NTPCLimited
(AGovernmentofIndiaUndertaking)

EOINo.02/EOI/2017/01 Dated:16thFebruary,2017

INVITATIONFOREXPRESSIONOFINTEREST(EOI)

FROM

INTERESTEDPARTIES

FOR

ESTABLISHINGINTEGRATEDCEMENTPLANT/CEMENTCLINKERGRINDINGUNIT/

CEMENTBLENDINGUNIT/ALLIEDPRODUCTSMANUFACTURINGUNITSIN/

ADJACENTTONTPCPOWERPLANT(s)ONBUILT,OWNANDOPERATE(BOO)/

JVMODE

1.0 Introduction

1.1. NTPCisIndiaslargestenergyconglomeratewithpresentinstalledcapacityof48,028
MW (including JVs/Subsidiaries) comprising of 45 NTPC Stations (19 Coal based
stations, 7 combined cycle gas/liquid fuel based stations, 1 Hydro based station), 9
Joint Venture stations (8 coal based and one gas based) and 9 renewable energy
projects. With 19 coal based power stations, NTPC is the largest thermal power
generatingcompanyinthecountry.Thecompanyhascoalbasedinstalledcapacityof
35,885MW.

Being the largest thermal power generating company in the country, NTPC produces
approx.65MillionTonsofAshannually,outofwhich80%isFlyAsh.PresentlyNTPC
Ash is being utilized in Land development, Ash Dyke Raising, Road/Rail
Embankments, Brick/Blocks/Tile industries & Cement Industries etc. NTPC intends to
increase its Ash Utilization by inviting EOI from interested parties for establishing
integrated cement plant/ cement clinker grinding unit/ cement blending unit/ allied
products manufacturing unit in/ adjacent to NTPC power plant(s) on Built, Own and
Operate(BOO)/JVmode.

Page1of5

2.0 ExpressionofInterest:

http://www.ntpctender.com/uploads/job_22170.html 1/7
2/16/2017 bcl_1530862688.htm

NTPC invites Expression of Interest (EOI) from interested parties for establishing
integrated cement plant/ cement clinker grinding unit/ cement blending unit/ allied
productsmanufacturingunitof1MTPAorhighercapacityin/adjacenttoNTPCPower
Plant premises on Built, Own and Operate (BOO)/JV mode, using Ash from NTPC
thermalpowerplants.Interestedpartiesmayclearlyindicatetheinputsrequiredfrom
NTPC

3.0 PurposeofEOI:

ThroughthisEOI,NTPCintendstoshortlistreputedpartieshavingrequisitecapability
and are willing to establish integrated cement plant/ cement clinker grinding unit/
cementblendingunit/alliedproductsmanufacturingunitof1MTPAorhighercapacity
in/adjacenttoatleastonespecifiedlocationchosenfromthelistofparticipatingplants
onBuilt,OwnandOperate(BOO)basis/JVmode.

TheInterestedPartiesshortlistedonthebasisoftheirExpressionofInterest(EOI)
maybeconsideredforfurtherstepsofbusinesspartnerselection.

4.0 RoleoftheInterestedParties/NTPC

4.1. InterestedPartiesmayexamineandindicateoneormoreNTPCpowerstations(both
underoperationaswellasunderconstruction)fromthelistofidentifiedpowerstations
given in this document for establishing the cement manufacturing unit (integrated
cementplant/blendingunit/clinkeringunit)oranyalliedproductmanufacturingunit.

4.2. Thecapacityofmanufacturingunitshallbeatleast1MTPAcapacity.Ahighercapacity
establishmentmaybepreferred.

4.3. AshrequiredfortheprojectshallbemadeavailablebyNTPC.

4.4. Interested party shall sign a long term agreement with NTPC for use of Fly Ash &
Electricity exclusively from the identified power station of NTPC from the date of
commissioningofcement/Alliedproductplant.

Page2of5

4.5. Allotherrawmaterialrequiredformanufacturingunitshallbearrangedbythe
InterestedParty.

4.6. Allclearancerelatedtoestablishmentofmanufacturingunitshallbeobtainedbythe
interestedpartyhoweverNTPCshallprovidenecessaryassistanceinthisprocess.

4.7. Theinterestedparty/JVCshallberesponsibleformarketing,sellingandlogisticsofthe
rawmaterialandproduceofthesePlants.

5.0 RequiredInformation:

http://www.ntpctender.com/uploads/job_22170.html 2/7
2/16/2017 bcl_1530862688.htm

5.1 Financialstrengthoftheorganizationisrequiredtoestablishthemanufacturingfacility
(organization structure, audited accounts of last three financial years, etc.). Audited
BalanceSheetsforlastthree(3)yearsmayalsobesubmitted.

5.2 InterestedpartiesmayclearlyindicatetheinputsrequiredfromNTPC

5.3 ThepartysubmittingtheEOIshallbebearingallcostsassociatedwiththepreparation
andsubmissionoftheEOIandNTPCwill,innocaseberesponsibleorliableforthese
costs,regardlessoftheconductoroutcomeoftheassessment/evaluationprocess.

6.0 SubmissionofEOIs:

Interested parties are required to submit all required documents complete in all
respectswithoneoriginalandoneauthenticatedcopiesforeachinHardformunder
theregisteredpostorhanddeliveredtotheaddress:

Mr.PraveenSaxena,
GeneralManager(BusinessDevelopment),
RoomNo.304,
NTPCLtd.
EOCAnnexe,A8A,SECTOR24,
NOIDA201301(U.P.),India.

Page3of5

On or before 17:00 Hrs. 10th March 2017. The top left hand corner of the envelope
shall indicate with EOI FOR ESTABLISHING INTEGRATED CEMENT PLANT/
CEMENT CLINKER GRINDING UNIT/ CEMENT BLENDING UNIT/ ALLIED
PRODUCTS MANUFACTURING IN/ ADJACENT TO NTPC POWER PLANTS ON
BUILT,OWNANDOPERATE(BOO)/JVMODE.

Latesubmissionswillnotbeaccepted.Electronic(Softform)copyoftheEOIshould
besenttotheemailaddressgivenbelow.Ifthereisanydiscrepancyinthedocuments
submittedinhardform&Softform,thedocumentsinhardformwillbeconsideredfor
evaluation.

i. Eachpageofthedocumentssubmittedshallbedulyauthenticatedbytheapplicant.
ii. ThelanguageofsubmissionofapplicationsshallbeinEnglish.
iii. FinancialData,ProjectCostsshallbeinINRonly.

Foranyfurtherclarification/queriesthefollowingpersonalsmaybecontacted:

Mr.MurariPrasad
Addl.GeneralManager(BusinessDevelopment)
http://www.ntpctender.com/uploads/job_22170.html 3/7
2/16/2017 bcl_1530862688.htm

Contact:01204947555
Mobile:9650990755
Email:murariprasad@rediffmail.com

Or

Mr.A.K.Kasauliya
Sr.Manager(BusinessDevelopment)
Contact:01204947537
Mobile:9650996613
Email:ajaykasauliya@gmail.com

ListofNTPCCoalBasedThermalPowerPlants

Page4of5

Following NTPC Coal based Thermal Power Plants has been considered in this EOI for
establishmentofintegratedcementplant/cementclinkergrindingunit/cementblendingunit/
alliedproductsmanufacturingunits.However,thislistisnotrestrictiveandinterestedparties
may indicate their choice of NTPC coal based thermal power plant also for the above
purpose.

Sl.No. Station TotalCapacity(MW)

1 Barh 1320

2 Farakka 2100

3 Bongaigaon 750

4 Dadri 1820

5 Badarpur 705

6 Mouda 1660

7 APCPL 1500

http://www.ntpctender.com/uploads/job_22170.html 4/7
2/16/2017 bcl_1530862688.htm

Page5of5

StandardFormatforExpressionofInterest

Date:_____________

GeneralManager(BusinessDevelopment),
RoomNo.304,
NTPCLtd.
EOCAnnexe,A8A,SECTOR24,
NOIDA201301(U.P.)India.

Subject:ExpressionofInterest(EOI)forestablishingintegratedcementplantorcement
clinkergrindingunitorcementblendingunitoralliedproductsmanufacturingunit,
inoradjacenttoNTPCPowerPlantpremisesonBuilt,OwnandOperate(BOO)
orJVmode.

DearSir,

In response to your public advertisement in [Insert the names of the newspaper and/or
website] on [Insert date of the advertisement] inviting EOI for establishing integrated
cement plant or cement clinker grinding unit or cement blending unit or allied products
manufacturing unit, in or adjacent to NTPC Power Plant premises on Built, Own and
Operate(BOO)orJVmode,weherebysubmitourEOI.

We have also attached information according to the standard form as per Annexure. The
information furnished by us in this EOI is true, correct and accurate to the best of our
knowledge.

Sincerelyyours,

Onbehalfofthefirm/company/organization:
Signature:________________________
(Person signing the EOI and supporting documents should be an Authorized Signatory
supportedbynecessaryBoardresolutions)
Nameofsignatory
Designation
CompanySeal/stamp
Page1of3

http://www.ntpctender.com/uploads/job_22170.html 5/7
2/16/2017 bcl_1530862688.htm

Annexure

1. Nameandaddress

a) NameoftheFirm/Company/Organization:
b) CorporateAddress:
c) RegisteredAddress:
d) TelephoneNo:
e) Fax:
f) Email:

2. ContactPerson:

a) Name:
b) Designation:
c) TelephoneNo:
d) Email:

3. CompanyProfile:

a) Coreareaofexpertise:
b) DateofIncorporation:
c) CINNo.:
d) VATNo.:
e) PANNo.:
f) ShareholdingPattern:
g) FinancialCapability(IncludingTurnover,ReserveandSurplusetc)

4. KeyOperatingparametersforlastthree
years:[InstalledCapacity,Utilizationfactoretc.]

5. SupportingDocuments:

[Providecopyoftheregistration,copyofVATandPANofthefirmwiththeirlatest
renewalswhereapplicable,AuditedFinancialsforlastthreeFinancialyears]

Page2of3

6.Experience/ Major projects under construction by the


Firm/Company/Organization(Alongwithvalueandtimeofcompletion/award):

http://www.ntpctender.com/uploads/job_22170.html 6/7
2/16/2017 bcl_1530862688.htm

7.ProposedProjectdetails:

A. Locationforwhichcompanyisinterested(inorderofpreference)
1. .
2. .
3.
4. .
5. .
B. Typeofplant(tickappropriate)
i. INTEGRATEDCEMENTPLANT
ii. CEMENTCLINKERGRINDINGUNIT
iii. CEMENTBLENDINGUNIT
iv. ALLIEDPRODUCTSMANUFACTURINGUNIT

C. ProposedCapacity.

D. ModeofProjectimplementation:
i. FullOwnership
ii. JVmode

E. Electricityrequirement(MW).

F. WaterRequirement(CUM/day)....

G. Ashrequirement(MT/day)

H. Landrequirement(Acre).

I. EstimatedInvestment(Rs.Cr.).

J. InputsrequiredfromNTPC&Quantum.

Page3of3