You are on page 1of 10
DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regeneration Gas Heater G60-FA2401 SUPPLIERS FRONT SHEET ( FOR A3/A4 DOCUMENTS ONLY DOCUMENT ] DISPATCH DOSSIER INDEX ~ BURNER FIPING — REGENERATION GAS HEATER G00- pias FA2401 "TOTAL No. OF PAGES ‘SUPPLIERS ORDER No. (INCLUDING FRONT) SHEET) 0 ‘SUPPLIERS OWN SUPPLIER OF REVISION DATE ‘SUPPLIER'S APPROVAL ‘SUBMITTED FOR: o m0) REVIEW eR) Project : Rhourde Nouss QH DETAMS CALCULATIONS TEST METHODS OR MATERIALS DEytlofya onsite gy suru noe bors tr ‘SUPPLIER NAME:- ‘CONTRACTIRAL OR OTHER OBLIGATIONS. PACKAGE DESCRIPTION :- 1. REVIEWED, NO COMMENTS. NO FURTHER SUBMITTAL REQUIRED. TAGNOS= ae aa eae C13. eviews, pmoceren wir wor, INCORPORATE COMMENTSAND RESUBMIT CLASSIFICATION TEVIEW CLASS (EF, C14. soraccurren, work may nor 5. FORINFORMATION ONLY. Cle carcene =, 9 NOV. 2610 nam Le FORDE ure, —_ o20ssi- | 5009 A0s | 0009 a PROIECENO, ‘SORLCODE SIGNATURE: a SLI DOCUMENT NO. Note: Dispatch Dossier Index - BURNER PIPING ~ REGENARATION GAS G60-FA2401: document 623-404-104BC. Actual Dispatch Dossier document number shall be 623-404-105BC = SNC SDRL R01. DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regeneration Gas Heater G60-FA2401 DESCRIPTION OF COMMODITY: Burner Piping Regeneration Gas Heater G60-FA2401 PO Number: 02058-1P5009 Supplier BOUSTEAD INTERNATIONAL HEATERS LIMITED Europa House Woodlands Court Albert Drive Burgess Hill, West Sussex RH15 9TN United Kingdom Telephone: +44 (1) 1444 237 500 Note 1: One dossier per package / skid required. If relevant documentation has been supplied previously in a Dispatch Dossier to the same receiving site, for identical goods, duplication is ot required, providing a clear statement to that effect is included in the applicable Section(s) or in the Contents List. Note 2: The Dispatch Dossier is to accompany the goods on dispatch and shall appear as a separate item on the shipping documents. One additional copy shall, on request, be forwarded to the project office. DISPATCH DOSSIER — BIH JOB 623 - BURNER PIPING - Regeneration Gas Heater G60-FA2401 INDEX No. SDR Description BIH document no. 4 G03 Packing and Protection Procedure 623-262-155AA 2 ‘G06 ‘Transportation Procedure (623-262-156AA_ 3 Lot Material Certificates for items welded at site (see Note below) 4 Packing List 5 BIH Release Notes 6 List of Deviations 7 Validated Punch List Note 1 All certificates included which are unique to the materia/equipment supplied are to be annotated with PO number and item number and material reference number. DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regeneration Gas Heater G60-FA2401 1. Packing and Protection Procedure 2.__ Transportation Procedure DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regenei jas Heatel 2401 icates for items welded at site DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regeneration Gas Heater G60-FA2401 DISPATCH DOSSIER ~— BIH JOB 623 — BURNER PIPING - Regeneration Gas Heater G60-FA2401 5. __ BIH Release Notes DISPATCH DOSSIER — BIH JOB 623 — BURNER PIPING - Regenet jas Heater 2404 6.__ List of Deviations DISPATCH DOSSIER — BIH JOB 623 - BURNER PIPING - 7. Validated Punch List

You might also like