1 25 0.2
2 25 0.25
Average
Specification 10% Max
Percentage residue
(%)
0.8
1.0
0.9
ineer's Representative
SOUNDNESS TEST
Date: 2016/3/28
For the given sample of cement, the standard consistency is achieved with
water consistency equal to 27%
Test No. 1
Time which water is added to cement 9:20
Time which needle of 1mm square section fails to pierce the test block to a depth of 5-7mm from
the bottom of the mould 11:10
Test No. 2
Time which water is added to cement9:40
Time which needle of 1mm square section fails to pierce the test block to a depth of 5-7mm from
the bottom of the mould11:30
Test No. 1
Time which water is added to cement 9:20
Time which needle which the needle makes an impression on the test block whilse the attachment
fails to make it 12:30
Test No. 2
Time which water is added to cement9:40
Time which needle of 1mm square section fails to pierce the test block to a depth of 5-7mm from
the bottom of the mould13:00
Position of Vicat
needlepoint after
penetration from
bottom
(mm)
4
5
6
7
8
TIME