Professional Documents
Culture Documents
A PURPOSE: -
This document is prepared to guide the operating personnel while loading & unloading BFPs (TDBFP or
MDBP) in Stage- II Units.
B SCOPE: -
This shall be applicable to all the 4 units of Stage II (4X 500 MW units) , TSTPP, NTPC Ltd.
C INTRODUCTION : -
After unit synchronization when ever the unit load reaches around 220 MW , we
need to load second BFP to meet feed water requirement. Normally TDBFP A& B are kept rolled
condition before unit synchronization from CRH source or auxiliary steam on recirculation at 2500
3000 RPM . Again at about 300-330 MW , the 2nd TDBFP is loaded and MDBFP is unloaded . Also
BFP change over takes place during normal operation to attend various defects on TDBFP from
time to time . In case of any emergency situations like tripping of running TDBFP , the MDBFP is
started & loaded to meet the FW flow requirement . All these cases need careful operation to
avoid any exigencies , so that the ensuing emergencies are avoided . This document will guide
the operating Desk engineers while carrying out such operations .
Sheet 1 Of 5
Prepared By Reviewed By Approved By
Sri K.Ch. Satyanarayana,S(O) Sri R.N.Das , SS(O) Sri D.Sarkar , DGM(O)
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ /014
AREA TG Operating Instruction For Loading, Unloading REV 0.00
UNIT - 3/4/5/6 & Change over of BFPs Date : 15/10/2007
E RESPONSIBILITY :
F LOADING PROCEDURE FOR 1ST TDBFP ( WHILE UNIT START UP AT 220 MW)
PROCEDURE :
1. The difference in Speed reference of TDBFP and scoop of MDBFP reference is very high >30%
2. Check running TDBFP s discharge pressure and BFPS common discharge header pressure .
3. Give open command to TDBFPS discharge valve and wait till its full open (open feedback is coming in
CRT)
4. Slowly raise the TDBFPS speed reference and watch discharge pressure to reach closer to common
discharge header pressure.
5. When TDBFPS discharge pressure approaches near to common discharge header pressure and is
short by 5-7 KSC , Check TDBFPS thrust bearing temperature
6. Increase speed reference command by 0.5% selector in three element window .
7. When TDBFPS discharge pressure equals common discharge header pressure , increase speed
reference by another 0.5% to ensure pump discharging to common discharge header.
8. Slight Increase in TDBFPS suction flow and consequent reduction in MDBFPS suction flow indicates
that TDBFP has taken load
9. Put the TDBFP control in CAS mode from three element window
10. Close recirculation valve of TDBFP
11. Open or close recirculation of MDBFPS according to flow requirement. BFP near run out zone alarm is
given for individual pump in CRT to indicate inability of specific pump to meet the requirement
12. After both pumps are in CAS mode ensure they are sharing the load as unit load increases .
Sheet 2 Of 5
Prepared By Reviewed By Approved By
Sri K.Ch. Satyanarayana,S(O) Sri R.N.Das , SS(O) Sri D.Sarkar , DGM(O)
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ /014
AREA TG Operating Instruction For Loading, Unloading REV 0.00
UNIT - 3/4/5/6 & Change over of BFPs Date : 15/10/2007
G LOADING PROCEDURE FOR 2ND TDBFP & UNLOADING MDBFP ( WHILE UNIT START UP AT
300 MW OR MORE )
PROCEDURE :
1. Check BFP common discharge header pressure and discharge pressure of BFP (to be loaded)
2. Give TDBFP discharge valve open command if it is not open .
3. Ensure discharge valve open feedback has appeared in CRT
4. Slowly raise the speed reference and watch discharge pressure to reach closer to common discharge
header pressure. (when reference deviations are high , 5% command selector can be used )
5. When discharge pressure of BFP (to be loaded) reaches near to common discharge header pressure
and short by 10-7 KSC , Check thrust bearing temperature .
6. Increase speed reference of BFP (to be loaded) by 0.5% selector command in three element control
window .
7. When BFPS (to be loaded) discharge pressure equals common discharge header pressure , increase
speed reference of BFPS (to be loaded ) by 0.5% to ensure pump has taken load & started
discharging to common discharge header
8. Slightly load this BFP .
9. Put the BFPS (to be loaded) in CAS mode from three element window
10. Now three pumps are in operation.
11. Close recirculation valve of TDBFP and when rise in feed water flow stabilized Open recirculation valve
of MDBFP .
12. Take MDBFP scoop control in manual and reduce it by 0.5% in one command for two to three time.
Reduction in MDBFPS suction flow and consequent increase in running TDBFPS suction flow indicates
the unloading of MDBFP . Slowly reduce scoop (5% command can be used) and keep it 35-40% , to
avoid suction flow lo-lo protection
13. Keep MDBFP running in recirculation for 30 minutes . then stop MDBFP & select it on auto standby
mode . AOP will stop in Auto mode after 30 minutes of pump stopping ..
14. Ensure MDBFP discharge valve is open and POSCLS feedback is coming to CRT
Sheet 3 Of 5
Prepared By Reviewed By Approved By
Sri K.Ch. Satyanarayana,S(O) Sri R.N.Das , SS(O) Sri D.Sarkar , DGM(O)
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ /014
AREA TG Operating Instruction For Loading, Unloading REV 0.00
UNIT - 3/4/5/6 & Change over of BFPs Date : 15/10/2007
Sheet 4 Of 5
Prepared By Reviewed By Approved By
Sri K.Ch. Satyanarayana,S(O) Sri R.N.Das , SS(O) Sri D.Sarkar , DGM(O)
NTPC/TSTPS OPERATION DEPARTMENT TS-II/OPN/OI /TG/ /014
AREA TG Operating Instruction For Loading, Unloading REV 0.00
UNIT - 3/4/5/6 & Change over of BFPs Date : 15/10/2007
Sheet 5 Of 5
Prepared By Reviewed By Approved By
Sri K.Ch. Satyanarayana,S(O) Sri R.N.Das , SS(O) Sri D.Sarkar , DGM(O)