Venn Diagram
Since, the group had already identified organization/institutions, individual the facilitator instructed
again the group to decide whether each organization or individual deserves a small, medium or large
circle to depict its relative importance to the community. The size of the circles may refer to the
membership size, resources or degree of influence, the participants will also indicate the name of symbol
of each organization on each circle, then the participants will draw a big circle in the manila paper to
represent the community. After the participants discussed on the relationship of the different organization,
the facilitator asked the participants on which institutions work together or have overlapping memberships
and they will also draw line of each organization, in the circle they should be placed as follows:
. Below were the questions asked by the facilitator to the participants including their output:
o What did the participants observe during the walkthrough? In the central zone, inner zone and outer
zone?
o Are there differences and/or similarities in the things that the participants observed in the different zones?
o What are some problems, issues and concerns that the participants noted?
Illustration of Terrain
Distance (km)
Categories Central Zone Inner Zone Outer Zone
Slope o Plain o Plain o Flat
Land use o Commercial o Institutional o Agricultural
o Agricultural o Agricultural o Commercial
o Park
o Pond
o Tourist attraction
o MRF
From the transect walk, the resource person instructed the participants to draw a resource map from what
they observed in their transect walk.
o Resource Mapping
GROUP 2
IP Sector
Subanen 250 Housing (Relocation) o Relocation site o Improve provision of water
has inadequate supply/ system
services(water)
Women Sector 30/300 Livelihood o Lack of capital o Source out funds
o Selective si BC o Training on
o Mismanaged project/financial
funds management
Infrastructure Roads & Bridges (FMR), o Lack of o Seek augmentation for
haging bridge and culvert maintenance of road maintenance
roads
Economic 50 SMEs and cooperative o Lack of capacity o Skills training on
Fisher Folk on business management
management
Environment o Mangrove plantation o Lack of o Strict monitoring;
o Solid waste management maintenance implementation of
o Non-segregation mangrove plantation for
of waste RA 9003
o Lack of IEC on o Create mangrove
Solid Waste plantation TF- Bantay
Management o Strict implementation of
o Absence of SWM per RA 9003
sanitary land fill
Participatory CBMS Validation
Purok No. of HHs No. of 0- No. of No. of HHs living in HHs HH of
Number F M 5 women malnourish makeshift who are access to
children who died ed children housing informal safe water
who due to 0-5 years settler
died pregnancy old
related
causes
1 110 100 2 1 3 5 0 15
2 250 300 1 0 2 9 0 0
Total 360 400 3 1 5 14 0 15
FACTORS THAT
ISSUES/CONCER
BEFORE PRESENT CAUSED THE RECOM
N
CHANGES
Abundance of green Bald, eroded Presence of illegal Global warming Forest
trees and grass explored logging Flash flood conservation
More trees mountain Conversion of Natural calamity Resettlement
Fresh water IP community forest land to Conflict land used Full enforcement
Presence of water displaced industrial land More kaingin practice of forest laws
shed Landslide Illegal logging Displacement of Conduct refo
Big trees Endangered Developed residence project
Virgin forest More building Industrialization Environmental Alternative
Haven of wild construction Poverty degradation livelihood
animals Migration River dried up IEC on the effect
High terrestrial Greediness of Improper waste of the
Presence of flor and leadership disposal deforestation
fauna Comty-based
Clean environment forest
protection prog
Enforcement of
IPRA law
PERFORMANCE OF BARANGAY OFFICIALS
PALAKPAK
PALPAK
1. IRA dependent
2. Arrogant
3. No permanent Barangay Hall / office
4. Some of the Barangay Officials are not residing in their respective Barangay
5. Lack of capability skills on M & E
Note: due to time limit the group was not able to finish the work.
GROUP 3
WEALTH RANKING
Effects:
- High rate of morbidity
- Hunger
- Malnutrition
- High crime incidence
- High mortality rate
- Less capacity to send
children to school
Core Problem:
60% of
Households are
living below
poverty
Causes:
- Katamaran
- Unemployment
- Illiteracy
- Limited job
opportunity
- Less access to basic
services
- Low literacy rate
- No owned lot
- Unstable peace &
order condition
- Disaster prone area