POWER & LIGHTING

QTY
CKT DESCRIPTION
LO S SD CKT HR

GROUND FLOOR
1 Room 1 to Room 6, Boys Room 7 42.5

2 Hallway (31.5) 4

3 Room 7 to Room 9, Maids Room 6 40.2

4 Fire Alarm Bell / Manual Pull Station 2 30.5

TOTAL 17 113

2ND FLOOR
1 Room 17 to Room 25 9 45.5

2 Hallway (30.3) 4

3 Room 10 to Room 16 7 41.6

4 Fire Alarm Bell / Manual Pull Station 2 30.5

TOTAL 20 118

3RD FLOOR
1 Room 27 to Room 34 9 45.5

2 Hallway (30.3m) 4

3 Room 40 to Room 35 6 37.3

4 Fire Alarm Bell / Manual Pull Station 2 30.5

TOTAL 19 113

TOTAL 0 0 56 344

ROUGH-INS
20mm PVC Pipe 245 lgts
20mm dia. Moulding @ 2.4m / piece 177 pcs < -- 41 rooms x 2 meters
20mm PVC Flexible Conduit 112 lm <-- 56 (Octagonal Box) x 2.0

BOXES
Octagonal Box, 4" x 4" x 2-1/8" with cover 56 pcs
Utility Box, 2" x 4" x 2-1/8" 68 pcs

FITTINGS / CONNECTORS
20mm MTA with Locknut and Bushing 372 sets <-- (56+ 68 ) x 3
20mm FLEX CONNECTOR 224 pcs <-- 156 * 2

CONDUCTORS
TF 1.25mm 1,472 lm

SCREWS / TOX
3/16" dia x 2" length screw (Boxes) 496 pcs <-- (56 + 68) x 4.0
3/16" dia x 2" length Tox 496 pcs <-- (56 + 68) x 4.0
3/16" dia x 2" length screw (Pipes) 736 pcs <-- (245 * 3) / 1
3/16" dia x 2" length Tox 736 pcs <-- (245 * 3) / 1
3/16" dia x 2" length screw (Mouldings) 426 pcs <-- (220 * 2.4) / 1
3/16" dia x 2" length Tox 426 pcs <-- (220 * 2.4) / 1

MISCELLANEOUS
3/16" dia. Concrete Drill Bit 6 pcs
5/8" dia. Concrete Drill Bit 2 pcs
Butane @ Php 75.00/bottle (Ace Hardware) 10 bots
Butane Torch @ Php 450.00/pc (Ace Hardware) 2 pcs
FIRE ALARM NO
OF
TRAYTO MH from MH from Riser SUB-TOTAL ADJ L-L
TOTRAY TRAY WIR
PNL CEILING FLOOR Down
ES

1.6 44 4 176
0 4 0
1.6 42 4 167
1.6 35 4 141
4.8 121 485

1.6 4.6 47 4 188


4.6 0 4 0
1.6 4.6 43 4 173
1.6 4.6 35 4 141
5 18 126 502

1.6 7.6 47 4 188


7.6 0 4 0
1.6 7.6 39 4 156
1.6 7.6 35 4 141
5 30 121 485

14 49 368.1 1472

x 2 meters
l Box) x 2.0
GND
Line Gnd Pipe

3.5mm (Lin 3.5mm (Gnd)


3.5mm (Lin 3.5mm (Gnd)
3.5mm (Lin 3.5mm (Gnd)

3.5mm (Lin 3.5mm (Gnd)


3.5mm (Lin 3.5mm (Gnd)
3.5mm (Lin 3.5mm (Gnd)

3.5mm (Lin 3.5mm (Gnd)


3.5mm (Lin 3.5mm (Gnd)
3.5mm (Lin 3.5mm (Gnd)
CKT NO. OF DEVICES (FOR CHIP
CKT. NO. LOAD DESCRIPTION
LENGTH
CO CO(CT) LO EF
PB-2 REF(1), CO(1) 5.00 1
PB-1 CO(1), LO(4), FL(1), EF(1) 11.90 1
PB-3 ACU OUTLET (1.5Hp) 5.90

SUB-TOTAL

SMOKE DETECTOR

CATV

TOTAL 1 1 4 1

2.5 300
0.75 75
1 107.14
CEILING
HEIGHT
NO. OF DEVICES (FOR CHIPPING WORKS) MOUNTING HEIGHT OF

S S2 S3 SW3 REF ACU OTHERS CO CO(CT) LO/FL EF


1 3 0.30 0.95 3.00 3.00
1 1 1 1 3 0.30 0.95 3.00 3.00
1 3

1 3

1 1 0 1 1 1 3
MOUNTING HEIGHT OF DEVICES (LM) CEILING TO DEVICE

S S2 S3 SW3 REF ACU OTHERS CO CO(CT) LO EF S


1.40 1.40 1.40 1.40 0.30 0.30 2.70 2.05 0.00 0.00 1.60
1.40 1.40 1.40 1.40 0.30 0.30 1.40 2.05 0.00 0.00 1.60
0.30

0.95
CEILING TO DEVICE (LM) SWITCH TO FIXTURE (LM)

S2 S3 SW3 REF ACU OTHERS SUBTOT S S2 S3 S3W


1.60 1.60 1.60 2.70 2.70 3.00 5.40
1.60 1.60 1.60 2.70 2.70 1.60 8.45 2.30 9.50 39.60
2.70 2.70

2.05 2.05
2.05

HOMERUN (to HOMERUN (PB TOTAL ONE WAY TOTAL WIRE TOTAL WIRE
FIXTURE (LM)
PB) to PNL) LENGTH (PVC) LENGTH (LINE) LENGTH (GND)

SUBTOT
0.00 5.00 1.60 17.00 34.00 17.00
51.40 1.50 1.60 23.45 98.30 23.45
1.60 10.20 20.40 10.20

152.70 50.65

3.60 7.20

0.00 3.80 5.85 5.85

60.10
TOTAL CHIPPING TOTAL COST
CHIPPING WORKS (COST / (CHIPPING
WORKS LENGTH LM) WORKS)

5.40 0.00
8.45 0.00
2.70 0.00

16.55 0.00

0.20 0.00

2.05 0.00

35.35
PROJECT TITLE: PROPOSED INTERIOR RENOVATION (RTW-SHOP MAGARBO)
OWNER: ANGELINA OAS
LOCATION: CITY MALL, CONSOLATION, CEBU

SHORT CIRCUIT CALCULATION @ NO LOAD

WIRE
BASE
CKT. LENGTH IMPEDANCE
PANEL NAME SIZE OF WIRE VOLTAGE (Line
(m) (/m) per
to Ground)
conductor

PB 50.00 14mm 0.001585 230.00

REMARKS: INTERRUPTING CAPACITY OF CIRCUIT BREAKER IN (PB) SHALL NOT BE LESS THAN 10KAIC.

DATE:02/28/2017
346654910.xls Page 1 of 18
TIME:01:57:01
DATE:02/28/2017
346654910.xls Page 1 of 18
TIME:01:57:01
IT CALCULATION @ NO LOAD

Isc = Base Voltage / Wire


Impedance x Circuit Length
(Amperes)

Isc = 5,804.42

DATE:02/28/2017
346654910.xls Page 1 of 18
TIME:01:57:01
DATE:02/28/2017
346654910.xls Page 1 of 18
TIME:01:57:01
PROJECT TITLE: PROPOSED INTERIOR RENOVATION (RTW-SHOP MAGARBO)
OWNER: ANGELINA OAS
LOCATION: CITY MALL, CONSOLATION, CEBU

VOLTAGE DROP CALCULATION

VOLTAGE DRO
CKT.
WIRE IMPEDANCE WIRE SIZE (AWG CURRENT X W
FEEDER LENGTH VOLTS CURRENT (A) PHASE
(/m) per conductor or kcmil) IMPEDANCE) X
(m)
LENGTH

PB 50.00 230.00 39.30 SINGLE 0.001585 14mm Vdrop =

REMARK: THE CALCULATED PERCENT DROP OF 2.708% IS LESS THAN THE ALLOWABLE VOLTAGE DROP OF 3%

Date: 02/28/2017
346654910.xls Page 17 of 18
Time: 01:57:01
OP CALCULATION

VOLTAGE DROP =
VOLTAGE DROP
CURRENT X WIRE
PERCENTAGE
IMPEDANCE) X CKT.
(%)
LENGTH

6.22905 2.708%