You are on page 1of 9

OTIS

ACD2 MRL
Field Installation Manual

3.2 Check of Run -Direction

ERO

UP
OTIS
ACD2 MRL
Field Installation Manual

3.3 Manual Brake Release check


See Reference about SPBC and details of MRO.

Press
BRB2 BRB1

BRB2 Press
Key- BRB1
switched

BRB1 not
BRB2
pressed
OTIS
ACD2 MRL
Field Installation Manual

4 PREPARE FIRST NORMAL RUN


Attention:
The elevator must be fully completed (wiring and mechanical assembly) before going beyond
this point.

4.1 Position DSBD (connect 4T with 5T)


OTIS
ACD2 MRL
Field Installation Manual

4.2 Check of Hoistway Signals (PRS with RLEV/ADO)

ERO

Start

Unpublished Work Copyright OTIS Elevator Company


ACD2 MRL
Field Installation Manual

4.3 Check of Hoistway Signals (PRS without RLEV/ADO)

ERO

Start
OTIS
ACD2 MRL
Field Installation Manual

4.4 Start up of the door system

4.4.1 NGSOK startup:

Reference: KAA31328AAA_SUR NGSOK Start up routine


OTIS
ACD2 MRL
Field Installation Manual

4.4.2 Start up of DCSS5E

To startup the DCSS5 Operator please refer to the corresponding Field Installation Manual in
Appendix.

4.5 Learn run


OTIS
ACD2 MRL
Field Installation Manual

Press
CHCS

Press
DDO

NORM

ERO

Press 1 for
calibration
Press 0 for
maintain

NORM
OTIS
ACD2 MRL
Field Installation Manual