Drive Test Team Services
DT Team conduct regular DT in VIP routes as per scheduled below :

DT Team are ready 24x7 hours to support ISAT customers complain.


Maximum number of VIP/VVIP complain handling will be as followed :

The SLA and delivery time duration of the DT Services are :

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 1 of 22
Drive Test Team Services
DT Team perform a regular DT cluster regularly in schedule duration as following

Each Team are consist of drive tester and rigger with fully equipped which is
described in the next part of this technical proposal

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 2 of 22
Yearly Project Schedule and Organization

Project Manager

Project Coordinator Project Coordinator Project Coordinator


of Jabotabek of West & Central Java of East Java Bali Nusra

RF Reporters RF Reporters RF Reporters RNO Support

DT & Rigger Teams DT and Rigger Teams DT and Rigger Teams

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 3 of 22
DT Team Configuration

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 4 of 22
Tools Configuration

Tools Setting Configuration :


Using Antenna with 3 dBi gain
Cable and Coupling with 2 dB Loss
Attenuator with 16 dB Loss
External Antenna and GPS are placed in the top of vehicle
Labeled equipment to ensure consistency data collection process
Servers are configured to supporting data testing

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 5 of 22
2G/3G Tools Methodology and KPI

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 6 of 22
2G/3G DT Equipment Setup

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 7 of 22
2G KPI Weighting

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 8 of 22
3G KPI Weighting

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 9 of 22
4G DT Tools, Methodology and KPI

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 10 of 22
2G DT KPI Plotting and Its Legend
RxLev RxQual

SQI

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 11 of 22
3G DT KPI Plotting and Its Legend
RSRP EcNo

DL Throughput MOS POLQA

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 12 of 22
4G DT KPI Plotting and Its Legend
RSRP SINR

RLC DL RLC UL
Throughput Throughput

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 13 of 22
Example of Problem Cause Analysis
Problem/Root Cause:
Bad Coverage due bad RSCP level
impacted from distance 2.3km with
downhill contour from serving cell to the
badspot area, served by SC426
3G_TALISE1.

PROPOSE:
Propose to downtilt for near area
around the site coverage improvement.
Downtilt needed from 2 to 5.
As permanent solution we can propose
new 3G site colo with 2G TONDO.

Elevation shown the badspot area is far


away around 2.3km from serving cell
within downhill contour.

Total tilt exchange from 2 to 5 can


be improve near site coverage.

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 14 of 22
Example of Problem Handling Tracker

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 15 of 22
Example Cluster and Complains Tracker

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 16 of 22
Frequency Scanning for External Interference
Method :
1. Mobile (using Omni Antenna to localize high possibility of interferer)
2. Static at Site (using directional antenna/Yagi Antenna to find specific
location of interferer)
3. The MTTR of scanning will be 8 hours for VIP area and 24 hours for non
VIP area , starting from ISAT email requested to start of scanning until
report delivery.
4. Number of Scanning report will be around 15 reports per area of
Jabotabek, WJ-CJ and EJ-BN.
Tools :
1. Spectrum Analyzer up to 8 GHz (Advantest U3751)
2. Antenna Omni and Antenna Direction (Yagi Type)
3. Filter Band Pass 900 MHz

Number of Frequency Scanning Team per area are listed below :

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 17 of 22
Frequency Scanning for Investigation Procedure

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 18 of 22
Frequency Scanning for External Interference

Provide the scanning polygon based on cells amount impacted by external


interference

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 19 of 22
Rigger Personal Protective Equipment

Each Rigger will be equipped with the standard PPE as following :


1. WAH Certificate
2. Personal Insurance
3. Head Protection
4. Full Body Harness with Absorber Lanyards
5. Foot Protection
6. Hand and Eye Protection
The other equipment are related to rigger regular tasks:
1. Site Master
2. Site Keys
3. GPS
4. Compass
5. Meter Tape
6. Tilting Meter
7. Camera
8. Phone
9. Adjustable Wrenches
10. Binocular
Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 20 of 22
Matrix Responsibilities

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 21 of 22
Contact for Further Information
PT. Global One Solusindo
Rasuna Office Park OR-07
Jln. HR. Rasuna Said
Kuningan, Jakarta Selatan, 12960 Indonesia
Phone/Fax :+62-21-22 983 265

Up:
Commercial
Denny Uneputty
duneputty@globalonesolusindo.com
+62 816 951 793

Technical
Andy Riadi
andy@globalonesolusindo.com
+62 815 1940 2516

Technical Proposal of Indosat DT NPO Project 2017 PT Global One Solusindo Page 22 of 22

You might also like