You are on page 1of 13
DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 >) SUPPLIERS FRONT SHEET ( FOR A3/A4 DOCUMENTS ONLY DocuMENT | DISPATCH DOSSIER INDEX —FUEL SKID - REGENERATION GAS TLE :60-FA2401 TOTAL No. OF FAGES SUPPLIERS ORDER No. (INCLUDING FRONT) SHEET) B ‘SUPPLIERS OWN ‘SUPPLIER OR TEVISIONDATE ‘SUPPLIER'S APPROVAL. DOCUMENT No. & SUBSUPPLIERS NAME NAME, REVISION REVISION (623-434-104BC o 911/10, ‘J. Kochmanski ‘SUBMITTED FOR: Project : Rhourde Nouss QH ‘L, _ REVIEWED.NO COMMENTS. NO FURTHER SUBMITTAL REQUIRED. (la. neviewen. xo comments, nxsuomr (CERTIFIED PRINT PER SDR” (ls. eviews, rroceren wirn work, INCORPORATE COMMENTSAND RESUBMIT CEASTAICATION REVIEW CLASS RS) oe ecearensr conta Cs. rormworwanion oxy. Ce carers, 19 NOV, 20m HOMES EIR “NAME: wb. TES 020581- P5009 A05 0013 OL ———s — eons Note: Dispatch Dossier Index — FUEL SKID - Regenaration Gas Heater 480-FA4101: document 623-434-104BC. Actual Dispatch Dossier document number shall be 623-434-105BC ~ SNC SDRL RO1. DISPATCH DOSSIER ~ BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 DESCRIPTION OF COMMODITY: Fuel Skid - Regeneration Gas Heater — G60-FA2401 PO Number: (02058-1P5009 Supplier: BOUSTEAD INTERNATIONAL HEATERS LIMITED Europa House Woodlands Court Albert Drive Burgess Hill, West Sussex RH15 STN United Kingdom Telephone: +.44 (1) 1444 237 500 Note One dossier per package / skid required. If relevant documentation has been supplied previously in a Dispatch Dossier to the same receiving site, for identical goods, duplication is not required, providing a clear statement to that effect is included in the applicable Section(s) or in the Contents List. Note 2: DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 The Dispatch Dossier is to accompany the goods on dispatch and shall appear as a separate item on the shipping documents. One additional copy shall, on request, be forwarded to the. project office. INDEX No. [SDR BIH document no. 1 coz Packing/Unpacking and Storage and Preservation | 623-434-155AA, Procedure 2 Gos Handling and Shipping Procedure (623-434 TE6AA 3 G06. Lifting Sketch 623-434-112BA 4 Lot Instrument Calibration Sheets I 5 Lot ‘Supplier Running / Test Log —__|— 6 Packing List 7 BIH Release Notes 8 List of Deviations Validated Punch List Note 1: All certificates included which are unique to the materiaVequipment supplied are to be annotated with PO number and item number and material reference number. DISPATCH DOSSIER — BIH JOB 623 —- FUEL SKID - Regeneration Gas Heater G60-FA2401 4.__ Packing / Unpacking and Storage and Preservation Procedure DISPATCH DOSSIER 2.__ Handling and Shipping Procedure DISPATCH DOSSIER — BIH JOB 623 Regeneration Gas Heater G60-FA2401 3.__Lifting Sketch DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 4. Instrument Calibration Sheets DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 5.__ Supplier Running / Test Log DISPATCH DOSSIER ~ BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 6.__ Packing List DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 7. __BIH Release Notes DISPATCH DOSSIER — BIH JOB 623 — FUEL SKID - Regeneration Gas Heater G60-FA2401 DISPATCH DOSSIER 9.__ Validated Punch List DISPATCH DOSSIER — BIH JOB 623 Regeneration Gas Heater G60-FA2401

You might also like