PRELIMINARIES

Facilities for the engineer


Temporary facilities for the engineer
Progress Photographs
Other General Requirements
Project Sign
Construction Safety and Health
ROWHOUSE
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
SINGLE ATTACHED
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
SINGLE DETACHED
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
MULTI PURPOSE BUILDING
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
FACILITIES
GUARD HOUSE
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
CHURCH
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
CLUB HOUSE
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin
BASKETBALL COURT AND PLAYGROUND
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
MRF
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
ROADS,DRAINAGE SYSTEM AND ELECTRIFICATION
Mobilization and Demobilization
Mobilization and Demobilization
Earthworks
Excavation
Backfilling
Gravel Bedding
Enbankment
Termite Control Works
Soil Poisoning
Plain and Reinforced Concrete Works
Reinforcing Steel Bars
Structural Concrete
Masonry Works
Masonry Units
Finishing Works
Non-Skid Plain Cement Paster Finish (smooth)
Plain Cement Plaster Finish
Roof and Framing works
Pre-Painted Metal Sheets
Steel Trusses and Lateral Struts, Side and Eaves Wall Framing
Purlins and Fascia
Sag Rod and Cross Bracing
Turn Buckle
Painting Works
Concrete Painting
Metal Painting
Electrical Works
Conduits, Boxes and Fittings, Supports
Wires and Wiring Devices
Lighting Fixtures/ Fixtures
Panel Board and Cabinets
Plumbing Works
Downspout/ Storm Drainage
Catch Basin