOT 100 EA 11.00
222. GATE VALVE 6.00 HOT 100 EA 1.00
223. GATE VALVE 10.00 HOT 100 EA 2.00
224. GATE VALVE 16.00 HOT 100 EA 1.00
225. GLOBE VALVE 6.00 HOT 100 EA 1.00
226. CHECK VALVE 16.00 HOT 100 EA 2.00
227. PIPE 8.00 HOT 125 M 1.00
228. PIPE 12.00 HOT 125 M 1.00
229. WELDOLET 16.00 HOT 125 EA 1.00
230. BLIND FLANGE 8.00 HOT 125 EA 1.00
231. BLIND FLANGE 12.00 HOT 125 EA 1.00
232. FLANGE 8.00 HOT 125 EA 1.00
233. FLANGE 12.00 HOT 125 EA 1.00
234. PIPE 16.00 HOT 150 M 19.00
235. FLANGE 16.00 HOT 150 EA 2.00
236. PIPE 14.00 HOT 175 M 60.00
237. PIPE 16.00 HOT 175 M 512.00
238. PIPE 18.00 HOT 175 M 4.00
239. PIPE 24.00 HOT 175 M 56.00
240. 45 ELBOW 18.00 HOT 175 EA 2.00
241. 90 ELBOW 14.00 HOT 175 EA 8.00
242. 90 ELBOW 16.00 HOT 175 EA 80.00
243. 90 ELBOW 24.00 HOT 175 EA 6.00
244. TEE 16.00 HOT 175 EA 3.00
245. REDUCER TEE 16.00 HOT 175 EA 1.00
246. REDUCER TEE 16.00 HOT 175 EA 1.00
247. REDUCER TEE 24.00 HOT 175 EA 1.00
248. REDUCER TEE 24.00 HOT 175 EA 1.00
249. REDUCER TEE 24.00 HOT 175 EA 3.00
250. ECC. REDUCER 18.00 HOT 175 EA 2.00
251. ECC. REDUCER 24.00 HOT 175 EA 2.00
252. BLIND FLANGE 18.00 HOT 175 EA 1.00
253. FLANGE 16.00 HOT 175 EA 7.00
254. FLANGE 18.00 HOT 175 EA 1.00
255. GATE VALVE 14.00 HOT 175 EA 2.00
256. GATE VALVE 16.00 HOT 175 EA 3.00
257. GATE VALVE 18.00 HOT 175 EA 1.00
258. GLOBE VALVE 16.00 HOT 175 EA 1.00
259. PIPE 0.50 PP 40 M 37.00
260. PIPE 1.00 PP 40 M 64.00
261. PIPE 1.50 PP 40 M 22.00
262. PIPE 3.00 PP 40 M 49.00
263. 45 ELBOW 1.00 PP 40 EA 1.00
264. 45 ELBOW 3.00 PP 40 EA 1.00
265. 90 ELBOW 0.50 PP 40 EA 8.00
266. 90 ELBOW 1.00 PP 40 EA 35.00
267. 90 ELBOW 1.50 PP 40 EA 4.00
268. 90 ELBOW 3.00 PP 40 EA 16.00
269. TEE 1.00 PP 40 EA 5.00
270. CON. REDUCER 3.00 PP 40 EA 2.00
271. SOCKOLET 8.00 PP 40 EA 5.00
272. SOCKOLET 12.00 PP 40 EA 1.00
273. FLANGE 0.50 PP 40 EA 1.00
274. FLANGE 1.00 PP 40 EA 2.00
275. FLANGE 1.50 PP 40 EA 2.00
276. FLANGE 3.00 PP 40 EA 6.00
277. GATE VALVE 0.50 PP 40 EA 1.00
278. GATE VALVE 1.00 PP 40 EA 6.00
279. GATE VALVE 3.00 PP 40 EA 1.00
280. GLOBE VALVE 1.00 PP 40 EA 2.00
281. GLOBE VALVE 1.50 PP 40 EA 1.00
282. TRAP 1.00 PP 40 EA 5.00
283. PIPE 0.50 PP 50 M 55.00
284. PIPE 0.75 PP 50 M 4.00
285. PIPE 1.00 PP 50 M 26.00
286. PIPE 1.50 PP 50 M 8.00
287. PIPE 8.00 PP 50 M 2.00
288. 45 ELBOW 1.00 PP 50 EA 6.00
289. 90 ELBOW 0.50 PP 50 EA 7.00
290. 90 ELBOW 0.75 PP 50 EA 2.00
291. 90 ELBOW 1.00 PP 50 EA 25.00
292. 90 ELBOW 1.50 PP 50 EA 7.00
293. TEE 1.00 PP 50 EA 2.00
294. TEE 1.50 PP 50 EA 2.00
295. REDUCER TEE 1.50 PP 50 EA 1.00
296. RED. COUPLING 0.75 PP 50 EA 1.00
297. SOCKOLET 8.00 PP 50 EA 2.00
298. WELDOLET 16.00 PP 50 EA 6.00
299. BLIND FLANGE 0.75 PP 50 EA 1.00
300. BLIND FLANGE 8.00 PP 50 EA 6.00
301. FLANGE 0.50 PP 50 EA 1.00
302. FLANGE 0.75 PP 50 EA 1.00
303. FLANGE 1.50 PP 50 EA 2.00
304. FLANGE 8.00 PP 50 EA 6.00
305. GATE VALVE 0.75 PP 50 EA 1.00
306. GATE VALVE 1.00 PP 50 EA 4.00
307. GATE VALVE 1.50 PP 50 EA 2.00
308. GLOBE VALVE 1.00 PP 50 EA 6.00
309. GLOBE VALVE 1.50 PP 50 EA 1.00
310. GLOBE VALVE 1.00 PP 50 EA 6.00
311. TRAP 1.00 PP 50 EA 2.00
312. PIPE 0.50 PP 65 M 109.00

347558168.xls\Form2B\03/08/2017 11 of 18
Form No. : 2B
Client : PT. Rekayasa Industri (Persero) Date : May 08, 2015
Project : Pusri STG & Coal Boiler Project Quo. No. : 005-DDL-Quo-II-15
Location : Palembang - South Sumatera Revision : 4
RFQ. No. : PSB-00-G9-RFQ-3149-R Doc. No. : PSB-00-G9-CR-4005-R
Works : Supply of Insulation & Refractory Materials and Installation Works REK Job No. : 13-1209

BILL OF QUANTITY

Size Insulation Material (IDR) Construction (IDR) TOTAL (IDR) Direct Manhours
No Description Unit Quantity
Direct Direct Total Unit Total
Inch Type Thick Direct Material Total Material Direct Labor Unit Rate Amount
Consumable Equipment Construction M/H Manhours
313. PIPE 0.75 PP 65 M 38.00
314. PIPE 1.00 PP 65 M 225.00
315. PIPE 6.00 PP 65 M 23.00
316. PIPE 8.00 PP 65 M 1.00
317. 90 ELBOW 0.50 PP 65 EA 13.00
318. 90 ELBOW 0.75 PP 65 EA 17.00
319. 90 ELBOW 1.00 PP 65 EA 63.00
320. 90 ELBOW 6.00 PP 65 EA 5.00
321. TEE 6.00 PP 65 EA 1.00
322. CON. REDUCER 2.00 PP 65 EA 3.00
323. RED. COUPLING 0.75 PP 65 EA 2.00
324. SOCKOLET 2.00 PP 65 EA 4.00
325. SOCKOLET 2.00 PP 65 EA 8.00
326. WELDOLET 16.00 PP 65 EA 1.00
327. BLIND FLANGE 8.00 PP 65 EA 1.00
328. FLANGE 0.50 PP 65 EA 2.00
329. FLANGE 1.00 PP 65 EA 4.00
330. FLANGE 6.00 PP 65 EA 4.00
331. FLANGE 8.00 PP 65 EA 1.00
332. GATE VALVE 6.00 PP 65 EA 2.00
333. PIPE 2.00 PP 75 M 166.00
334. 90 ELBOW 2.00 PP 75 EA 18.00
335. CON. REDUCER 2.00 PP 75 EA 1.00
336. CON. REDUCER 6.00 PP 75 EA 2.00
337. CON. REDUCER 8.00 PP 75 EA 2.00
338. FLANGE 4.00 PP 75 EA 4.00
339. FLANGE 6.00 PP 75 EA 2.00
340. PIPE 8.00 PP 100 M 7.00
341. 90 ELBOW 8.00 PP 100 EA 5.00
342. WELDOLET 16.00 PP 100 EA 2.00
343. GATE VALVE 8.00 PP 100 EA 2.00

Total of Insulation for Piping

2.3. Instrument Insulation

Material Specification : see Appendix - 1

TRANSMITTER AND ANALYZER


1. PIPE 50 - 100 C 0.50 25 M 22.00
2. PIPE 101 - 300 C 0.50 40 M 188.00
3. PIPE 301 - 400 C 0.50 50 M 22.00
4. PIPE 401 - 650 C 0.50 65 M 22.00

INSTRUMENT INSULATION "


5. PIPE 50 C 0.25 25 0.10
6. PIPE 110 C 0.25 25 0.20
7. PIPE 190 C 0.25 40 4.10
8. PIPE 370 C 0.25 50 16.00
9. PIPE 390 C 0.25 50 40.00
10. PIPE 420 C 0.25 65 10.00

INSTRUMENT INSULATION "


11. PIPE 110 C 0.50 40 46.00
12. PIPE 150 C 0.50 40 1.00
13. PIPE 190 C 0.50 40 14.00
14. PIPE 350 C 0.50 50 9.00
15. PIPE 370 C 0.50 50 46.00
16. PIPE 390 C 0.50 50 131.00
17. PIPE 400 C 0.50 50 9.00
18. PIPE 420 C 0.50 65 15.00

INSTRUMENT INSULATION "


19. PIPE 200 C 0.75 40 67.00
20. PIPE 300 C 0.75 50 45.00
21. PIPE 500 C 0.75 65 59.00

22. 6P-PV-4006 10.00 50 5.00


23. 6P-PV-4006 16.00 50 15.00
24. 6P-PV-4007 5.00 50 5.00
25. 6P-PV-4007 16.00 50 15.00

Total of Direct Works

Total of Direct Works

Grand Total (Exclusive 10% VAT)

NOTE : 1. The above price not includes 10% VAT/PPn.


2. Validity : 120 (one hundred and twenty) days from the date of our quotation.
3. Client shall provide space area for site office, warehouse and workshop.
4. Client must provide work permit and the working area must ready for done.

347558168.xls\Form2B\03/08/2017 12 of 18
Client : PT. Rekayasa Industri (Persero)
Project : Pusri STG & Coal Boiler Project Date
Location : Palembang - South Sumatera Quo. No.
RFQ. No. : PSB-00-G9-RFQ-3149-R Revision
Works : Supply of Insulation & Refractory Materials and Installation Works Req. No.

MATERIAL SPECIFICATION
No. Description Insulation Material Jacketing Material

1. Hot Insulation

1.1. PIPING & FITTING Calcium Silicate Pipe Cover Smooth Aluminium Sheet with
"MR" Brand polykraft moisture barrier
Density 220 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C533 Class I Thickness : 0.5 mm
or JIS A9510

1.2. FLANGE & VALVE Rockwool Wire Blanket Smooth Aluminium Sheet with
"TOMBO" Brand paperkraft moisture barrier
Density 100 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C592 Class II Thickness : 0.8 mm
or JIS A9504

1.3. INSTRUMENT Calcium Silicate Pipe Cover Smooth Aluminium Sheet with
"MR" Brand polykraft moisture barrier
Density 220 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C533 Class I Thickness : 0.5 mm
or JIS A9510

1.4. EQUIPMENT / Rockwool Wire Blanket Corrugated Aluminium with


VESSEL "TOMBO" Brand paperkraft moisture barrier
Density 100 Kg/M3 ASTM B209 Alloy 3003 H-14
ASTM C592 Class II 0.5 mmt x 1" corrugation
or JIS A9504 (for vertical vessel)

1.5. STACK Rockwool Wire Blanket Smooth Aluminium Sheet with


(DELETED) "TOMBO" Brand paperkraft moisture barrier
Density 80 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C592 Class II Thickness : 0.8 mm
or JIS A9504

347558168.xls\Spec\03/08/2017 13 of 18
Client : PT. Rekayasa Industri (Persero)
Project : Pusri STG & Coal Boiler Project Date
Location : Palembang - South Sumatera Quo. No.
RFQ. No. : PSB-00-G9-RFQ-3149-R Revision
Works : Supply of Insulation & Refractory Materials and Installation Works Req. No.

MATERIAL SPECIFICATION
No. Description Insulation Material Jacketing Material

1.6. BOILER PROPER


1.6.1. BOILER PIPING & Calcium Silicate Pipe Cover Smooth Aluminium Sheet with
CONNCETING PIPE "MR" Brand polykraft moisture barrier
Density 220 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C533 Class I Thickness : 0.5 mm
or JIS A9510

FLANGE & VALVE Rockwool Wire Blanket Smooth Aluminium Sheet with
"TOMBO" Brand paperkraft moisture barrier
Density 100 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C592 Class II Thickness : 0.8 mm
or JIS A9504

1.6.2. BOILER FURNACE & Rockwool Wire Blanket -


2ND PASS WALL "TOMBO" Brand (by REKIN)
Density 100 Kg/M3
ASTM C592 Class II
or JIS A9504

1.6.3. BOTTOM CASING Rockwool Wire Blanket -


"TOMBO" Brand (by REKIN)
Density 100 Kg/M3
ASTM C592 Class II
or JIS A9504

1.6.4. MANHOLE DOOR Rockwool Wire Blanket -


"TOMBO" Brand (by REKIN)
Density 100 Kg/M3
ASTM C592 Class II
or JIS A9504

1.6.5. BOILER NOZE INNER Calcium Silicate Board -


"MR" Brand
Density 220 Kg/M3
ASTM C533 Class I
or JIS A9510

1.6.6. PENTHOUSE Rockwool Wire Blanket -


CASING (1) "TOMBO" Brand (by REKIN)
Density 100 Kg/M3
ASTM C592 Class II
or JIS A9504

347558168.xls\Spec\03/08/2017 14 of 18
Client : PT. Rekayasa Industri (Persero)
Project : Pusri STG & Coal Boiler Project Date
Location : Palembang - South Sumatera Quo. No.
RFQ. No. : PSB-00-G9-RFQ-3149-R Revision
Works : Supply of Insulation & Refractory Materials and Installation Works Req. No.

MATERIAL SPECIFICATION
No. Description Insulation Material Jacketing Material

1.6.7. PENTHOUSE Rockwool Wire Blanket Smooth Aluminium Sheet with


CASING (2) "TOMBO" Brand polykraft moisture barrier
Density 100 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C592 Class II Thickness : 0.5 mm
or JIS A9504

1.6.8. STEAM DRUM Calcium Silicate Board Smooth Aluminium Sheet with
"MR" Brand polykraft moisture barrier
Density 220 Kg/M3 Alloy 3003 H-14 ASTM B209
ASTM C533 Class I Thickness : 0.5 mm
or JIS A9510

1.6.9. 1SH OUTLET HEADER Rockwool Wire Blanket -


ECO OUTLET HEADER "TOMBO" Brand (by REKIN)
2ND PASS EVA HEAD Density 100 Kg/M3
2ND PASS EVA HEAD ASTM C592 Class II
or JIS A9504

1.6.10. 2SH INLET HEADER & Rockwool Wire Blanket -


2SH OUTLET HEADER "TOMBO" Brand
3SH INLET HEADER & Density 100 Kg/M3
3SH OUTLET HEADER ASTM C592 Class II
or JIS A9504

2. Refractory Work

2.1. BOILER PROPER C-16 -

TAICAST KN 1300 S

(IP Brand)

347558168.xls\Spec\03/08/2017 15 of 18
Appendix - 1
: May 08, 2015
: 005-DDL-Quo-II-15
: 4
: PSB-00-G9-CR-4005-R

MATERIAL SPECIFICATION
Accessories Material

304 SUS Tie Wires 1.0 mm


(for insulation secured up to 12")
304 SUS Tie Wires 1.2 mm
(for insulation secured 14"-18")
304 SUS Band " x 0.016"
304 SUS Wing Seal "
(for insulation secured 20" & over)
304 SUS Band " x 0.016"
304 SUS Wing Seal "
(for jacketing secured 30" & over)
304 SUS Self Tapping Screw
size : 4.2 mm x "
Silicone sealant, 300 ml, clear color

304 SUS Tie Wires 1.0 mm


(for insulation secured up to 12")
304 SUS Tie Wires 1.2 mm
(for insulation secured 14"-18")
304 SUS Band " x 0.016"
304 SUS Wing Seal "
(for insulation secured 20" & over)
304 SUS Toggle Clip "
304 SUS Pop Rivet 3.2 x 11 mm
Silicone sealant, 300 ml, clear color

304 SUS Tie Wires 1.0 mm


304 SUS Self Tapping Screw
size : 4.2 mm x "
Silicone sealant, 300 ml, clear color

304 SUS Band " x 0.016"


304 SUS Wing Seal "
(for insulation secured)
304 SUS Self Tapping Screw
size : 4 mm x "
304 SUS Band " x 0.020"
304 SUS Wing Seal "
(for jacketing secured)
Silicone sealant, 300 ml, clear color

304 SUS Band " x 0.016"


304 SUS Wing Seal "
304 SUS Self Tapping Screw
size : 4 mm x "
Silicone sealant, 300 ml, clear color

347558168.xls\Spec\03/08/2017 16 of 18
Appendix - 1
: May 08, 2015
: 005-DDL-Quo-II-15
: 4
: PSB-00-G9-CR-4005-R

MATERIAL SPECIFICATION
Accessories Material

304 SUS Tie Wires 1.0 mm


(for insulation secured up to 12")
304 SUS Tie Wires 1.2 mm
(for insulation secured 14"-18")
304 SUS Band " x 0.016"
304 SUS Wing Seal "
(for insulation secured 20" & over)
304 SUS Band " x 0.016"
304 SUS Wing Seal "
(for jacketing secured 30" & over)
304 SUS Self Tapping Screw
size : 4.2 mm x "
Silicone sealant, 300 ml, clear color

Anchor Clip
Silicone sealant, 300 ml, clear color

304 SUS Wire Netting


Stud Bolt Anchor
Nut & Washer

304 SUS Wire Netting


Stud Bolt Anchor
Nut & Washer

304 SUS Wire Netting


Stud Bolt Anchor
Nut & Washer

347558168.xls\Spec\03/08/2017 17 of 18
Appendix - 1
: May 08, 2015
: 005-DDL-Quo-II-15
: 4
: PSB-00-G9-CR-4005-R

MATERIAL SPECIFICATION
Accessories Material

304 SUS Wire Netting


Stud Bolt Anchor
Nut & Washer

Hexagonal Wire Mesh


Heat Resistance Compound
Anchor
304 SUS Self Tapping Screw
size : 4.2 mm x "
Silicone sealant, 300 ml, clear color

Tie Wire

304 SUS Tie Wires 1.0 mm


304 SUS Wire Netting

347558168.xls\Spec\03/08/2017 18 of 18