You are on page 1of 45

MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT

DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1 EQPT 20119 516-RA-E-20119 MDS FOR CRUDE HEATER C 01/12/2011 NA


2 EQPT 20120 516-RA-E-20120 MDS FOR WASH WATER PREHEATER C 01/12/2011 NA
3 EQPT 31003 516-PA-E-31003 MATERIAL REQUISITION FOR HOT OIL HEATER PACKAGE C 22/03/2012 NA
4 EQPT 31013 516-PA-E-31013 SPECIFICATION FOR HOT OIL HEATER PACKAGE C 22/03/2012 NA
5 EQPT 31053 516-PA-E-31053 INSPECTION DATA SHEET FOR HOT OIL HEATER PACKAGE C 22/03/2012 NA
6 EQPT 31112 516-PA-E-31112 MDS FOR HOT OIL HEATER PACKAGE C 22/03/2012 NA
7 EQPT 31203 516-PA-D-31203 TBE AND RECOMMENDATION FOR HOT OIL HEATER PACKAGE A 06/03/2012 NA
8 EQPT 39889 516-PA-E-39889 VENDOR FOLLOW UP FOR HOT OIL HEATER PACKAGE A1 22/09/2012 NA
MATERIAL REQUISITION FOR HP & LP FLARE AND BURN PIT
9 EQPT 31007 516-PA-E-31007 C 16/03/2012 NA
PACKAGES

10 EQPT 31017 516-PA-E-31017 SPECIFICATION FOR HP & LP FLARES AND BURN PIT PACKAGES C 16/03/2012 NA

11 EQPT 31057 516-PA-E-31057 IDS FOR HP & LP FLARES AND BURN PIT PACKAGES C 16/03/2012 NA
12 EQPT 31122 516-PA-E-31122 MDS FOR HP FLARE PACKAGE B 16/03/2012 NA
13 EQPT 31123 516-PA-E-31123 MDS FOR LP FLARE PACKAGE B 16/03/2012 NA
14 EQPT 31124 516-PA-E-31124 MDS FOR BURN PIT PACKAGES B 16/03/2012 NA
TBE AND RECOMMENDATION FOR HP & LP FLARE AND BURN PIT
15 EQPT 31213 516-PA-D-31213 A 22/08/2012 NA
PACKAGES

16 EQPT 39894 516-PA-E-39894 VENDOR FOLLOW UP FOR HP & LP FLARE AND BURN PIT PACKAGES A1 22/09/2012 NA

17 EQPT 8328 516-GA-E-08328 PROCESS DATA SHEET - DRY CRUDE COOLER B 01/12/2011 NA
18 EQPT 30001 516-MA-E-30001 SPECIFICATION FOR CENTRIFUGAL PUMPS B 10/11/2011 NA
19 EQPT 30003 516-MA-E-30003 MATERIAL REQUISITION FOR FIRE WATER PUMP PACKAGE E 17/02/2012 NA

20 EQPT 30005 516-MA-E-30005 MATERIAL REQUISITION FOR CENTRIFUGAL PUMPS - UTILITY AREA C 10/11/2011 NA

MATERIAL REQUISITION FOR VERTICALLY SUSPENDED


21 EQPT 30006 516-MA-E-30006 C 25/11/2011 NA
CENTRIFUGAL PUMPS
MATERIAL REQUISITION FOR CENTRIFUGAL PUMPS - PROCESS
22 EQPT 30011 516-MA-E-30011 D 16/11/2011 NA
AREA
23 EQPT 30013 516-MA-E-30013 SPECIFICATION FOR FIRE WATER PUMP PACKAGE E 17/02/2012 NA
24 EQPT 30051 516-MA-E-30051 IDS FOR CENTRIFUGAL PUMPS C 10/11/2011 NA
25 EQPT 30052 516-MA-E-30052 IDS FOR SOURCE WELL WATER PUMPS A 00/01/1900 NA
26 EQPT 30053 516-MA-E-30053 IDS FOR FIRE WATER PUMP PACKAGE E 17/02/2012 NA
27 EQPT 30111 516-MA-E-30111 MDS FOR CRUDE OIL EXPORT PUMPS E 16/11/2011 NA
28 EQPT 30112 516-MA-E-30112 MDS FOR PRODUCED WATER TRANSFER PUMPS C 16/11/2011 NA
29 EQPT 30113 516-MA-E-30113 MDS FOR WASH WATER SUPPLY PUMPS C 10/11/2011 NA
30 EQPT 30114 516-MA-E-30114 MDS FOR EFFLUENT WATER PUMPS E 16/11/2011 NA
31 EQPT 30115 516-MA-E-30115 MDS FOR CLOSED DRAIN PUMPS D 25/11/2011 NA

REV-D 1 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

32 EQPT 30116 516-MA-E-30116 MDS FOR DIESEL TRANSFER PUMPS C 10/11/2011 NA


33 EQPT 30117 516-MA-E-30117 MDS FOR POTABLE WATER PUMPS C 10/11/2011 NA
34 EQPT 30118 516-MA-E-30118 MDS FOR WATER INJECTION PUMPS F 16/11/2011 NA
35 EQPT 30119 516-MA-E-30119 MDS FOR SLOP OIL TRANSFER PUMP D 25/11/2011 NA
36 EQPT 30121 516-MA-E-30121 MDS FOR HP FLARE KO DRUM PUMP C 25/11/2011 NA
37 EQPT 30122 516-MA-E-30122 MDS FOR LP FLARE KO DRUM PUMP C 25/11/2011 NA
38 EQPT 30123 516-MA-E-30123 MDS FOR WET TANK PW TRANSFER PUMPS C 16/11/2011 NA
39 EQPT 30124 516-MA-E-30124 MDS FOR DESALTER FEED PUMPS C 16/11/2011 NA
40 EQPT 30126 516-MA-E-30126 MDS FOR FIRE WATER MAIN PUMP (DIESEL) E 17/02/2012 NA
41 EQPT 30127 516-MA-E-30127 MDS FOR DIESEL ENGINE E 17/02/2012 NA
42 EQPT 30128 516-MA-E-30128 MDS FOR FIRE WATER JOCKEY PUMP C 17/02/2012 NA
43 EQPT 30130 516-MA-E-30130 MDS FOR OPEN DRAIN PUMPS C 25/11/2011 NA
44 EQPT 30131 516-MA-E-30131 DELETED - MDS FOR BACKWASH WATER TRANSFER PUMPS A1 21/04/2011 DELETED
TBE AND RECOMMENDATION FOR CENTRIFUGAL PUMPS IN
45 EQPT 30201 516-MA-D-30201 B 09/11/2011 NA
PROCESS AREA
TECHNICAL BID EVALUATION AND RECOMMENDATION FOR FIRE
46 EQPT 30203 516-MA-D-30203 B 24/11/2011 NA
WATER PUMPS
TBE& RECOMMENDATION FOR CENTRIFUGAL PUMPS - UTILITY
47 EQPT 30205 516-MA-D-30205 A 09/11/2011 NA
AREA
TBE AND RECOMMENDAION FOR VERTICALLY SUSPENDED
48 EQPT 30206 516-MA-D-30206 B 00/01/1900 NA
CENTRIFUGAL PUMPS
49 EQPT 39890 516-PA-E-39890 VENDOR FOLLOW UP FOR FIRE WATER PUMP PACKAGE A1 22/09/2012 NA
DELETED - VENDOR FOLLOW UP FOR BALANCE GAS COMPRESSOR
DISCHARGE COOLER (AIR COOLER) (REASON : BGC DISCHARGE
50 EQPT 29995 516-RA-E-29995 A1 26/04/2011 DELETED
COOLER IS NOW INCLUDED AS ART OF BG COMPRESSOR
PACKAGE)
51 EQPT 30002 516-MA-E-30002 MATERIAL REQUISITION FOR SOURCE WELL WATER PUMPS B 00/01/1900 NA
52 EQPT 30012 516-MA-E-30012 SPECIFICATION FOR SOURCE WELL WATER PUMPS. B 00/01/1900 NA
53 EQPT 30125 516-MA-E-30125 MDS FOR SOURCE WELL WATER PUMPS B 00/01/1900 NA

54 EQPT 30202 516-MA-E-30202 TBE AND RECOMMENDATION FOR SOURCE WELL WATER PUMPS A1 00/01/1900 NA

55 EQPT 31260 516-MA-E-31260 MECHANICAL DATA SHEET FOR DIESEL GENERATORS FOR ESP C 00/01/1900 NA

56 EQPT 39895 516-PA-E-39895 VENDOR FOLLOW UP FOR SOURCE WELL WATER PUMPS A1 00/01/1900 NA
57 EQPT 39898 516-MA-E-39898 VENDOR FOLLOW UP FOR CENTRIFUGAL PUMPS A1 30/07/2012 NA
58 EQPT 30004 516-MA-E-30004 MATERIAL REQUISITION FOR BALANCE GAS COMPRESSOR C 23/12/2011 NA
59 EQPT 30014 516-MA-E-30014 SPECIFICATION FOR BALANCE GAS COMPRESSOR C 23/12/2011 NA
60 EQPT 30054 516-MA-E-30054 IDS FOR BALANCE GAS COMPRESSOR B 23/12/2011 NA

REV-D 2 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

61 EQPT 30129 516-MA-E-30129 MDS FOR BALANCE GAS COMPRESSOR C 23/12/2011 NA


TBE AND RECOMMENDATION FOR BALANCE GAS COMPRESSOR
62 EQPT 30204 516-MA-D-30204 B 24/11/2011 NA
PACAKGE
MATERIAL REQUISITION FOR AIR COMPRESSOR AND AIR DRYER
63 EQPT 31004 516-PA-E-31004 E 24/04/2012 NA
PACKAGE

64 EQPT 31014 516-PA-E-31014 SPECIFICATION FOR AIR COMPRESSOR & AIR DRYER PACKAGE. D 24/04/2012 NA

65 EQPT 31113 516-PA-E-31113 MDS FOR AIR COMPRESSOR & AIR DRYER PACKAGE E 24/04/2012 NA
TBE AND RECOMMENDATION FOR AIR COMPRESSOR & AIR DRYER
66 EQPT 31204 516-PA-D-31204 A 14/04/2012 NA
PACKAGE
67 EQPT 31240 516-PA-E-31240 SPECIFICATION FOR NITROGEN GENERATION PACKAGE B 24/04/2012 NA
68 EQPT 31250 516-PA-E-31250 MDS FOR NITROGEN GENERATION PACKAG B 24/04/2012 NA
VENDOR FOLLOW UP FOR AIR COMPRESSOR AND AIR DRYER
69 EQPT 39893 516-PA-E-39893 A1 22/09/2012 NA
PACKAGE
70 EQPT 31005 516-PA-E-31005 MATERIAL REQUISITION FOR WALNUTSHELL FILTER PACKAGE C 11/07/2012 NA
71 EQPT 31009 516-PA-E-31009 MATERIAL REQUISITION FOR HVAC PACKAGE D 29/08/2012 NA
72 EQPT 31015 516-PA-E-31015 SPECIFICATION FOR WALNUTSHELL FILTER PACKAGE C 11/07/2012 NA
73 EQPT 31019 516-PA-E-31019 SPECIFICATION FOR HVAC PACKAGE D 29/08/2012 NA
74 EQPT 31055 516-PA-E-31055 IDS FOR WALNUTSHELL FILTER PACKAGE B 11/07/2012 NA
75 EQPT 31114 516-PA-E-31114 DELETED - MDS FOR WALNUTSHELL FILTER A1 21/04/2011 DELETED
TECHNICAL BID EVALUATION AND RECOMMENDATION FOR
76 EQPT 31205 516-PA-D-31205 A 20/01/2012 NA
WALNUTSHELL FILTER
77 EQPT 39892 516-PA-E-39892 VENDOR FOLLOW UP FOR WALNUTSHELL FILTER A1 22/09/2012 NA
78 EQPT 31006 516-PA-E-31006 MATERIAL REQUISITION FOR CHEMICAL INJECTION SYSTEMS B 20/04/2012 NA
79 EQPT 31016 516-PA-E-31016 SPECIFICATION FOR CHEMICAL INJECTION SYSTEMS B 20/04/2012 NA
80 EQPT 31056 516-PA-E-31056 IDS FOR CHEMICAL INJECTION SYSTEMS B 20/04/2012 NA
81 EQPT 31115 516-PA-E-31115 MDS FOR BIOCIDE A & B INJECTION SYSTEMS B 20/04/2012 NA
MDS FOR WATER CLARIFIER (POLYELECTROLYTE) INJECTION
82 EQPT 31116 516-PA-E-31116 B 20/04/2012 NA
SYSTEM
83 EQPT 31117 516-PA-E-31117 MDS FOR SCALE INHIBITOR INJECTION SYSTEM B 20/04/2012 NA
MDS FOR CORROSION INHIBITOR INJECTION SYSTEMS (GAS &
84 EQPT 31118 516-PA-E-31118 B 20/04/2012 NA
LIQUID)
85 EQPT 31119 516-PA-E-31119 MDS FOR OXYGEN SCAVENGER INJECTION SYSTEM B 20/04/2012 NA
86 EQPT 31120 516-PA-E-31120 MDS FOR DEMULSIFIER INJECTION SYSTEM B 20/04/2012 NA
87 EQPT 31121 516-PA-E-31121 MDS FOR ANTI FOAM INJECTION SYSTEM B 20/04/2012 NA

88 EQPT 31206 516-PA-D-31206 TBE AND RECOMMENDATION FOR CHEMICAL INJECTION SYSTEMS A 06/03/2012 NA

REV-D 3 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

MATERIAL REQUISITION FOR MAINTENANCE BULDING MONORAIL


89 EQPT 31207 516-PA-E-31207 B 00/01/1900 NA
HOIST

90 EQPT 31208 516-PA-E-31208 SPECIFICATION FOR MAINTENANCE BULDING MONORAIL HOIST A 00/01/1900 NA

91 EQPT 31209 516-PA-E-31209 MDS FOR MAINTENANCE BULDING MONORAIL HOIST A 00/01/1900 NA
TBE AND RECOMMENDATION FOR MAINTENANCE BUILDING
92 EQPT 31210 516-PA-E-31210 A1 00/01/1900 NA
MONORAIL
VENDOR FOLLOW UP FOR CHEMICAL INJECTION SYSTEMS
93 EQPT 39887 516-PA-E-39887 A1 22/09/2012 NA
PACKAGE
94 EQPT 39896 516-PA-E-39896 VENDOR FOLLOW UP FOR MAINTENANCE BULDING MONORAIL A1 00/01/1900 NA

95 EQPT 31002 516-PA-E-31002 MATERIAL REQUISITON FOR EMERGENCY DIESEL GENERATOR C 26/09/2012 NA

96 EQPT 31012 516-PA-E-31012 SPECIFICATION FOR EMERGENCY DIESEL GENERAT0R C 26/09/2012 NA


97 EQPT 31111 516-PA-E-31111 MDS FOR EMERGENCY DIESEL GENERATOR C 26/09/2012 NA
TBE AND RECOMMENDATION FOR EMERGENCY DIESEL
98 EQPT 31202 516-PA-D-31202 A 27/09/2012 NA
GENERATOR PACKAGE
99 EQPT 39891 516-PA-E-39891 VENDOR FOLLOW UP FOR EMERGENCY DIESEL GENERATOR A1 00/01/1900 NA
100 EQPT 31001 516-PA-E-31001 MATERIAL REQUITISON FOR FUEL GAS TREATMENT PACKAGE D 19/04/2012 NA
101 EQPT 31011 516-PA-E-31011 SPECIFICATION FOR FUEL GAS TREATMENT PACKAGE D 19/04/2012 NA
TBE AND RECOMMENDATION FOR FUEL GAS TREATMENT
102 EQPT 31201 516-PA-D-31201 B 15/02/2012 NA
PACKAGE
103 EQPT 39888 516-PA-E-39888 VENDOR FOLLOW UP FOR FUEL GAS TREATMENT PACKAGE A1 22/09/2012 NA
104 EQPT 20006 516-RA-E-20006 MATERIAL REQUISITION FOR STORAGE TANKS C 11/11/2011 NA
105 EQPT 20007 516-RA-E-20007 MR FOR FRP POTABLE WATER STORAGE TANK C 28/08/2012 NA
106 EQPT 20016 516-RA-E-20016 SPECIFICATION FOR STORAGE TANKS B 11/11/2011 NA
107 EQPT 20017 516-RA-E-20017 SPECIFICATION FOR FRP TANK B 28/08/2012 NA
DELETED - TBE AND RECOMMENDATION FOR FRP PORTABLE
108 EQPT 20026 516-RA-D-20026 WATER STORAGE TANK NOTE : AS THIS EQUIPMENT WILL BE A1 23/08/2012 NA
PROCURED LOCALLY BY AGC
109 EQPT 20122 516-RA-E-20122 MDS FOR WET CRUDE TANKS C 11/11/2011 NA
110 EQPT 20123 516-RA-E-20123 MDS FOR OFFSPEC. CRUDE OIL STORAGE TANK C 11/11/2011 NA
111 EQPT 20124 516-RA-E-20124 MDS FOR EFFLUENT WATER TANK C 11/11/2011 NA
112 EQPT 20126 516-RA-E-20126 MDS FOR FIRE WATER STORAGE TANK E 11/11/2011 NA
113 EQPT 20127 516-RA-E-20127 MDS FOR WASH WATER TANK C 11/11/2011 NA
114 EQPT 20128 516-RA-E-20128 MDS FOR DIESEL STORAGE TANK D 17/11/2011 NA
115 EQPT 20129 516-RA-E-20129 MDS FOR PRODUCED WATER TANK C 11/11/2011 NA
116 EQPT 20130 516-RA-E-20130 MDS FOR DRY TANK C 11/11/2011 NA
117 EQPT 20131 516-RA-E-20131 MDS FOR POTABLE WATER STORAGE TANK C 28/08/2012 NA

REV-D 4 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

118 EQPT 20221 516-RB-D-20221 SKETCH FOR WET CRUDE TANKS WITH NOZZLE ORIENTATION D 11/11/2011 NA
SKETCH FOR OFFSPEC CRUDE OIL STORAGE TANK WITH NOZZLE
119 EQPT 20222 516-RB-D-20222 D 11/11/2011 NA
ORIENTATION

120 EQPT 20223 516-RB-D-20223 SKETCH FOR EFFLUENT WATER TANK WITH NOZZLE ORIENTATION D 11/11/2011 NA

SKETCH FOR FIRE WATER STORAGE TANK WITH NOZZLE


121 EQPT 20225 516-RB-D-20225 F 11/11/2011 NA
ORIENTATION
122 EQPT 20226 516-RB-D-20226 SKETCH FOR WASH WATER TANK WITH NOZZLE ORIENTATION D 11/11/2011 NA

123 EQPT 20227 516-RB-D-20227 SKETCH FOR DIESEL STORAGE TANK WITH NOZZLE ORIENTATION D 17/11/2011 NA

124 EQPT 20228 516-RB-D-20228 SKETCH FOR PRODUCED WATER TANK WITH NOZZLE ORIENTATION D 11/11/2011 NA

125 EQPT 20229 516-RB-D-20229 SKETCH FOR DRY TANK WITH NOZZLE ORIENTATION D 11/11/2011 NA
DELETED - SKETCH FOR POTABLE WATER STORAGE TANK
REASON:ALL THE AVAILABLE DATA FOR THE POTABLE WATER
126 EQPT 20230 516-RB-D-20230 A1 09/05/2011 DELETED
STORAGE TANK IS INCLUDED IN THE MDS (516-RA-E-20131) AND
SEPARATE SKETCH IS NOT REQUIRED.
TECHNICAL BID EVALUATION AND RECOMMENDATION FOR
127 EQPT 20231 516-RA-D-20231 A 31/10/2011 NA
STORAGE TANKS
128 EQPT 29997 516-RA-E-29997 VENDOR FOLLOW UP FOR STORAGE TANKS A1 22/09/2012 NA
DELETED - VENDOR FOLLOW UP FOR FRP POTABLE WATER
129 EQPT 29999 516-RA-E-29999 STORAGE TANK NOTE : AS THIS EQUIPMENT WILL BE PROCURED A1 23/08/2012 NA
LOCALLY BY AGC

130 EQPT 20001 516-RA-E-20001 MATERIAL REQUISITION FOR SEPARATOR PACKAGE C 01/12/2011 NA

131 EQPT 20011 516-RA-E-20011 SPECIFICATION FOR SEPARATOR PACKAGE C 01/12/2011 NA


132 EQPT 20021 516-RA-D-20021 TBE AND RECOMMENDATION FOR SEPARATORS PACKAGE A 22/08/2012 NA
133 EQPT 20051 516-RA-E-20051 IDS FOR SEPARATOR PACKAGE C 01/12/2011 NA
134 EQPT 20101 516-RA-E-20101 MDS FOR HP SEPARATOR PACKAGE C 01/12/2011 NA
135 EQPT 20102 516-RA-E-20102 MDS FOR LP SEPARATOR PACKAGE C 01/12/2011 NA
136 EQPT 20103 516-RA-E-20103 MDS FOR HP TEST SEPARATOR PACKAGE C 01/12/2011 NA
137 EQPT 20104 516-RA-E-20104 MDS FOR LP TEST SEPARATOR PACKAGE C 01/12/2011 NA
138 EQPT 20201 516-RC-D-20201 SKETCH FOR HP SEPARATOR WITH NOZZLE ORIENTATION C 01/12/2011 NA

139 EQPT 20202 516-RC-D-20202 SKETCH FOR LP SEPARATOR WITH NOZZLE ORIENTATION C 01/12/2011 NA

140 EQPT 20203 516-RC-D-20203 SKETCH FOR HP TEST SEPARATOR WITH NOZZLE ORIENTATION C 01/12/2011 NA

REV-D 5 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

141 EQPT 20204 516-RC-D-20204 SKETCH FOR LP TEST SEPARATOR WITH NOZZLE ORIENTATION C 01/12/2011 NA

142 EQPT 29993 516-RA-E-29993 VENDOR FOLLOW UP FOR SEPARATOR PACKAGE A1 22/09/2012 NA
143 EQPT 20002 516-RA-E-20002 MATERIAL REQUISITION FOR DESALTER PACKAGE D 28/11/2011 NA
144 EQPT 20012 516-RA-E-20012 SPECIFICATION FOR DESALTER PACKAGE D 28/11/2011 NA
145 EQPT 20022 516-RA-D-20022 TBE AND RECOMMENDATION FOR DESALTER PACKAGE A 18/11/2011 NA
146 EQPT 20052 516-RA-E-20052 INSPECTION DATA SHEET FOR DESALTER PACKAGE D 28/11/2011 NA
VENDOR FOLLOW UP FOR DESALTER PACKAGE (DESALTER &
147 EQPT 29994 516-RA-E-29994 A1 22/09/2012 NA
DEHYDRATOR)
148 EQPT 20003 516-RA-E-20003 MATERIAL REQUISITION FOR PRESSURE VESSELS D 17/11/2011 NA
149 EQPT 20013 516-RA-E-20013 SPECIFICATION FOR PRESSURE VESSELS B 17/11/2011 NA
150 EQPT 20023 516-RA-D-20023 TBE AND RECOMMENDATION FOR PRESSURE VESSELS A 28/09/2011 NA
151 EQPT 20053 516-RA-E-20053 IDS FOR PRESSURE VESSELS C 17/11/2011 NA
152 EQPT 20105 516-RA-E-20105 MDS FOR HP GAS KO DRUM C 17/11/2011 NA
153 EQPT 20106 516-RA-E-20106 MDS FOR LP GAS KO DRUM C 17/11/2011 NA
154 EQPT 20107 516-RA-E-20107 MDS FOR PLANT AIR RECEIVER C 17/11/2011 NA
155 EQPT 20108 516-RA-E-20108 MDS FOR INSTRUMENT AIR RECEIVER C 17/11/2011 NA
156 EQPT 20109 516-RA-E-20109 MDS FOR BALANCE GAS COMPRESSOR SUCTION SCRUBBER C 17/11/2011 NA
157 EQPT 20110 516-RA-E-20110 MDS FOR CLOSED DRAIN VESSEL C 17/11/2011 NA
158 EQPT 20111 516-RA-E-20111 MDS FOR HP FLARE KO DRUM C 17/11/2011 NA
159 EQPT 20112 516-RA-E-20112 MDS FOR LP FLARE KO DRUM C 17/11/2011 NA
160 EQPT 20113 516-RA-E-20113 MDS FOR WET TANK DEGASSING BOOT C 17/11/2011 NA
161 EQPT 20114 516-RA-E-20114 MDS FOR OFF SPEC TANK DEGASSING BOOT C 17/11/2011 NA
162 EQPT 20115 516-RA-E-20115 MDS FOR SLOP OIL VESSEL D 17/11/2011 NA
163 EQPT 20116 516-RA-E-20116 MDS FOR PRESSURISED DRAIN VESSEL C 17/11/2011 NA
164 EQPT 20117 516-RA-E-20117 MDS FOR FUEL GAS KO DRUM D 17/11/2011 NA
165 EQPT 20205 516-RC-D-20205 SKETCH FOR HP GAS KO DRUM WITH NOZZLE ORIENTATION C 17/11/2011 NA
166 EQPT 20206 516-RC-D-20206 SKETCH FOR LP GAS KO DRUM WITH NOZZLE ORIENTATION C 17/11/2011 NA

167 EQPT 20207 516-RC-D-20207 SKETCH FOR PLANT AIR RECEIVER WITH NOZZLE ORIENTATION C 17/11/2011 NA

SKETCH FOR INSTRUMENT AIR RECEIVER WITH NOZZLE


168 EQPT 20208 516-RC-D-20208 C 17/11/2011 NA
ORIENTATION
SKETCH FOR BALANCE GAS COMPRESSOR SUCTION SCRUBBER
169 EQPT 20209 516-RC-D-20209 C 17/11/2011 NA
WITH NOZZLE ORIENTATION

170 EQPT 20210 516-RC-D-20210 SKETCH FOR CLOSED DRAIN VESEEL WITH NOZZLE ORIENTATION C 17/11/2011 NA

171 EQPT 20211 516-RC-D-20211 SKETCH FOR HP FLARE KO DRUM WITH NOZZLE ORIENTATION C 17/11/2011 NA
172 EQPT 20212 516-RC-D-20212 SKETCH FOR LP FLARE KO DRUM WITH NOZZLE ORIENTATION C 17/11/2011 NA

REV-D 6 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

SKETCH FOR WET TANK DEGASSING BOOT WITH NOZZLE


173 EQPT 20213 516-RC-D-20213 C 17/11/2011 NA
ORIENTATION
SKETCH FOR OFF SPEC TANK DEGASSING BOOT WITH NOZZLE
174 EQPT 20214 516-RC-D-20214 C 17/11/2011 NA
ORIENTATION
175 EQPT 20215 516-RC-D-20215 SKETCH FOR SLOP OIL VESSEL WITH NOZZLE ORIENTATION D 17/11/2011 NA
SKETCH FOR PRESSURISED DRAIN VESSEL WITH NOZZLE
176 EQPT 20216 516-RC-D-20216 C 17/11/2011 NA
ORIENTATION
177 EQPT 20217 516-RC-D-20217 SKETCH FOR FUEL GAS KOD WITH NOZZLE ORIENTATION D 17/11/2011 NA
178 EQPT 29998 516-RA-E-29998 VENDOR FOLLOW UP FOR PRESSURE VESSELS A1 22/09/2012 NA
179 EQPT 39899 516-MA-E-39899 VENDOR FOLLOW UP FOR BALANCE GAS COMPRESSOR A1 22/09/2012 NA
DELETED - MR FOR BALANCE GAS COMPRESSOR DISCHARGE
180 EQPT 20005 516-RA-E-20005 COOLER (REASON : BGC DISCHARGE COOLER IS NOW INCLUDED A1 26/04/2011 DELETED
AS PART OF BG COMPRESSOR PACKAGE)
181 EQPT 20008 516-RA-E-20008 MATERIAL REQUISITION FOR AIR COOLER B 26/12/2011 NA
DELETED - SPECIFICATION FOR BALANCE GAS COMPRESSOR
182 EQPT 20015 516-RA-E-20015 DISCHARGE COOLER (REASON : BGC DISCHARGE COOLER IS NOW A1 26/04/2011 DELETED
INCLUDED AS PART OF BG COMPRESSOR PACKAGE)
183 EQPT 20018 516-RA-E-20018 SPECIFICATION FOR AIR COOLER B 26/12/2011 NA
DELETED - TBE AND RECOMMENDATION FOR BALANCE GAS
COMPRESSOR DISCHARGE COOLER (REASON : BGC DISCHARGE
184 EQPT 20025 516-RA-D-20025 A1 26/04/2011 DELETED
COOLER IS NOW INCLUDED AS PART OF BG COMPRESSOR
PACKAGE)
185 EQPT 20027 516-RA-D-20027 TBE AND RECOMMENDATION FOR AIR COOLER A 16/12/2011 NA
DELETED - IDS FOR BALANCE GAS COMPRESSOR DISCHARGE
COOLER
186 EQPT 20055 516-RA-E-20055 A1 26/04/2011 DELETED
(REASON : BGC DISCHARGE COOLER IS NOW INCLUDED AS PART
OF BG COMPRESSOR PACKAGE)
187 EQPT 20058 516-RA-E-20058 IDS FOR AIR COOLER B 26/12/2011 NA

DELETED - MDS FOR BALANCE GAS COMPRESSOR DISCHARGE


188 EQPT 20121 516-RA-E-20121 COOLER (REASON : BGC DISCHARGE COOLER IS NOW INCLUDED A1 26/04/2011 DELETED
AS PART OF BG COMPRESSOR PACKAGE)

189 EQPT 20132 516-RA-E-20132 MDS FOR DRY CRUDE COOLER B 26/12/2011 NA
190 EQPT 29992 516-RA-E-29992 VENDOR DOCUMENT REVIEW FOR AIR COOLER A1 03/07/2012 NA
191 EQPT 8327 516-GA-E-08327 PROCESS DATA SHEET - LP TEST HEATER B 23/11/2011 NA
192 EQPT 20004 516-RA-E-20004 MR FOR HEAT EXCHANGERS (PHE) C 01/12/2011 NA
193 EQPT 20014 516-RA-E-20014 SPECIFICATION FOR HEAT EXCHANGERS (PHE) B 01/12/2011 NA
194 EQPT 20024 516-RA-D-20024 TBE AND RECOMMENDATION FOR HEAT EXCHANGERS (PHE) A 19/11/2011 NA

REV-D 7 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

195 EQPT 20054 516-RA-E-20054 IDS FOR HEAT EXCHANGERS (PHE) C 01/12/2011 NA
196 EQPT 20118 516-RA-E-20118 MDS FOR CRUDE / CRUDE EXCHANGER C 01/12/2011 NA
197 EQPT 20133 516-RA-E-20133 MDS FOR LP TEST HEATER C 01/12/2011 NA
198 EQPT 29996 516-RA-E-29996 VENDOR FOLLOW UP FOR HEAT EXCHANGERS (PHE) A1 23/08/2012 NA
199 PRO 8001 516-GA-E-08001 PROCESS DESIGN BASIS E 31/08/2011 NA
200 PRO 8003 516-GA-E-08003 PROCESS SIMULATION & HMB REPORT E 07/09/2011 NA
201 PRO 8103 516-GD-B-08103 OVERALL PROCESS FLOW SCHEME E 10/08/2011 NA
202 PRO 8111 516-GD-B-08111 PFD FOR INLET FLOW LINES AND HEADERS E 11/08/2011 NA
203 PRO 8112 516-GD-B-08112 PFD FOR HP & LP SEPARATOR E 11/08/2011 NA
204 PRO 8113 516-GD-B-08113 PFD FOR WET TANK AND OFF-SPEC TANK F 11/08/2011 NA
PFD FOR DESALTER FEED, CRUDE HEATING, 1ST STAGE & 2ND
205 PRO 8114 516-GD-B-08114 E 11/08/2011 NA
STAGE DESALTER TRAIN 1 & 2 (2 SHEETS)
206 PRO 8115 516-GD-B-08115 PFD FOR CRUDE EXPORT F 11/08/2011 NA
207 PRO 8116 516-GD-B-08116 PFD FOR BALANCE GAS COMPRESSOR SYSTEM E 11/08/2011 NA
208 PRO 8117 516-GD-B-08117 PFD FOR PRODUCED WATER TREATMENT SYSTEM F 11/08/2011 NA
209 PRO 8118 516-GD-B-08118 PFD FOR HP & LP TEST SEPARATORS E 11/08/2011 NA
210 PRO 8451 516-GD-B-08451 PFD - STREAM SUMMARY - CASE 1A (SI UNITS) C 30/11/2011 NA
211 PRO 8452 516-GD-B-08452 PFD - STREAM SUMMARY - CASE 1A (IMPERIAL UNITS) C 30/11/2011 NA
212 PRO 8453 516-GD-B-08453 PFD - STREAM SUMMARY - CASE 1B (SI UNITS) C 30/11/2011 NA
213 PRO 8454 516-GD-B-08454 PFD - STREAM SUMMARY - CASE 1B (IMPERIAL UNITS) C 30/11/2011 NA
214 PRO 8455 516-GD-B-08455 PFD - STREAM SUMMARY - CASE 1C (SI UNITS) C 30/11/2011 NA
215 PRO 8456 516-GD-B-08456 PFD - STREAM SUMMARY - CASE 1C (IMPERIAL UNITS) C 30/11/2011 NA
216 PRO 8457 516-GD-B-08457 PFD - STREAM SUMMARY - CASE 1D (SI UNITS) C 30/11/2011 NA
217 PRO 8458 516-GD-B-08458 PFD - STREAM SUMMARY - CASE 1D (IMPERIAL UNITS) C 30/11/2011 NA
218 PRO 8459 516-GD-B-08459 PFD - STREAM SUMMARY - CASE 2A (SI UNITS) C 30/11/2011 NA
219 PRO 8460 516-GD-B-08460 PFD - STREAM SUMMARY - CASE 2A (IMPERIAL UNITS) C 30/11/2011 NA
220 PRO 8461 516-GD-B-08461 PFD - STREAM SUMMARY - CASE 2B (SI UNITS) C 30/11/2011 NA
221 PRO 8462 516-GD-B-08462 PFD - STREAM SUMMARY - CASE 2B (IMPERIAL UNITS) C 30/11/2011 NA
222 PRO 8463 516-GD-B-08463 PFD - STREAM SUMMARY - CASE 2C (SI UNITS) C 30/11/2011 NA
223 PRO 8464 516-GD-B-08464 PFD - STREAM SUMMARY - CASE 2C (IMPERIAL UNITS) C 30/11/2011 NA
224 PRO 8465 516-GD-B-08465 PFD - STREAM SUMMARY - CASE 2D (SI UNITS) C 30/11/2011 NA
225 PRO 8466 516-GD-B-08466 PFD - STREAM SUMMARY - CASE 2D (IMPERIAL UNITS) C 30/11/2011 NA
226 PRO 8467 516-GD-B-08467 PFD - STREAM SUMMARY - CASE 3A (SI UNITS) C 30/11/2011 NA
227 PRO 8468 516-GD-B-08468 PFD - STREAM SUMMARY - CASE 3A (IMPERIAL UNITS) C 30/11/2011 NA
228 PRO 8469 516-GD-B-08469 PFD - STREAM SUMMARY - CASE 3B (SI UNITS) C 30/11/2011 NA
229 PRO 8470 516-GD-B-08470 PFD - STREAM SUMMARY - CASE 3B (IMPERIAL UNITS) C 30/11/2011 NA
230 PRO 8471 516-GD-B-08471 PFD - STREAM SUMMARY - CASE 3C (SI UNITS) C 30/11/2011 NA

REV-D 8 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

231 PRO 8472 516-GD-B-08472 PFD - STREAM SUMMARY - CASE 3C (IMPERIAL UNITS) C 30/11/2011 NA
232 PRO 8473 516-GD-B-08473 PFD - STREAM SUMMARY - CASE 3D (SI UNITS) C 30/11/2011 NA
233 PRO 8474 516-GD-B-08474 PFD - STREAM SUMMARY - CASE 3D (IMPERIAL UNITS) C 30/11/2011 NA
234 PRO 8475 516-GD-B-08475 PFD - STREAM SUMMARY - MN-MO-MF - SUMMER B 30/11/2011 NA
235 PRO 8476 516-GD-B-08476 PFD - STREAM SUMMARY - MN-MO-MF - WINTER B 30/11/2011 NA
236 PRO 8477 516-GD-B-08477 PFD - STREAM SUMMARY - MN-MO-CR - SUMMER B 30/11/2011 NA
237 PRO 8478 516-GD-B-08478 PFD - STREAM SUMMARY - MN-MO-CR - WINTER B 30/11/2011 NA
238 PRO 8479 516-GD-B-08479 PFD - STREAM SUMMARY - MN-MR - SUMMER B 30/11/2011 NA
239 PRO 8480 516-GD-B-08480 PFD - STREAM SUMMARY - MN-MR - WINTER B 30/11/2011 NA
240 PRO 8481 516-GD-B-08481 PFD - STREAM SUMMARY - DF-MR - SUMMER B 30/11/2011 NA
241 PRO 8482 516-GD-B-08482 PFD - STREAM SUMMARY - DF-MR - WINTER B 30/11/2011 NA
242 PRO 8483 516-GD-B-08483 PFD - STREAM SUMMARY - AB-MR - SUMMER B 30/11/2011 NA
243 PRO 8484 516-GD-B-08484 PFD - STREAM SUMMARY - AB-MR - WINTER B 30/11/2011 NA
244 PRO 8485 516-GD-B-08485 PFD - STREAM SUMMARY - M/W/B - SUMMER B 30/11/2011 NA
245 PRO 8486 516-GD-B-08486 PFD - STREAM SUMMARY - M/W/B - WINTER B 30/11/2011 NA
246 PRO 86001 516-GD-B-86001 UFD - WASH WATER SYSTEM & POTABLE WATER SYSTEM C 10/11/2011 NA
247 PRO 86002 516-GD-B-86002 UFD - PLANT AIR & INSTRUMENT AIR SYSTEM C 18/11/2011 NA
248 PRO 86003 516-GD-B-86003 UFD - FUEL GAS SYSTEM D 05/09/2012 NA
249 PRO 86004 516-GD-B-86004 UFD DIESEL OIL SYSTEM C 10/11/2011 NA
250 PRO 86005 516-GD-B-86005 UFD - HOT OIL SYSTEM D 05/09/2012 NA
UFD - CHEMICAL INJECTION SYSTEM 1 - OXYGEN SCAVENGER,
251 PRO 86006 516-GD-B-86006 C 10/11/2011 NA
BIOCIDE-A & BIOCIDE-B INJECTION PACKAGES
UFD - CHEMICAL INJECTION SYSTEM 1- SCALE INHIBITOR &
252 PRO 86007 516-GD-B-86007 C 10/11/2011 NA
CORROSION INHIBITOR INJECTION PACKAGES
UFD - CHEMICAL INJECTION SYSTEM 2- DEMULSIFIER & ANTIFOAM
253 PRO 86008 516-GD-B-86008 C 10/11/2011 NA
INJECTION PACKAGES
UFD - CHEMICAL INJECTION SYSTEM 2- SCALE INHIBITOR INJECTION
254 PRO 86009 516-GD-B-86009 C 10/11/2011 NA
PACKAGE

UFD - CHEMICAL INJECTION SYSTEM 2 - CORROSION INHIBITOR &


255 PRO 86010 516-GD-B-86010 C 10/11/2011 NA
GAS CORROSION INHIBITOR INJECTION PACKAGES

UFD - CHEMICAL INJECTION SYSTEM 3 - GAS CORROSION


256 PRO 86011 516-GD-B-86011 INHIBITOR, CORROSION INHIBITOR & DEMULSIFIER INJECTION C 10/11/2011 NA
PACKAGES

UFD - CHEMICAL INJECTION SYSTEM 4- OXYGEN SCAVENGER,


257 PRO 86012 516-GD-B-86012 C 10/11/2011 NA
SCALE INHIBITOR, BIOCIDE-A & BIOCIDE-B INJECTION PACKAGES

REV-D 9 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

UFD - CHEMICAL INJECTION SYSTEM 4- WATER CLARIFIER &


258 PRO 86013 516-GD-B-86013 C 10/11/2011 NA
CORROSION INHIBITOR INJECTION PACKAGES

259 PRO 86014 516-GD-B-86014 UFD - CLOSED DRAIN SYSTEM AND PRESSURISED DRAIN SYSTEM C 10/11/2011 NA

260 PRO 86015 516-GD-B-86015 UFD - HP FLARE SYSTEM D 27/04/2012 NA


261 PRO 86016 516-GD-B-86016 UFD - LP FLARE SYSTEM & BURN PIT D 27/04/2012 NA

262 PRO 8121 516-GD-B-08121 MATERIAL SELECTION DIAGRAM INLET FLOW LINES AND HEADERS C 16/09/2011 NA

263 PRO 8122 516-GD-B-08122 MATERIAL SELECTION DIAGRAM HP & LP SEPARATOR C 16/09/2011 NA
264 PRO 8123 516-GD-B-08123 MATERIAL SELECTION DIAGRAM WET TANK & OFF-SPEC TANK D 16/09/2011 NA

MATERIAL SELECTION DIAGRAM DESALTER FEED, CRUDE HEATING,


265 PRO 8124 516-GD-B-08124 C 16/09/2011 NA
1ST STAGE & 2ND STAGE DESALTER - TRAIN 1&2 (2 SHEETS)

266 PRO 8125 516-GD-B-08125 MATERIAL SELECTION DIAGRAM CRUDE EXPORT D 16/09/2011 NA
MATERIAL SELECTION DIAGRAM BALANCE GAS COMPRESSOR
267 PRO 8126 516-GD-B-08126 C 16/09/2011 NA
SYSTEM
MATERIAL SELECTION DIAGRAM PRODUCED WATER TREATMENT
268 PRO 8127 516-GD-B-08127 D 16/09/2011 NA
SYSTEM
269 PRO 8128 516-GD-B-08128 MATERIAL SELECTION DIAGRAM HP & LP TEST SEPARATORS C 16/09/2011 NA
270 PRO 8002 516-GA-E-08002 UTILITIES DESIGN BASIS D 13/09/2012 NA
271 PRO 8301 516-GA-E-08301 PACKAGE SPECIFICATION FOR HP SEPARATOR B 16/11/2011 NA
272 PRO 8302 516-GA-E-08302 PACKAGE SPECIFICATION FOR LP SEPARATOR B 16/11/2011 NA
273 PRO 8303 516-GA-E-08303 PACKAGE SPECIFICAION FOR HP TEST SEPARATOR B 16/11/2011 NA
274 PRO 8304 516-GA-E-08304 PACKAGE SPECIFICATION FOR LP TEST SEPARATOR B 16/11/2011 NA
275 PRO 8305 516-GA-E-08305 PDS - HP GAS KO DRUM B 17/11/2011 NA
276 PRO 8306 516-GA-E-08306 PDS - LP GAS KO DRUM B 17/11/2011 NA
277 PRO 8307 516-GA-E-08307 PDS - BALANCE GAS COMPRESSOR SUCTION SCRUBBER B 17/11/2011 NA
278 PRO 8309 516-GA-E-08309 PDS - CRUDE - CRUDE HEAT EXCHANGER B 17/11/2011 NA
279 PRO 8310 516-GA-E-08310 PDS- CRUDE HEATER B 22/11/2011 NA
280 PRO 8311 516-GA-E-08311 PDS - WASH WATER PRE HEATER B 17/11/2011 NA
DELETED - PDS - BALANCE GAS COMPRESSOR DISCHARGE
281 PRO 8312 516-GA-E-08312 COOLER REASON : EQUIPMENT INCORPORATED IN OTHER A2 21/06/2011 DELETED
DOCUMENT
282 PRO 8313 516-GA-E-08313 PROCESS DATA SHEET FOR DESALTER FEED PUMPS B 15/11/2011 NA
PROCESS DATA SHEET FOR WET TANK PRODUCED WATER
283 PRO 8314 516-GA-E-08314 B 15/11/2011 NA
TRANSFER PUMPS
284 PRO 8315 516-GA-E-08315 PROCESS DATA SHEET FOR CRUDE OIL EXPORT PUMPS C 15/11/2011 NA

285 PRO 8316 516-GA-E-08316 PROCESS DATA SHEET FOR PRODUCED WATER TRANSFER PUMPS B 15/11/2011 NA

REV-D 10 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

286 PRO 8317 516-GA-E-08317 PROCESS DATA SHEET FOR EFFLUENT WATER PUMPS C 15/11/2011 NA
287 PRO 8318 516-GA-E-08318 PROCESS DATA SHEET FOR WATER INJECTION PUMPS C 15/11/2011 NA
288 PRO 8319 516-GA-E-08319 PROCESS DATA SHEET - WET TANK B 24/11/2011 NA
289 PRO 8320 516-GA-E-08320 PROCESS DATA SHEET - OFF-SPEC TANK B 24/11/2011 NA
290 PRO 8321 516-GA-E-08321 PROCESS DATA SHEET - DRY TANK B 24/11/2011 NA
291 PRO 8322 516-GA-E-08322 PDS - PRODUCED WATER TANK B 24/11/2011 NA
292 PRO 8323 516-GA-E-08323 PDS - EFFLUENT WATER TANK B 24/11/2011 NA
293 PRO 8324 516-GA-E-08324 PDS - WET TANK DEGASSING BOOT B 17/11/2011 NA
294 PRO 8325 516-GA-E-08325 PDS - OFF SPEC TANK DEGASSING BOOT B 17/11/2011 NA
295 PRO 8401 516-GA-E-08401 PACKAGE SPECIFICATION - DESALTER PACKAGE B 25/11/2011 NA
296 PRO 8402 516-GA-E-08402 PACKAGE SPECIFICATION FOR BALANCE GAS COMPRESSOR B 28/11/2011 NA
297 PRO 8404 516-GA-E-08404 PACKAGE SPECIFICATION FOR OIL METERING SKID C 25/11/2011 NA
298 PRO 8405 516-GA-E-08405 PACKAGE SPECIFICATION FOR MULTIPHASE FLOW METER C 01/12/2011 NA
299 PRO 86083 516-GD-B-86083 NETWORK DRAWING - PRESSURISED DRAIN NETWORK C 05/12/2011 TBA
300 PRO 86101 516-GA-E-86101 PROCESS DATA SHEET - POTABLE WATER TANK B 24/11/2011 NA
301 PRO 86102 516-GA-E-86102 PDS FOR POTABLE WATER PUMPS B 15/11/2011 NA
302 PRO 86103 516-GA-E-86103 PDS - DIESEL STORAGE TANK B 24/11/2011 NA
303 PRO 86104 516-GA-E-86104 PROCESS DATA SHEET FOR DIESEL FILTERS B 01/12/2011 NA
304 PRO 86105 516-GA-E-86105 PROCESS DATA SHEET FOR DIESEL TRANSFER PUMPS B 16/11/2011 NA
305 PRO 86106 516-GA-E-86106 PDS FOR PLANT AIR RECEIVER B 21/11/2011 NA
306 PRO 86107 516-GA-E-86107 PDS FOR INSTRUMENT AIR RECEIVER B 21/11/2011 NA
307 PRO 86108 516-GA-E-86108 PDS - FUEL GAS KO DRUM B 21/11/2011 NA
308 PRO 86109 516-GA-E-86109 PDS FOR HP FLARE KO DRUM B 21/11/2011 NA
309 PRO 86110 516-GA-E-86110 PDS FOR LP FLARE KO DRUM B 21/11/2011 NA
310 PRO 86111 516-GA-E-86111 PDS FOR HP FLARE KO DRUM PUMPS B 25/11/2011 NA
311 PRO 86112 516-GA-E-86112 PDS FOR LP FLARE KO DRUM PUMPS B 25/11/2011 NA
312 PRO 86113 516-GA-E-86113 PROCESS DATA SHEET - WASH WATER TANK C 24/11/2011 NA
313 PRO 86114 516-GA-E-86114 PROCESS DATA SHEET FOR WASH WATER SUPPLY PUMPS B 16/11/2011 NA
314 PRO 86115 516-GA-E-86115 PDS FOR SOURCE WELL WATER PUMPS C 23/12/2011 NA
315 PRO 86116 516-GA-E-86116 PROCESS DATA SHEET FOR SLOP OIL VESSEL C 21/11/2011 NA
316 PRO 86117 516-GA-E-86117 PROCESS DATA SHEET FOR SLOP OIL PUMPS C 25/11/2011 NA
317 PRO 86118 516-GA-E-86118 PDS FOR CLOSED DRAIN VESSEL C 21/11/2011 NA
318 PRO 86119 516-GA-E-86119 PROCESS DATA SHEET FOR CLOSED DRAIN PUMPS C 25/11/2011 NA
319 PRO 86120 516-GA-E-86120 PDS FOR OPEN DRAIN PUMPS B 25/11/2011 NA
DELETED - PDS FOR PROCESS DATA SHEET FOR FUEL GAS
320 PRO 86122 516-GA-E-86122 COALESCER FILTER REASON: AS THIS IS INCLUDED IN PACKAGE A1 09/05/2011 DELETED
SPECIFICATION OF FUEL GAS TREATMENT PACKAGE

REV-D 11 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

DELETED - PDS FOR BACKWASH WATER TRANSFER PUMPS NOTE :


321 PRO 86124 516-GA-E-86124 THIS HAS BEEN INCLUDED WITHIN THE WALNUT FILTRATION A1 14/12/2011 DELETED
PACAKGE
322 PRO 86125 516-GA-E-86125 PDS FOR PRESSURISED DRAIN VESSEL B 21/11/2011 NA
323 PRO 86201 516-GA-E-86201 PACKAGE SPECIFICATION FOR HOT OIL HEATING SYSTEM C 29/11/2011 NA
324 PRO 86202 516-GA-E-86202 PACKAGE SPECIFICATION FOR FUEL GAS TREATMENT SYSTEM B 29/11/2011 NA
325 PRO 86203 516-GA-E-86203 PACKAGE SPECIFICATION HP FLARE PACKAGE B 16/03/2012 NA
326 PRO 86204 516-GA-E-86204 PACKAGE SPECIFICATION LP FLARE PACKAGE B 16/03/2012 NA
PACKAGE SPECIFICATION AIR COMPRESSOR AND AIR DRYER (016-Z-
327 PRO 86205 516-GA-E-86205 B 30/11/2011 NA
401)
PACKAGE SPECIFICATION FOR WALNUT SHELL FILTRATION
328 PRO 86206 516-GA-E-86206 D 23/12/2011 NA
PACKAGE
329 PRO 86207 516-GA-E-86207 PACKAGE SPECIFICATION ANTIFOAM INJECTION C 01/12/2011 NA
330 PRO 86208 516-GA-E-86208 PACKAGE SPECIFICATION FOR DEMULSIFIER INJECTION C 01/12/2011 NA
331 PRO 86209 516-GA-E-86209 PACKAGE SPECIFICATION OXYGEN SCAVENGER INJECTION C 01/12/2011 NA
332 PRO 86210 516-GA-E-86210 PACKAGE SPECIFICATION BIOCIDE A & B INJECTION C 01/12/2011 NA
333 PRO 86211 516-GA-E-86211 PACKAGE SPECIFICATION SCALE INHIBITOR INJECTION C 01/12/2011 NA
334 PRO 86212 516-GA-E-86212 PACKAGE SPECIFICATION CORROSION INHIBITOR INJECTION C 01/12/2011 NA
PACKAGE SPECIFICATION WATER CLARIFIER (POLYELECTROLYTE)
335 PRO 86213 516-GA-E-86213 C 01/12/2011 NA
INJECTION
336 PRO 86214 516-GA-E-86214 PACKAGE SPECIFICATION BURN PIT PACKAGE B 16/03/2012 NA

DELETED - PACKAGE SPECIFICATION FOR NITROGEN GENERATION


337 PRO 86215 516-GA-E-86215 PACKAGE NOTE : THIS NITROGEN GENERATION PACKAGE IS A1 20/06/2012 DELETED
INCLUDED WITHIN THE NSTRUMENT AIR COMPRESSOR PACKAGE

338 PRO 8006 516-GA-E-08006 FLUID LIST C 27/09/2011 NA


339 PRO 8007 516-GA-E-08007 UTILITY SUMMARY C 13/09/2012 TBA
340 PRO 8008 516-GA-E-08008 CHEMICAL INJECTION SUMMARY B 16/12/2011 TBA
341 PRO 8009 516-GA-D-08009 EQUIPMENT LIST C 29/12/2011 TBA
342 PRO 8013 516-GA-D-08013 LINE LIST C 18/09/2012 TBA
343 PRO 8101 516-GD-B-08101 PROCESS DRAWING INDEX C 09/12/2011 TBA
P&ID- STANDARD SYMBOLS AND NOMENCLATURE FOR PIPING AND
344 PRO 8131 516-GD-B-08131 D 05/12/2011 NA
EQUIPMENT

345 PRO 8132 516-GD-B-08132 P&ID- STANDARD SYMBOLS AND NOMENCLATURE FOR EQUIPMENT D 05/12/2011 NA

P&ID- STANDARD SYMBOLS AND NOMENCLATURE FOR


346 PRO 8133 516-GD-B-08133 D 05/12/2011 NA
INSTRUMENTATION AND CONTROL
P&ID- STANDARD SYMBOLS AND NOMENCLATURE FOR
347 PRO 8134 516-GD-B-08134 D 05/12/2011 NA
INSTRUMENT LEVEL CONTROL

REV-D 12 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

348 PRO 8135 516-GD-B-08135 P&ID- DETAILS FOR MOV, CONTROL VALVES, XV AND MOTORS D 05/12/2011 NA
349 PRO 8136 516-GD-B-08136 P&ID- DETAILS FOR ESDV AND SBDV D 05/12/2011 NA
350 PRO 8137 516-GD-B-08137 P&ID- DETAILS FOR CHEMICAL INJECTION D 05/12/2011 NA
351 PRO 8138 516-GD-B-08138 P&ID FOR SAMPLE / DRAIN CONNECTION DETAILS D 05/12/2011 NA
P&ID FOR PRODUCTION AND TEST FEEDERS FROM MINAGISH,
352 PRO 8139 516-GD-B-08139 D 28/09/2011 TBA
DHARIF AND ABDULLIYAH RESERVOIRS
P&ID FOR WELL FLOWLINES 1 TO 3 FROM DHARIF RESERVOIRS & 1
353 PRO 8140 516-GD-B-08140 D 28/09/2011 TBA
TO 3 FROM M/W/B RESERVOIRS
354 PRO 8141 516-GD-B-08141 P&ID FOR WELL FLOWLINES 4 TO 9 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

355 PRO 8142 516-GD-B-08142 P&ID FOR WELL FLOWLINES 10 TO 15 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

356 PRO 8143 516-GD-B-08143 P&ID FOR WELL FLOWLINES 16 TO 21 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

357 PRO 8144 516-GD-B-08144 P&ID FOR WELL FLOWLINES 22 TO 27 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

358 PRO 8145 516-GD-B-08145 P&ID FOR WELL FLOWLINES 28 TO 33 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

359 PRO 8146 516-GD-B-08146 P&ID FOR WELL FLOWLINES 34 TO 39 FROM M/W/B RESERVOIRS D 28/09/2011 TBA

360 PRO 8147 516-GD-B-08147 P&ID FOR WELL FLOWLINES 40 TO 45 FROM M/W/B RESEROIRS D 28/09/2011 TBA

P&ID FOR WELL FLOWLINES 46 TO 50 FROM M/W/B RESERVOIRS & 1


361 PRO 8148 516-GD-B-08148 D 28/09/2011 TBA
FROM ABDULLIYAH

362 PRO 8149 516-GD-B-08149 P&ID FOR WELL FLOWLINES 2 TO 7 FROM ABDULLIYAH RESERVOIRS D 28/09/2011 TBA

363 PRO 8150 516-GD-B-08150 P&ID FOR HP HEADER 1 & 2 AND HP TEST HEADER D 28/09/2011 TBA
P&ID FOR LP HEADER 1 & 2 AND LP TEST HEADER (MN-MR, DF-MR,
364 PRO 8151 516-GD-B-08151 D 28/09/2011 TBA
M/W/B WELL FLOWLINES 1 TO 14)
P&ID FOR LP HEADER 1 & 2 AND LP TEST HEADER (M/W/B WELL
365 PRO 8152 516-GD-B-08152 D 28/09/2011 TBA
FLOWLINES 15 TO 37)
P&ID FOR LP HEADER 1 & 2 AND LP TEST HEADER (M/W/B WELL
366 PRO 8153 516-GD-B-08153 D 28/09/2011 TBA
FLOWLINES 38 TO 50, AB-MR)
P&ID FOR LP HEADER 1 & 2 AND LP TEST HEADERS (CHEMICAL
367 PRO 8154 516-GD-B-08154 D 28/09/2011 TBA
INJECTION AND HIPPS VALVES)
368 PRO 8155 516-GD-B-08155 P&ID - HP SEPARATOR TRAIN 1 D 29/09/2011 TBA
369 PRO 8156 516-GD-B-08156 P&ID - LP SEPARATOR TRAIN 1 D 29/09/2011 TBA
370 PRO 8157 516-GD-B-08157 P&ID - WET TANK D 29/09/2011 TBA
371 PRO 8158 516-GD-B-08158 P&ID - OFF SPEC TANK D 29/09/2011 TBA
372 PRO 8159 516-GD-B-08159 P&ID - DESALTER FEED PUMPS D 29/09/2011 TBA

REV-D 13 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

373 PRO 8160 516-GD-B-08160 P&ID - WET TANK PW TRANSFER PUMPS D 29/09/2011 TBA

374 PRO 8161 516-GD-B-08161 P&ID CRUDE CRUDE HEAT EXCHANGER & CRUDE HEATER TRAIN 1 D 29/09/2011 TBA

P&ID - 1ST STAGE DESALTER TRAIN-1


375 PRO 8162 516-GD-B-08162 D 29/09/2011 TBA

376 PRO 8163 516-GD-B-08163 P&ID - WASH WATER PRE-HEATER TRAIN 1 D 29/09/2011 TBA
377 PRO 8164 516-GD-B-08164 P&ID - 2ND STAGE DESALTER - TRAIN 1 D 29/09/2011 TBA
378 PRO 8165 516-GD-B-08165 P&ID - DRY CRUDE COOLER & DRY TANK (2 SHEEETS) D 29/09/2011 TBA
379 PRO 8166 516-GD-B-08166 P&ID - CRUDE OIL EXPORT PUMPS E 29/09/2011 TBA
380 PRO 8167 516-GD-B-08167 P&ID - OIL METERING SKID E 29/09/2011 TBA
381 PRO 8168 516-GD-B-08168 P&ID - HP GAS KO DRUM D 29/09/2011 TBA
382 PRO 8169 516-GD-B-08169 P&ID - LP GAS KO DRUM D 29/09/2011 TBA
383 PRO 8170 516-GD-B-08170 P&ID - VAPOUR RECOVERY HEADER D 29/09/2011 TBA
384 PRO 8171 516-GD-B-08171 P&ID - BALANCE GAS COMPRESSOR SUCTION SCRUBBER D 29/09/2011 TBA
385 PRO 8172 516-GD-B-08172 P&ID - BALANCE GAS COMPRESSOR PACKAGE (3 SHEETS) D 29/09/2011 TBA
386 PRO 8173 516-GD-B-08173 P&ID - BALANCE GAS COMPRESSOR CONTROL SYSTEM D 29/09/2011 TBA
DELETED - P&ID - BALANCE GAS COMPRESSOR DISCHARGE
387 PRO 8174 516-GD-B-08174 COOLER REASON : THIS IS INCLUDED WITHIN THE VENDOR A 29/07/2011 DELETED
PACKAGE
388 PRO 8175 516-GD-B-08175 P&ID - GAS EXPORT HEADERS D 29/09/2011 TBA
389 PRO 8176 516-GD-B-08176 P&ID - SLOP OIL VESSEL D 03/10/2011 TBA
390 PRO 8177 516-GD-B-08177 P&ID - PRODUCED WATER TANK D 03/10/2011 TBA
391 PRO 8178 516-GD-B-08178 P&ID - PRODUCED WATER TRANSFER PUMPS D 03/10/2011 TBA
392 PRO 8179 516-GD-B-08179 P&ID - WALNUTSHELL FILTER PACKAGE E 03/10/2011 TBA
393 PRO 8180 516-GD-B-08180 P&ID - EFFLUENT WATER TANK D 03/10/2011 TBA
394 PRO 8181 516-GD-B-08181 P&ID - EFFLUENT WATER PUMPS E 03/10/2011 TBA
395 PRO 8182 516-GD-B-08182 P&ID - WATER INJECTION PUMPS E 03/10/2011 TBA
396 PRO 8201 516-GD-B-08201 P&ID - HP SEPARATOR TRAIN 2 D 03/10/2011 TBA
397 PRO 8202 516-GD-B-08202 P&ID - LP SEPARATOR TRAIN 2 D 03/10/2011 TBA

398 PRO 8203 516-GD-B-08203 P&ID - CRUDE-CRUDE EXCHANGER AND CRUDE HEATER TRAIN 2 D 03/10/2011 TBA

399 PRO 8204 516-GD-B-08204 P&ID - 1ST STAGE DESALTER TRAIN-2 D 03/10/2011 TBA
400 PRO 8205 516-GD-B-08205 P&ID - WASH WATER PRE-HEATER TRAIN 2 D 03/10/2011 TBA
401 PRO 8206 516-GD-B-08206 P&ID - 2ND STAGE DESALTER TRAIN-2 D 03/10/2011 TBA
402 PRO 8207 516-GD-B-08207 P&ID - HP TEST SEPARATOR D 03/10/2011 TBA
403 PRO 8208 516-GD-B-08208 P&ID - LP TEST SEPARATOR D 03/10/2011 TBA
404 PRO 85591 516-GD-B-85591 UFD - FIRE WATER SYSTEM F 29/11/2011 NA

REV-D 14 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

405 PRO 86021 516-GD-B-86021 P&ID - POTABLE WATER SYSTEM D 04/10/2011 TBA
406 PRO 86022 516-GD-B-86022 P&ID - WASH WATER STORAGE TANK AND SUPPLY PUMPS D 04/10/2011 TBA

407 PRO 86023 516-GD-B-86023 P&ID - PLANT AIR & INSTRUMENT AIR SYSTEM - AIR COMPRESSOR D 04/10/2011 TBA

P&ID - PLANT AIR & INSTRUMENT AIR SYSTEM - INSTRUMENT AIR


408 PRO 86024 516-GD-B-86024 D 04/10/2011 TBA
DRYER PACKAGE
P&ID - PLANT AIR & INSTRUMENT AIR SYSTEM - INSTRUMENT AIR
409 PRO 86025 516-GD-B-86025 D 04/10/2011 TBA
RECEIVER
410 PRO 86026 516-GD-B-86026 P&ID - FUEL GAS KO DRUM D 04/10/2011 TBA
411 PRO 86027 516-GD-B-86027 P&ID - FUEL GAS TREATMENT SYSTEM B 05/09/2012 TBA
412 PRO 86028 516-GD-B-86028 P&ID - DIESEL SYSTEM D 04/10/2011 TBA

413 PRO 86029 516-GD-B-86029 P&ID - HOT OIL EXPANSION VESSEL & HOT OIL CIRCULATION PUMP C 05/09/2012 TBA

414 PRO 86030 516-GD-B-86030 P&ID - HOT OIL HEATER & HOT OIL FUEL GAS KOD C 05/09/2012 TBA
P&ID - CHEMICAL INJECTION SYSTEM 1 - OXYGEN SCAVENGER
415 PRO 86031 516-GD-B-86031 D 10/11/2010 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - OXYGEN SCAVENGER
416 PRO 86031 516-GD-B-86031 D 10/11/2010 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - OXYGEN SCAVENGER
417 PRO 86031 516-GD-B-86031 D 10/11/2010 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - OXYGEN SCAVENGER
418 PRO 86031 516-GD-B-86031 D 10/11/2010 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - BIOCIDE-A & BIOCIDE-B
419 PRO 86032 516-GD-B-86032 D 28/09/2011 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - BIOCIDE-A & BIOCIDE-B
420 PRO 86033 516-GD-B-86033 D 28/09/2011 TBA
INJECTION PUMPS
P&ID - CHEMICAL INJECTION SYSTEM 1 - SCALE INHIBITOR
421 PRO 86034 516-GD-B-86034 D 28/09/2011 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 1 - CORROSION INHIBITOR
422 PRO 86035 516-GD-B-86035 D 28/09/2011 TBA
INJECTION PACKAGE
423 PRO 86036 516-GD-B-86036 P&ID - CHEMICAL INJECTION SYSTEM 2 -DEMULSIFIER TANK D 28/09/2011 TBA
P&ID - CHEMICAL INJECTION SYSTEM 2 - DEMULSIFIER INJECTION -
424 PRO 86037 516-GD-B-86037 D 28/09/2011 TBA
HP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - DEMULSIFIER INJECTION -
425 PRO 86038 516-GD-B-86038 D 28/09/2011 TBA
LP SEPARATOR
426 PRO 86039 516-GD-B-86039 P&ID - CHEMICAL INJECTION SYSTEM 2 - ANTIFOAM TANK D 28/09/2011 TBA
P&ID - CHEMICAL INJECTION SYSTEM 2 - ANTIFOAM INJECTION - HP
427 PRO 86040 516-GD-B-86040 D 28/09/2011 TBA
SEPARATOR

REV-D 15 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

P&ID - CHEMICAL INJECTION SYSTEM 2 - ANTIFOAM INJECTION - LP


428 PRO 86041 516-GD-B-86041 D 28/09/2011 TBA
SEPARATOR

429 PRO 86042 516-GD-B-86042 P&ID - CHEMICAL INJECTION SYSTEM 2 - SCALE INHIBITOR TANK D 28/09/2011 TBA

P&ID - CHEMICAL INJECTION SYSTEM 2 - SCALE INNIBITOR


430 PRO 86043 516-GD-B-86043 D 28/09/2011 TBA
INJECTION - HP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - SCALE INNIBITOR
431 PRO 86044 516-GD-B-86044 D 28/09/2011 TBA
INJECTION - LP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - SCALE INNIBITOR
432 PRO 86045 516-GD-B-86045 D 28/09/2011 TBA
INJECTION - DESALTER
P&ID - CHEMICAL INJECTION SYSTEM 2 - SCALE INHIBITOR
433 PRO 86046 516-GD-B-86046 D 28/09/2011 TBA
INJECTION - DEHYDRATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - CORROSION INHIBITOR
434 PRO 86047 516-GD-B-86047 D 28/09/2011 TBA
TANK
P&ID - CHEMICAL INJECTION SYSTEM 2 - CORROSION INHIBITOR
435 PRO 86048 516-GD-B-86048 D 28/09/2011 TBA
INJECTION - HP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - CORROSION INHIBITOR
436 PRO 86049 516-GD-B-86049 D 28/09/2011 TBA
INJECTION - LP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - CORROSION INHIBITOR
437 PRO 86050 516-GD-B-86050 D 28/09/2011 TBA
INJECTION - DESALTER
P&ID - CHEMICAL INJECTION SYSTEM 2 - GAS CORROSION
438 PRO 86051 516-GD-B-86051 D 28/09/2011 TBA
INHIBITOR TANK
P&ID - CHEMICAL INJECTION SYSTEM 2 - GAS CORROSION
439 PRO 86052 516-GD-B-86052 D 28/09/2011 TBA
INHIBITOR - HP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - GAS CORROSION
440 PRO 86053 516-GD-B-86053 D 28/09/2011 TBA
INHIBITOR - LP SEPARATOR
P&ID - CHEMICAL INJECTION SYSTEM 3 - GAS CORROSION
441 PRO 86054 516-GD-B-86054 D 28/09/2011 TBA
INHIBITOR TANK
P&ID - CHEMICAL INJECTION SYSTEM 3 - GAS CORROSION
442 PRO 86055 516-GD-B-86055 D 28/09/2011 TBA
INHIBITOR INJECTION - HP & LP GAS EXPORT
DELETED - P&ID - CHEMICAL INJECTION SYSTEM 3 - CORROSION
INHIBITOR INJECTION PACKAGE REASON: AS WE DO NOT HAVE ANY
443 PRO 86056 516-GD-B-86056 A2 24/05/2011 DELETED
CORROSION INHIBITOR INJECTION SYSTEM FOR CRUDE EXPORT
HEADE
P&ID - CHEMICAL INJECTION SYSTEM 3 - DEMULSIFIER INJECTION
444 PRO 86057 516-GD-B-86057 D 28/09/2011 TBA
PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 4 - OXYGEN SCAVENGER
445 PRO 86058 516-GD-B-86058 D 28/09/2011 TBA
INJECTION PACKAGE

REV-D 16 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

P&ID - CHEMICAL INJECTION SYSTEM 4 - SCALE INHIBITOR


446 PRO 86059 516-GD-B-86059 D 28/09/2011 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 4 - BIOCIDE-A & BIOCIDE-B
447 PRO 86060 516-GD-B-86060 D 28/09/2011 TBA
INJECTION PACKAGE
448 PRO 86069 516-GD-B-86069 P&ID - LP FLARE PACKAGE D 09/08/2012 TBA
DELETED - P&ID WELL WATER SYSTEM REASON: AS THE WELL
449 PRO 86081 516-GD-B-86081 A1 09/05/2011 DELETED
WATER SYSTEM IS INCLUDED IN WASH WATER SYSTEM PID
P&ID - CHEMICAL INJECTION SYSTEM 2 - DEMULSIFIER INJECTION -
450 PRO 86084 516-GD-B-86084 D 28/09/2011 TBA
DEHYDRATOR
P&ID - CHEMICAL INJECTION SYSTEM 2 - DEMULSIFIER INJECTION -
451 PRO 86085 516-GD-B-86085 D 28/09/2011 TBA
DESALTER
P&ID - CHEMICAL INJECTION SYSTEM 3 - GAS CORROSION
452 PRO 86086 516-GD-B-86086 D 28/09/2011 TBA
INHIBITOR INJECTION-COMPRESSOR DISCHARGE COOLER
P&ID - CHEMICAL INJECTION SYSTEM 4 - BIOCIDE-A & BIOCIDE-B
453 PRO 86061 516-GD-B-86061 D 28/09/2011 TBA
PUMPS
P&ID - CHEMICAL INJECTION SYSTEM 4 - CORROSION INHIBITOR
454 PRO 86062 516-GD-B-86062 D 28/09/2011 TBA
INJECTION PACKAGE
P&ID - CHEMICAL INJECTION SYSTEM 4 - WATER CLARIFIER
455 PRO 86063 516-GD-B-86063 D 28/09/2011 TBA
INJECTION PACKAGE
456 PRO 86064 516-GD-B-86064 P&ID - HP FLARE K.O DRUM D 04/10/2011 TBA
457 PRO 86065 516-GD-B-86065 P&ID - LP FLARE K.O DRUM D 04/10/2011 TBA
458 PRO 86066 516-GD-B-86066 P&ID - CLOSED AND PRESSURISED DRAIN SYSTEM D 04/10/2011 TBA
459 PRO 86067 516-GD-B-86067 P&ID - OPEN DRAIN SYSTEM D 04/10/2011 TBA
460 PRO 86068 516-GD-B-86068 P&ID - HP FLARE PACKAGE D 09/08/2012 TBA
461 PRO 86070 516-GD-B-86070 P&ID - BURN PIT D 16/03/2012 TBA
NETWORK DRAWING - POTABLE WATER & WASH WATER
462 PRO 86072 516-GD-B-86072 C 05/12/2011 TBA
DISTRIBUTION

463 PRO 86073 516-GD-B-86073 NETWORK DRAWING - PLANT AIR & INSTRUMENT AIR DISTRIBUTION C 05/12/2011 TBA

464 PRO 86075 516-GD-B-86075 NETWORK DRAWING - FUEL GAS DISTRIBUTION C 05/12/2011 TBA
465 PRO 86076 516-GD-B-86076 NETWORK DRAWING - HP FLARE NETWORK C 05/12/2011 TBA
DELETED - P&ID - LP FLARE NETWORK REASON: AS THIS NET WORK
466 PRO 86077 516-GD-B-86077 A1 09/05/2011 DELETED
HAS BEEN INCLUDED IN PROCESS PID
467 PRO 86078 516-GD-B-86078 NETWORK DRAWING - CLOSED DRAIN NETWORK C 05/12/2011 TBA
468 PRO 86079 516-GD-B-86079 OPEN-DRAIN SYSTEM - OILY WATER & EFFLUENT WATER B 30/08/2012 TBA

469 PRO 86080 516-GD-B-86080 NETWORK DRAWING - NORTH AND SOUTH BURN PIT NET WORK C 05/12/2011 TBA

470 PRO 8010 516-GA-E-08010 PUMP HYDRAULIC CALCULATIONS & REPORT C 30/08/2012 NA
471 PRO 8011 516-GA-E-08011 VESSEL SIZING CALCULATIONS & REPORT C 30/12/2011 NA

REV-D 17 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

472 PRO 8012 516-GA-E-08012 HYDRAULIC CALCULATIONS (LINE SIZING) REPORT C 01/09/2012 NA
473 PRO 8005 516-GA-E-08005 EMERGENCY SHUTDOWN PHILOSOPHY D 01/12/2011 NA
474 PRO 8015 516-GA-D-08015 CAUSE & EFFECT DIAGRAM E1 02/12/2011 TBA
475 PRO 8016 516-GA-E-08016 PROCESSES DESCRIPTION AND OPERATION MANUAL A 00/01/1900 NA
476 PRO 8019 516-GA-E-08019 RELIEF AND BLOWDOWN PHILOSOPHY D 28/02/2012 NA
477 PRO 8004 516-GA-E-08004 PROCESS DESCRIPTION AND CONTROL PHILOSOPHY D 01/12/2011 NA

478 PRO 8351 516-GA-E-08351 P/U - INSTRUMENT PROCESS DATA SHEET FOR CONTROL VALVES D 22/12/2011 NA

P/U-INSTRUMENT PROCESS DATA SHEET FOR ON-OFF, BDV, MOV,


479 PRO 8352 516-GA-E-08352 D 10/12/2011 NA
ESD AND HIPPS VALVES
480 PRO 8353 516-GA-E-08353 P/U-INSTRUMENT PROCESS DATA SHEET-SAFETY VALVES E 23/01/2012 NA
P/U-INSTRUMENT PROCESS DATA SHEET - FLOW ELEMENTS /
481 PRO 8355 516-GA-E-08355 C 22/12/2011 NA
RESTRICTION ORIFICE
DELETED - P/U-IDS ANALYSERS REASON: AS THIS WILL BE
482 PRO 8356 516-GA-E-08356 A1 09/05/2011 DELETED
COMBINED WITH INSTRUMENT DATA SHEET
483 PRO 8357 516-GA-E-08357 P/U - IDS PRESSURE AND VACUUM RELIEF VALVES B 30/12/2011 NA
484 PRO 8018 516-GA-E-08018 COMMISSIONING PROCEDURES B 00/01/1900 NA
485 C&S 11016 516-CI-E-11016 MTO FOR CONCRETE A 20/09/2012 NA
486 C&S 10000 516-CB-B-10000 BORE HOLE LOCATION LAYOUTS (2 SHEETS) C 01/02/2011 TBA
487 C&S 10011 516-CB-A-10011 SITE GRADING LAYOUT AND DETAILS - MAIN PROCESS AREA C 08/11/2011 TBA
488 C&S 10012 516-CB-A-10012 SITE GRADING LAYOUT & DETAILS (FLARE & BURN PIT AREA) C 08/11/2011 TBA
489 C&S 10002 516-CB-A-10002 OVERALL EQUIPMENT FOUNDATION LAYOUT B 18/09/2012 TBA
490 C&S 10003 516-CG-B-10003 OVERALL PAVING LAYOUT A 00/01/1900 TBA
491 C&S 10004 516-CF-B-10004 UNDERGROUND & STORM WATER DRAINAGE LAYOUT B 10/12/2011 TBA
492 C&S 10005 516-CF-B-10005 UNDERGROUND DETAILS DRAWING B 10/12/2011 TBA
493 C&S 10006 516-CG-B-10006 ROAD LAYOUT D 08/11/2011 TBA
494 C&S 10007 516-CG-A-10007 FENCE LAYOUT D 14/10/2011 TBA
495 C&S 10008 516-CG-C-10008 PAVING DETAIL DRAWING B 08/11/2011 TBA
496 C&S 10014 516-CF-B-10014 SCHEME FOR STORM WATER DRAINAGE ARRANGEMENT A 00/01/1900 NA
497 C&S 10010 516-CB-B-10010 CIVIL DESIGN BASIS B 23/03/2011 NA
498 C&S 16025 516-CC-B-16025 SCHEMATIC ARRANGEMENT OF CHEMICAL STORE B 03/08/2011 NA
499 C&S 16030 516-CH-B-16030 LABORATORY BUILDING WATER AND DRAINAGE LAYOUT A 00/01/1900 TBA
500 C&S 16031 516-CH-B-16031 CONTROL ROOM BUILDING - WATER AND DRAINAGE LAYOUT A 00/01/1900 TBA
501 C&S 16032 516-CH-B-16032 SUBSTATION BUILDING - WATER AND DRAINAGE LAYOUT A 00/01/1900 TBA
502 C&S 39897 516-PA-E-39897 VENDOR FOLLOW UP FOR HVAC A1 00/01/1900 NA
503 C&S 10009 516-CG-C-10009 ROAD DETAIL DRAWING B 08/11/2011 TBA
504 C&S 11001 516-CE-B-11001 CULVERT DETAIL DRAWING D 30/11/2011 TBA
505 C&S 11007 516-CG-C-11007 BUND WALL DETAIL DRAWING B 29/11/2011 TBA

REV-D 18 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

506 C&S 11008 516-CF-B-11008 SEPTIC TANK DETAIL DRAWING B 29/11/2011 TBA

DELETED - EYE WASH SAFETY SHOWER FOUNDATION & SHELTER


507 C&S 11012 516-CE-C-11012 DETAIL DRAWING NOTE : THE EYE WASH SHOWER IS A LOCALLY A1 14/09/2012 DELETED
PROCURED ITEM. NO FOUNDATION DETAIL IS REQUIRED FOR THIS

508 C&S 11014 516-CI-E-11014 MATERIAL REQUISITION FOR STEEL STRUCTURE A 00/01/1900 NA
509 C&S 11017 516-CE-B-11017 RETAINING WALL DETAIL DRAWING C 02/12/2011 NA
510 C&S 11018 516-CI-E-11018 FIELD WORK SPECIFICATION - CIVIL WORKS A 00/01/1900 NA
511 C&S 12000 516-CI-E-12000 FOUNDATION CALCULATION REPORT (GENERAL) A 00/01/1900 NA
512 C&S 12001 516-CI-E-12001 FOUNDATION CALCULATION REPORT (TANKS) B 18/09/2012 NA
513 C&S 12002 516-CI-E-12002 FOUNDATION CALCULATION REPORT (COMPRESSORS) B 26/09/2012 NA
514 C&S 12003 516-CI-E-12003 FOUNDATION CALCULATION REPORT (PUMPS) B 26/09/2012 NA
515 C&S 12004 516-CI-E-12004 STRUCTURES CALCULATION REPORT C 00/01/1900 NA
516 C&S 12005 516-CI-E-12005 BUILDINGS AND SHELTERS CALCULATION REPORT A7 00/01/1900 NA
517 C&S 12006 516-CI-E-12006 FOUNDATION CALCULATION REPORT ((FLARE FOUNDATIONS) A 00/01/1900 NA
518 C&S 12010 516-CE-B-12010 HP SEPARATOR TRAIN 1 & 2 FOUNDATION DETAIL DRAWING B 09/09/2012 TBA
519 C&S 12011 516-CE-B-12011 LP SEPARATOR TRAIN 1 & 2 FOUNDATION DETAIL DRAWING B 09/09/2012 TBA

520 C&S 12012 516-CE-B-12012 HP TEST SEPARATOR G.A & R.C DETAILS OF SKID FOUNDATION B 30/08/2012 TBA

521 C&S 12013 516-CE-B-12013 LP TEST SEPARATOR G.A & R.C DETAILS OF SKID FOUNDATION B 30/08/2012 TBA
BALANCE GAS COMPRESSOR SUCTION SCRUBBER FOUNDATION
522 C&S 12014 516-CE-B-12014 C 05/09/2012 TBA
DETAIL DRAWING
BALANCE GAS COMPRESSOR 1ST STAGE GAS COOLER
523 C&S 12015 516-CE-B-12015 B 07/09/2012 TBA
FOUNDATION DETAIL DRAWING
524 C&S 12016 516-CE-B-12016 DESALTER TRAIN 1 & 2 FOUNDATION DETAIL DRAWING B 13/08/2012 TBA
DELETED - CRUDE HEATER TRAIN 1 & 2 FOUNDATION DETAIL
525 C&S 12017 516-CE-C-12017 A1 19/05/2011 DELETED
DRAWING REASON : THIS TITLE IS REPEATED IN 12018 ALSO
526 C&S 12018 516-CE-B-12018 CRUDE HEAT EXCHANGER FOUNDATION DETAIL DRAWING B 26/06/2012 TBA
WASH WATER PRE-HEATER TRAIN 1 & 2 FOUNDATION DETAIL
527 C&S 12023 516-CE-B-12023 B 26/06/2012 TBA
DRAWING
528 C&S 12025 516-CE-B-12025 HP GAS FLARE FOUNDATION DETAIL DRAWING A1 00/01/1900 TBA
529 C&S 12027 516-CE-B-12027 LP GAS FLARE FOUNDATION DETAIL DRAWING A1 00/01/1900 TBA
DELETED - HP/LP GAS FLARE IGNITION SYSTEM FOUNDATION
530 C&S 12029 516-CE-C-12029 DETAIL DRAWING A1 06/08/2012 DELETED
NOTE : ALREADY COVERED IN 12502.
531 C&S 12031 516-CE-C-12031 BURN PIT DETAILS DRAWINGS A1 00/01/1900 TBA
BALANCE GAS COMPRESSOR PACKAGE FOUNDATION DETAIL
532 C&S 12033 516-CE-B-12033 B 26/09/2012 TBA
DRAWING

REV-D 19 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

533 C&S 12035 516-CE-C-12035 INSTRUMENT AIR COMPRESSOR FOUNDATION DETAIL DRAWING B 24/09/2012 TBA

534 C&S 12037 516-CE-C-12037 FUEL GAS TREATMENT PLANT FOUNDATION DETAIL DRAWING A1 00/01/1900 TBA
DELETED - PRODUCED WATER FILTRATION PLANT FOUNDATION
535 C&S 12039 516-CE-C-12039 DETAIL DRAWING NOTE : COVERED IN WALL NUT SHELL FILTER A1 06/08/2012 DELETED
FOUNDATION
536 C&S 12040 516-CE-B-12040 LP TEST HEATER FOUNDATION DETAIL DRAWING B 26/06/2012 TBA
537 C&S 12041 516-CE-C-12041 HOT OIL PACKAGE FOUNDATION DETAIL DRAWING B 06/09/2012 TBA
538 C&S 12043 516-CE-C-12043 CRUDE OIL METERING SKID FOUNDATION DETAIL DRAWING B 24/09/2012 TBA
539 C&S 12045 516-CE-C-12045 WAL NUT SHELL FILTER FOUNDATION DETAIL DRAWING A1 00/01/1900 TBA

540 C&S 12046 516-CE-B-12046 DRY CRUDE COOLER SUPPORT FOUNDATION DETAIL DRAWING B 05/07/2012 TBA

541 C&S 12101 516-CE-B-12101 OFF SPEC. TANK FOUNDATION DETAIL DRAWING E 06/12/2011 TBA
542 C&S 12103 516-CE-B-12103 WASH WATER TANK FOUNDATION DETAIL DRAWING D 08/12/2011 TBA
543 C&S 12105 516-CE-B-12105 PRODUCED WATER TANK FOUNDATION DETAIL DRAWING E 05/12/2011 TBA
544 C&S 12107 516-CE-B-12107 EFFLUENT WATER TANK FOUNDATION DETAIL DRAWING E 08/12/2011 TBA
545 C&S 12109 516-CE-B-12109 SLOP OIL VESSEL FOUNDATION DETAIL DRAWING B 11/09/2012 TBA
546 C&S 12111 516-CE-B-12111 FIRE WATER TANK FOUNDATION DETAIL DRAWING E 08/12/2011 TBA
547 C&S 12113 516-CE-B-12113 POTABLE WATER TANK FOUNDATION DETAIL DRAWING B 26/09/2012 TBA
548 C&S 12115 516-CE-B-12115 HP GAS K.O. DRUM FOUNDATION DETAIL DRAWING C 05/09/2012 TBA
DELETED - INSTRUMENT AIR DRIER FOUNDATION DETAIL
549 C&S 12117 516-CE-C-12117 DRAWING NOTE : COVERED IN INSTRUMENT AIR COMPRESSOR A1 06/08/2012 DELETED
SKID ARRANGEMENT
550 C&S 12119 516-CE-B-12119 WET TANK DEGASSING BOOT FOUNDATION DETAIL DRAWING C 05/09/2012 TBA
551 C&S 12123 516-CE-B-12123 CLOSED DRAIN SUMP FOUNDATION DETAIL DRAWING B 11/09/2012 TBA
552 C&S 12125 516-CE-C-12125 FUEL GAS KO DRUM FOUNDATION DETAIL DRAWING A 00/01/1900 TBA
553 C&S 12127 516-CE-B-12127 WET TANK FOUNDATION DETAIL DRAWING E 05/12/2011 TBA
554 C&S 12129 516-CE-B-12129 DRY TANK FOUNDATION DETAIL DRAWING F 13/12/2011 TBA

555 C&S 12131 516-CE-B-12131 OFF SPEC. TANK DEGASSING BOOT FOUNDATION DETAIL DRAWING C 05/09/2012 TBA

DELETED - WET AIR RECEIVER FOUNDATION DETAIL DRAWING APPLICABL


556 C&S 12135 516-CE-C-12135 A1 06/08/2012
NOTE : ALREADY COVERED IN 12137 E
557 C&S 12137 516-CE-B-12137 PLANT AIR RECEIVER FOUNDATION DETAIL DRAWING D 05/09/2012 TBA
558 C&S 12139 516-CE-B-12139 HP FLARE KO DRUM FOUNDATI0N DETAIL DRAWING B 30/08/2012 TBA
559 C&S 12141 516-CE-B-12141 LP FLARE KO DRUM FOUNDATI0N DETAIL DRAWING B 30/08/2012 TBA
560 C&S 12143 516-CE-B-12143 OPEN DRAIN SUMP FOUNDATION DETAILS DRAWING C 13/06/2012 TBA
561 C&S 12145 516-CE-B-12145 LP GAS K O DRUM FOUNDATION DETAIL DRAWING C 05/09/2012 TBA
562 C&S 12201 516-CE-B-12201 CRUDE OIL EXPORT PUMP FOUNDATION DETAIL DRAWING B 03/07/2012 TBA

REV-D 20 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

563 C&S 12203 516-CE-B-12203 DESALTER FEED PUMP FOUNDATION DETAIL DRAWING B 14/06/2012 TBA
PRODUCED WATER TRANSFER PUMP FOUNDATION DETAIL
564 C&S 12205 516-CE-B-12205 B 31/05/2012 TBA
DRAWING
565 C&S 12207 516-CE-B-12207 EFFLUENT WATER PUMP FOUNDATION DETAIL DRAWING B 03/07/2012 TBA
566 C&S 12209 516-CE-B-12209 WATER INJECTION PUMP FOUNDATION DETAIL DRAWING B 07/09/2012 TBA
567 C&S 12211 516-CE-B-12211 WASH WATER SUPPLY PUMP FOUNDATION DETAIL DRAWING B 16/08/2012 TBA
568 C&S 12215 516-CE-B-12215 HP FLARE K.O. DRUM PUMP FOUNDATION DETAIL DRAWING B 01/06/2012 TBA

569 C&S 12217 516-CE-B-12217 PRESSUREISED DRAIN VESSEL FOUNDATION DETAIL DRAWING C 05/09/2012 TBA

570 C&S 12219 516-CE-B-12219 INSTRUMENT AIR RECEIVER FOUNDATION DETAIL DRAWING C 05/09/2012 TBA
DELETED - PROCESS AREA OPEN DRAIN WATER PUMP
571 C&S 12221 516-CE-C-12221 FOUNDATION DETAIL DRAWING A1 06/08/2012 DELETED
NOTE : ALREADY COVERED IN 12143
572 C&S 12223 516-CE-B-12223 FIRE WATER PUMP FOUNDATION DETAIL DRAWING B 30/08/2012 TBA
573 C&S 12225 516-CE-B-12225 PORTABLE WATER PUMP FOUNDATION DETAIL DRAWING B 31/05/2012 TBA
HOT OIL HEATER PACKAGE - AUXILIARY EQUIPMENT STRUCTURE &
574 C&S 12227 516-CE-B-12227 A1 00/01/1900 TBA
FOUNDATION DETAIL DRAWING
DIESEL UNLOADING TRANSFER PUMP FOUNDATION DETAIL
575 C&S 12229 516-CE-C-12229 B 31/05/2012 TBA
DRAWING
576 C&S 12231 516-CE-B-12231 FIRE WATER JOCKEY PUMP FOUNDATION DETAIL DRAWING B 30/08/2012 TBA
577 C&S 12233 516-CE-B-12233 LP FLARE KO DRUM PUMP FOUNDATI0N DETAIL DRAWING B 01/06/2012 TBA

578 C&S 12235 516-CE-B-12235 WET TANK PW TRANSFER PUMP FOUNDATION DETAIL DRAWING B 31/05/2012 TBA

579 C&S 12301 516-CE-B-12301 CHEMICAL INJECTION PACKAGE FOUNDATION DETAIL DRAWING B 22/09/2012 TBA

580 C&S 12401 516-CE-C-12401 EMERGENCY POWER GENERATOR FOUNDATION DETAIL DRAWINGS A 00/01/1900 TBA

581 C&S 12403 516-CE-B-12403 DIESEL STORAGE TANK FOUNDATION DETAIL DRAWING B 30/08/2012 TBA
582 C&S 12405 516-CE-B-12405 POWER TRANSFORMERS FOUNDATION DETAIL DRAWING C 10/05/2012 TBA
583 C&S 12407 516-CE-B-12407 AUXILIARY TRANSFORMERS FOUNDATION DETAIL DRAWING C 10/05/2012 TBA
584 C&S 12409 516-CE-B-12409 LIGHT POLE FOUNDATION DETAIL DRAWING A1 00/01/1900 TBA
DELETED - - DISTRIBUTION BOARD EQUIPMENT FOUNDATION
585 C&S 12411 516-CE-C-12411 A1 06/08/2012 DELETED
DETAIL DRAWING NOTED : NOT APPLICABLE
586 C&S 12502 516-CE-B-12502 FLAME FRONT GENERATOR FOUNDATION DETAIL DRAWING B 07/09/2012 TBA
587 C&S 13012 516-CE-B-13012 EFFLUENT PUMP SHELTER FOUNDATION DETAIL DRAWING B 25/11/2011 TBA
588 C&S 13016 516-CE-B-13016 DESALTER PUMP SHELTER FOUNDATION DETAIL DRAWING C1 25/11/2011 TBA
589 C&S 13020 516-CE-B-13020 WATER INJECTION SHELTER FOUNDATION DETAIL DRAWING B 25/11/2011 TBA
590 C&S 13024 516-CE-B-13024 FIRE WATER PUMP SHELTER FOUNDATION DETAIL DRAWING B 25/11/2011 TBA

REV-D 21 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

591 C&S 13028 516-CE-B-13028 PRODUCED WATER PUMP SHELTER FOUNDATION DETAIL DRAWING C1 25/11/2011 TBA

592 C&S 13032 516-CE-B-13032 WET TANK PUMP SHELTER FOUNDATION DETAIL DRAWING C1 25/11/2011 TBA
593 C&S 13033 516-CD-B-13033 PUMP SHADE STRUCTURE DETAIL DRAWING A1 00/01/1900 TBA
MAINTENANCE WORKSHOP & STORAGE SHED STRUCTURE &
594 C&S 14003 516-CE-B-14003 B 25/11/2011 TBA
FOUNDATION DETAIL DRAWING
COMPRESSOR SHED STRUCTURE & FOUNDATION DETAIL
595 C&S 14005 516-CE-C-14005 B 24/09/2012 TBA
DRAWING
DELETED -CHEMICAL INJECTION SKID SHED STRUCTURE &
596 C&S 14007 516-CE-C-14007 FOUNDATION DETAIL DRAWING A1 06/08/2012 DELETED
NOTE : NOT APPLICABLE
DELETED - GAS COMPRESSOR SHED DETAIL DRAWING
597 C&S 14013 516-CC-B-14013 A1 06/08/2012 DELETED
NOTE : ALREADY COVERED IN 14021
MAINTENANCE WORKSHOP & STORAGE SHED STRUCTURE DETAIL
598 C&S 14017 516-CD-B-14017 B 25/11/2011 TBA
DRAWING
599 C&S 14018 516-CI-E-14018 COMPRESSOR SHED STRUCTURE DETAIL DRAWING A1 00/01/1900 TBA
DELETED CHEMICAL INJECTION SKID SHED STRUCTURE DETAIL APPLICABL
600 C&S 14019 516-CI-E-14019 A1 06/08/2012
DRAWING NOTE : NOT APPLICABLE E
601 C&S 14021 516-CD-B-14021 GAS COMPRESSOR SHED STRUCTURAL DETAIL DRAWING B 24/09/2012 TBA

DELETED- N2 & CHEMICAL STORE SHELTER STRUCTURE DETAIL


602 C&S 14101 516-CE-C-14101 A1 05/08/2011 DELETED
DRAWING REASON: SINCE THERE IS NO N2 & CHEMICAL STORE

DELETED- N2 & CHEMICAL STORE SHELTER FOUNDATION DETAIL


603 C&S 14103 516-CE-C-14103 A1 05/08/2011 DELETED
DRAWING REASON: SINCE THERE IS NO N2 & CHEMICAL STORE

604 C&S 14107 516-CE-B-14107 CHEMICAL BULK STORE SHELTER FOUNDATION DETAIL DRAWING B 25/11/2011 TBA

605 C&S 15001 516-CE-B-15001 PIPE TRACK FOUNDATION DETAIL DRAWING C 29/11/2011 TBA
606 C&S 15101 516-CD-B-15101 PIPES RACK & PIPES BRIDGE STRUCTURE DETAIL DRAWING I 14/12/2011 TBA
607 C&S 15103 516-CE-B-15103 PIPE RACK & PIPE BRIDGE FOUNDATION DETAIL DRAWING E 21/12/2011 TBA
608 C&S 15202 516-CD-B-15202 PIPES SUPPORT STRUCTURE DETAIL DRAWING E 07/12/2011 TBA
609 C&S 15203 516-CE-B-15203 PIPE SUPPORT FOUNDATION DETAIL DRAWING D 09/12/2011 TBA
610 C&S 15205 516-CD-B-15205 TYPICAL CONNECTION DETAILS B 10/05/2012 NA
611 C&S 15206 516-CD-B-15206 PIPE SUPPORT STRUCTURE DETAIL DRAWING IN TANK AREA C 20/09/2012 TBA
PIPE SUPPORT FOUNDATION DETAIL DRAWING IN TANK & FLARE
612 C&S 15207 516-CE-B-15207 C 26/09/2012 TBA
AREA
PIPE TRACK FOUNDATION DETAIL DRAWING IN FLARE & BURN PIT
613 C&S 15208 516-CE-B-15208 A 00/01/1900 TBA
AREA
614 C&S 18999 516-CI-E-18999 VENDOR FOLLOW UP FOR STRUCTURES A1 00/01/1900 TBA

REV-D 22 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

DELETED - - MOV ISOLATOR EQUIPMENT FOUNDATION DETAIL


615 C&S 12413 516-CE-C-12413 A1 06/08/2012 DELETED
DRAWING NOTE : NOT APPLICABLE
616 C&S 12501 516-CE-C-12501 INSTRUMENT EQUIPMENT FOUNDATION DETAIL DRAWING B 24/09/2012 TBA
617 C&S 13001 516-CE-B-13001 FIRE FIGHTING EQUIPMENT FOUNDATION DETAIL DRAWING B 24/09/2012 TBA
618 C&S 13003 516-CE-B-13003 CORROSION PROBE REMOVAL PIT DETAIL DRAWING B 24/09/2012 TBA
619 C&S 13005 516-CD-B-13005 CRUDE PUMP SHELTER STRUCTURE DETAIL DRAWING B 25/11/2011 TBA
620 C&S 13006 516-CE-B-13006 CRUDE PUMP SHELTER FOUNDATION DETAIL DRAWING B 25/11/2011 TBA
621 C&S 13011 516-CD-B-13011 EFFLUENT PUMP SHELTER STRUCTURE DETAIL DRAWING B 25/11/2011 TBA
622 C&S 13015 516-CD-B-13015 DESALTER PUMP SHELTER STRUCTURE DETAIL DRAWING C1 25/11/2011 TBA
623 C&S 13019 516-CD-B-13019 WATER INJECTION SHELTER STRUCTURE DETAIL DRAWING B 25/11/2011 TBA
624 C&S 13023 516-CD-B-13023 FIRE WATER PUMP SHELTER STRUCTURE DETAIL DRAWING B 25/11/2011 TBA

625 C&S 13027 516-CD-B-13027 PRODUCED WATER PUMP SHELTER STRUCTURE DETAIL DRAWING C1 25/11/2011 TBA

626 C&S 13031 516-CD-B-13031 WET TANK PUMP SHELTER STRUCTURE DETAIL DRAWING C1 25/11/2011 TBA

627 C&S 14022 516-CC-B-14022 MAINTENANCE WORKSHOP AND STORAGE SHED ARRANGEMENT B 03/08/2011 TBA

628 C&S 14105 516-CD-B-14105 CHEMICAL BULK STORE SHELTER STRUCTURAL DETAIL DRAWING B 25/11/2011 TBA

629 C&S 16001 516-CC-B-16001 CONTROL ROOM BUILDING DETAIL DRAWING C 30/01/2012 TBA
630 C&S 16007 516-CC-B-16007 LABORATORY BUILDING DETAIL DRAWING D 09/11/2011 TBA
631 C&S 16011 516-CC-B-16011 ELECTRICAL SUBSTATION BUILDING DETAIL DRAWING C 23/01/2012 TBA
632 C&S 16019 516-CC-B-16019 GATE HOUSE DETAIL DRAWING B 09/11/2011 TBA
633 C&S 16021 516-CC-B-16021 ANALYSER HOUSE DETAIL DRAWING A 24/08/2012 DELETED
634 C&S 16022 516-CC-B-16022 CONTROL ROOM BUILDING ARRANGEMENT C 03/08/2011 NA
635 C&S 16024 516-CC-B-16024 SUBSTATION BUILDING ARRANGEMENT (2 SHEETS) C 10/12/2011 NA
636 C&S 16026 516-CC-C-16026 SCHEMATIC ARRANGEMENT OF ANALYSER BUILDING B 03/08/2011 NA
637 C&S 16027 516-CC-B-16027 SCHEMATIC ARRANGEMENT FOR OFFICE BUILDING C 29/08/2011 NA
638 C&S 16028 516-CC-B-16028 OFFICE BUILDING DETAIL DRAWING B 09/11/2011 NA
639 C&S 16023 516-CC-C-16023 LAB BUILDING ARRANGEMENT B 03/08/2011 NA
640 ELEC 40001 516-EA-E-40001 ELECTRICAL DESIGN BASIS D 27/04/2011 NA
641 ELEC 40002 516-EA-D-40002 ELECTRICAL LOAD SUMMARY & POWER BALANCE D 22/12/2011 TBA
642 ELEC 40005 516-EA-E-40005 LOAD FLOW AND SHORT CIRCUIT STUDIES D 00/01/1900 NA
643 ELEC 40006 516-EA-E-40006 MOTOR STARTING STUDY D 00/01/1900 NA

644 ELEC 40008 516-EA-E-40008 PROTECTION RELAY COORDINATION STUDY AND SETTING TABLE A 00/01/1900 TBA

645 ELEC 41085 516-EC-B-41085 KEY SINGLE LINE DIAGRAM F 22/12/2011 TBA
646 ELEC 41106 516-EC-D-41106 SINGLE LINE DIAGRAM - OUTDOOR LIGHTING PANELS D 24/02/2012 TBA
647 ELEC 41107 516-EC-D-41107 SINGLE LINE DIAGRAM - AREA LIGHTING PANELS C 13/01/2012 TBA

REV-D 23 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

648 ELEC 41108 516-EC-D-41108 SINGLE LINE DIAGRAM - ROAD LIGHTING PANELS C 13/01/2012 TBA
649 ELEC 41109 516-EC-D-41109 SINGLE LINE DIAGRAM - FENCE LIGHTING PANELS C 13/01/2012 TBA

SINGLE LINE DIAGRAM-OUTDOOR LIGHTING PANELS-MAINTENANCE


650 ELEC 41110 516-EC-D-41110 C 04/05/2012 TBA
WORKSHOP & STORAGE SHED, CHEMICAL STORE

651 ELEC 41111 516-EC-B-41111 SINGLE LINE DIAGRAM - BUILDING B 09/07/2012 TBA
652 ELEC 41112 516-EC-D-41112 SINGLE LINE DIAGRAM - MOV DISTRIBUTION BOARD C 24/02/2012 TBA
SINGLE LINE DIAGRAM-MAIN LIGHTING NORMAL DISTRIBUTION
653 ELEC 41113 516-EC-D-41113 C 24/02/2012 TBA
BOARD
SINGLE LINE DIAGRAM-MAIN LIGHTING EMERGENCY DISTRIBUTION
654 ELEC 41114 516-EC-D-41114 C 24/02/2012 TBA
BOARD
DELETED - SINGLE LINE DIAGRAM PLANT AREA & SUBSTATION
APPLICABL
655 ELEC 41115 516-EC-B-41115 BUILDING WELDING & CONVENIENCE SOCKET PANEL NOTE : A1 23/08/2012
E
INCLUDED IN 516-EC-B-41111
SINGLE LINE DIAGRAM - 250V AUXILIARY PANEL FOR PLANT
656 ELEC 41116 516-EC-D-41116 B 04/05/2012 TBA
DISTRIBUTION
SINGLE LINE DIAGRAM - 250V AUXILIARY PANEL FOR CONTOL
657 ELEC 41117 516-EC-D-41117 B 04/05/2012 TBA
BUILDING
658 ELEC 41001 516-EB-B-41001 ELECTRICAL EQUIPMENT LAYOUT - SUBSTATION B 23/12/2011 TBA

MATERIAL REQUISITION FOR 11KV SWITCHGEAR, REMOTE


659 ELEC 40039 516-EA-E-40039 D 08/11/2011 NA
CONTROL AND PROTECTION PANEL AND ANNUNCIATOR PANEL

660 ELEC 40040 516-EA-E-40040 DATA SHEET FOR 11KV SWITCHGEAR C 08/11/2011 NA

661 ELEC 40041 516-EA-E-40041 DATA SHEET FOR 11KV REMOTE CONTROL & PROTECTION PANEL C 08/11/2011 NA

662 ELEC 40042 516-EA-E-40042 INSPECTION DATA SHEET FOR 11KV SWITCHGEAR C 08/11/2011 NA
TECHNICAL BID EVALUATION FOR 11KV SWITCHGEAR & REMOTE
663 ELEC 40045 516-EA-D-40045 B 18/10/2011 NA
CONTROL AND PROTECTION PANEL
664 ELEC 40046 516-EA-E-40046 MATERIAL REQUISITION FOR 3.3KV SWITCHGEAR D 09/11/2011 NA
665 ELEC 40047 516-EA-E-40047 DATA SHEET FOR 3.3KV SWITCHGEAR C 09/11/2011 NA
666 ELEC 40048 516-EA-E-40048 DATA SHEET FOR LOW VOLTAGE BUSDUCT D 10/11/2011 NA
667 ELEC 40049 516-EA-E-40049 SPECIFICATION FOR 3.3KV SWITCHGEAR C 09/11/2011 NA
668 ELEC 40052 516-EA-D-40052 TECHNICAL BID EVALUATION FOR 3.3KV SWITCHGEAR B 18/10/2011 NA
SINGLE LINE DIAGRAM - 11KV SWITCHGEAR ELECTRICAL
669 ELEC 41086 516-EC-B-41086 D 03/01/2012 NA
SUBSTATION
SINGLE LINE DIAGRAM - 3.3KV SWITCHGEAR ELECTRICAL
670 ELEC 41089 516-EC-B-41089 D 05/01/2012 NA
SUBSTATION
671 ELEC 40053 516-EA-E-40053 MATERIAL REQUISITION FOR LOW VOLTAGE SWITCHGEAR D 10/11/2011 NA
672 ELEC 40054 516-EA-E-40054 DATA SHEET FOR LOW VOLTAGE SWITCHGEAR C 10/11/2011 NA

REV-D 24 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

673 ELEC 40055 516-EA-E-40055 SPECIFICATION FOR LOW VOLTAGE SWITCHGEAR C 10/11/2011 NA

674 ELEC 40057 516-EA-D-40057 TECHNICAL BID EVALUATION FOR LOW VOLTAGE SWITCHGEAR B 31/10/2011 NA

MATERIAL REQUISITION FOR LV AUXILIARY DISTRIBUTION BOARDS


675 ELEC 40058 516-EA-E-40058 C 04/05/2012 NA
& INTERFACE RELAY PANELS
676 ELEC 40059 516-EA-E-40059 DATA SHEET FOR LV AUXILIARY DISTRIBUTION BOARDS C 04/05/2012 NA
SPECIFICATION FOR LV AUXILIARY DISTRIBUTION BOARDS &
677 ELEC 40060 516-EA-E-40060 B 04/05/2012 NA
INTERFACE RELAY PANELS
678 ELEC 40061 516-EA-E-40061 TBE FOR LV AUXILIARY DISTRIBUTION BOARDS A1 00/01/1900 NA
679 ELEC 40097 516-EA-E-40097 DATA SHEET FOR INTERFACE RELAY PANEL B 24/07/2012 NA
680 ELEC 41095 516-EC-B-41095 SINGLE LINE DIAGRAM - 440V SWITCHGEAR-1 C 11/09/2012 NA
681 ELEC 41096 516-EC-B-41096 SINGLE LINE DIAGRAM - 440V SWITCHGEAR-2 C 11/09/2012 NA
682 ELEC 41105 516-EC-B-41105 SINGLE LINE DIAGRAM - 440V EDG B 13/12/2011 NA
683 ELEC 41118 516-EC-D-41118 CONTROL SCHEMATICS FOR MCC B 11/09/2012 NA
684 ELEC 40062 516-EA-E-40062 MATERIAL REQUISITION FOR 110V DC AND 24V DC UPS B 29/02/2012 NA
685 ELEC 40063 516-EA-E-40063 DATA SHEET FOR 110V DC UPS B 29/02/2012 NA
686 ELEC 40064 516-EA-E-40064 DATA SHEET FOR 24V DC UPS B 29/02/2012 NA
687 ELEC 40065 516-EA-E-40065 SPECIFICATION FOR 110V DC AND 24V DC UPS B 29/02/2012 NA
688 ELEC 40068 516-EA-D-40068 TBE FOR 110V DC UPS & 24V DC UPS A1 00/01/1900 NA
689 ELEC 40069 516-EA-E-40069 MATERIAL REQUISITION FOR 110V AC UPS B 16/08/2012 NA
690 ELEC 40070 516-EA-E-40070 DATA SHEET FOR 110V AC UPS B 16/08/2012 NA
691 ELEC 40071 516-EA-E-40071 SPECIFICATION FOR 110V AC UPS B 12/03/2012 NA
692 ELEC 40074 516-EA-E-40074 TBE FOR THE SUPPLY OF 110V AC UPS A1 00/01/1900 NA
693 ELEC 41092 516-EC-B-41092 SINGLE LINE DIAGRAM - 110V DC UPS B 29/02/2012 NA
694 ELEC 41093 516-EC-B-41093 SINGLE LINE DIAGRAM - 110V AC UPS B 17/08/2012 NA
695 ELEC 41094 516-EC-B-41094 SINGLE LINE DIAGRAM - 24V DC UPS B 29/02/2012 NA
696 ELEC 40009 516-EA-E-40009 MATERIAL REQUISITION FOR TRANSFORMERS D 08/09/2011 NA
697 ELEC 40010 516-EA-E-40010 DATA SHEET FOR TRANSFORMERS - 11/3.3 KV D 08/09/2011 NA
698 ELEC 40011 516-EA-E-40011 DATA SHEET FOR TRANSFORMERS - 11/0.44 KV D 08/09/2011 NA
699 ELEC 40013 516-EA-E-40013 SPECIFICATION FOR TRANSFORMERS D 08/09/2011 NA
700 ELEC 40014 516-EA-D-40014 TECHNICAL BID EVALUATION FOR TRANSFORMERS B 21/09/2011 NA
701 ELEC 40003 516-EA-E-40003 ELECTRICAL CABLE SIZING CALCULATION C 13/03/2012 NA
702 ELEC 40025 516-EA-E-40025 MATERIAL REQUISITION FOR POWER BULK MATERIALS B 22/09/2012 NA
703 ELEC 40026 516-EA-E-40026 TECHNICAL SPECIFICATION FOR POWER BULK MATERIALS C 24/05/2012 NA
704 ELEC 40028 516-EA-E-40028 TBE OF BULK MATERIALS A1 00/01/1900 NA
705 ELEC 40098 516-EA-E-40098 MTO FOR ELECTRICAL MISCELLANEOUS ITEMS A1 00/01/1900 NA
706 ELEC 41002 516-EB-B-41002 ELECTRICAL AREA KEY PLAN C 19/09/2011 TBA

REV-D 25 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

707 ELEC 41004 516-EB-A-41004 ELECTRICAL OVERALL CABLE ROUTING LAYOUT - PROCESS AREA C 07/09/2012 NA

ELECTRICAL CABLE ROUTING LAYOUT - MNG-1 KOC SUBSTATION


708 ELEC 41005 516-EB-A-41005 D 09/04/2012 TBA
TO NEW GC-16 SUBSTATION
709 ELEC 41006 516-EB-B-41006 ELECTRICAL CABLE ROUTING LAYOUT AREA A B 07/09/2012 TBA
710 ELEC 41007 516-EB-B-41007 ELECTRICAL CABLE ROUTING LAYOUT AREA B C 07/09/2012 TBA
711 ELEC 41008 516-EB-B-41008 ELECTRICAL CABLE ROUTING LAYOUT AREA C C 07/09/2012 TBA
712 ELEC 41009 516-EB-B-41009 ELECTRICAL CABLE ROUTING LAYOUT AREA D B 07/09/2012 TBA
713 ELEC 41010 516-EB-B-41010 ELECTRICAL CABLE ROUTING LAYOUT AREA E B 07/09/2012 TBA
714 ELEC 41011 516-EB-B-41011 ELECTRICAL CABLE ROUTING LAYOUT AREA F B 07/09/2012 TBA

715 ELEC 41012 516-EB-B-41012 ELECTRICAL CABLE ROUTING LAYOUT - ELECTRICAL SUBSTATION B 28/08/2012 TBA

ELECTRICAL CABLE ROUTING LAYOUT FOR FLARE AND BURN PIT


716 ELEC 41013 516-EB-A-41013 C 16/08/2012 TBA
AREA
717 ELEC 41014 516-EB-B-41014 ELECTRICAL CABLE ROUTING LAYOUT AREA G C 07/09/2012 TBA
718 ELEC 41015 516-EB-B-41015 ELECTRICAL CABLE ROUTING LAYOUT AREA H B 07/09/2012 TBA
719 ELEC 41016 516-EB-B-41016 ELECTRICAL CABLE ROUTING LAYOUT AREA J C 07/09/2012 TBA
720 ELEC 41017 516-EB-B-41017 ELECTRICAL CABLE ROUTING LAYOUT AREA K C 07/09/2012 TBA
721 ELEC 41018 516-ED-D-41018 ELECTRICAL DUCT BANK SECTION DETAILS B 20/09/2012 TBA
722 ELEC 41019 516-ED-D-41019 ELECTRICAL CABLE TRENCH SECTION DETAILS B 20/09/2012 TBA

DELETED - CABLE TRAY SECTION DETAILS APPLICABL


723 ELEC 41020 516-ED-D-41020 A1 24/08/2011
REASON : NOT GOING TO BE PPD DUE TO THE DEVT DURING ENGG. E

724 ELEC 41021 516-ED-D-41021 POWER INSTALLATION DETAILS B 28/08/2012 TBA


ELECTRICAL CABLE TRAY FILLING SCHEDULE
725 ELEC 41022 516-ED-D-41022 B 14/09/2012 TBA

726 ELEC 41023 516-ED-D-41023 ELECTRICAL CABLE DUCT BANK FILLING SCHEDULE B 20/09/2012 TBA
727 ELEC 41027 516-EE-D-41027 ELECTRICAL CABLE SCHEDULE B 18/09/2012 TBA
DELETED -CABLE INTERCONNECTION SCHEDULE-LV
APPLICABL
728 ELEC 41028 516-EC-E-41028 NOTE : COVERED IN 516-EC-E-41029-CABLE INTERCONNECTION A1 12/09/2012
E
SCHEDULE
729 ELEC 41029 516-EE-D-41029 CABLE INTERCONNECTION SCHEDULE A 22/09/2012 TBA
730 ELEC 40015 516-EA-E-40015 MATERIAL REQUISITION FOR HV CABLES E 30/11/2011 NA
TECHNICAL BID EVALUATION FOR HV CABLES
731 ELEC 40018 516-EA-D-40018 A 03/11/2011 NA

732 ELEC 40020 516-EA-E-40020 MATERIAL REQUISITION FOR LV & CONTROL CABLES D 20/09/2012 NA
733 ELEC 40023 516-EE-E-40023 MTO FOR LV & CONTROL CABLES C 21/09/2012 NA
734 ELEC 40024 516-EA-E-40024 TBE FOR LV CABLE A1 00/01/1900 NA

REV-D 26 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

735 ELEC 40016 516-EA-E-40016 DATA SHEET FOR HV CABLES E 30/11/2011 NA


736 ELEC 40021 516-EA-E-40021 DATA SHEET FOR LV & CONTROL CABLES C 30/04/2012 NA
DELETED - - MTO OF BULK MATERIALS REASON : NOT GOING TO BE
737 ELEC 40036 516-EE-E-40036 A1 24/08/2011 DELETED
PPD DUE TO THE DEVT DURING ENGG.
738 ELEC 40004 516-EA-E-40004 EARTHING CALCULATION REPORT B 18/11/2011 TBA
739 ELEC 40095 516-EB-B-40095 LIGHTNING PROTECTION LAYOUT-CONTROL BUILDING B 12/06/2012 TBA
740 ELEC 40096 516-EB-B-40096 LIGHTNING PROTECTION LAYOUT-ELECTRICAL SUBSTATION B 12/06/2012 TBA
741 ELEC 41061 516-EB-A-41061 OVERALL EARTHING LAYOUT FOR PROCESS AREA C 16/11/2011 TBA
742 ELEC 41062 516-EB-B-41062 EARTHING LAYOUT - AREA A C 16/11/2011 TBA
743 ELEC 41063 516-EB-B-41063 EARTHING LAYOUT - AREA B C 16/11/2011 TBA
744 ELEC 41064 516-EB-B-41064 EARTHING LAYOUT - AREA C C 16/11/2011 TBA
745 ELEC 41065 516-EB-B-41065 EARTHING LAYOUT - AREA D C 16/11/2011 TBA
746 ELEC 41066 516-EB-B-41066 EARTHING LAYOUT - AREA E C 16/11/2011 TBA
747 ELEC 41067 516-EB-B-41067 EARTHING LAYOUT - AREA F C 16/11/2011 TBA
748 ELEC 41068 516-EB-A-41068 EARTHING LAYOUT FOR FLARE AND BURN PIT AREA C 16/11/2011 TBA
749 ELEC 41069 516-EB-B-41069 EARTHING LAYOUT - AREA G C 16/11/2011 TBA
750 ELEC 41070 516-EB-B-41070 EARTHING LAYOUT - AREA H C 16/11/2011 TBA
751 ELEC 41071 516-EB-B-41071 EARTHING LAYOUT - AREA J C 16/11/2011 TBA
752 ELEC 41072 516-EB-B-41072 EARTHING LAYOUT - AREA K C 16/11/2011 TBA
753 ELEC 41075 516-EB-A-41075 EARTHING LAYOUT ELECTRICAL SUBSTATION C 03/01/2012 TBA
754 ELEC 41078 516-EB-B-41078 EARTHING LAYOUT CONTROL BUILDING B 18/05/2012 TBA
755 ELEC 41079 516-ED-D-41079 EARTHING INSTALLATION DETAILS C 07/09/2011 TBA
756 ELEC 41080 516-EA-E-41080 LIGHTNING CALCULATION STUDY REPORT B 30/11/2011 NA

DELETED - - LIGHTNING LAYOUT CONTROL BUILDING REASON :


757 ELEC 41083 516-EB-B-41083 A1 24/08/2011 DELETED
NOT GOING TO BE PPD DUE TO THE DEVT DURING ENGG.

DELETED - LIGHTNING LAYOUT - SUBSTATION DETAILS REASON :


758 ELEC 41084 516-EB-B-41084 A1 24/08/2011 DELETED
NOT GOING TO BE PPD DUE TO THE DEVT DURING ENGG.

759 ELEC 40037 516-EE-E-40037 MTO FOR EARTHING SYSTEM MATERIALS B 20/09/2012 NA
760 ELEC 40007 516-EA-E-40007 LIGHTING CALCULATION REPORT C 05/12/2011 TBA
DELETED - MTO FOR LIGHTING FIXTURES REASON : NOT GOING TO
761 ELEC 40038 516-EE-E-40038 A1 24/08/2011 DELETED
BE PPD DUE TO THE DEVT DURING ENGG.
762 ELEC 41030 516-EB-A-41030 ROAD, FENCE & AREA LIGHTING LAYOUT AND SCHEMATIC C 06/12/2011 TBA
763 ELEC 41031 516-EB-B-41031 LIGHTING LAYOUT AND SCHEMATIC - AREA A C 29/12/2011 TBA
764 ELEC 41032 516-EB-B-41032 LIGHTING LAYOUT AND SCHEMATIC - AREA B C 29/12/2011 TBA
765 ELEC 41033 516-EB-B-41033 LIGHTING LAYOUT AND SCHEMATIC - AREA C C 29/12/2011 TBA
766 ELEC 41034 516-EB-B-41034 LIGHTING LAYOUT AND SCHEMATIC - AREA D C 29/12/2011 TBA

REV-D 27 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

767 ELEC 41035 516-EB-B-41035 LIGHTING LAYOUT AND SCHEMATIC - AREA E C 29/12/2011 TBA
768 ELEC 41036 516-EB-B-41036 LIGHTING LAYOUT AND SCHEMATIC - AREA F C 29/12/2011 TBA
769 ELEC 41037 516-EB-B-41037 LIGHTING LAYOUT AND SCHEMATIC - BUILDING B 05/09/2012 TBA

770 ELEC 41038 516-EB-B-41038 LIGHTING LAYOUT AND SCHEMATIC - FLARE AND BURN PIT AREA C 29/12/2011 TBA

771 ELEC 41039 516-EB-B-41039 LIGHTING LAYOUT AND SCHEMATIC - AREA G C 29/12/2011 TBA
772 ELEC 41040 516-EB-B-41040 LIGHTING LAYOUT AND SCHEMATIC - AREA H A1 00/01/1900 TBA
773 ELEC 41041 516-EB-B-41041 LIGHTING LAYOUT AND SCHEMATIC - AREA J C 29/12/2011 TBA
774 ELEC 41042 516-EB-B-41042 LIGHTING LAYOUT AND SCHEMATIC - AREA K C 29/12/2011 TBA
DELETED - LIGHTING LAYOUT AND SCHEMATIC - CONTROL APPLICABL
775 ELEC 41059 516-EB-B-41059 A1 23/08/2012
BUILDING NOTE : INCLUDED 516-EB-B-41037 E
776 ELEC 41060 516-ED-D-41060 LIGHTING INSTALLATION DETAILS D 07/09/2011 TBA
777 ELEC 40029 516-EA-E-40029 MATERIAL REQUISITION FOR LIGHTING POLES D 02/02/2012 NA
778 ELEC 40030 516-EA-E-40030 TECHNICAL SPECIFICATION FOR LIGHTING POLES C 02/02/2012 NA
779 ELEC 40031 516-EA-E-40031 TBE FOR LIGHTING POLES A1 00/01/1900 NA
780 ELEC 40032 516-EA-E-40032 MATERIAL REQUISITION FOR LIGHTING FIXTURES D 16/01/2012 NA
781 ELEC 40034 516-EA-E-40034 TECHNICAL SPECIFICATION FOR LIGHTING FIXTURES C 16/01/2012 NA
782 ELEC 40035 516-EA-E-40035 TBE FOR LIGHTING FIXTURES A1 00/01/1900 NA
783 ELEC 47999 516-KA-E-47999 VENDOR FOLLOW UP FOR PLANT PIPING CP A1 00/01/1900 NA
INSTALLATION SPECIFICATION FOR CATHODIC PROTECTION OF
784 ELEC 47004 516-KA-E-47004 D 13/05/2011 NA
TANKS BOTTOM AND BURIED PIPING

785 ELEC 47006 516-KA-E-47006 DESIGN SPECIFICATION AND SIZING FOR VESSEL INTERNAL CP B 13/05/2011 NA

786 ELEC 47007 516-KA-E-47007 MATERIAL REQUISITION FOR PLANT PIPING CP D 16/07/2012 NA
787 ELEC 47008 516-KA-E-47008 TECHNICAL SPECIFICATION FOR SACRIFICIAL ANODES B 13/05/2011 NA
788 ELEC 47009 516-KA-E-47009 DATA SHEET FOR SACRIFICIAL ANODES B 13/05/2011 NA

789 ELEC 47010 516-KA-D-47010 TBE FOR CATHODIC PROTECTION SYSTEM FOR PLANT PIPING CP A 25/07/2012 NA

790 ELEC 47013 516-KA-E-47013 SPECIFICATION FOR TANKS CP MATERIALS B 13/05/2011 NA


791 ELEC 47014 516-KA-E-47014 DATA SHEET FOR TANKS CP MATERIALS C 13/05/2011 NA
792 ELEC 47036 516-KA-E-47036 DESIGN SPECIFICATION AND SIZING FOR TANKS CP SYSTEMS C 13/05/2011 NA
DESIGN SPECIFICATION AND SIZING FOR BURIED PIPING CP
793 ELEC 47038 516-KA-E-47038 D 16/07/2012 NA
SYSTEMS
794 ELEC 47039 516-KA-E-47039 SPECIFICATION FOR PIPING CP MATERIALS C 16/07/2012 NA
795 ELEC 47040 516-KA-E-47040 DATA SHEETS FOR PIPING CP MATERIALS D 16/07/2012 NA
796 ELEC 47101 516-KD-A-47101 CATHODIC PROTECTION LAYOUT C 22/12/2011 TBA

REV-D 28 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

INSTALLATION DETAILS FOR CP OF BURIED PIPING INSIDE GC-16


797 ELEC 47102 516-KD-D-47102 PLANT B 22/12/2011 NA

798 ELEC 40092 516-EA-E-40092 MATERIAL REQUISITION FOR ELECTRICAL HEAT TRACING PACKAGE A 00/01/1900 NA

TECHNICAL SPECIFICATION FOR ELECTRICAL HEAT TRACING


799 ELEC 40093 516-EA-E-40093 A 00/01/1900 NA
PACKAGE
800 ELEC 40094 516-EA-D-40094 TBE FOR ELECTRICAL HEAT TRACING PACKAGE A1 00/01/1900 NA
DELETED- LIST OF TECHNICAL ATTACHMENTS OF FIELD WORK
801 ELEC 40099 516-EA-E-40099 SPECIFICATION-ELECTRICAL INSTALLATION (REASON : THIS HAS A 13/02/2012 DELETED
BEEN COMBINED WITH INSTR. FWS - 516-SA-E-50002
802 ELEC 46988 516-EA-E-46988 VENDOR FOLLOW UP FOR TRANSFORMERS A1 23/08/2012 NA
803 ELEC 46989 516-EA-E-46989 VENDOR FOLLOW UP SPECIFICATION FOR MV CABLES A1 23/08/2012 NA
804 ELEC 46990 516-EA-E-46990 VENDOR FOLLOW UP SPECIFICATION FOR LV CABLES. A1 00/01/1900 NA
805 ELEC 46991 516-EA-E-46991 VENDOR FOLLOW UP FOR BULK MATERIALS A1 00/01/1900 NA
806 ELEC 46992 516-EA-E-46992 VENDOR FOLLOW UP SPECIFICATION FOR LIGHTING POLES A1 00/01/1900 NA

807 ELEC 46993 516-EA-E-46993 VENDOR FOLLOW UP SPECIFICATION FOR LIGHTING FIXTURES A1 00/01/1900 NA

VENDOR FOLLOW UP FOR 11KV SWITCHGEAR & REMOTE CONTROL


808 ELEC 46994 516-EA-E-46994 A1 23/08/2012 NA
AND PROTECTION PANEL
VENDOR FOLLOW UP SPECIFICATION FOR 3.3KV SWITCHGEAR &
809 ELEC 46995 516-EA-E-46995 A1 00/01/1900 NA
REMOTE CONTROL PANEL
VENDOR FOLLOW UP SPECIFICATION FOR LOW VOLTAGE
810 ELEC 46996 516-EA-E-46996 A1 00/01/1900 NA
SWITCHGEAR
VENDOR FOLLOW UP SPECIFICATION FOR LV AUXILIARY
811 ELEC 46997 516-EA-E-46997 A1 00/01/1900 NA
DISTRIBUTION BOARDS

812 ELEC 46998 516-EA-E-46998 VENDOR FOLLOW UP SPECIFICATION FOR 110V DC AND 24V DC UPS A1 00/01/1900 NA

813 ELEC 46999 516-EA-E-46999 VENDOR FOLLOW UP SPECIFICATION FOR 110V AC UPS A1 00/01/1900 NA
814 INST 50000 516-SA-E-50000 INSTRUMENT DESIGN BASIS C 19/07/2011 TBA
815 INST 50001 516-SA-D-50001 INSTRUMENT I/O LIST (INCLUDING F&G) C 24/02/2012 TBA
816 INST 50200 516-SA-E-50200 INSTRUMENT INDEX (INCLUDING F&G) B 27/09/2012 TBA
817 INST 50060 516-SA-E-50060 DATASHEET FOR CONTROL VALVE B 13/04/2012 NA
818 INST 50061 516-SA-E-50061 DATASHEET FOR HIPPS VALVES C 03/02/2012 NA
819 INST 50062 516-SA-E-50062 DATASHEET FOR BALL ON-OFF / ESD VALVES E 07/02/2012 NA
820 INST 50063 516-SA-E-50063 DATASHEET FOR SAFETY RELIEF VALVES C 08/06/2012 NA
821 INST 50064 516-SA-E-50064 DATASHEET FOR MOTORISED ON/OFF VALVE E 13/04/2012 NA
822 INST 50066 516-SA-E-50066 INSTRUMENT/VALVES DATA SHEET FOR OIL METERING SKID D 31/05/2012 NA
823 INST 50070 516-SA-E-50070 DATA SHEETS FOR PRESSURE / VACUUM RELIEF VALVES A 00/01/1900 NA

REV-D 29 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

824 INST 50110 516-SA-E-50110 MATERIAL REQUISITION FOR CONTROL VALVES B 13/04/2012 NA
825 INST 50111 516-SA-E-50111 MATERIAL REQUISITION FOR HIPPS C 03/02/2012 NA
826 INST 50112 516-SA-E-50112 MATERIAL REQUISITION FOR ON-OFF / ESD VALVES E 07/02/2012 NA
827 INST 50113 516-SA-E-50113 MATERIAL REQUISITION FOR SAFETY RELIEF VALVES C 08/06/2012 NA
828 INST 50114 516-SA-E-50114 MATERIAL REQUISITION FOR MOTORISED ON/OFF VALVE E 13/04/2012 NA

829 INST 50120 516-SA-E-50120 MATERIAL REQUISITION FOR PRESSURE / VACUUM RELIEF VALVES A 00/01/1900 NA

830 INST 50160 516-SA-D-50160 TBE & RECOMMENDAION FOR CONTROL VALVES A 09/03/2012 NA

831 INST 50161 516-SA-D-50161 TECHNICAL BID EVALUATION AND RECOMMENDATION FOR HIPPS A 22/11/2011 NA

832 INST 50162 516-SA-D-50162 TBE & RECOMMENDATION FOR ON-OFF/ESD VALVES A 03/02/2012 NA
833 INST 50163 516-SA-D-50163 TBE & RECOMMENDATION FOR SAFETY RELIEF VALVES A 22/08/2012 NA
834 INST 50164 516-SA-D-50164 TBE & RECOMMENDATION FOR MOTORISED ON-OFF VALVES A 06/03/2012 NA
835 INST 50170 516-SA-E-50170 TBE FOR PVRV A1 00/01/1900 NA
836 INST 51001 516-SA-E-51001 VENDOR DOCUMENT REVIEW FOR PVRV A1 00/01/1900 NA

837 INST 50051 516-SA-E-50051 DATASHEET FOR ORIFICE PLATE AND RESTRICTION ORIFICE PLATE A 00/01/1900 NA

DELETED - DATASHEET FOR MULTI-PHASE FLOWMETER REASON:


838 INST 50052 516-SA-E-50052 B 07/03/2012 DELETED
THIS HAS BEEN FORWARDED TO VENDOR 'S SCOPE
DATASHEET FOR ELECTRONIC TRANSMITTERS (PRESSURE, DP,
839 INST 50053 516-SA-E-50053 C 08/08/2012 NA
TEMPERATURE)

DELETED - DATASHEET FOR TURBINE FLOWMETER REASON : THE


840 INST 50054 516-SA-E-50054 A1 20/05/2011 DELETED
TURBINE FLOW METERS ARE IN THE PACKAGE VENDOR SCOPE

841 INST 50055 516-SA-E-50055 DATASHEET FOR ULTRASONIC FLOWMETER B 11/09/2012 NA


842 INST 50056 516-SA-E-50056 DATASHEET FOR LEVEL GAUGE B 18/09/2012 NA
843 INST 50057 516-SA-E-50057 DATASHEET FOR PRESSURE, DP AND TEMPERATURE GAUGE A 00/01/1900 NA
844 INST 50067 516-SA-E-50067 DATASHEET FOR F&G DETECTORS C 31/05/2012 NA
845 INST 50069 516-SA-E-50069 DATA SHEET FOR RADAR LEVEL TRANSMITTER B 15/09/2012 NA
DATA SHEET FOR MAGNETIC FLOWMETER & THERMAL MASS
846 INST 50071 516-SA-E-50071 B 15/09/2012 NA
FLOWMETER
MATERIAL REQUISITION FOR ORIFICE PLATE AND RESTRICTION
847 INST 50101 516-SA-E-50101 A 00/01/1900 NA
ORIFICE PLATE
848 INST 50102 516-SA-E-50102 MATERIAL REQUISITION FOR MULTI-PHASE FLOWMETER C 07/03/2012 NA
MATERIAL REQUISITION FOR ELECTRONIC TRANSMITTERS
849 INST 50103 516-SA-E-50103 C 08/08/2012 NA
(PRESSURE, DP, TEMPERATURE)

DELETED - MR FOR TURBINE FLOWMETER REASON : THE TURBINE


850 INST 50104 516-SA-E-50104 A1 20/05/2011 DELETED
FLOW METERS ARE IN THE PACKAGE VENDOR SCOPE

REV-D 30 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

851 INST 50105 516-SA-E-50105 MATERIAL REQUISITION FOR ULTRASONIC FLOWMETER B 11/09/2012 NA
852 INST 50106 516-SA-E-50106 MATERIAL REQUISITION FOR LEVEL GAUGE B 18/09/2012 NA
853 INST 50107 516-SA-E-50107 MR FOR PRESSURE, DP AND TEMPERATURE GAUGES GAUGE A 00/01/1900 NA
854 INST 50115 516-SA-E-50115 MATERIAL REQUISITION FOR F&G DETECTORS C 31/05/2012 NA
855 INST 50116 516-SA-E-50116 MATERIAL REQUISITION FOR OIL METERING PACKAGE D 31/05/2012 NA
856 INST 50119 516-SA-E-50119 MATERIAL REQUISITION FOR RADAR LEVEL TRANSMITTER B 15/09/2012 NA
MATERIAL REQUISITION FOR MAGNETIC FLOW METER & THERMAL
857 INST 50121 516-SA-E-50121 B 15/09/2012 NA
MASS FLOW METER
TBE AND RECOMMENDATION FOR ORIFICE PLATE AND
858 INST 50151 516-SA-D-50151 A 22/09/2012 NA
RESTRICTION ORIFICE PLATE
859 INST 50152 516-SA-D-50152 TBE & RECOMMENDATION FOR MULTI-PHASE FLOWMETER A 19/03/2012 NA
TBE & RECOMMENDATION FOR ELECTRONIC TRANSMITTERS
860 INST 50153 516-SA-D-50153 A 09/08/2012 NA
(PRESSURE, DP, TEMPERATURE)

DELETED - TBE FOR TURBINE FLOWMETER REASON : THE TURBINE


861 INST 50154 516-SA-E-50154 A1 25/08/2011 DELETED
FLOW METERS ARE IN THE PACKAGE VENDOR SCOPE

862 INST 50155 516-SA-D-50155 TBE & RECOMMENDATION FOR ULTRASONIC FLOWMETER A 25/07/2012 NA
863 INST 50156 516-SA-D-50156 TBE & RECOMMENDATION FOR LEVEL GAUGE A 28/08/2012 NA
TBE & RECOMMENDATION FOR PRESSURE, DP AND TEMPERATURE
864 INST 50157 516-SA-D-50157 A 11/09/2012 NA
GAUGES
865 INST 50165 516-SA-D-50165 TBE AND RECOMMENDATION FOR F&G DETECTORS A 22/08/2012 NA
866 INST 50166 516-SA-D-50166 TBE & RECOMMENDATION FOR OIL METERING PACKAGE B 30/11/2011 NA

867 INST 50169 516-SA-D-50169 TBE AND RECOMMENDATION FOR RADAR LEVEL TRANSMITTER A 15/09/2012 NA

TBE & RECOMMENDATION FOR MAGNETIC FLOWMETER & THERMAL


868 INST 50171 516-SA-D-50171 A 00/01/1900 NA
MASS FLOWMETER

869 INST 51000 516-SA-E-51000 VENDOR DOCUMENT REVIEW FOR RADAR LEVEL TRANSMITTER A1 00/01/1900 NA

870 INST 50050 516-SA-E-50050 DATASHEET FOR ANALYZERS B 19/06/2012 NA


871 INST 50072 516-SA-E-50072 DATASHEET FOR CORROSION PROBE D 09/09/2012 NA
872 INST 50100 516-SA-E-50100 MATERIAL REQUISITON FOR ANALYZERS B 19/06/2012 NA
873 INST 50150 516-SA-D-50150 TBE & RECOMMENDATIONS FOR ANALYZERS A 06/06/2012 NA
874 INST 48000 516-HA-E-48000 MATERIAL REQUISITION FOR CONTROL SYSTEMS C 24/01/2012 NA
875 INST 48001 516-HC-B-48001 CONTROL SYSTEM ARCHITECTURE & INTERFACE DRAWING C 24/01/2012 TBA
SPECIFICATION FOR INTEGRATED CONTROL AND SAFETY SYSTEM
876 INST 48002 516-HA-E-48002 D 24/01/2012 NA
(ICSS)
877 INST 48010 516-HA-E-48010 FOUNDATION FIELDBUS DESIGN PHILOSOPHY E 28/10/2011 NA
878 INST 48025 516-HA-E-48025 TBE AND RECOMMENDATION FOR CONTROL SYSTEM A 24/01/2012 NA

REV-D 31 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

879 INST 50455 516-SA-E-50455 CONTROL NARRATIVE - DCS B 01/09/2012 TBA


880 INST 50456 516-SA-E-50456 CONTROL NARRATIVE - ESD/SSLS B 06/09/2012 TBA
881 INST 50457 516-SA-D-50457 FIRE AND GAS CAUSE & EFFECT MATRIX B 00/01/1900 NA

FIELD WORKS SPECIFICATION - ELECTRICAL, INSTRUMENTATION &


882 INST 50002 516-SA-E-50002 A 20/06/2012 NA
CONTROL SYSTEM INSTALLATIONS NOTE : WILL NOT MORE ISSUED

883 INST 50065 516-SA-E-50065 DATASHEET FOR INSTRUMENTATION, CONTROL & FO CABLE C 00/01/1900 NA
884 INST 50068 516-SA-E-50068 DATASHEET FOR INSTRUMENTATION JB C 30/08/2012 NA
MATERIAL REQUISTION FOR INSTRUMENTATION, CONTROL & FO
885 INST 50117 516-SA-E-50117 C 00/01/1900 NA
CABLE
886 INST 50118 516-SA-E-50118 MATERIAL REQUISITION FOR INSTRUMENTATION JB C 30/08/2012 NA
TBE & RECOMMENDATION FOR INSTRUMENTATION, CONTROL & FO
887 INST 50167 516-SA-D-50167 A1 00/01/1900 NA
CABLE
888 INST 50168 516-SA-D-50168 TBE & RECOMMENDATION FOR INSTRUMENTATION JB A 22/08/2012 NA
889 INST 50301 516-SB-B-50301 INSTRUMENT LOCATION AND AIR DISTRIBUTION LAYOUT B 24/02/2012 TBA
890 INST 50350 516-SB-A-50350 INSTRUMENT CABLE TRAY / TRENCH ROUTING LAYOUT B 24/09/2012 TBA
891 INST 50351 516-SB-A-50351 FO CABLE ROUTING FROM NEW GC-16 TO GC-28 B 06/09/2012 TBA
892 INST 50450 516-SD-E-50450 HOOK-UP DIAGRAMS (PNEUMATIC & PROCESS) B 29/03/2012 TBA
893 INST 50452 516-SD-D-50452 LEVEL SKETCHES B 05/09/2012 TBA
894 INST 50453 516-SC-E-50453 JB WIRING DIAGRAM A1 00/01/1900 TBA
895 INST 50454 516-SD-D-50454 INSTRUMENT CABLE SCHEDULE & MTO B 27/09/2012 TBA
APPLICABL
896 INST 50550 516-SD-E-50550 CABLE BLOCK DIAGRAM (DELETED) A1 24/09/2012
E
897 INST 50600 516-SD-E-50600 INSTRUMENT SUPPORT DRAWINGS B 09/01/2012 TBA
898 INST 50651 516-SM-D-50651 INSTRUMENT JB MTO B 18/09/2012 NA
899 INST 50652 516-SM-E-50652 INSTRUMENT BULK MTO A1 00/01/1900 NA
900 INST 50300 516-SB-B-50300 CONTROL ROOM LAYOUT B 18/09/2012 TBA
901 INST 50980 516-SA-E-50980 VENDOR FOLLOW UP FOR CONTROL SYSTEMS A1 00/01/1900 NA
902 INST 50981 516-SA-E-50981 VENDOR FOLLOW UP FOR CCTV A1 00/01/1900 NA
903 INST 50982 516-SA-E-50982 VENDOR FOLLOW UP FOR TELECOM & PA SYSTEM A1 00/01/1900 NA
904 INST 50983 516-SA-E-50983 VENDOR FOLLOW UP FOR ANALYZERS A1 25/09/2012 NA
VENDOR FOLLOW UP FOR ORIFICE PLATE AND RESTRICTION
905 INST 50984 516-SA-E-50984 A1 00/01/1900 NA
ORIFICE PLATE
906 INST 50985 516-SA-E-50985 VENDOR FOLLOW UP FOR MULTI-PHASE FLOWMETER A1 25/09/2012 NA
VENDOR FOLLOW UP FOR ELECTRONIC TRANSMITTERS
907 INST 50986 516-SA-E-50986 A1 00/01/1900 NA
(PRESSURE, DP, TEMPERATURE)

REV-D 32 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

DELETED - VENDOR FOLLOW UP FOR TURBINE FLOWMETER


908 INST 50987 516-SA-E-50987 REASON : THE TURBINE FLOW METERS ARE IN THE PACKAGE A1 25/08/2011 DELETED
VENDOR SCOPE
909 INST 50988 516-SA-E-50988 VENDOR FOLLOW UP FOR ULTRASONIC FLOWMETER A1 00/01/1900 NA
910 INST 50989 516-SA-E-50989 VENDOR FOLLOW UP FOR LEVEL GAUGE A1 00/01/1900 NA
VENDOR FOLLOW UP FOR PRESSURE, DP AND TEMPERATURE
911 INST 50990 516-SA-E-50990 A1 00/01/1900 NA
GAUGES GAUGE
912 INST 50991 516-SA-E-50991 VENDOR FOLLOW UP FOR CONTROL VALVE A1 25/09/2012 NA
913 INST 50992 516-SA-E-50992 VENDOR FOLLOW UP FOR HIPPS VALVE A1 24/08/2012 NA
914 INST 50993 516-SA-E-50993 VENDOR FOLLOW UP FOR BALL ON-OFF / ESD VALVE A1 24/08/2012 NA
915 INST 50994 516-SA-E-50994 VENDOR FOLLOW UP FOR SAFETY RELIEF VALVE A1 00/01/1900 NA
916 INST 50995 516-SA-E-50995 VENDOR FOLLOW UP FOR MOTORISED ON-OFF VALVE A1 25/09/2012 NA
917 INST 50996 516-SA-E-50996 VENDOR FOLLOW UP FOR F&G DETECTORS A1 00/01/1900 NA
918 INST 50997 516-SA-E-50997 VENDOR FOLLOW UP FOR OIL METERING PACKAGE A1 25/09/2012 NA
VENDOR FOLLOW UP FOR FOR INSTRUMENTATION, CONTROL & FO
919 INST 50998 516-SA-E-50998 A1 00/01/1900 NA
CABLE
920 INST 50999 516-SA-E-50999 VENDOR FOLLOW UP FOR INSTRUMENTATION JB A1 00/01/1900 NA
921 INST 49000 516-HD-D-49000 PAGA BLOCK DIAGRAM C 12/07/2012 TBA
MATERIAL REQUISTION FOR CLOSED CIRCUIT TELEVISION SYSTEM
922 INST 49100 516-HA-E-49100 C 12/07/2012 NA
(CCTV)
MATERIAL REQUISITION FOR PUBLIC ADDRESS AND GENERAL
923 INST 49102 516-HA-E-49102 C 12/07/2012 NA
ALARM SYSTEM
924 INST 49200 516-HA-E-49200 TBE AND RECOMMENDATION FOR CCTV A 11/07/2012 NA

925 INST 49201 516-HA-E-49201 DELETED - TBA FOR TELEMETRY REASON : MR NOT APPLICABLE A1 01/06/2011 DELETED

926 INST 49202 516-HA-E-49202 TBE AND RECOMMENDATION FOR PAGA A 11/07/2012 NA
927 HSE 85800 516-ZX-E-85800 PROJECT HSE PLAN (GENERAL) B 19/04/2011 NA
928 HSE 85801 516-ZX-E-85801 HSE PLAN FOR ENGINEERING B 19/04/2011 NA
929 HSE 85806 516-ZA-E-85806 CLOSE OUT REPORTS A1 00/01/1900 NA
930 LOSPE 85000 516-ZA-E-85000 LOSS PREVENTION AND HSE PHILOSOPHY B 19/04/2011 NA

931 LOSPE 85351 516-ZB-B-85351 FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT OFFICE BUILDING B 05/09/2011 TBA

932 LOSPE 85352 516-ZA-E-85352 TECHNICAL SPECIFICATION FOR DELUGE SYSTEM E 10/11/2011 NA
DELETED - FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT
ANALYSER BUILDING REASON : INPUTS ARE PRVOIDED TO
933 LOSPE 85354 516-ZB-B-85354 B 08/11/2011 DELETED
DOCUMENT NO. 516-ZB-A-85321(FF & SQ LAYOUT FOR PROCESS
AREA)
934 LOSPE 85356 516-ZA-E-85356 TECHNICAL SPECIFICATION FOR INERGEN SYSTEM B 15/11/2011 NA

REV-D 33 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

935 LOSPE 85798 516-ZA-E-85798 VENDOR FOLLOW UP FOR SAFETY EQUIPMENT A1 00/01/1900 NA
936 LOSPE 85799 516-ZA-E-85799 VENDOR FOLLOW UP FOR FIRE FIGHTING EQUIPMENTS A1 00/01/1900 NA
937 LOSPE 85550 516-GD-B-85550 P&ID FOR FIRE WATER NETWORK F 17/11/2011 TBA
938 LOSPE 85551 516-GD-B-85551 P&ID - FIREWATER TANK E 15/11/2011 TBA
939 LOSPE 85552 516-GD-B-85552 P&ID - DIESEL FIREWATER PUMPS F 15/11/2011 TBA
940 LOSPE 85553 516-GD-B-85553 P&ID - FIREWATER JOCKEY PUMPS E 19/08/2011 TBA
941 LOSPE 85554 516-GD-B-85554 P&ID - DELUGE SYSTEM - DRY TANK E 26/08/2011 TBA
942 LOSPE 85555 516-GD-B-85555 P&ID - DELUGE SYSTEM - WET TANK E 02/09/2011 TBA
943 LOSPE 85556 516-GD-B-85556 P&ID - DELUGE SYSTEM - OFF SPEC TANK E 02/09/2011 TBA
944 LOSPE 85557 516-GD-B-85557 P&ID - DELUGE SYSTEM - BALANCE GAS COMPRESSOR E 27/09/2011 TBA
945 LOSPE 85558 516-GD-B-85558 P&ID - DELUGE SYSTEM - CRUDE OIL EXPORT PUMPS E 27/09/2011 TBA
946 LOSPE 85559 516-GD-B-85559 P&ID - DELUGE SYSTEM - DESALTER FEED PUMPS E 27/09/2011 TBA
947 LOSPE 85560 516-GD-B-85560 P&ID - DELUGE SYSTEM - HP/LP SEPERATOR - TRAIN 1 & 2 E 09/09/2011 TBA
948 LOSPE 85561 516-GD-B-85561 P&ID - DELUGE SYSTEM - HP/LP TEST SEPERATOR E 09/09/2011 TBA
949 LOSPE 85563 516-GD-B-85563 P&ID - FOAM SYSTEM - DRY TANK C 19/08/2011 TBA
P&ID - FOAM SYSTEM - WET TANK
950 LOSPE 85564 516-GD-B-85564 C 19/08/2011 TBA

951 LOSPE 85565 516-GD-B-85565 P&ID - FOAM SYSTEM - OFF SPEC. TANK C 19/08/2011 TBA
952 LOSPE 85592 516-GD-B-85592 P&ID DELUGE SYSTEM -DESALTER TRAIN 1 AND 2 D 14/10/2011 TBA
953 LOSPE 85201 516-ZB-A-85201 FIRE PROOFING GENERAL LAYOUT E 04/10/2011 TBA
954 LOSPE 85301 516-ZB-A-85301 FIRE FIGHTING - GENERAL LAYOUT F 17/11/2011 TBA
955 LOSPE 85321 516-ZB-A-85321 FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT PROCESS AREA B 29/09/2011 TBA

956 LOSPE 85322 516-ZB-B-85322 FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT CONTROL BUILDING D 08/11/2011 TBA

FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT ELECTRICAL


957 LOSPE 85323 516-ZB-A-85323 D 08/11/2011 TBA
SUBSTATION
FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT LABORATORY
958 LOSPE 85324 516-ZB-B-85324 B 29/09/2011 TBA
BUILDING
FIRE FIGHTING & SAFETY EQUIPMENT LAYOUT MAINTENANCE
959 LOSPE 85325 516-ZB-B-85325 C 08/11/2011 TBA
BUILDING
HAZARDOUS AREA CLASSIFICATION - GENERAL LAYOUT AND
960 LOSPE 85500 516-ZB-A-85500 D 07/09/2011 TBA
DETAILS(2 SHEETS)
HAZARDOUS AREA CLASSIFICATION LAYOUT - FLARE AND BURN PIT
961 LOSPE 85501 516-ZB-A-85501 D 07/09/2011 TBA
AREA
962 LOSPE 85450 516-ZA-E-85450 FIREWATER NETWORK HYDRAULICS REPORT E 21/11/2011 NA
FLARE AND BURN PIT HEAT RADIATION AND GAS DISPERSION
963 LOSPE 85454 516-ZA-E-85454 B 09/09/2011 NA
REPORT
964 LOSPE 85455 516-ZA-E-85455 PLANT LAYOUT & INTERDISTANCE ANALYSIS REPORT C 20/09/2011 TBA

REV-D 34 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

965 LOSPE 85360 516-ZA-E-85360 MATERIAL REQUISITION FOR FIRE FIGHTING EQUIPMENTS D 28/11/2011 NA
966 LOSPE 85361 516-ZA-E-85361 MATERIAL REQUISITION FOR SAFETY EQUIPMENT B 24/11/2011 NA
967 LOSPE 85370 516-ZA-E-85370 TBE - FIRE FIGHTING EQUIPMENTS A1 00/01/1900 NA
968 LOSPE 85371 516-ZA-E-85371 TBE - SAFETY EQUIPMENTS A1 00/01/1900 NA
969 LOSPE 85390 516-ZA-E-85390 TECHNICAL DATA SHEET FOR FIRE FIGHTING EQUIPMENTS F 19/08/2011 NA
970 LOSPE 85391 516-ZA-E-85391 TDS - SAFETY EQUIPMENTS B 19/08/2011 NA
P&ID DELUGE SYSTEM -PRODUCED WATER TANK
971 LOSPE 85393 516-GD-B-85393 E 13/10/2011 TBA

P&ID FOAM SYSTEM - PRODUCED WATER TANK


972 LOSPE 85394 516-GD-B-85394 C 10/10/2011 TBA

973 LOSPE 85432 516-ZA-E-85432 PROCESS DATASHEET FOR FIREWATER TANK F 24/11/2011 NA
974 LOSPE 85433 516-ZA-E-85433 PROCESS DATASHEET FOR DIESEL FIREWATER PUMPS E 25/11/2011 NA
975 LOSPE 85434 516-ZA-E-85434 PROCESS DATASHEET FOR FIREWATER JOCKEY PUMPS B 25/11/2011 NA
976 LOSPE 85525 516-ZA-E-85525 HAZARDOUS AREA CLASSIFICATION DATASHEET D 24/08/2011 NA
977 LOSPE 85100 516-ZA-E-85100 FIRE & GAS SYSTEM DESIGN GUIDELINES D 09/09/2011 NA
978 LOSPE 85101 516-ZB-A-85101 FIRE & GAS DETECTION - GENERAL LAYOUT C 02/11/2011 TBA
979 LOSPE 85102 516-ZB-B-85102 FIRE & GAS DETECTION LAYOUT CONTROL BUILDING C 31/10/2011 TBA
980 LOSPE 85103 516-ZB-A-85103 FIRE & GAS DETECTION LAYOUT ELECTRICAL SUBSTATION C 31/10/2011 TBA

DELETED - FIRE & GAS DETECTION LAYOUT ANALIZER BUILDING


981 LOSPE 85104 516-ZB-B-85104 B 31/10/2011 DELETED
REASON : TRANSFERRED TO VENDOR'S SCOPE

982 LOSPE 85105 516-ZB-B-85105 FIRE & GAS DETECTION LAYOUT LABORATORY BUILDING B 12/10/2011 TBA
983 LOSPE 85106 516-ZB-B-85106 FIRE & GAS DETECTION LAYOUT OFFICE BUILDING C 05/09/2011 TBA
984 LOSPE 85200 516-ZA-E-85200 PASSIVE FIRE PROTECTION DESIGN GUIDELINES B 19/04/2011 NA
985 LOSPE 85300 516-ZA-E-85300 ACTIVE FIRE PROTECTION DESIGN GUIDELINES E 21/11/2011 NA
986 LOSPE 85380 516-ZA-E-85380 LIST OF FIRE FIGHTING EQUIPMENTS F 19/08/2011 NA
987 LOSPE 85381 516-ZA-E-85381 LIST OF SAFETY EQUIPMENTS B 19/08/2011 NA
988 LOSPE 85570 516-ZA-E-85570 PVRV DISPERSION REPORT B 08/11/2011 NA
989 LOSPE 85250 516-ZA-E-85250 FIRE PROOFING SCHEDULE C 06/06/2011 NA
990 LOSPE 85400 516-ZA-E-85400 SAFETY SIGN SPECIFICATION C 04/10/2011 NA
LAYOUT SAFETY SIGN AND EMERGENCY ESCAPE ROUTE PROCESS
991 LOSPE 85401 516-ZB-A-85401 B 20/09/2011 TBA
AREA
LAYOUT SAFETY SIGN AND EMERGENCY ESCAPE ROUTE FLARE
992 LOSPE 85402 516-ZB-A-85402 B 20/09/2011 TBA
AND BURN PIT AREA
LAYOUT SAFETY SIGN AND EMERGENCY ESCAPE ROUTE CONTROL
993 LOSPE 85403 516-ZB-B-85403 B 20/09/2011 TBA
BUILDING
LAYOUT SAFETY SIGN AND EMERGENCY ESCAPE ROUTE
994 LOSPE 85404 516-ZB-B-85404 B 20/09/2011 TBA
ELECTRICAL SUBSTATION

REV-D 35 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

LAYOUT SAFETY SIGN AND EMERGENCY ESCAPE ROUTE


995 LOSPE 85405 516-ZB-B-85405 B 20/09/2011 TBA
MAINTENANCE BUILDING
996 LOSPE 85580 516-ZA-E-85580 MATERIAL REQUISITION FOR SAFETY SIGNS B 29/11/2011 NA
997 PMT 9000 516-ZA-E-09000 PROJECT CO-ORDINATION PROCEDURE B 05/04/2011 NA
998 PMT 9001 516-ZA-E-09001 PROJECT ENGINEERING EXECUTION PLAN B 05/04/2011 NA

999 PMT 9003 516-ZA-E-09003 ENGINEERING DOCUMENT CODING AND NUMBERING PROCEDURE C 24/03/2011 NA

1000 PMT 9004 516-ZA-E-09004 DESIGN REVIEW AND CONTROL PROCEDURE B 05/04/2011 NA
1001 PMT 9005 516-ZA-E-09005 DELIVERABLE LIST D1 00/01/1900 NA
1002 PMT 9006 516-ZA-E-09006 P3 SCHEDULE B 21/09/2012 NA
1003 PMT 9600 516-ZA-E-09600 DETAILED ENGINEERING PROJECT QUALITY PLAN B 02/04/2011 NA
PROJECT ENGINEERING ORGANISATION: FUNCTIONS AND
1004 PMT 9602 516-ZA-E-09602 B 25/03/2011 NA
RESPONSIBILITIES
DETAILED ENGINEERING QUALITY ASSURANCE ACTIVITIES AND
1005 PMT 9603 516-ZA-E-09603 B 02/04/2011 NA
AUDIT PLAN
1006 PIPING 60000 516-GA-E-60000 PIPING DESIGN BASIS B 12/07/2011 NA
1007 PIPING 60001 516-GA-E-60001 PIPING GENERAL/WORKS SPECIFICATION B 25/04/2011 NA
1008 PIPING 60007 516-GA-E-60007 MECHANICAL HANDLING PHILOSOPHY C 05/08/2011 NA
1009 PIPING 60008 516-GA-D-60008 TIE IN LIST B 05/09/2012 TBA
LIST OF TECHNICAL ATTACHMENT OF FIELD WORK SPECIFICATION -
1010 PIPING 60018 516-GA-E-60018 B1 00/01/1900 NA
MECHNICAL INSTALLATION
1011 PIPING 62000 516-GB-A-62000 PLOT PLAN (2 SHEETS) F 31/08/2011 TBA
1012 PIPING 62015 516-GB-B-62015 UNIT PLOT PLAN-KEY PLAN B 02/11/2011 TBA
1013 PIPING 62017 516-GB-B-62017 UNIT PLOT PLAN-1 PRODUCTION & TEST HEADER AREA B 02/11/2011 TBA

1014 PIPING 62018 516-GB-B-62018 UNIT PLOT PLAN -2-FUTURE PRODUCTION & TEST HEADER AREA B 02/11/2011 TBA

1015 PIPING 62019 516-GB-B-62019 UNIT PLOT PLAN -3-FIRE WATER TANK AREA B 02/11/2011 TBA
1016 PIPING 62020 516-GB-B-62020 UNIT PLOT PLAN -4 - SEPARATORS AREA B 02/11/2011 TBA
UNIT PLOT PLAN -5 - PRODUCED WATER TANK AREA
1017 PIPING 62021 516-GB-B-62021 B 02/11/2011 TBA

1018 PIPING 62022 516-GB-B-62022 UNIT PLOT PLAN -6 - PRODUCED WATER TREATMENT AREA B 02/11/2011 TBA
1019 PIPING 62023 516-GB-B-62023 UNIT PLOT PLAN -7 - 1ST & 2ND STAGE DESALTER AREA B 02/11/2011 TBA
1020 PIPING 62024 516-GB-B-62024 UNIT PLOT PLAN -8 - HOT OIL & DIESEL STORAGE TANK AREA B 02/11/2011 TBA
1021 PIPING 62025 516-GB-B-62025 UNIT PLOT PLAN -9 COMPRESSOR AREA B 02/11/2011 TBA
1022 PIPING 62026 516-GB-B-62026 UNIT PLOT PLAN -10- SUB STATION AREA B 02/11/2011 TBA
1023 PIPING 62027 516-GB-B-62027 UNIT PLOT PLAN -11- DRY TANK STORAGE AREA B 02/11/2011 TBA
1024 PIPING 62028 516-GB-B-62028 UNIT PLOT PLAN -12 - OFF-SPEC & WET TANK STORAGE AREA B 02/11/2011 TBA
1025 PIPING 62076 516-GC-A-62076 SINGLE LINE DIAGRAM FOR WET TANK PW TRANSFER PUMP A 25/08/2012 NA

REV-D 36 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1026 PIPING 62081 516-GC-A-62081 SINGLE LINE DIAGRAM FOR WATER INJECTION PUMP SHELTER A 25/08/2012 NA

1027 PIPING 62082 516-GC-A-62082 SINGLE LINE DIAGRAM FOR CRUDE OIL EXPORT PUMP SHELTER A 25/08/2012 NA

1028 PIPING 62083 516-GC-A-62083 SINGLE LINE DIAGRAM FOR EFFLUENT WATER PUMP A 25/08/2012 NA

1029 PIPING 62084 516-GC-A-62084 SINGLE LINE DIAGRAM FOR PRODUCED WATER EFFLUENT PUMP A 25/08/2012 NA

DELETED - UNDERGROUND LAYOUT DRAWINGS REASON: COVER IN


1030 PIPING 62071 516-GC-A-62071 A1 02/11/2011 DELETED
DOCUMENT NOS. 62091 TO 62095
1031 PIPING 62091 516-GC-A-62091 UNDERGROUND LAYOUT - STORAGE TANK AREA B 14/09/2012 TBA
1032 PIPING 62092 516-GC-A-62092 UNDERGROUND LAYOUT - PROCESS AREA B 22/09/2012 TBA
UNDERGROUND LAYOUT - FIRE WATER AND HOT OIL PACKAGE
1033 PIPING 62093 516-GC-A-62093 B1 00/01/1900 TBA
AREA

1034 PIPING 62094 516-GC-A-62094 UNDERGROUND LAYOUT - PRODUCED WATER TREATMENT AREA B 27/09/2012 TBA

1035 PIPING 62095 516-GC-A-62095 UNDERGROUND LAYOUT - PRODUCTION & TEST HEADER AREA B1 00/01/1900 TBA

1036 PIPING 62096 516-GC-A-62096 UNDERGROUND LAYOUT DRAWING 6 A1 00/01/1900 TBA


1037 PIPING 60002 516-GA-E-60002 PIPING MATERIAL SPECIFICATION B 26/07/2011 NA
1038 PIPING 60048 516-GA-E-60048 SPECIFICATION FOR SOURCE SERVICE REQUIREMENT (NACE) C 02/08/2011 NA
SPECIFICATION FOR INTERNAL FBE COATING OF PIPES AND
1039 PIPING 60049 516-GA-E-60049 C 13/05/2011 NA
FITTINGS
MATERIAL REQUISITION FOR CS SEAMLESS PLANT PIPES (UNDER
1040 PIPING 60705 516-GA-E-60705 A 00/01/1900 NA
GROUND)
MATERIAL REQUISITION FOR CS WROUGHT FITTINGS (UNDER
1041 PIPING 60706 516-GA-E-60706 A 00/01/1900 NA
GROUND)
MATERIAL REQUISITION FOR CORROSION COUPON AND
1042 PIPING 60709 516-GA-E-60709 D 09/09/2012 NA
CORROSION PROBE
1043 PIPING 60710 516-GA-E-60710 DATA SHEET FOR CORROSION COUPON D 12/01/2012 NA
1044 PIPING 60713 516-GA-E-60713 MATERIAL REQUISITION FOR INJECTION QUILL C 01/09/2012 NA
1045 PIPING 60714 516-GA-E-60714 DATA SHEET FOR INJECTION QUILL B 26/12/2011 NA
1046 PIPING 60717 516-GA-D-60717 TBE & RECOMMENDATION FOR CHEMICAL INJECTION QUILL A 05/09/2012 NA
1047 PIPING 60718 516-GA-E-60718 MATERIAL REQUISITION FOR FLEXIBLE HOSE B 00/01/1900 NA
1048 PIPING 60721 516-GA-E-60721 DATA SHEET FOR FLEXIBLE HOSE B 20/12/2011 NA
1049 PIPING 60722 516-GA-E-60722 TBA FOR FLEXIBLE HOSE A1 00/01/1900 NA
MATERIAL REQUISITION FOR SS AND CORROSSION RESISTANT
1050 PIPING 60733 516-GA-E-60733 C 20/07/2012 NA
ALLOY WROUGHT FITTINGS
DATA SHEET FOR SS AND CORROSION RESISTANT ALLOY
1051 PIPING 60734 516-GA-E-60734 B 23/12/2011 NA
WROUGHT FITTINGS

REV-D 37 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1052 PIPING 60741 516-GA-E-60741 MATERIAL REQUISITION FOR STRAINER C 00/01/1900 NA


1053 PIPING 60742 516-GA-E-60742 DATA SHEET FOR STRAINER C 29/12/2011 NA
1054 PIPING 60760 516-GA-D-60760 TBE AND RECOMMENDATION FOR GASKETS A 20/12/2011 NA
1055 PIPING 60766 516-GA-E-60766 TBA FOR STRAINER A1 00/01/1900 NA
1056 PIPING 60776 516-GA-E-60776 MATERIAL REQUISITION FOR FLANGE INSUALTION KIT B 00/01/1900 NA
1057 PIPING 60777 516-GA-E-60777 DATA SHEET FOR FLANGE INSUALTION KIT C 29/12/2011 NA
1058 PIPING 60778 516-GA-D-60778 TBE & RECOMMENDATION FOR FLANGE INSULATION KIT A1 00/01/1900 NA
1059 PIPING 60781 516-GA-E-60781 MATERIAL REQUISITION FOR SPRING SUPPORTS B 00/01/1900 NA
1060 PIPING 60782 516-GA-E-60782 DATA SHEET FOR SPRING SUPPORTS B 00/01/1900 NA
1061 PIPING 60800 516-GA-E-60800 SPECIFICATION FOR PAINTING AND COATING C 05/05/2011 NA
SPECIFICATION FOR EXTERNAL COATING/WRAPPING OF BURIED
1062 PIPING 60808 516-GA-E-60808 B 16/06/2011 NA
PIPING SYSTEMS AND JOINTS
1063 PIPING 60810 516-GA-E-60810 SPECIFICATION FOR INTERNAL LINING OF TANKS B 05/05/2011 NA
1064 PIPING 60811 516-GA-E-60811 SPECIFICATION FOR INTERNAL LINING OF VESSELS C 07/06/2011 NA

1065 PIPING 60821 516-GA-E-60821 TECHNICAL SPECIFICATION FOR THERMAL/ACOUSTIC INSULATION B 06/05/2011 NA

WELDING PROCEDURE APPROVAL & WELDING QUALITY


1066 PIPING 60900 516-GA-E-60900 B 20/04/2011 NA
REQUIREMENTS FOR PRESSURE RETAINING EQUIPMENTS & PIPING

1067 PIPING 60901 516-GA-E-60901 WELDING SPECIFICATION FOR ON PLOT PIPING D 16/06/2011 NA
1068 PIPING 60902 516-GA-E-60902 SPECIFICATION FOR WELDING OF STORAGE TANK B 20/04/2011 NA
FIELD WORK SPECIFICATION-MECHANICAL WORKS NOTE : WILL
1069 PIPING 62170 516-GA-E-62170 B1 20/06/2012 NA
NOT MORE ISSUED
1070 PIPING 67000 516-GA-E-67000 MATERIALS SELECTION REPORT B 02/08/2011 NA
1071 PIPING 67002 516-GA-E-67002 CORROSION & SCALE RISK ASSESSMENT STUDY REPORT B 05/08/2011 NA
1072 PIPING 60016 516-GA-E-60016 PIPING 1ST MTO B 05/09/2011 NA
1073 PIPING 60017 516-GA-E-60017 PIPING INTERMEDIATE MTO A 00/01/1900 NA
1074 PIPING 60024 516-GA-E-60024 PIPING SUPPORT MTO A1 00/01/1900 NA
1075 PIPING 60027 516-GA-E-60027 MATERIAL REQUISITION FOR FORGED BALL VALVES D 22/05/2012 NA
1076 PIPING 60028 516-GA-E-60028 MATERIAL REQUISITION FOR CAST BALL VALVES F 25/05/2012 NA

1077 PIPING 60029 516-GA-E-60029 MATERIAL REQUISITION FOR FORGED GATE, GLOBE CHECK VALVES D 22/05/2012 NA

MATERIAL REQUISITION FOR CAST GATE, GLOBE AND CHECK


1078 PIPING 60030 516-GA-E-60030 E 24/05/2012 NA
VALVES
1079 PIPING 60031 516-GA-E-60031 MATERIAL REQUISITION FOR PLUG VALVES D 25/05/2012 NA
1080 PIPING 60032 516-GA-E-60032 MATERIAL REQUISITION FOR BRONZE VALVES F 24/05/2012 NA
1081 PIPING 60033 516-GA-E-60033 MR FOR CS SEAMLESS PLANT PIPES D 29/05/2012 NA
1082 PIPING 60034 516-GA-E-60034 MR FOR CS (SAW) PLANT PIPES D 28/05/2012 NA

REV-D 38 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1083 PIPING 60035 516-GA-E-60035 MR FOR SS & CRA SEAMLESS PLANT PIPES C 24/07/2012 NA
1084 PIPING 60036 516-GA-E-60036 MR FOR CS FORGED FITTINGS C 29/05/2012 NA
1085 PIPING 60037 516-GA-E-60037 MR FOR CS WROGHT FITTINGS C 29/05/2012 NA

1086 PIPING 60038 516-GA-E-60038 MR FOR SS AND CORROSION RESISTANT ALLOY FORGED FITTINGS C 29/05/2012 NA

MR FOR FLANGE AND LINE BLANKS ( INCLUDING SPECTACLE BLIND,


1087 PIPING 60039 516-GA-E-60039 D 29/05/2012 NA
JACK SCREW FLANGES)
1088 PIPING 60040 516-GA-E-60040 MR FOR RTR PIPES AND FITTINGS F 28/05/2012 NA
1089 PIPING 60041 516-GA-E-60041 MATERIAL REQUISITION FOR GASKETS B 31/05/2012 NA
1090 PIPING 60042 516-GA-E-60042 MATERIAL REQUISITION FOR STUD BOLTS AND NUTS B 00/01/1900 NA
SPECIFICATION FOR SOURCE SERVICE REQUIREMENT (NACE) AND
1091 PIPING 60050 516-GA-E-60050 B 02/08/2011 NA
FBE LINING

1092 PIPING 60701 516-GA-E-60701 MATERIAL REQUISITION FOR MECHANICAL INTERLOCK SYSTEM C 25/05/2012 NA

TBE AND RECOMMENDATION FOR MECHANICAL INTERLOCK


1093 PIPING 60702 516-GA-D-60702 A 02/05/2012 NA
SYSYTEM
1094 PIPING 60703 516-GA-E-60703 DATA SHEET FOR FORGED BALL VALVES D 15/12/2011 NA
1095 PIPING 60704 516-GA-D-60704 TBE AND RECOMMENDATION FOR FORGED BALL VALVES A 29/03/2012 NA
1096 PIPING 60707 516-GA-E-60707 DATA SHEET FOR CAST BALL VALVES C 15/12/2011 NA
1097 PIPING 60708 516-GA-D-60708 TBE AND RECOMMENDATION FOR CAST BALL VALVES A 29/03/2012 NA
1098 PIPING 60711 516-GA-E-60711 DATA SHEET FOR FORGED GATE, GLOBE AND CHECK VALVES B 15/12/2011 NA
TBE & RECOMMENDATION FOR FORGED GATE, GLOBE CHECK
1099 PIPING 60712 516-GA-D-60712 A 24/02/2012 NA
VALVES
1100 PIPING 60715 516-GA-E-60715 DATA SHEET FOR CAST GATE, GLOBE AND CHECK VALVES B 15/12/2011 NA
TBE AND RECOMMENDATION FOR CAST GATE, GLOBE CHECK
1101 PIPING 60716 516-GA-D-60716 A 29/03/2012 NA
VALVES
1102 PIPING 60719 516-GA-E-60719 DATA SHEET FOR PLUG VALVES B 10/12/2011 NA
1103 PIPING 60720 516-GA-D-60720 TBE AND RECOMMENDATION FOR PLUG VALVES A 29/03/2012 NA
1104 PIPING 60723 516-GA-E-60723 DATA SHEET FOR BRONZE VALVES B 15/12/2011 NA
1105 PIPING 60724 516-GA-D-60724 TBE & RECOMENDATION FOR BRONZE VALVES A 28/05/2012 NA
1106 PIPING 60727 516-GA-E-60727 DATA SHEET FOR CS SEAMLESS PLANT PIPES B 10/12/2011 NA
1107 PIPING 60728 516-GA-D-60728 TBE & RECOMMENDATION FOR CS SEAMLESS PLANT PIPES A 02/05/2012 NA
1108 PIPING 60731 516-GA-E-60731 DATA SHEET FOR CS (SAW) PLANT PIPES B 10/12/2011 NA
1109 PIPING 60732 516-GA-D-60732 TBE & RECOMMENDATION FOR CS SAW PLANT PIPES B 11/04/2012 NA
1110 PIPING 60735 516-GA-E-60735 DATA SHEET FOR SS & CRA SEAMLESS PLANT PIPES B 13/12/2011 NA

1111 PIPING 60736 516-GA-D-60736 TBE & RECOMMENDATION FOR SS & CRA SEAMLESS PLANT PIPES A 25/07/2012 NA

1112 PIPING 60738 516-GA-D-60738 TBE & RECOMMENDATION FOR SS & CRA WROUGHT FITTINGS A 00/01/1900 NA

REV-D 39 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1113 PIPING 60739 516-GA-E-60739 DATA SHEET FOR CS FORGED FITTINGS B 13/12/2011 NA
1114 PIPING 60740 516-GA-D-60740 TBE & RECOMMENDATION FOR CS FORGED FITTINGS A 02/05/2012 NA
1115 PIPING 60743 516-GA-E-60743 DATA SHEET FOR CS WROGHT FITTINGS B 13/12/2011 NA
1116 PIPING 60744 516-GA-D-60744 TBE & RECOMMENDATION FOR CS WROGHT FITTINGS A 24/04/2012 NA
DATA SHEET FOR SS AND CORROSION RESISTANT ALLOY FORGED
1117 PIPING 60747 516-GA-E-60747 B 13/12/2011 NA
FITTINGS
1118 PIPING 60748 516-GA-D-60748 TBE& RECOMMENDATION FOR SS & CRA FORGED FITTINGS A 02/05/2012 NA
1119 PIPING 60749 516-GA-E-60749 MATERIAL REQUISITION FOR NON SLAM CHECK VALVES D 25/05/2012 NA
1120 PIPING 60750 516-GA-E-60750 DATA SHEET FOR NON SLAM CHECK VALVES B 15/12/2011 NA
DATA SHEET FOR FLANGE AND LINE BLANKS ( INCLUDING
1121 PIPING 60751 516-GA-E-60751 B 15/12/2011 NA
SPECTACLE BLIND, JACK SCREW FLANGES)
TBE & RECOMMENDATION FOR FLANGES AND LINE BLANKS (
1122 PIPING 60752 516-GA-D-60752 A 28/05/2012 NA
INCLUDING SPECTACLE BLIND, JACK SCREW FLANGES)
1123 PIPING 60753 516-GA-D-60753 TBE AND RECOMMENDATION FOR NON SLAM CHECK VALVES A 28/05/2012 NA
1124 PIPING 60754 516-GA-E-60754 HOT DIP GALVANIZING FOR STUD BOLTS AND NUTS B 02/08/2011 NA
1125 PIPING 60755 516-GA-E-60755 DATA SHEET FOR RTR PIPES AND FITTINGS D 15/12/2011 NA
TECHNICAL BID EVALUATION AND RECOMMENDATION FOR RTR
1126 PIPING 60756 516-GA-D-60756 A 09/03/2012 NA
PIPES AND FITTINGS
1127 PIPING 60757 516-GA-E-60757 MATERIAL REQUISITION FOR BUTTERFLY VALVES E 25/05/2012 NA
1128 PIPING 60758 516-GA-E-60758 DATA SHEET FOR BUTTERFLY VALVES B 15/12/2011 NA
1129 PIPING 60761 516-GA-D-60761 TBE AND RECOMMENDATION FOR BUTTERFLY VALVE A 29/03/2012 NA
1130 PIPING 60762 516-GA-E-60762 CLADDING REQUIREMENTS FOR SOUR SERVICE VALVES B 02/08/2011 NA
1131 PIPING 60763 516-GA-D-60763 TBE & RECOMMENDATION FOR STUD BOLTS AND NUTS A1 00/01/1900 NA
TBE & RECOMMENDATION FOR CORROSION COUPON &
1132 PIPING 60767 516-GA-D-60767 A 25/08/2012 NA
CORROSION PROBE
1133 PIPING 60790 516-GA-D-60790 TBE FOR SPRING SUPPORT A 22/09/2012 NA
1134 PIPING 60812 516-GA-E-60812 MTO FOR PAINTING A 00/01/1900 NA
1135 PIPING 60822 516-GA-E-60822 MTO FOR INSULATION B 25/09/2012 NA
1136 PIPING 69972 516-GA-E-69972 VENDOR FOLLOW UP FOR NON SLAM CHECK VALVE A1 00/01/1900 NA
1137 PIPING 69973 516-GA-E-69973 VENDOR FOLLOW UP FOR SPRING SUPPORTS A1 00/01/1900 NA
1138 PIPING 69974 516-GA-E-69974 VENDOR FOLLOW UP FOR CORROSION COUPON & PROBE A1 00/01/1900 NA
1139 PIPING 69975 516-GA-E-69975 VENDOR FOLLOW UP FOR FLANGE INSULATION KIT A1 00/01/1900 NA
1140 PIPING 69976 516-GA-E-69976 VENDOR FOLLOW UP FOR STRAINER A1 00/01/1900 NA
1141 PIPING 69977 516-GA-E-69977 VENDOR FOLLOW UP FOR HOSES A1 00/01/1900 NA
1142 PIPING 69978 516-GA-E-69978 VENDOR FOLLOW UP FOR INJECTION QUILL A1 00/01/1900 NA
1143 PIPING 69979 516-GA-E-69979 VENDOR FOLLOW UP FOR SS/CRA WROUGHT FITTINGS A1 00/01/1900 NA
1144 PIPING 69982 516-GA-E-69982 VENDOR FOLLOW UP FOR MECHANICAL INTERLOCK SYSTEM A1 00/01/1900 NA
1145 PIPING 69983 516-GA-E-69983 VENDOR FOLLOW UP FOR FORGED BALL VALVES A1 25/08/2012 NA

REV-D 40 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1146 PIPING 69984 516-GA-E-69984 VENDOR FOLLOW UP FOR CAST BALL VALVES A1 22/09/2012 NA

1147 PIPING 69985 516-GA-E-69985 VENDOR FOLLOW UP FOR FORGED GATE, GLOBE CHECK VALVE A1 25/08/2012 NA

1148 PIPING 69986 516-GA-E-69986 VENDOR FOLLOW UP FOR CAST GATE, GLOBE CHECK VALVE A1 22/09/2012 NA
1149 PIPING 69987 516-GA-E-69987 VENDOR FOLLOW UP FOR PLUG VALVES A1 22/09/2012 NA
1150 PIPING 69988 516-GA-E-69988 VENDOR FOLLOW UP FOR BRONZE VALVE A1 25/08/2012 NA
1151 PIPING 69989 516-GA-E-69989 VENDOR FOLLOW UP FOR CS SEAMLESS PLANT PIPES A1 26/09/2012 NA
1152 PIPING 69990 516-GA-E-69990 VENDOR FOLLOW UP FOR CS SAW PLANT PIPE A1 26/09/2012 NA
1153 PIPING 69991 516-GA-E-69991 VENDOR FOLLOW UP FOR SS & CRA SEAMLESS PLANT PIPE A1 26/09/2012 NA
1154 PIPING 69992 516-GA-E-69992 VENDOR FOLLOW UP FOR CS FORGED FITTINGS A1 26/09/2012 NA
1155 PIPING 69993 516-GA-E-69993 VENDOR FOLLOW UP FOR CS WROGHT FITTINGS A1 26/09/2012 NA
1156 PIPING 69994 516-GA-E-69994 VENDOR FOLLOW UP FOR SS & CRA FORGED FITTINGS A1 26/09/2012 NA
VENDOR FOLLOW UP FOR FLANGE AND LINE BLANKS ( INCLUDING
1157 PIPING 69995 516-GA-E-69995 A1 26/09/2012 NA
SPECTACLE BLIND, JACK SCREW FLANGES)
1158 PIPING 69996 516-GA-E-69996 VENDOR FOLLOW UP FOR RTR PIPE AND FITTINGS A1 26/09/2012 NA
1159 PIPING 69997 516-GA-E-69997 VENDOR FOLLOW UP FOR BUTTERFLY VALVES A1 22/09/2012 NA
1160 PIPING 69998 516-GA-E-69998 VENDOR FOLLOW UP FOR GASKET A1 00/01/1900 NA
1161 PIPING 69999 516-GA-E-69999 VENDOR FOLLOW UP FOR BOLTING A1 00/01/1900 NA
MAINTENANCE AND ACCESSIBILITY STUDY (3D MODEL 60% AND 90%
1162 PIPING 60026 516-GA-E-60026 B 25/08/2012 NA
REVIEW)
DELETED - PIPING ISOMETRICS BOOK - 2 REASON : THESE
1163 PIPING 62086 516-GE-D-62086 A1 02/11/2011 DELETED
INFORMATION ARE COVERED IN 62121 TO 62125
DELETED - PIPING ISOMETRICS BOOK - 3 REASON : THESE
1164 PIPING 62087 516-GE-D-62087 A1 02/11/2011 DELETED
INFORMATION ARE COVERED IN 62121 TO 62125
DELETED - PIPING ISOMETRICS BOOK - 4 REASON : THESE
1165 PIPING 62088 516-GE-D-62088 A1 02/11/2011 DELETED
INFORMATION ARE COVERED IN 62121 TO 62125
DELETED - PIPING ISOMETRICS BOOK - 5 REASON : THESE
1166 PIPING 62089 516-GE-D-62089 A1 02/11/2011 DELETED
INFORMATION ARE COVERED IN 62121 TO 62125
1167 PIPING 62121 516-GC-D-62121 ISOMETRICS BOOK - 1 A 13/01/2012 TBA
1168 PIPING 62122 516-GC-D-62122 ISOMETRICS BOOK - 2 B 04/02/2012 TBA
1169 PIPING 62123 516-GC-D-62123 ISOMETRICS BOOK - 3 D 12/05/2012 TBA
1170 PIPING 62124 516-GC-D-62124 ISOMETRICS BOOK - 4 E 19/07/2012 TBA
1171 PIPING 62125 516-GC-D-62125 ISOMETRICS BOOK - 5 D 24/08/2012 TBA
1172 PIPING 62030 516-GC-B-62030 INTERFACE LOCATION DRAWING - PSV IN FLOWLINES A 27/09/2012 TBA
1173 PIPING 62031 516-GC-B-62031 INTERFACE LOCATION DRAWING FOR FLOWLINES C 30/08/2011 TBA
1174 PIPING 62032 516-GC-D-62032 GROUP FEEDER LINES AND FUEL GAS TIE-IN DRAWING B 21/07/2011 TBA
1175 PIPING 62033 516-GC-D-62033 EXPORT GAS AND CRUDE OIL TIE-IN DRAWING D 29/07/2011 TBA

REV-D 41 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1176 PIPING 62034 516-GC-D-62034 EFFLUENT WATER TRANSFER AND INJECTION LINE TIE-IN DRAWING D 29/07/2011 TBA

1177 PIPING 62035 516-GC-B-62035 BRACKISH & POTABLE WATER LINE - TIE-IN DRAWING C 30/08/2011 TBA
1178 PIPING 62036 516-GC-B-62036 30" PRODUCTION FEEDER RELIEF LINE TIE IN DRAWING A 00/01/1900 TBA
1179 PIPING 62040 516-GC-B-62040 PIPING GENERAL ARRANGEMENT KEY PLAN B 06/01/2012 TBA
1180 PIPING 62041 516-GC-A-62041 PIPING GAD FEEDER LINE AREA A 14/09/2012 TBA
1181 PIPING 62042 516-GC-A-62042 PIPING GAD FLOW LINE PSV AREA -1 A 14/09/2012 TBA
1182 PIPING 62043 516-GC-A-62043 PIPING GAD FLOW LINE PSV AREA -2 A 14/09/2012 TBA
1183 PIPING 62044 516-GC-A-62044 PIPING GAD FLOW LINE PSV AREA -3 A 14/09/2012 TBA
1184 PIPING 62045 516-GC-A-62045 PIPING GAD PRODUCTION & TEST HEADER AREA -1 A 14/09/2012 TBA
1185 PIPING 62046 516-GC-A-62046 PIPING GAD PRODUCTION & TEST HEADER AREA -2 A 18/09/2012 TBA
1186 PIPING 62047 516-GC-A-62047 PIPING GAD PRODUCTION & TEST HEADER AREA -3 A 22/09/2012 TBA
1187 PIPING 62048 516-GC-A-62048 PIPING GAD PRODUCTION & TEST HEADER AREA -4 A 15/09/2012 TBA
1188 PIPING 62049 516-GC-A-62049 PIPING GAD PSV HEADER TO BURN PIT AREA-1 A 14/09/2012 TBA
1189 PIPING 62050 516-GC-A-62050 PIPING GAD EFFLUENT WATER EXPORT LINES AREA A1 00/01/1900 TBA
1190 PIPING 62051 516-GC-A-62051 PIPING GAD PSV HEADER TO BURN PIT AREA-2 A1 00/01/1900 TBA
1191 PIPING 62052 516-GC-A-62052 PIPING GAD AIR COMPRESSOR AREA A 18/09/2012 TBA
1192 PIPING 62053 516-GC-A-62053 PIPING GAD PIPE RACK PR-1 AREA-1 A 14/09/2012 TBA
1193 PIPING 62054 516-GC-A-62054 PIPING GAD PIPE RACK PR-1 AREA-2 A 14/09/2012 TBA
1194 PIPING 62055 516-GC-A-62055 PIPING GAD PIPE RACK PR-1 AREA-3 A 07/09/2012 TBA
1195 PIPING 62056 516-GC-A-62056 PIPING GAD PIPE RACK PR-1 AREA-4 A 07/09/2012 TBA
1196 PIPING 62057 516-GC-A-62057 PIPING GAD FIRE WATER TANK AREA A 14/09/2012 TBA
1197 PIPING 62058 516-GC-A-62058 PIPING GAD WASH WATER TANK AREA A 15/09/2012 TBA
1198 PIPING 62059 516-GC-A-62059 PIPING GAD DIESEL FIRE WATER PUMP AREA A 14/09/2012 TBA
1199 PIPING 62060 516-GC-A-62060 PIPING GAD FIREWATER JOCKEY & WASH WATER PUMP AREA A 14/09/2012 TBA
1200 PIPING 62061 516-GC-A-62061 PIPING GAD POTABLE WATER TANK AREA A1 00/01/1900 TBA
1201 PIPING 62062 516-GC-A-62062 PIPING GAD HP SEPARATOR AREA TRAIN -1 A 15/09/2012 TBA
1202 PIPING 62063 516-GC-A-62063 PIPING GAD LP SEPARATOR AREA TRAIN -1 A 14/09/2012 TBA

1203 PIPING 62064 516-GC-A-62064 PIPING GAD LP TEST SEPARATOR & HP SEPARATOR TRAIN -2 AREA A 07/09/2012 TBA

1204 PIPING 62065 516-GC-A-62065 PIPING GAD LP TEST SEPARATOR TRAIN -2 AREA A 07/09/2012 TBA
1205 PIPING 62066 516-GC-A-62066 PIPING GAD CRUDE HEATER AREA TRAIN -1 A 14/09/2012 TBA
1206 PIPING 62067 516-GC-A-62067 PIPING GAD CRUDE HEATER AREA TRAIN -2 A 18/09/2012 TBA
1207 PIPING 62068 516-GC-A-62068 PIPING GAD DRY CRUDE COOLER AREA A 18/09/2012 TBA
1208 PIPING 62069 516-GC-A-62069 PIPING GAD DESALTER AREA TRAIN -1 A 18/09/2012 TBA
1209 PIPING 62070 516-GC-A-62070 PIPING GAD DESALTER AREA TRAIN -2 A 18/09/2012 TBA
1210 PIPING 62126 516-GC-A-62126 PIPING GAD SLOP OIL VESSEL & LP GAS KO DRUM AREA A 22/09/2012 TBA
1211 PIPING 62127 516-GC-A-62127 PIPING GAD BALANCE GAS COMPRESSOR PACKAGE AREA A 18/09/2012 TBA

REV-D 42 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1212 PIPING 62128 516-GC-A-62128 PIPING GAD BALANCE GAS COMPRESSOR PACKAGE AREA-2 A 18/09/2012 TBA
PIPING GAD BALANCE GAS COMPRESSOR SUCTION SCRUBBER
1213 PIPING 62129 516-GC-A-62129 A 18/09/2012 TBA
AREA
1214 PIPING 62130 516-GC-A-62130 PIPING GAD CLOSED DRAIN VESSEL AREA A 22/09/2012 TBA
1215 PIPING 62131 516-GC-A-62131 PIPING GAD PIPE RACK PR-02 AREA-1 A 22/09/2012 TBA
1216 PIPING 62132 516-GC-A-62132 PIPING GAD PIPE RACK PR-02 AREA-2 A 22/09/2012 TBA
1217 PIPING 62133 516-GC-A-62133 PIPING GAD PIPE RACK PR-02 AREA-3 A 22/09/2012 TBA
1218 PIPING 62134 516-GC-A-62134 PIPING GAD PIPE RACK PR-02 AREA-4 A 25/09/2012 TBA
1219 PIPING 62135 516-GC-A-62135 PIPING GAD PIPE RACK PR-02 AREA-5 A 26/09/2012 TBA
1220 PIPING 62136 516-GC-A-62136 PIPING GAD PIPE RACK PR-02 AREA-6 A 24/09/2012 TBA
1221 PIPING 62137 516-GC-A-62137 PIPING GAD FUEL GAS TREATMENT AREA A 25/09/2012 TBA
1222 PIPING 62138 516-GC-A-62138 PIPING GAD PIPERACK PR-04 AREA A 26/09/2012 TBA
1223 PIPING 62139 516-GC-A-62139 PIPING GAD PIPERACK PR-05 AREA A 22/09/2012 TBA
1224 PIPING 62140 516-GC-A-62140 PIPING GAD PRODUCED WATER TANK AREA-1 A 24/09/2012 TBA
1225 PIPING 62141 516-GC-A-62141 PIPING GAD PRODUCED WATER TANK AREA-2 A 22/09/2012 TBA
1226 PIPING 62142 516-GC-A-62142 PIPING GAD PRODUCED WATER TRANSFER PUMPS AREA A 22/09/2012 TBA
1227 PIPING 62143 516-GC-A-62143 PIPING GAD EFFLUENT WATER TANK AREA A 22/09/2012 TBA
1228 PIPING 62144 516-GC-A-62144 PIPING GAD WALNUT SHELTER FILTERS AREA-1 A 26/09/2012 TBA
1229 PIPING 62145 516-GC-A-62145 PIPING GAD WALNUT SHELTER FILTERS AREA-2 A 25/09/2012 TBA
1230 PIPING 62146 516-GC-A-62146 PIPING GAD EFFLUENT WATER PUMPS AREA A 25/09/2012 TBA
1231 PIPING 62147 516-GC-A-62147 PIPING GAD WATER INJECTION PUMPS AREA A1 00/01/1900 TBA
1232 PIPING 62148 516-GC-A-62148 PIPING GAD WET TANK PW TRANSFER PUMPS AREA A 26/09/2012 TBA
1233 PIPING 62149 516-GC-A-62149 PIPING GAD DESALTER FEED PUMPS AREA A 24/09/2012 TBA
1234 PIPING 62150 516-GC-A-62150 PIPING GAD OFF-SPEC TANK AREA-1 A 24/09/2012 TBA
1235 PIPING 62151 516-GC-A-62151 PIPING GAD OFF-SPEC TANK AREA-2 A 26/09/2012 TBA
1236 PIPING 62152 516-GC-A-62152 PIPING GAD OFF-SPEC & WET TANK AREA-1 A 25/09/2012 TBA
1237 PIPING 62153 516-GC-A-62153 PIPING GAD OFF-SPEC & WET TANK AREA-2 A 26/09/2012 TBA
1238 PIPING 62154 516-GC-A-62154 PIPING GAD WET TANK AREA A 24/09/2012 TBA
1239 PIPING 62155 516-GC-A-62155 PIPING GAD DRY TANK AREA-1 A 25/09/2012 TBA
1240 PIPING 62156 516-GC-A-62156 PIPING GAD DRY TANK AREA-2 A 25/09/2012 TBA
1241 PIPING 62157 516-GC-A-62157 PIPING GAD CRUDE OIL EXPORT PUMPS AREA A 26/09/2012 TBA
1242 PIPING 62158 516-GC-A-62158 PIPING GAD CRUDE OIL METERING SKID AREA A 26/09/2012 TBA
1243 PIPING 62159 516-GC-A-62159 PIPING GAD CRUDE OIL & GAS EXPORT LINES AREA A 26/09/2012 TBA
1244 PIPING 62160 516-GC-A-62160 PIPING GAD DIESEL STORAGE TANK AREA A 26/09/2012 TBA
1245 PIPING 62161 516-GC-A-62161 PIPING GAD PIPE SLEEPER TO FLARE KO DRUM AREA-1 A1 00/01/1900 TBA
1246 PIPING 62162 516-GC-A-62162 PIPING GAD PIPE SLEEPER TO FLARE KO DRUM AREA-2 A1 00/01/1900 TBA
1247 PIPING 62163 516-GC-A-62163 PIPING GAD FLARE KO DRUM AREA A1 00/01/1900 TBA

REV-D 43 of 44
MASTER DELIVERABLE REGISTER FOR NEW GC-16 PROJECT
DOCUMENT NO: 516-ZA-E-09005

ACTUAL
DISCIPL LAST
SL NO: SP. NO DOCUMENT NO DESCRIPTION DATE FOR AS BUILT REMARKS
INE REV.
IFC

1248 PIPING 62164 516-GC-A-62164 PIPING GAD PIPE SLEEPER TO HP FLARE AREA A1 00/01/1900 TBA
1249 PIPING 62165 516-GC-A-62165 PIPING GAD PIPE SLEEPER TO BURN PIT AREA-1 A1 00/01/1900 TBA
1250 PIPING 62166 516-GC-A-62166 PIPING GAD PIPE SLEEPER TO BURN PIT AREA-2 A 26/09/2012 TBA
1251 PIPING 62167 516-GC-A-62167 PIPING GAD PIPE SLEEPER TO BURN PIT AREA-3 A1 00/01/1900 TBA
1252 PIPING 62168 516-GC-A-62168 PIPING GAD PIPE SLEEPER TO BURN PIT AREA-4 A1 00/01/1900 TBA
1253 PIPING 62169 516-GC-A-62169 PIPING GAD PIPE SLEEPER TO LP FLARE AREA A1 00/01/1900 TBA
1254 PIPING 60003 516-GA-E-60003 PIPING FLEXIBILITY CRITERIA B 25/04/2011 NA
1255 PIPING 60004 516-GA-E-60004 PIPING SUPPORT DESIGN STANDARD B 21/10/2011 NA
DELETED - SUPPORT BOOKS-1 NOTE : THIS DOCUMENT WILL NOT
1256 PIPING 60019 516-GA-D-60019 A1 13/12/2011 DELETED
BE RELEASED.
DELETED - SUPPORT BOOKS-2 NOTE : THIS DOCUMENT WILL NOT
1257 PIPING 60020 516-GA-D-60020 A1 13/12/2011 DELETED
BE RELEASED.
DELETED - SUPPORT BOOKS-3 NOTE : THIS DOCUMENT WILL NOT
1258 PIPING 60021 516-GA-D-60021 A1 13/12/2011 DELETED
BE RELEASED.
DELETED - SUPPORT BOOKS-4 NOTE : THIS DOCUMENT WILL NOT
1259 PIPING 60022 516-GA-D-60022 A1 13/12/2011 DELETED
BE RELEASED.
DELETED - SUPPORT BOOKS-5 NOTE : THIS DOCUMENT WILL NOT
1260 PIPING 60023 516-GA-D-60023 A1 13/12/2011 DELETED
BE RELEASED.
1261 PIPING 60025 516-GA-E-60025 PIPING SUPPORT PREFABRICATION LIST A1 00/01/1900 NA
PIPING SUPPORT STANDARD FOR BRACKETS AND REINFORCING
1262 PIPING 60046 516-GA-E-60046 B 31/08/2011 NA
PLATES ON VESSELS

1263 PIPING 60047 516-GA-E-60047 VERTICAL AND HORIZONTAL EXTENSIONS FOR PIPES SUPPORTS B 31/08/2011 NA

1264 PIPING 60051 516-GA-E-60051 3D (PDS) MODEL SET UP PROCEDURE B 25/04/2011 NA

1265 PIPING 60052 516-GA-E-60052 3D (PDS) CAD MODEL PROGRESS MEASUREMENT PROCEDURE B 20/04/2011 NA

1266 PIPING 60053 516-GA-E-60053 3D CAD MODELLING PROCEDURE B 20/04/2011 NA


1267 PIPING 60054 516-GA-E-60054 PLANT PIPING STRESS ANALYSIS REPORT A1 00/01/1900 NA
1268 PIPING 62101 516-GG-E-62101 SPECIAL PIPE SUPPORT DRAWING BOOK A1 00/01/1900 NA

REV-D 44 of 44

You might also like