GENERAL LAYOUT
1481-6I-03-a1510-001 GENERAL LAYOUT
1481-6I-03-A-1510-001 GENERAL LAYOUT
1481-6I-03-A-1510-001 GENERAL LAYOUT GAS PIPE LINE
592-00-03-00A-001 GENERAL LAYOUT
880-A-06-1001-9-001 VICINITY PLAN
GIS BUILDING
1481-6i-03-B1540-001 220 KV SF6 SWITCHGEAR BLDG PLAN,ELEVATION,SECTIONS AND SCHEDULE
1481-6I-03-B-1540-001 220KV SWITCHGERA BLDG PLAN,ELEVATION,SECTIONS AND SCHEDULE
1481-6I-03-E-1600-001 AREA ILLUMINATION CABLING AND WIRING OF LIGHTING TOWERS
1481-6I-03-G-1430-001 GENERAL LAYOUT DETAIL OF PIPE AND CABLE DUCT
1481-6I-03-G-1430-002 CABLE DUCT PIPE AND ELECTRICAL TRENCH GENERAL LAYOUT
1481-6I-03-G-1540-003 200KV SF6 SWITCHGEAR BLDG LAYOUT PLAN AT EL.-0.05
1481-6I-03-G-1540-004 220KV SF6 SWITCHGEAR BLDG DETAILS OF CABLE DUCT
1481-6I-03-G-1540-005 220KV SF6 SWITCHGEAR BLDG REIN. DETAILS OF FLOOR SLAB AT EL-0.05 AND CASING IN MASONARY WALL
1481-6I-03-G-1540-007 220KV SF6 SWITCHGEAR BLDG DETAIL OF ROO SLAB AND BEAM
1481-6I-G-1540-001 220KV SF6 SWITCHGEAR BLD. FOUNDATION PLAN AND DETAIL
592-03-03-010-B-002 220KV SF6 SWITCHGEAR BUILDING ELEVATION, DETAILS AND FINISHING SCHEDULES
592-03-03-010-G-003 220KV SF6 SWITCHGEAR BUILDING STRUCTURAL DETAILS
592-03-03-042-G-002 220KV SF6 SWITCHGER BUILDING DETAILS OF FOUNDATION, PL BEAMS AND COLUMNS
880-A09-10-05-9-07-04-B 220KV SF6 SWITCHGEAR BUILDING DETAILS OF CABLE DUCT-1
880-A09-10-05-9-07-07 220 KV SF6 SWITCHGEAR BUILDING DETAIL OF COLUMNS
880-A-09-10-05-9-07-10 220KV SF6 SWITCHGEAR BUILDING DETAIL OF ROOF SLAB
880-A09-10-05-9-07-13 C 220 KV SF6 SWITCHGEAR BUILDING DEAILS OF CABLE DUCT-2
CABLE DUCT
1481-6I-03-G-1540-002 220KV SF6 SWITCHDEAR BLDG DETAIL OF CABLE DUCT
1481-6I-03-G-1540-002 220KV SF6 SWITCHGEAR BLDG DETAIL OF CABLE DUCT
4481-6I-03-G-14-1430-002 Cable duct pipe and elecrical trench
880-A09-20-12-9-24-505 CABLE DUCT (main plant) LAYOUT PLAN
880-A09-20-12-9-24-505 CABLE DUCT (Main Plant) PLANS,SECTIONS AND OPENING DETAILS
961-05-03-11G-002 Cable Duct Details of O.H DUCT 1
961-05-03-11G-004 Cable Duct Between Electrical COntrol Building and Boiler Area 1
961-05-03-911G-001 Cable Duct around SF6 Switch Gear Building
PIPE RACK
1481-6i-03-g-1430-007 detail of pipe rack foundation
961-05-03-11-G-005 DETAIL OF PIPE RACK FOUNDATINS
IN TAKE CHANNEL
880-A06-1002-9-026-BW COOLING WATER INTAKE CHANNEL PLAN AND PROFILE
880-A09 COOLING WATER INTAKE CHANNEL AT BIN QASIM POWER STATION
880-A09-20-12-9-40-502 COOLING WATER INTAKE CHANNEL LAYOUT PLAN AND SECTIONS
LEVELING AND GRADING PLAN SOUTH WEST AREA, ROADS AND EMBANKMENTS COOLING WATER INTAKE CHANNEL
AREA ILLUMINATION
1481-6I-03-G-1600-001 AREA ILLUINATION FLOOD LIGHTING TOWER 18M 15M HIGH FOUNDATION PLAN AND STRUCTURAL DETAIL