Professional Documents
Culture Documents
Application of Talpac
Truck travel time calculation
Fleet productivity estimation for long & short term planning
Determination of optimum loading technique or bucket size
Sensitivity analysis to road design criteria Talpac has been
designed for the
Calculation of TKPH or TMPH ratings for use in tyre selection.
mining industry by
Estimation of fuel usage.
mining engineers
Determination of haulage costs using discounted cash flow and incre-
mental truck costing.
Truck fleet size optimisation to quantify the economic effect of over and under trucking.
Equipment loading analysis to optimise loader bucket size, truck capacity and number of
passes.
Collation of results from calculations to
examine the relationship between
variables in the calculation, eg. haul
distance vs productivity, haul dis-
Features
Help facilities are available on line
tance vs
truck fleet size User defined reports and graphics choices
Bench marking High correlations between actual timings and simulations
Equipment selection and justification Accurate and reliable
Incremental Analysis In-built truck and loader databases
Operating time evaluation
Non operational and operational delays simulated
Integration of equipment performance and cost data
Flexibility in data storage
Integration with monitoring systems
Runges strong business focus is integral to all our software systemsthis translates into the
development of tools which allow detailed modeling of scenarios for business analysis.
Website: www.runge.com
Brisbane ::: Perth ::: Singleton ::: Calgary ::: Santiago ::: Denver ::: Johannesburg
Mining Strategies :: Business Planning :: Mining Consulting :: Geological Consulting :: Training :: Software