When comparing PowerPlan to Southern Company Upgrades


other alternatives, PowerPlans its Business Operations with
application screens and navigation PowerPlan Solutions
through the application were found
to be much more intuitive and user-
Atlanta-based Southern Company is one of the largest electricity generators
friendly. in the nation. It serves both regulated and competitive markets in a territory
spanning more than 120,000 square miles, including parts of Alabama,
Susan Self,
Georgia, Florida, and Mississippi.
Accounting Services Manager,
Southern Company Services In 2008, Southern Company selected project and cost management solutions
from PowerPlan to make its business operations in Generation more efficient
and precise. These solutions are a critical component of an overall process
About and technology transformation being rolled out system-wide.
Southern Company
Key Challenges
Founded: Mid-1920s
Upgrade: Southern Company sought to improve its project and cost
Business: Retail electric management, forecasting and budgeting capabilities in order to drive
service operational efficiencies and support more effective decision-making. Its
Headquarters: Atlanta, Georgia existing systems couldnt provide sufficient, timely or detailed information
and were labor-intensive and expensive to maintain.
Employees: 26,000
Metered Costing: The utility needed visibility into granular cost details for operations
Customers: 4.417 million and maintenance (O&M), but the homegrown legacy accounting system
only tracked information at the account number level. To optimize business
Generating
Capacity: 42,963 operations, it needed for some business units to track and report accurate,
megawatts actual asset-related costs down to the work order level a process that
the new EAM and ERP systems could not support without customizations.
2010 Revenue: $17.456 billion
Total Assets: $55.032 billion
Budgeting: Generation sought to improve its budget Integration: The new solution would become the
control through management of asset and asset integration hub of Southern Companys larger
group costs, such as systems, pumps and motors. Enterprise Solutions initiative, which replaces multiple


The ability to capture legacy systems and
accurate capital and manual processes with
real-time O&M actuals system consolidation and
and enable comparisons We always wanted to take our costs down automation. Therefore, it
to budget in a single to the plant asset level, and with PowerPlan needed to readily integrate
tool would provide real with the utilitys new
benefits in terms of we can track to the Maximo work order and ERP, EAM and project
budget awareness and equipment ID. Receiving cost data from scheduling applications.
management.
PowerPlan in near real time at this level is Compliance: The
Projects: For projects, a huge benefit. In addition, the PowerPlan software provider
the accounting burden
needed to be kept out
of the field operations.
For Generation, work
software was very easy to learn. Before I went
through a day of training, I was able to sit down

needed to be a trusted
partner committed to
maintaining regulatory
and accounting
breakdown structures and use this software. compliance, and the
and asset/location Billy Ely, solution needed to be
hierarchies needed Enterprise Solutions Director, configurable to support
to reflect the work future requirements.
Southern Company
performed rather than
the accounting. Cost
structures needed to be Decision Drivers and Implementation
derived automatically from the EAM. After considering its options, Southern Company
chose solutions from PowerPlan to enhance its project
Reporting: Southern Company needed all information and cost management abilities. The capital side of
reported to be as real-time as possible. It sought the business had consolidated on PowerPlans core
standard and ad hoc reporting and query capabilities fixed assets software in 2001 to improve compliance,
that were simple, flexible and user-friendly. automation and efficiency, and it was determined there
was a good fit for Operations and Maintenance use for
Reliability: Optimizing asset management through select business units.
improved cost management and visibility would lead to
increased asset reliability.

Field EAMs PowerPlan


Project Project
Dept Budget
Budget vs. Cost
vs. Actual
Actual Mgmt
Field Worker Field Worker

Field Worker Project & Cost Mgmt

Capital Acctg Financial Income &


Physical Field WOs
Field WOs & Auto- Asset & Property
Assets Created
Field WOs
Created Componentization Depr Tax
Created

Granular Cost Collection


(lower level than the GL)

Automatic Accounting
PowerPlan delivered the expertise, functionality and Budget Compliance: The ability to have budgets
synergy with Maximo and Oracle Financials that were and costs in a single system is expected to improve
needed. The applications screens, navigation and the ability of Generation to manage asset budgets
reporting capabilities were effective and intuitive, by plant, unit, system and sub-system. Since
whereas the alternatives would have required implementation, the Generation business unit has
customizations. The utility was further impressed by not been through a budget cycle using PowerPlan
PowerPlans willingness to consider the value of a but to-date cost data provided at the asset level is
requested feature and add improvements to the base providing an early indication of the ability to improve
product. And, as a bonus, PowerPlan offered a journal budget compliance. With more accurate and timely
prep tool that met a key business requirement. information, budget constraints at higher levels can be
more effectively deployed.
In 2008, the PowerPlan Capital Budgeting and
Project Management modules were selected as well Project Management: The process of initiating and
as Tax Provision and monitoring work orders and


Lessee Accounting. projects is simplified in the
The PowerPlan PowerPlans consultants demonstrated new system. The utility has
implementation access to specific costs
coincides with the their understanding of utility business and is tracking budgets to
phased Enterprise requirements, and PowerPlan offered an actuals. The Engineering
Solutions rollout to and Construction Services
Southern Companys
five Generation business
units. Three of the
overall better functional fit for Southern
Companys requirements in the areas of
organization is generating
realistic forecasts using
real-time data and spread/
operating companies project costing and reporting. curve patterns that can
are currently live, and Susan Self, be defined to support
the rollout is scheduled Accounting Services Manager, budgeting and forecasting
for completion in to any level of the work
Southern Company Services
February 2012. breakdown structure.
PowerPlan is already
live at all Southern Company entities for core financial Financial Optimization of Assets: Better, more timely
functionality such as journals and cost allocations. information is a key enabler of improved asset
reliability and asset life expectancy. PowerPlan aligns
Southern Companys Business Benefits the work-related data structures in the EAM system
with PowerPlans Suite with the accounting-related structures in the ERP. It
Cost Management: PowerPlan is now the central layers on budget and commitment information, thus
tracking mechanism for the large majority of Southern allowing field operations to make sense of their spend,
Companys $55 billion of assets. With costs at the to strategically allocate resources and dollars, and to
plant asset level, PowerPlan is a fully balanced forecast and communicate those decisions. The level
subledger to the G/L while holding transactions at a of alignment is flexible down to a single critical piece
very low level of detail for Generation. The information of equipment, the class of equipment across multiple
in Southern Companys reports and queries is more locations, a subsystem or system, the station in total,
effective now that actual and projected costs are or the company.
aggregated in real time, and cost data is exchanged
between Maximo, Oracle and PowerPlan in near real Fewer Bigger Systems: Southern Company was
time. able to retire 22 systems and an untold number of
spreadsheets with the implementation of the platform
shown below:
Southern Companys Summary of Operational Benefits
The PowerPlan project resulted in a number of operational benefits across Southern Company. First, it has automated the
generation of accounting and unitization rules from naturally present work information. This allows for fewer work orders
to be created in the EAM system. Next, the implementation has allowed work breakdown structures and asset hierarchy
to represent the actual work completed instead of an Accounting Breakdown Structure.

The project allows for cumulative period true-up so that operations doesnt have to know everything at the outset. At the
same time, it has automated accounting true-up to as-builts without manual journals. Best of all, the system provides
cost feedback to operations at least daily, at any level of detail (including actual vs. budget, down to the task, equipment
ID, location and cost-element level). In addition, it aligns with EAM data structures and rollups for location and equipment
hierarchies, as well as corporate and account hierarchies. Lastly, the integrated PowerPlan solution allows for daily labor
& contractor commitment costing and processing.

The result: less accounting, fewer work orders, better financial results, and more focus on operations.

Maximo Supply Chain

Reporting Contractor
Work Mgt Inventory Purchasing
Services Labor
Oracle
Material CLR POs Commitments
Issues/ Timesheets Oracle Oracle
Hrs Returns Commitments Purchasing iExpense

MWO Data

Future Time/ PowerPlan Oracle


Commitment Fixed Assets Oracle
Receivables
HR / Payroll Allocations (Actual & Budget) Validations Payables
Labor $$ (SCS Only)
Billings (SNC, SCS, OpCo Affiliate
Journals
Account Derivation
Actuals Generation/Nuclear Projects Mgmt
Budget Tax Processing Actual Costs
Application Budget & Forecast Prep by E&CS Budgets Stats Oracle General Ledger
Charge Repository
Budgets Detail Cost Reporting (MWO) Oracle-
Sourced
Actuals

Budgets Current Year Budget

1 678 223 2800


PowerPlan.com

All content is Copyright 2017 PowerPlan, Inc. All rights reserved.


Product functionality is subject to change without notice.

You might also like