Identification of Hazards
Assessment of Risk
Collapses the crane or falling Persons injuries Clear weather is required and permissible wind
load during work in a bad speed.
Weather
Operational Requirements:
Site Provisions:
1. We will use 4 legged chains for lift the load from the ground to the roof
3- Weather conditions, ground conditions, nearby water sources etc.
Clear weather is required and permissible wind speed.
4-Details of communication system between crane operator, slinger/ signaller, crane co-ordinator etc.
Radio communication
5- Test and thorough examination.
The lifting accessories certificate is attached.
6- Control of loads.
By using two robs tied in two opposite side
Method Statement
Responsibilities
Infrastructure project will undertake the responsibilities for the management of this lifting operation as
defined in the OSHA Standard for the lifting and movement of goods involving crane operation.
Personnel
Infrastructure project will provide the following personnel complete with relevant personal protective
equipment. The duties of these people will be as defined in OSHA Standard:-
Note: The appointed person may decide that one person can carry out more than one duty. This
does not however, include the crane driver who must concentrate on operating the crane.
Weather Conditions
The Appointed Person or, in his absence, the Crane Supervisor, will ensure that the lifting operation only
takes place if the weather conditions are within the limits recommended by the crane manufacturer. 3
day weather forecast.
Ground Conditions
Have assurances been obtained that the ground can withstand the load? Yes/No
Sequence of Operations
Uploading the shriller unit from the ground by using lifting bar and lift it to the roof by crane
2
I confirm that the lifts have been planned and will be carried out in Signed:
accordance with OSHA Standard and that I accept responsibility for
the preparation of this Risk Assessment and Method Statement.
Date:
I confirm that I have been fully briefed on the contents of this Risk Signed:
Assessment and Method Statement and that I accept the duty of
ensuring that the lift(s) will be carried out in accordance with the
method and procedures set out in this document. Date: