Analysis of Item

1.1.1 2.1 Earth work in surface excavation not exceeding 30 cm in depth but
2.1.1 exceeding
All kinds of1.5
soilm in width as well as 10 sqm on plan including disposal of
Code Description Rate Unit Qty
Details of cost for 100 sqm. and
average depth 15cm.
LABOUR
0114 Beldar 270.00 Day 7.2 Day
0115 Coolie 270.00 Day 6 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 100 sqm.
Say

1.2.1 2.2 Earth work in rough excavation, banking excavated earth in layers not
2.2.1 exceeding
All kinds of 20
soilcm in depth, breaking clods watering, rolling each layer
Code Description Rate Unit Qty
Details of cost for 10 cum.
LABOUR
0114 Beldar 270.00 Day 5.9 Day
0115 Coolie 270.00 Day 3.6 Day
0101 Bhisti 270.00 Day 0.4 Day
0113 Chowkidar 270.00 Day 0.008 Day
Roller charges (one roller does
1850 sqm. of consolidation per
day)
0003 Hire charges of Diesel Road 1500.00 Day 0.008 Day
Roller - 8 to 10 tonne
1235 Diesel oil 41.29 litre 0.144 litre
2342 Carriage of solvent/ Diesel. 8.76 quintal 0.0014 quintal

9999 Sundries 1.72 L.S. 2.73 L.S.


TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.3.1 2.3 Banking excavated earth in layers not exceeding 20 cm. in depth,
2.3.1 breaking
All kinds ofclods,
soil watering, rolling each layer with tonne roller, or wooden
Code Description Rate Unit Qty
Details of cost for 10 cum.
LABOUR
0114 Beldar 270.00 Day 2.2 Day
0115 Coolie 270.00 Day 3.6 Day
0101 Bhisti 270.00 Day 0.4 Day
Roller charges (one roller does
1850 sqm. of consolidation per
day)
0003 Hire charges of Diesel Road 1500.00 Day 0.008 Day
Roller - 8 to 10 tonne
0113 Chowkidar 270.00 Day 0.008 Day
1235 Diesel oil 41.29 litre 0.144 litre
2342 Carriage of solvent/ Diesel. 8.76 quintal 0.0014 quintal

9999 Sundries 1.72 L.S. 2.73 L.S.


TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.4 2.4 Deduct for not rolling with power roller of minimum 8 tonnes for banking
Code excavated
Description earth in layers not exceeding
Rate 20 cmUnit
in depth.
Qty
Details of cost for 10 cum.
LABOUR
0113 Chowkidar 270.00 Day 0.008 Day
0003 Hire charges of Diesel Road 1500.00 Day 0.008 Day
Roller - 8 to 10 tonne
1235 Diesel oil 41.29 litre 0.144 litre
2342 Carriage of solvent/ Diesel. 8.76 quintal 0.0014 quintal

9999 Sundries 1.72 L.S. 1.82 L.S.


TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.5 2.5 Deduct for not watering the excavated earth for banking
Code Description Rate Unit Qty
Details of cost for 10 cum.
LABOUR
0101 Bhisti 270.00 Day 0.4 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.6.1 2.6 Earth work in excavation by mechanical means (Hydraulic excavator )/


2.6.1 manual
All kindsmeans
of soilover areas (exceeding 30cm in depth. 1.5m in width as well
Code Description Rate Unit Qty
Details of cost for 10 cum.
Average output of Hydraulic
Excavator per hour = 30cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.04125 Day
driver and fuel.
0018 Hire and running charges of 1000.00 Day 0.04125 Day
loader.
LABOUR
0128 Mate 270.00 Day 0.4 Day
0115 Coolie 270.00 Day 2 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.7.1 2.7 Earth work in excavation/ by mechanical means (Hydraulic Excavator)/


2.7.1 manual
Ordinarymeans
rock over areas (exceeding 30 cm in depth, 1.5m in width as
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.0625 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.0625 Day
tipper
0132 Rock Excavator 247.00 Day 0.705 Day
0133 Rock Breaker 247.00 Day 1.59 Day
0134 Rock Hole Driller 247.00 Day 0.355 Day
0114 Beldar 270.00 Day 0.5 Day
0115 Coolie 270.00 Day 1.35 Day
9999 Sundries 1.72 L.S. 10.79 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.7.2 2.7 Earth work in excavation/ by mechanical means (Hydraulic Excavator)/


2.7.2 manual
Hard rockmeans over areas
(requiring (exceeding 30 cm in depth, 1.5m in width as
blasting)
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.125 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.125 Day
tipper
0132 Rock Excavator 247.00 Day 1.06 Day
0133 Rock Breaker 247.00 Day 2.825 Day
0134 Rock Hole Driller 247.00 Day 0.885 Day
0114 Beldar 270.00 Day 0.45 Day
0115 Coolie 270.00 Day 1.35 Day
0325 Blasting powder 35.00 kilogra 3.93 kilogram
m
0326 Blasting fuse (fuse wire) 15.00 each 4 each
9999 Sundries 1.72 L.S. 16.12 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.7.3 2.7 Earth work in excavation/ by mechanical means (Hydraulic Excavator)/


2.7.3 manual
Hard rockmeans over prohibited)
(blasting areas (exceeding 30 cm in depth, 1.5m in width as
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.125 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.125 Day
tipper
0132 Rock Excavator 247.00 Day 2.47 Day
0133 Rock Breaker 247.00 Day 6 Day
0135 Stone Chiseller 260.00 Day 1.06 Day
0103 Blacksmith 2nd class 350.00 Day 0.175 Day
0114 Beldar 270.00 Day 0.75 Day
0115 Coolie 270.00 Day 1.8 Day
9999 Sundries 1.72 L.S. 16.12 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.8.1 2.8 Earth work in excavation by mechanical means (Hydraulic Excavator )/


2.8.1 manual
All kindsmeans
of soil.in foundation trenches or drains (not exceeding 1.5 m in
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.04125 Day
driver and fuel.
0018 Hire and running charges of 1000.00 Day 0.04125 Day
loader.
LABOUR
0128 Mate 270.00 Day 0.4 Day
0115 Coolie 270.00 Day 2.05 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.9.1 2.9 Excavation work by mechanical means (Hydraulic excavator) / manual


2.9.1 means
Ordinaryin rock
foundation trenches or drains not exceeding 1.5 m in width or 10
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.0625 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.0625 Day
tipper
LABOUR
0132 Rock Excavator 247.00 Day 0.885 Day
0133 Rock Breaker 247.00 Day 1.765 Day
0134 Rock Hole Driller 247.00 Day 0.53 Day
0114 Beldar 270.00 Day 0.5 Day
0115 Coolie 270.00 Day 1.3 Day
9999 Sundries 1.72 L.S. 13.52 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.9.2 2.9 Excavation work by mechanical means (Hydraulic excavator) / manual


2.9.2 means in foundation
Hard rock trenches or drains not exceeding 1.5 m in width or 10
(requiring blasting)
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.125 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.125 Day
tipper
LABOUR
0132 Rock Excavator 247.00 Day 1.24 Day
0133 Rock Breaker 247.00 Day 3 Day
0134 Rock Hole Driller 247.00 Day 1.06 Day
0114 Beldar 270.00 Day 0.5 Day
0115 Coolie 270.00 Day 1.3 Day
0325 Blasting powder 35.00 kilogra 6.42 kilogram
m
0326 Blasting fuse (fuse wire) 15.00 each 7 each
9999 Sundries 1.72 L.S. 18.85 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.9.3 2.9 Excavation work by mechanical means (Hydraulic excavator) / manual


2.9.3 means in foundation
Hard rock trenches or drains not exceeding 1.5 m in width or 10
(blasting prohibited)
Code Description Rate Unit Qty
Details of cost for 10 cum.
MACHINERY
0020 Hydraulic Excavator (3D) with 6700.00 Day 0.125 Day
driver and fuel.
0017 Hire and running charges of 1700.00 Day 0.125 Day
tipper
LABOUR
0132 Rock Excavator 247.00 Day 2.65 Day
0133 Rock Breaker 247.00 Day 6.175 Day
0135 Stone Chiseller 260.00 Day 1.06 Day
0103 Blacksmith 2nd class 350.00 Day 0.175 Day
0114 Beldar 270.00 Day 0.75 Day
0115 Coolie 270.00 Day 1.5 Day
9999 Sundries 1.72 L.S. 17.94 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.10.1 2.10 Excavating trenches of required width for pipes, cables, etc including
2.10.1 excavation
All kinds of for
soilsockets, and dressing of sides, ramming of bottoms, depth
2.10.1.1 Pipes, cables etc, not exceeding 80 mm dia.
Code Description Rate Unit Qty
Details of cost for 180m length
of a pipe of an average dia. say
40mm.
Slope assumed 1 in 200.
Earth work and filling-
Minimum depth of trench 60cm.

Average depth = (0.6+1.5)/2 =


1.05
Width for this depth 0.45 cm
180x0.45x1.05 = 85.05 cum
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 85.05 cum
Earth work
2.25 Rate as per Item Number 2.25 of 88.00 cum 85.05 cum
SH: Earth Work
TOTAL
Cost of 180m length of pipes
Cost for 1m. length of pipe
Say

1.10.1 2.10 Excavating trenches of required width for pipes, cables, etc including
2.10.1 excavation
All kinds of for
soilsockets, and dressing of sides, ramming of bottoms, depth
2.10.1.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia.
Code Description Rate Unit Qty
Details of cost for 110m length
of a pipe of an average dia. say
200mm
Slope assumed 1 in 200.
Earth work and filling-
Minimum depth of trench =
0.75+0.20 = 0.95m
Average depth = (1.50+0.95)/2
= 1.225M
Width = 0.40 + 0.20 = 0.60 m
110x0.60x1.225 = 80.85 cum
5% for collars = 4.04 cum
Total = 84.89 cum
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 84.89 cum
Earth work
2.25 Rate as per Item Number 2.25 of 88.00 cum 84.89 cum
SH: Earth Work
TOTAL
Cost of 110m length of pipe
Cost for 1m length of pipe
Say

1.10.1 2.10 Excavating trenches of required width for pipes, cables, etc including
2.10.1 excavation
All kinds of for
soilsockets, and dressing of sides, ramming of bottoms, depth
2.10.1.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm.
Code Description Rate Unit Qty
Details of cost for 60m length of
a pipe of an average dia. say
450mm.
Slope assumed 1 in 200.
Earth work and filling-
Minimum depth of trench
0.75+0.45= 1.20m
Average depth = (1.50+1.20)/2
= 1.35
Width = 0.40 + 0.45 = 0.85 m
60x0.85x1.35 = 68.85 cum
5% for collars = 3.44 cum
Total = 72.29 cum
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 72.29 cum
Earth work
2.25 Rate as per Item Number 2.25 of 88.00 cum 72.29 cum
SH: Earth Work
TOTAL
Cost of 60m length of pipe
Cost for 1m length of pipe
Say

1.11 2.11 Extra for excavating trenches for pipes, cables etc. in all kinds of soil for
Code depth exceeding 1.5 m, but not exceeding
Description Rate 3 m._x000D_
Unit Qty
Details of cost for 300m length
of pipe of an average dia. say
200mm (rate in percentage)

Slope assumed 1 in 200.


100x0.60x1.75 = 105.00 cum
200x0.60x2.00 = 240.00 cum.
Total = 345.00 cum.
Collars 5%= 17.25 cum.
Total = 362.25 cum.
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 362.25 cum
Earth work
2.25 Rate as per Item Number 2.25 of 88.00 cum 362.25 cum
SH: Earth Work
1/2x200x1.60x1 = 160 cum
2.6.1 Rate as per Item Number 2.6.1 of 135.80 cum 160 cum
SH: Earth Work
2.25 Rate as per Item Number 2.25 of 88.00 cum 160 cum
SH: Earth Work
Extra for additional lift
1/2x200x0.60x1.50 = 135.00
cum
Collars 5%=6.75 cum.
Total= 141.75 cum
2.26.1 Rate as per Item Number 2.26.1 36.30 cum 141.75 cum
of SH: Earth Work
Cost for 300 m. length of pipe

2.10.1.2 Rate as per Item Number 173.85 metre -300 metre


2.10.1.2 of SH:Earth Work
(Cost for 300 m. length of pipe
upto 1.5 m depth)
Extra cost for 300 metre = Z = X
-Y
Extra cost for one metre = Z/300

Percentage increase over item


no 2.10.1.2 =(Zx100)/Y
Say

1.12 2.12 Extra for excavating trenches for pipes, cables, etc, in all kinds of soil for
Code depth exceeding 3 m in depth, but
Description not exceeding
Rate Unit 4.5 m._x000D_
Qty
Details of cost for a 100m length
of a pipe of an average dia. say
200mm
Slope assumed 1 in 200.
Earth work and filling-
1x100x0.60x2 = 120 cum
Collars 5% = 6 cum.
Total = 126 cum.
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 126 cum
Earth work
2.25 Rate as per item No.2.25 of SH: 88.00 cum 126 cum
Earth work
Earth work
100x1.60x1.25 = 200 cum
2.6.1 Rate as per item no. 2.6.1 of SH: 135.80 cum 200 cum
Earth work
2.25 Rate as per item No.2.25 of SH: 88.00 cum 200 cum
Earth work
Extra for additional lift
1x100x0.60x1.50 = 90 cum.
2x0.50x100x0.60x0.50 = 30
cum.
Total = 120 cum.
Collars 5% = 6 cum.
Total = 126 cum
2.26.1 Rate as per item no. 2.26.1 of 36.30 cum 126 cum
SH: Earth work
Cost for 100 m. length of pipe

2.10.1.2 Rate as per Item Number 173.85 Metre -100 Metre


2.10.1.2 of SH: Earth work
(Cost for 100 m. length of pipe
upto 1.5 m depth)
Extra cost for 100 metre = Z = X-
Y
Extra cost for one metre = Z/100

Percentage increase over item


no 2.10.1.2 =(Zx100)/Y
Say

1.13.1 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.1 excavation
Ordinary rockfor:sockets, depth upto 1.5 m including getting out the
2.13.1.1 Pipes, cables etc. not exceeding 80 mm dia.
Code Description Rate Unit Qty
Details of cost for 180 m length
of a pipe of a average dia. say
40mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.10.1.1
2.9.1 Rate as per Item Number 2.9.1 of 222.60 cum 85.05 cum
SH: Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 85.05 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (26910.53 -
26416.53) = 494.00

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (26915.47 - 26416.53) =
498.94
TOTAL
KST @ 4 % on all except (A) i.e.
on (26990.31 - 26416.53) =
573.78
Labour Cess @ 1 % on all except
(A) i.e. on (26990.31 - 26416.53)
= 573.78
Cost for 180 m. length of pipe

Cost for 1m. length of pipe


Say

1.13.1 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.1 excavation
Ordinary rockfor:sockets, depth upto 1.5 m including getting out the
2.13.1.2 Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia.
Code Description Rate Unit Qty
Details of cost for 80 m length of
pipe of an average dia. Say
200mm.
Slope assumed 1:200
Excavation-
Minimum depth of trench.
0.75+0.15+0.20 = 1.10m
Average depth = (1.10+1.50)/2
= 1.30m
Minimum width of trench =
0.90m
80x0.90x1.30 = 93.60 cum.
2.9.1 Rate as per item no. 2.9.1 of SH: 222.60 cum 93.6 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 93.6 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2.2 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (29615.56 -
29072.16) = 543.40

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (29620.99 - 29072.16) =
548.83
TOTAL
KST @ 4 % on all except (A) i.e.
on (29703.31 - 29072.16) =
631.15
Labour Cess @ 1 % on all except
(A) i.e. on (29703.31 - 29072.16)
= 631.15
Cost for 80 m. length of pipe
Cost for 1m. length of pipe
Say

1.13.1 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.1 excavation
Ordinary rockfor:sockets, depth upto 1.5 m including getting out the
2.13.1.3 Pipes, cables exceeding 300 mm dia but not exceeding 600mm dia
Code Description Rate Unit Qty
Details of cost for 30 m. length
of a pipe of an average dia. say
450mm.
Slope assumed 1 in 200.
Excavation-
Minimum depth of trench.
0.75+0.15+0.45 = 1.35m
Average depth = (1.35+1.50)/2
= 1.425m
Minimum width of trench =
0.90m
30x0.90x1.425 = 38.475 cum.
5% for collar = 1.924cum
Total = 40.399cum
2.9.1 Rate as per item no. 2.9.1 of SH: 222.60 cum 40.399 cum
Earth Work
2.25 Rate as per item No.2.25 of SH: 88.00 cum 40.399 cum
Earth Work
0114 Beldar 270.00 Day 0.94 Day
TOTAL
Add 1 % for water charges on all
except (A) i.e. on (12780.11 -
12547.93) = 232.18
TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (12782.43 - 12547.93) =
234.50
TOTAL
KST @ 4 % on all except (A) i.e.
on (12817.61 - 12547.93) =
269.68
Labour Cess @ 1 % on all except
(A) i.e. on (12817.61 - 12547.93)
= 269.68
Cost for 30 m length of a pipe

Cost for one m length of a pipe

Say

1.13.2 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.2 excavation for sockets,
Hard rock (requiring depth upto 1.5 m including getting out the
blasting)
2.13.2.1 Pipes, cables etc. not exceeding 80 mm dia.
Code Description Rate Unit Qty
Details of cost for 180 m length
of a pipe of a average dia. say
40mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.10.1.1
2.9.2 Rate as per item no. 2.9.2 of SH: 397.75 cum 85.05 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 85.05 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2.5 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (41930.54 -
41313.04) = 617.50

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (41936.72 - 41313.04) =
623.68
TOTAL
KST @ 4 % on all except (A) i.e.
on (42030.27 - 41313.04) =
717.23
Labour Cess @ 1 % on all except
(A) i.e. on (42030.27 - 41313.04)
= 717.23
Cost for 180 m. length of pipe

Cost for 1m. length of pipe


Say

1.13.2 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.2 excavation for sockets,
Hard rock (requiring depth upto 1.5 m including getting out the
blasting)
2.13.2.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia.
Code Description Rate Unit Qty
Details of cost for 80 m length of
a pipe of an average dia. say
200mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.13.1.2
2.9.2 Rate as per item no. 2.9.2 of SH: 397.75 cum 93.6 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 93.6 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2.75 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (46145.45 -
45466.20) = 679.25

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (46152.24 - 45466.20) =
686.04
TOTAL
KST @ 4 % on all except (A) i.e.
on (46255.15 - 45466.20) =
788.95
Labour Cess @ 1 % on all except
(A) i.e. on (46255.15 - 45466.20)
= 788.95
Cost for 80 m. length of pipe
Cost for 1m. length of pipe
Say

1.13.2 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.2 excavation for sockets,
Hard rock (requiring depth upto 1.5 m including getting out the
blasting)
2.13.2.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600mm dia
Code Description Rate Unit Qty
Details of cost for 30 m length of
a pipe of an average dia. Say
450mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.13.1.3
2.9.2 Rate as per item no. 2.9.2 of SH: 397.75 cum 40.399 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 40.399 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 1.17 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (19912.80 -
19623.81) = 288.99

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (19915.69 - 19623.81) =
291.88
TOTAL
KST @ 4 % on all except (A) i.e.
on (19959.47 - 19623.81) =
335.66
Labour Cess @ 1 % on all except
(A) i.e. on (19959.47 - 19623.81)
= 335.66
Cost for 30 m. length of pipe
Cost for 1m. length of pipe
Say
1.13.3 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.3 excavation for sockets,
Hard rock (blasting depth upto 1.5 m including getting out the
prohibited)
2.13.3.1 Pipes, cables etc. not exceeding 80 mm dia.
Code Description Rate Unit Qty
Details of cost for 180 m length
of a pipe of a average dia. say
40mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.10.1.1
2.9.3 Rate of item no 2.9.3 of SH: 516.55 cum 85.05 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 85.05 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2.5 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (52034.48 -
51416.98) = 617.50

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (52040.66 - 51416.98) =
623.68
TOTAL
KST @ 4 % on all except (A) i.e.
on (52134.21 - 51416.98) =
717.23
Labour Cess @ 1 % on all except
(A) i.e. on (52134.21 - 51416.98)
= 717.23
Cost for 180 m. length of pipe

Cost for 1m. length of pipe


Say

1.13.3 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.3 excavation for sockets,
Hard rock (blasting depth upto 1.5 m including getting out the
prohibited)
2.13.3.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia.
Code Description Rate Unit Qty
Details of cost for 80 m length of
a pipe of an average dia. say
200mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.13.1.2
2.9.3 Rate as per item no. 2.9.3 of SH: 516.55 cum 93.6 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 93.6 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 2.75 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (57265.13 -
56585.88) = 679.25

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (57271.92 - 56585.88) =
686.04
TOTAL
KST @ 4 % on all except (A) i.e.
on (57374.83 - 56585.88) =
788.95
Labour Cess @ 1 % on all except
(A) i.e. on (57374.83 - 56585.88)
= 788.95
Cost for 80 m. length of pipe
Cost for 1m. length of pipe
Say

1.13.3 2.13 Excavating trenches of required width for pipes, cables, etc, including
2.13.3 excavation for sockets,
Hard rock (blasting depth upto 1.5 m including getting out the
prohibited)
2.13.3.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600mm dia.
Code Description Rate Unit Qty
Details of cost for 30 m length of
a pipe of an average dia. Say
450mm.
Slope assumed 1:200
Excavation-
Quantity same as in item
No.2.13.1.3
2.9.3 Rate as per item no. 2.9.3 of SH: 516.55 cum 40.399 cum
Earth Work
Refilling, ramming and watering

2.25 Rate as per item No.2.25 of SH: 88.00 cum 40.399 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 1.17 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (24712.20 -
24423.21) = 288.99

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (24715.09 - 24423.21) =
291.88
TOTAL
KST @ 4 % on all except (A) i.e.
on (24758.87 - 24423.21) =
335.66
Labour Cess @ 1 % on all except
(A) i.e. on (24758.87 - 24423.21)
= 335.66
Cost for 30 m. length of pipe
Cost for 1m. length of pipe
Say

1.14 2.14 Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock
Code exceeding
Description 1.5 m in depth but not exceeding 3Unit
Rate m._x000D_Qty
Details of cost for 300m length
of a pipe of an average dia. say
200mm. Slope assumed 1 in
200.
Excavation-
100x0.90x1.50 = 157.50 cum.
200x0.90x20.00 = 360 cum.
Total = 517.50 cum.
2.9.2 Rate as per item no. 2.9.2 of SH: 397.75 cum 517.5 cum
Earth Work
0.50x200x1.90x1 = 190 cum.
2.7.2 Rate as per item no. 2.7.2 of SH: 365.20 cum 190 cum
Earth Work
Refilling, ramming and watering

517.50+190.00 = 707.50 cum.


2.25 Rate as per item No.2.25 of SH: 88.00 cum 707.5 cum
Earth Work
Extra for additional lift
0.5x300x0.9x1.5 = 202.50 cum.

2.26.2 Rate as per item no. 2.26.2 of 65.10 cum 202.5 cum
SH: Earth Work
Extra labour for ramming of rock

0114 Beldar 270.00 Day 16.5 Day


TOTAL
Add 1 % for water charges on all
except (A) i.e. on (354741.88 -
350666.38) = 4075.50

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (354782.64 - 350666.38)
= 4116.26
TOTAL
KST @ 4 % on all except (A) i.e.
on (355400.08 - 350666.38) =
4733.70
Labour Cess @ 1 % on all except
(A) i.e. on (355400.08 -
350666.38) = 4733.70
Cost for 300m length of pipe
2.13.2.2 Rate as per Item No.2.13.2.2 of 578.70 Metre -300 Metre
SH: Earth Work
(cost of 300 m length of pipe
upto 1.5m depth)
Extra cost for 300 m = X - Y
Extra cost for one m
Percentage increase over item
2.13.2.2 = (Zx100)/Y
Say

1.15 2.15 Extra for excavating trenches for pipes, cables, etc. in ordinary/hard rock
Code exceeding
Description 3m in depth but not exceeding
Rate 4.5 Unit
m._x000D_Qty
Details of cost for 100m length
of a pipe of an average dia. say
200mm. (rate in percentage)
Slope assumed 1 in 200.

Max depth assumed 3.5m


Excavation-
100x0.90x2 = 180 cum.
2.9.2 Rate as per item no. 2.9.2 of SH: 397.75 cum 180 cum
Earth Work
100x1.90x1.25 = 237.5
2.7.2 Rate as per item no. 2.7.2 of SH: 365.20 cum 237.5 cum
Earth Work
Extra for additional lift
1x100x0.90x1.50 = 135
2x0.50x100x0.90x0.50 = 45
Total = 180 cum.
2.26.2 Rate as per item no. 2.26.2 of 65.10 cum 180 cum
SH: Earth Work
Refilling, ramming and watering

180+237.50 = 417.50 cum.


2.25 Rate as per item No.2.25 of SH: 88.00 cum 417.5 cum
Earth Work
Extra labour for ramming of rock

0114 Beldar 247.00 Day 9.25 Day


TOTAL = 199,217.75
Add 1 % for water charges on all
except (A) i.e. on (209072.75 -
206788.00) = 2284.75

TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (209095.60 - 206788.00)
= 2307.60
TOTAL
KST @ 4 % on all except (A) i.e.
on (209441.74 - 206788.00) =
2653.74
Labour Cess @ 1 % on all except
(A) i.e. on (209441.74 -
206788.00) = 2653.74
Cost for 100m length of pipe
2.13.2.2 Rate as per item No 2.13.2.2 of 578.70 Metre -100 Metre
SH: Earth Work
(cost of 100 m length of pipe
exceeding 1.5 m and upto 3 m
depth)
Extra cost for 100 m = X - Y
Extra cost for 1 m
Percentage increase over item
2.13.2.2 = (Zx100)Y
Say
1.16.1 2.16 Close timbering in trenches including strutting, shoring and packing
2.16.1 cavities
Depth not(wherever
exceeding required)
1.5 m. complete. (Measurements to be taken of the
Code Description Rate Unit Qty
Details of cost for a trench 30m
long and 1.5m deep area
2x30x1.50=90 sqm-
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 213.75 cudm

90x0.038 = 3.42 cum = 3420


cudm
Qty taken for cost of using once
after deducting for credit =
3420xx = 213.75 dm

Wallings l00mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 75 cudm
scantling
4x30x0.10x0.10 = 1.20cum=
1200 cudm
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 3.1875 metre

and 1.5m long


2x17x1.50 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.1875 m
CARRIAGE
Poling boards = 3.42 cum
Walling = 1.20 cum.
Balli struts: 3.14/4x(0.125)x51
= 0.63 cum

Total of carriage = 5.25x =


1.3125 cum.
2204 Carriage of Timber 100.11 cum 1.3125 cum
0112 Carpenter 2nd class 350.00 Day 0.5 Day
0114 Beldar 270.00 Day 1 Day
9999 Sundries 1.72 L.S. 26.91 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm.
Cost per sqm.
Say

1.16.2 2.16 Close timbering in trenches including strutting, shoring and packing
2.16.2 cavities (wherever
Depth exceeding required)
1.5 complete.
m but not (Measurements
exceeding 3 m. to be taken of the
Code Description Rate Unit Qty
Details of cost for a trench 30m
long and 1.5m deep
Area 2x30x1.50=90 sqm
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 213.75 cudm

90x0.038 = 3.42 cum = 3420


cudm
Qty taken for cost of using once
after deducting for credit =
3420xx = 213.75 dm

Walings 100 mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 75 cudm
scantling
4x30x0.10x0.10 = 1.20cum =
1200 cudm
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 3.1875 metre

and 1.5m long


2x17x1.50 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.1875 m
CARRIAGE
Poling boards = 3.42 cum
Walling= 1.20 cum.
Balli struts: 3.14/4x(0.125)x51
= 0.63 cum

Total of carriage = 5.25x =


1.3125 cum.
2204 Carriage of Timber 100.11 cum 1.3125 cum
0112 Carpenter 2nd class 350.00 Day 0.75 Day
0114 Beldar 270.00 Day 2 Day
9999 Sundries 1.72 L.S. 40.43 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm.
Cost per sqm.
Say

1.16.3 2.16 Close timbering in trenches including strutting, shoring and packing
2.16.3 cavities (wherever
Depth exceeding 3 required)
m but notcomplete.
exceeding(Measurements
4.5 m. to be taken of the
Code Description Rate Unit Qty
Details of cost for a trench 30m
long and 1.5m deep
Area 2x30x1.5=90 sqm-
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 213.75 cudm

90x0.038 = 3.42 cum = 3420


cudm
Qty taken for cost of using once
after deducting for credit =
3420xx = 213.75 dm

Wallings 100mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 75 cudm
scantling
4x30x0.10x0.10 = I.20cum =
1200 dm3
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 3.1875 metre

and 1.5m long


2x17x1.5 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.1875 m
CARRIAGE
Poling boards = 3.42 cum
Walling = 1.20 cum.
Balli struts: 3.14/4x(0.125)x51
= 0.63 cum

Total of carriage = 5.25x =


1.3125 cum.
2204 Carriage of Timber 100.11 cum 1.3125 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 1.5 Day
0114 Beldar 270.00 Day 4 Day
9999 Sundries 1.72 L.S. 80.73 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm.
Cost per sqm.
Say

1.17.1 2.17 Close timbering in case of shafts, wells, cesspits, manholes and the like
2.17.1 including
Depth notstrutting,
exceedingshoring
1.5 m. and packing cavities (wherever required) etc.
Code Description Rate Unit Qty
Details of cost for a manhole
1.2m x 1.0m x1.5m- Surface
area: 2x(1.2+1.0)x1.5 = 6.6sqm

MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 15.6875 cudm

6.60x0.038 = 0.251 cum = 251


cudm
Qty taken for cost of using once
after deducting for credit =
251xx = 15.6875 dm

Wallings 100mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 5.125 cudm
scantling
2x2x1.124x0.1x0.1 = 0.045 cum

2x2x0.924x0.1x0.1 = 0.037 cum.

Total Kail wood = 0.082 cum. =


82dm
Qty taken for cost of using once
after deducting for credit =
82xx = 5.125 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4118 metre

and 1.50m long


2x2x0.924 = 3.696
2x2x0.724 = 2.896
Total of balli = 6.592m
Qty taken for cost of using once
after deducting for credit =
6.592xx = 0.4118m

2204 Carriage of Timber 100.11 cum 0.1035 cum


CARRIAGE
Poling boards = 0.251 cum
Walling = 0.082 cum.
Balli struts 3.14/4x(0.125)x6.59
= 0.081 cum.

Total of carriage = 0.414 cum x


= 0.1035 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.06 Day
0114 Beldar 270.00 Day 0.12 Day
9999 Sundries 1.72 L.S. 2.73 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.17.2 2.17 Close timbering in case of shafts, wells, cesspits, manholes and the like
2.17.2 including strutting,
Depth exceeding 1.5shoring andexceeding
m but not packing cavities
3 m. (wherever required) etc.
Code Description Rate Unit Qty
Details of cost for a manhole
1.2m x 1.0m x1.5m- Surface
area: 2x(1.2+1.0)x1.5 = 6.6sqm

MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 15.6875 cudm

6.6x0.038 = 0.251 cum = 251


cudm
Qty taken for cost of using once
after deducting for credit =
251xx = 15.6875 dm

Walling of
1197 Second class kail wood in 300.00 10 cudm 5.125 cudm
scantling
2x2x1.124x0.1x0.1 = 0.045 cum

2x2x0.924x0.1x0.1 = 0.037 cum.

Total Kail wood = 0.082 cum. =


82dm
Qty taken for cost of using once
after deducting for credit =
82xx = 5.125 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4118 metre

and 1.5m long


2x2x0.924 = 3.696
2x2x0.724 = 2.896
Total of balli = 6.592m
Qty taken for cost of using once
after deducting for credit =
6.592xx = 0.4118 m

2204 Carriage of Timber 100.11 cum 0.1035 cum


CARRIAGE
Poling boards = 0.251 cum
Walling = 0.082 cum.
Balli struts 3.14/4x(0.125)x6.59
= 0.081 cum.

Total of carriage = 0.414 cum x


= 0.1035 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.12 Day
0114 Beldar 270.00 Day 0.25 Day
9999 Sundries 1.72 L.S. 5.46 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.17.3 2.17 Close timbering in case of shafts, wells, cesspits, manholes and the like
2.17.3 including strutting,
Depth exceeding 3m shoring and
but not packing 4.5
exceeding cavities
m. (wherever required) etc.
Code Description Rate Unit Qty
Details of cost for a manhole
1.2m x 1.0m x1.5m- Surface
area: 2x(1.2+1.0)x1.5 = 6.6sqm

MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost
Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 15.6875 cudm

6.6x0.038 = 0.251 cum = 251


cudm
Qty taken for cost of using once
after deducting for credit =
251xx = 15.6875 dm

Walling of
1197 Second class kail wood in 300.00 10 cudm 5.125 cudm
scantling
2x2x1.124x0.10x0.10 = 0.045
cum
2x2x0.924x0.10x0.10 = 0.037
cum.
Total Kail wood = 0.082 cum. =
82dm
Qty taken for cost of using once
after deducting for credit =
82xx = 5.125 dm
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4118 metre

and 1.50m long


2x2x0.924 = 3.696
2x2x0.724 = 2.896
Total of balli = 6.592m
Qty taken for cost of using once
after deducting for credit =
6.592xx = 0.4118 m

2204 Carriage of Timber 100.11 cum 0.1035 cum


CARRIAGE
Poling boards = 0.251 cum
Walling = 0.082 cum.
Balli struts 3.14/4x(0.125)x6.59
= 0.081 cum.

Total of carriage = 0.414 cum x


= 0.1035 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.19 Day
0114 Beldar 270.00 Day 0.38 Day
9999 Sundries 1.72 L.S. 8.06 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.18.1 2.18 Close timbering over areas including strutting, shoring and packing,
2.18.1 cavities
Depth not(wherever
exceedingrequired)
1.5 m. etc. complete. (Measurements to be taken of
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.50m deep-Area
-30x1.5m = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 106.875 cudm

250x38mm : 45x0.038 = 1.71


cum = 1710 cudm
Qty taken for cost of using once
after deducting for credit =
1710xx = 106.875 dm

Wallings l00mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 18.75 cudm
scantling
100x100mm : 30x0.10x0.10 =
0.30cum = 300 cudm
Qty taken for cost of using once
after deducting for credit =
300xx = 18.75 dm

Raking struts
0302 Safeda ballies 125 mm diameter 40.00 metre 1.59 metre

Qty taken for cost of using once


after deducting for credit =
25.5xx = 1.59 m
2204 Carriage of Timber 100.11 cum 0.581 cum
CARRIAGE
Poling boards = 1.71 cum
Walling = 0.30 cum
Raking struts 3.14/4x(0.125) =
0.313 cum
Total of carriage = 2.323 cum
x = 0.581 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.25 Day
0114 Beldar 270.00 Day 0.5 Day
9999 Sundries 1.72 L.S. 31.46 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 Sqm.
Cost per sqm.
Say

1.18.2 2.18 Close timbering over areas including strutting, shoring and packing,
2.18.2 cavities (wherever
Depth exceeding required)
1.5 etc.
m but not complete.
exceeding 3 (Measurements
m. to be taken of
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.5m deep-Area
-30x1.5m = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 106.875 cudm

250x38mm : 45x0.038 = 1.71


cum =1710_x000D_
cudm
Qty taken for cost of using once
after deducting for credit =
1710xx = 106.875 dm

Walling of
1197 Second class kail wood in 300.00 10 cudm 18.75 cudm
scantling
100x100mm : 30x0.10x0.10 =
0.30cum = 300_x000D_
cudm
Qty taken for cost of using once
after deducting for credit =
300xx = 18.75 dm

Raking struts
0302 Safeda ballies 125 mm diameter 40.00 metre 1.59 metre

17 x 1.5 = 25.5m
Qty taken for cost of using once
after deducting for credit =
25.5xx = 1.59 m
2204 Carriage of Timber 100.11 cum 0.581 cum
CARRIAGE
Poling boards = 1.71 cum
Walling = 0.30 cum.
Raking struts 3.14/4x(0.125) =
0.313 cum
Total of carriage = 2.323 cum
x = 0.581 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.5 Day
0114 Beldar 270.00 Day 1 Day
9999 Sundries 1.72 L.S. 34.06 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 Sqm.
Cost per sqm.
Say

1.18.3 2.18 Close timbering over areas including strutting, shoring and packing,
2.18.3 cavities (wherever
Depth exceeding 3 required)
m but notetc. complete.
exceeding 4.5 (Measurements
m. to be taken of
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.5m deep-Area
-30x1.5m = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 106.875 cudm

250x38mm : 45x0.038 = 1.71


cum = 1710_x000D_
cudm
Qty taken for cost of using once
after deducting for credit =
1710xx = 106.875 dm

Walling of
1197 Second class kail wood in 300.00 10 cudm 18.75 cudm
scantling
100x100mm : 30x0.10x0.10 =
0.30cum = 300_x000D_
cudm
Qty taken for cost of using once
after deducting for credit =
300xx = 18.75 dm

Raking struts
0302 Safeda ballies 125 mm diameter 40.00 metre 1.59 metre

and 1.5m long


17 x 1.50 = 25.5m
Qty taken for cost of using once
after deducting for credit =
25.5xx = 1.59 m
2204 Carriage of Timber 100.11 cum 0.581 cum
CARRIAGE
Poling boards = 1.71 cum
Walling = 0.30 cum.
Raking struts 3.14/4x(0.125) =
0.313 cum
Total of carriage = 2.323 cum
x = 0.581 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.75 Day
0114 Beldar 270.00 Day 1.5 Day
9999 Sundries 1.72 L.S. 47.58 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 Sqm.
Cost per sqm.
Say

1.19 2.19 Extra for planking, strutting and packing materials for cavities (in close
Code timbering)
Description if required to be left permanently
Rate in position._x000D_
Unit Qty
Details of cost for a trench 30m
long and 1.5m deep area
2x30x1.5=90 sqm-
MATERIAL
Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 2992.5 cudm

90x0.038 = 3.42 cum = 3420


cudm
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 3420 - 427.5 = 2992.5 dm

Walings 100mmx100mm of
1197 Second class kail wood in 300.00 10 cudm 1050 cudm
scantling
4x30x0.10x0.10 = 1.20cum =
1200 cudm
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 1200 - 150 = 1050 dm

Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 44.63 metre

and 1.5m long


2x17x1.5 = 51m
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 51 - 6.37 = 44.63 m
2204 Carriage of Timber 100.11 cum 2.675 cum
Poling boards = 3.42 cum
Walling= 1.20 cum.
Balli struts: 3.14/4x(0.125) x 51
= 0.63 cum
= 5.25 cum Taking half = 5.25 x
= 2.675 cum
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm.
Cost per sqm.
Say

1.20.1 2.20 Open timbering in trenches including strutting and shoring complete
2.20.1 (measurements to be1.5
Depth not exceeding taken
m. of the face area timbered):
Code Description Rate Unit Qty
Details of cost for a trench of
length 30m and 1.50m deep
surface area - 2x30x1.5 = 90
sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling board of
1198 Second class kail wood in planks 350.00 10 cudm 71.25 cudm

1.5mx0.25x0.038m_x000D_
2x40x1.5x0.25x0.038= 1.14cum
= 1140 cudm
Qty taken for cost of using once
after deducting for credit =
1140xx = 71.25 cudm

1197 Second class kail wood in 300.00 10 cudm 75 cudm


scantling
Walling l00mmxl00mm :
4x30mx0.l0mx0.l0m_x000D_
= 1.20cum= 1200 cudm
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 3.18 metre

and 1.5m long


2x17x1.50 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.18 m
2204 Carriage of Timber 100.11 cum 0.74 cum
CARRIAGE:
Poling boards = 1.14 cum
Walling = 1.20 cum
Ballies struts 3.14/4x(0.125) =
0.63 cum
Total of carriage = 2.97 cum x
= 0.74
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.25 Day
0114 Beldar 270.00 Day 0.5 Day
9999 Sundries 1.72 L.S. 19.76 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm
Cost per sqm.
Say

1.20.2 2.20 Open timbering in trenches including strutting and shoring complete
2.20.2 (measurements
Depth exceedingto1.5bemtaken of the
but not face area
exceeding timbered):
3 m.
Code Description Rate Unit Qty
Details of cost for a trench of
length 30m and 1.5m deep
surface area - 2x30x1.5 = 90
sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 71.25 cudm

1.50mx0.25x0.038m
2x40x1.50x0.25x0.038=
1.14cum= 1140 cudm
Qty taken for cost of using once
after deducting for credit =
1140xx = 71.25 dm

Wallings of
1197 Second class kail wood in 300.00 10 cudm 75 cudm
scantling
100mmx 100mm:
4x30mx0.l0mx0.l0m_x000D_
= 1.20cum= 1200 cudm
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 3.18 metre

and 1.5m long


2x17x1.5 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.18 m
2204 Carriage of Timber 100.11 cum 0.74 cum
CARRIAGE:
Poling boards = 1.14 cum
Walling = 1.20 cum
Ballies struts 3.14/4x(0.125) =
0.63 cum
Total of carriage = 2.97 cum x
= 0.74
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.5 Day
0114 Beldar 270.00 Day 1 Day
9999 Sundries 1.72 L.S. 33.15 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm
Cost per sqm.
Say

1.20.3 2.20 Open timbering in trenches including strutting and shoring complete
2.20.3 (measurements
Depth exceedingto3 be taken
m but notofexceeding
the face area timbered):
4.5 m.
Code Description Rate Unit Qty
Details of cost for a trench of
length 30m and 1.5m deep
surface area - 2x30x1.5 = 90
sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 71.25 cudm

1.50mx0.25x0.038m :_x000D_
2x40x1.5x0.25x0.038= 1.14 cum
= 1140 cudm
Qty taken for cost of using once
after deducting for credit =
1140xx = 71.25 dm

Wallings of
1197 Second class kail wood in 300.00 10 cudm 75 cudm
scantling
l00mmxl00mm :
4x30mx0.lmx0.lm_x000D_
= 1.20cum= 1200 cudm
Qty taken for cost of using once
after deducting for credit =
1200xx = 75 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 3.18 metre

and 1.5m long


2x17x1.5 = 51m
Qty taken for cost of using once
after deducting for credit =
51xx = 3.18 m
2204 Carriage of Timber 100.11 cum 0.74 cum
CARRIAGE:
Poling boards = 1.14 cum
Walling = 1.20 cum
Ballies struts 3.14/4x(0.125) =
0.63 cum
Total of carriage = 2.97 cum x
= 0.74
LABOUR
0112 Carpenter 2nd class 350.00 Day 1 Day
0114 Beldar 270.00 Day 1.75 Day
9999 Sundries 1.72 L.S. 46.67 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 Sqm
Cost per sqm.
Say

1.21.1 2.21 Open timbering in case of shafts, wells, cesspits, manholes and the like
2.21.1 including
Depth notstrutting
exceedingand shoring
1.5 m. complete (Measurements to be taken of
Code Description Rate Unit Qty
Details of cost for a manhole
1.2x 1m x 1.5m - Surface area
2(1.2+1.0)x1.5 = 6.6 sqm
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 5.375 cudm

250mm wide and 38mm


thick_x000D_
6x0.25xl.5x0.038 = 0.086 cum =
86cudm
Qty taken for cost of using once
after deducting for credit =
86xx = 5.3755 dm

Walling l00mmxl00mm of
1197 Second class kail wood in 300.00 10 cudm 3 cudm
scantling
4x1.2x0.1x0.1 = 0.048 cum = 48
dm
Qty taken for cost of using once
after deducting for credit =
486xx = 3 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4 metre
(4x1.0=4.0)+(2x1.2=2.4) =
6.4m
Qty taken for cost of using once
after deducting for credit =
6.4xx = 0.4 m
2204 Carriage of Timber 100.11 cum 0.053 cum
CARRIAGE :
Poling boards = 0.086 cum
Walling = 0.048 cum
Ballies struts 3.14/4x(0.125) x
6.4 = 0.079 cum
Total of carriage = 0.213 cum x
= 0.053 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.03 Day
0114 Beldar 270.00 Day 0.06 Day
9999 Sundries 1.72 L.S. 1.82 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.21.2 2.21 Open timbering in case of shafts, wells, cesspits, manholes and the like
2.21.2 including strutting
Depth exceeding and
1.5 m shoring complete (Measurements
but not exceeding 3 m. to be taken of
Code Description Rate Unit Qty
Details of cost for a manhole
1.2x 1m x 1.5m - Surface area
2(1.2+1.0)x1.5 = 6.6 sqm
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 5.375 cudm

250mm wide and 38mm thick


:_x000D_
6x0.25x1.50x0.038 = 0.086 cum
= 86cudm
Qty taken for cost of using once
after deducting for credit =
86xx = 5.3755 dm

Walling 100mmxl00mm of
1197 Second class kail wood in 300.00 10 cudm 3 cudm
scantling
4x1.20x0.10x0.10 = 0.048 cum
= 48 dm
Qty taken for cost of using once
after deducting for credit =
486xx = 3 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4 metre

(4x1.00=4.00)+(2x1.20=2.40) =
6.40m
Qty taken for cost of using once
after deducting for credit =
6.40xx = 0.40 m
2204 Carriage of Timber 100.11 cum 0.053 cum
CARRIAGE :
Poling boards = 0.086 cum
Walling = 0.048 cum
Ballies struts 3.14/4x(0.125) x
6.40 = 0.079 cum
Total of carriage = 0.213 cum x
= 0.053 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.06 Day
0114 Beldar 270.00 Day 0.12 Day
9999 Sundries 1.72 L.S. 2.73 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.21.3 2.21 Open timbering in case of shafts, wells, cesspits, manholes and the like
2.21.3 including strutting
Depth exceeding 3 and shoring
m but complete4.5
not exceeding (Measurements
m. to be taken of
Code Description Rate Unit Qty
Details of cost for a manhole
1.2x 1m x 1.5m - Surface area
2(1.20+1.00)x1.50 = 6.60 sqm

MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 5.375 cudm

250mm wide and 38mm thick


:_x000D_
6x0.25x1.50x0.038 = 0.086 cum
= 86cudm
Qty taken for cost of using once
after deducting for credit =
86xx = 5.3755 dm

Walling 100mmxl00mm of
1197 Second class kail wood in 300.00 10 cudm 3 cudm
scantling
4x1.2x0.10x0.10 = 0.048 cum =
48 dm
Qty taken for cost of using once
after deducting for credit =
486xx = 3 dm
Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 0.4 metre

(4x1.0=4.0)+(2x1.2=2.4) =
6.4m
Qty taken for cost of using once
after deducting for credit =
6.4xx = 0.4 m
2204 Carriage of Timber 100.11 cum 0.053 cum
CARRIAGE :
Poling boards = 0.086 cum
Walling = 0.048 cum
Ballies struts 3.14/4x(0.125) x
6.4 = 0.079 cum
Total of carriage = 0.213 cum x
= 0.053 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.1 Day
0114 Beldar 270.00 Day 0.2 Day
9999 Sundries 1.72 L.S. 3.64 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 6.6 sqm.
Cost per sqm.
Say

1.22.1 2.22 Open timbering over areas including strutting, shoring etc. complete.
2.22.1 (Measurements to be 1.5
Depth not exceeding taken
m. of the face area timbered):
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.5m deep area = 30 x
1.5 = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 35.625 cudm

250mm x 38mm
40x1.50x0.25x0.038 = 0.57cum.
= 570 dm
Qty taken for cost of using once
after deducting for credit =
570xx = 35.625 dm

Raking struts-
0302 Safeda ballies 125 mm diameter 40.00 metre 3.75 metre

40x1.50 = 60m
Qty taken for cost of using once
after deducting for credit =
60xx = 3.75 m
2204 Carriage of Timber 100.11 cum 0.3275 cum
CARRIAGE :
Poling boards = 0.57 cum
Ballies 40x1.5x3.14/4x0.125 =
0.4 cum.
Total for carriage = 1.31 cum x
= 0.3275 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.12 Day
0114 Beldar 270.00 Day 0.25 Day
9999 Sundries 1.72 L.S. 19.76 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 sqm.
Cost per sqm.
Say

1.22.2 2.22 Open timbering over areas including strutting, shoring etc. complete.
2.22.2 (Measurements
Depth exceedingto1.5 bemtaken of the
but not face area
exceeding timbered):
3 m.
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.5m deep area = 30 x
1.5 = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 35.625 cudm

250mm x 38mm
40x1.50x0.25x0.038 = 0.57cum.
= 570 dm
Qty taken for cost of using once
after deducting for credit =
570xx = 35.625 dm

Raking struts-
0302 Safeda ballies 125 mm diameter 40.00 metre 3.75 metre

40x1.50 = 60m
Qty taken for cost of using once
after deducting for credit =
60xx = 3.75 m
2204 Carriage of Timber 100.11 cum 0.3275 cum
CARRIAGE :
Poling boards = 0.57 cum
Ballies 40x1.50x3.14/4x0.125 =
0.4 cum.

Total for carriage = 1.31 cum x


= 0.3275 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.25 Day
0114 Beldar 270.00 Day 0.5 Day
9999 Sundries 1.72 L.S. 33.15 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 sqm.
Cost per sqm.
Say

1.22.3 2.22 Open timbering over areas including strutting, shoring etc. complete.
2.22.3 (Measurements
Depth exceedingto3 be taken
m but ofexceeding
not the face area timbered):
4.5 m.
Code Description Rate Unit Qty
Details of cost for an area 30m
long and 1.5m deep area = 30 x
1.50 = 45 sqm.
MATERIAL
The Material can be used four
times on the same work and
after use of material credit is
given @ 75% of cost

Polling boards of
1198 Second class kail wood in planks 350.00 10 cudm 35.625 cudm

250mm x 38mm _x000D_


40x1.50x0.25x0.038 = 0.57cum.
= 570 dm
Qty taken for cost of using once
after deducting for credit =
570xx = 35.625 dm

Raking struts-
0302 Safeda ballies 125 mm diameter 40.00 metre 3.75 metre
40x1.50 = 60m
Qty taken for cost of using once
after deducting for credit =
60xx = 3.75 m
2204 Carriage of Timber 100.11 cum 0.3275 cum
CARRIAGE :
Poling boards = 0.57 cum
Ballies 40x1.5x3.14/4x0.125 =
0.4 cum.
Total for carriage = 1.31 cum x
= 0.3275 cum
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.5 Day
0114 Beldar 270.00 Day 0.88 Day
9999 Sundries 1.72 L.S. 47.58 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 45 sqm.
Cost per sqm.
Say

1.23 2.23 Extra for planking and strutting in open timbering if required to be left
Code permanently
Description in position._x000D_Rate Unit Qty
Details of cost for a trench of
length 30m and 1.5m deep
surface area - 2x30x1.5 = 90
sqm.
MATERIAL
Poling boards of
1198 Second class kail wood in planks 350.00 10 cudm 997.5 cudm

1.50mx0.25x0.038
2x40x1.50x0.25x0.038 =
1.14cum = 1140 cudm
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 1140 - 142.5 = 997.5 dm

Walling 100mmx 100mm of


1197 Second class kail wood in 300.00 10 cudm 1050 cudm
scantling
4x30mx0.10 mx0.10 m =
1.20cum= 1200 cudm
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 1200 - 150 = 1050 dm

Struts of
0302 Safeda ballies 125 mm diameter 40.00 metre 44.63 metre

and 1.5m long


2x17x1.5= 51m
Less @ 1/8 of Qty as timber is
supposed to be used once before
= 51 - 6.37 = 44.63 m
2204 Carriage of Timber 100.11 cum 1.485 cum
Poling boards = 1.14 cum
Walling = 1.20 cum
Ballies struts 51x3.14xx0.125
= 0.63 cum
Total of carriage = 2.97 cum
Taking half = 2.97 x = 1.485
cum
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 90 sqm.
Cost per sqm.
Say

1.25 2.25 Filling available excavated earth (excluding rock) in trenches, plinth, sides
Code of foundations etc. in layers not Rate
Description exceeding 20cm
Unitin depth,
Qty consolidating
Details of cost for 10 cum.
LABOUR
0128 Mate 270.00 Day 0.2 Day
0115 Coolie 270.00 Day 2.5 Day
0101 Bhisti 270.00 Day 0.2 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.26.1 2.26 Extra for every additional lift of 1.5 m or part thereof in excavation
2.26.1 /banking excavated
All kinds of soil. or stacked materials.
Code Description Rate Unit Qty
Details of cost of 10 cum.
LABOUR
0128 Mate 270.00 Day 0.1 Day
0114 Beldar 270.00 Day 1.1 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.26.2 2.26 Extra for every additional lift of 1.5 m or part thereof in excavation
2.26.2 /banking
Ordinary excavated
or hard rock.or stacked materials.
Code Description Rate Unit Qty
Details of cost of 10 cum.
LABOUR
0128 Mate 270.00 Day 0.2 Day
0114 Beldar 270.00 Day 1.95 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.27 2.27 Supplying and filling in plinth with Jamuna sand under floors including,
Code watering,
Description ramming consolidating and dressing
Rate complete.
Unit Qty
Details of cost for 10 cum.
MATERIAL
6501 Sand zone V (Jamuna) 500.00 cum 10 cum
2335 Carriage of Jamuna sand 87.60 cum 10 cum
LABOUR
0114 Beldar 270.00 Day 0.89 Day
0115 Coolie 270.00 Day 1.07 Day
0101 Bhisti 270.00 Day 0.35 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.28.1 2.28 Surface dressing of the ground including removing vegetation and in-
2.28.1 equalities
All kinds ofnot exceeding 15 cm deep and disposal of rubbish, lead upto
soil.
Code Description Rate Unit Qty
Details of cost for 100 sqm.
LABOUR
0114 Beldar 270.00 Day 1.97 Day
0115 Coolie 270.00 Day 1.29 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 100 sqm.
Say

1.29.1 2.29 Ploughing the existing ground to a depth of 15 cm to 25 cm and watering


2.29.1 the same.of soil.
All kinds
Code Description Rate Unit Qty
Details of cost for 100 sqm.
LABOUR
0114 Beldar 270.00 Day 2.75 Day
0101 Bhisti 270.00 Day 0.5 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 100 sqm.
Say

1.30.1 2.30 Excavating holes more than 0.10 cum & upto 0.5 cum including getting
2.30.1 out the excavated
All kinds of soil. soil, then returning the soil as required in layers not
Code Description Rate Unit Qty
Details of cost for 10 holes-
Earth work 10 x 0.30 (avg) = 3.0
cum
2.8.1 Rate as per item no. 2.8.1 of SH: 137.30 cum 3 cum
Earth work
Extra labour for filling and
ramming
9999 Sundries 1.72 L.S. 13.52 L.S.
TOTAL
Add 1 % for water charges on all
except (A) i.e. on (432.04 -
411.90) = 20.14
TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (432.24 - 411.90) = 20.34

TOTAL
KST @ 4 % on all except (A) i.e.
on (435.29 - 411.90) = 23.39

Labour Cess @ 1 % on all except


(A) i.e. on (435.29 - 411.90) =
23.39
Cost of 10 holes
Cost of 1 hole
Say

1.30.2 2.30 Excavating holes more than 0.10 cum & upto 0.5 cum including getting
2.30.2 out the excavated
Ordinary rock soil, then returning the soil as required in layers not
Code Description Rate Unit Qty
Details of cost for 10 holes-
Earth work 10 x 0.3 (avg) = 3.0
cum
2.9.1 Rate as per Item Number 2.9.1 of 222.60 cum 3 cum
SH: Earth Work
Extra labour for filling and
ramming
9999 Sundries 1.49 L.S. 13.52 L.S.
TOTAL
Add 1 % for water charges on all
except (A) i.e. on (687.94 -
667.80) = 20.14
TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (688.14 - 667.80) = 20.34

TOTAL
KST @ 4 % on all except (A) i.e.
on (691.19 - 667.80) = 23.39

Labour Cess @ 1 % on all except


(A) i.e. on (691.19 - 667.80) =
23.39
Cost of 10 holes
Cost of 1 hole
Say

1.30.3 2.30 Excavating holes more than 0.10 cum & upto 0.5 cum including getting
2.30.3 out
Hardthe excavated
rock (requiring soil, then returning the soil as required in layers not
blasting)
Code Description Rate Unit Qty
Details of cost for 10 holes-
Earth work 10 x 0.3 (avg) = 3.0
cum
2.9.2 Rate as per Item Number 2.9.2 of 397.75 cum 3 cum
SH: Earth Work
Extra labour for filling and
ramming
9999 Sundries 1.49 L.S. 13.52 L.S.
TOTAL
Add 1 % for water charges on all
except (A) i.e. on (1213.39 -
1193.25) = 20.14
TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (1213.59 - 1193.25) =
20.34
TOTAL
KST @ 4 % on all except (A) i.e.
on (1216.64 - 1193.25) = 23.39

Labour Cess @ 1 % on all except


(A) i.e. on (1216.64 - 1193.25) =
23.39
Cost of 10 holes
Cost of 1 hole
Say

1.30.4 2.30 Excavating holes more than 0.10 cum & upto 0.5 cum including getting
2.30.4 out
Hardthe excavated
rock (blastingsoil, then returning the soil as required in layers not
prohibited)
Code Description Rate Unit Qty
Details of cost for 10 holes-
Earth work 10 x 0.3 (avg) = 3.0
cum
2.9.3 Rate as per Item Number 2.9.3 of 516.55 cum 3 cum
SH: Earth Work
Extra labour for filling and
ramming
9999 Sundries 1.49 L.S. 13.52 L.S.
TOTAL
Add 1 % for water charges on all
except (A) i.e. on (1569.79 -
1549.65) = 20.14
TOTAL
Add 15 % for contractor's profit
and overheads on all except (A)
i.e. on (1569.99 - 1549.65) =
20.34
TOTAL
KST @ 4 % on all except (A) i.e.
on (1573.04 - 1549.65) = 23.39

Labour Cess @ 1 % on all except


(A) i.e. on (1573.04 - 1549.65) =
23.39
Cost of 10 holes
Cost of 1 hole
Say

1.31 2.31 Clearing jungle including uprooting of rank vegetation, grass, brush wood,
Code trees and saplings of girth upto Rate
Description 30 cm measured
Unitat a height
Qty of 1 m above
Details of cost for 100 sqm.
LABOUR
0114 Beldar 247.00 Day 1.08 Day
0115 Coolie 247.00 Day 0.6 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 100 sqm.
Say

1.32 2.32 Clearing grass and removal of the rubbish upto a distance of 50 m outside
Code the periphery of the area cleared.
Description Rate Unit Qty
Details of cost for 100 sqm.
LABOUR
0114 Beldar 270.00 Day 0.6 Day
0115 Coolie 270.00 Day 0.25 Day
9999 Sundries 1.72 L.S. 1.82 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 100 sqm.
Say

1.33.1 2.33 Felling trees of the girth (measured at a height of 1 m above ground level)
2.33.1 including
Beyond 30cutting of upto
cm girth trunks and
and branches
including 60removing
cm girth the roots and stacking
Code Description Rate Unit Qty
Details of cost for one tree of
15cm dia and_x000D_
average height 3m
LABOUR
quantity of wood-
3.14/4x0.15x0.15x3 = 0.053
cum.
Add 20% for branches = 0.011
cum.
Total = 0.064 cum.
Labour for cutting in trees
removing the_x000D_
roots from the soil and then
filling in Pit and_x000D_
depresions.

0114 Beldar 270.00 Day 0.33 Day


0115 Coolie 270.00 Day 0.17 Day
9999 Sundries 1.72 L.S. 2.73 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of one tree
Say

1.33.2 2.33 Felling trees of the girth (measured at a height of 1 m above ground level)
2.33.2 including
Beyond 60cutting of upto
cm girth trunks and
and branches
including removing
120 cm girththe roots and stacking
Code Description Rate Unit Qty
Details of cost for a tree of
average girth_x000D_
90cm, average dia. 0.3m and
length 5m
LABOUR
quantity of wood-_x000D_
(22x0.30x0.30x5)/7x4 = 0.35
cum
20% branches = 0.07 cum
Total = 0.42 cum
Labour for cutting trees,
removing roots from the soil and
filling in pit & depressions:

0114 Beldar 270.00 Day 1.5 Day


0115 Coolie 270.00 Day 0.75 Day
9999 Sundries 1.72 L.S. 5.46 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of one tree
Say

1.33.3 2.33 Felling trees of the girth (measured at a height of 1 m above ground level)
2.33.3 including
Beyond 120 cutting of trunks
cm girth andincluding
upto and branches240
removing the roots and stacking
cm girth
Code Description Rate Unit Qty
Details of cost for a tree of
average girth 180cm, average
dia. 0.6m and length 7m

LABOUR
quantity of wood-_x000D_
(22x06x0.60x7)/7x4 = 1.98 cum.
+
20% branches = 0.40 cum.
Total = 2.38 cum.
Labour for cutting trees,
removing roots from the soil and
filling in pit & depressions:

0114 Beldar 270.00 Day 7 Day


0115 Coolie 270.00 Day 3.5 Day
9999 Sundries 1.72 L.S. 8.06 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of one tree
Say

1.33.4 2.33 Felling trees of the girth (measured at a height of 1 m above ground level)
2.33.4 including
Above 240cutting of trunks and branches removing the roots and stacking
cm girth
Code Description Rate Unit Qty
Details of cost for a tree of
average girth 300cm, average
dia. 1m and length 10m

LABOUR
quantity of wood-_x000D_
(22 x 1 x 1 x 10)/7x4 = 7.86 cum

20% Branches = 1.57 cum.


Total = 9.43 cum.
Labour for cutting trees,
removing roots from the soil and
filling in pit & depressions:

0114 Beldar 270.00 Day 14 Day


0115 Coolie 270.00 Day 7 Day
9999 Sundries 1.72 L.S. 26.91 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of one tree
Say

1.34.1 2.34 Supplying chemical emulsion in sealed containers including delivery as


2.34.1 specified.
Chlorpyriphos/ Lindane emulsifiable concentrate of 20%
Code Description Rate Unit Qty
Details of cost of 100 litres
7022 Chlorpyriphos 20% E.C. / Lindane 160.00 litre 100 litre
20% E.C.
2342 Carriage of solvent/ Diesel. 8.76 quintal 1 quintal

TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 100 litres
Cost for 1 litre
Say

1.35.1 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-
termite
2.35.1 Along treatment
external wall(excluding
where thethe cost
apron isof chemical
not emulsion)
provided :
using chemical
2.35.1.1 emulsion @ 7.5 litresLindane
With Chlorpyriphos/ / sqm ofE.C.
the20%
vertical
withsurface of the substructure to a
1% concentration.
Code Description Rate Unit Qty
Details of cost for 10 metres
MATERIAL
Chlorpyriphos 1% concentration
= 10.0x0.30x7.5 = 22.5 litres

Chlorpyriphos 20% required =


22.5/20 =1.125 litres
Chlorpyriphos 20% E.C. / Lindane
20% E.C. 1.125 litres (to be
supplied free of cost)
LABOUR
0114 Beldar 270.00 Day 0.33 Day
(for excavating channel) rodding
in chemical spraying the
emulssion and refilling the same

9999 Sundries, rent of sprayer etc. 1.72 L.S. 13.52 L.S.

TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 10 metres
Cost for 1 metre
Say

1.35.2 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-
termite
2.35.2 Along treatment
the external (excluding
wall below the cost oforchemical
concrete masonryemulsion) : chemical
apron using
2.35.2.1 emulsion @ 2.25 litres
With Chlorpyriphos/ per linear
Lindane E.C. metre including
20% with drilling and plugging
1% concentration.
Code Description Rate Unit Qty
Details of cost for 10 metres
MATERIAL
Chlorpyriphos 1% concentration
= 10x2.25 = 22.5 litres

Chlorpyriphos 20% required =


22.50/20 = 1.125 litres
Chlorpyriphos 20% E.C. / Lindane
20% E.C._x000D_
1.125 litres (to be supplied free
of cost)
LABOUR
0114 Beldar 270.00 Day 0.4 Day
(for drilling holes and injecting
chemical)
9999 Sundries and rent of a sprayer 1.72 L.S. 35.88 L.S.
and mortar and making good the
holes
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 10 metres
Cost for 1 metre
Say

1.35.3 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-
termite treatment
2.35.3 Treatment (excluding
of soil under thefloors
existing cost of chemical
using emulsion)
chemical : @ one litre
emulsion
per hole, 300 mm apart including drilling 12 mm diameter
2.35.3.1 With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration. holes and
Code Description Rate Unit Qty
Details of cost for 9 sqm. (3
metre x 3 metre)
No. of holes - 100 nos.
MATERIAL
Chlorpyriphos 1% required
100x1 litre = 100 litres
Chlorpyriphos 20% E.C. = 100/20
= 5.0 litres
Chlorpyriphos 20% E.C. / Lindane
20% E.C. 5 litres (to be supplied
free of cost)
LABOUR
0114 Beldar 270.00 Day 2 Day
(For making holes & spraying)

0124 Mason (brick layer) 2nd class 350.00 Day 0.5 Day
9999 Sundries, rent of sprayer and 1.72 L.S. 35.88 L.S.
mortar
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 9 square metre
Cost per square metre
Say

1.35.4 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-
termite treatment
2.35.4 Treatment (excluding
of existing masonrythe costchemical
using of chemical emulsion)
emulsion : litre per
@ one
2.35.4.1 With Chlorpyriphos/ Lindane E.C. 20% with 1% concentration. and
hole at 300 mm interval including drilling holes at 45 degree
Code Description Rate Unit Qty
Details of cost for 10 metres
MATERIAL
No. of holes 10.0/0.30 =
33.33+1 = 34.33 holes
Say 34 holes
chlorpyriphos 1% concentration
required
= 34x1.0 = 34.00 litres
Chlorpyriphos 20% E.C. required

34.00/20 = 1.70 litres


7022 Chlorpyriphos 20% E.C. / Lindane 160.00 litre 0 litre
20% E.C.
LABOUR
0114 Beldar 270.00 Day 0.3 Day
0124 Mason (brick layer) 2nd class 350.00 Day 0.05 Day
9999 Sundries, rent of pump etc. 1.72 L.S. 17.94 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 10 metres
Cost for 1 metre
Say

1.35.5 2.35 Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-
2.35.5 termite
Treatmenttreatment
at points (excluding
of contactthe cost of
of wood chemical
work emulsion)
by chemical :
emulsion
Code Chlorpyriphos/
Description Lindane (in oil orRate
kerosene based
Unit solution)
Qty @ 0.5 litres per
Details of cost for 10 metres
MATERIAL
No. of holes 10.0/0.15 =
66.67+1 = 67.67 holes
Say 68 holes
Chlordane 1% concentration
required
= 68 x 0.5 = 34.00 litres
Chlordane 20% E.C. required
34.00/20=1.70 litres
Chlordane 20% E.C./ Lindane
20% E.C. 1.7_x000D_
litres (to be supplied free of cost)

Kerosene oil = 34-1.7 = 32.30


litres
0771 Kerosene oil 65.00 litre 32.3 litre
LABOUR
0112 Carpenter 2nd class 350.00 Day 0.2 Day
(For making holes and plugging
the same)
0114 Beldar 270.00 Day 0.2 Day
for injecting chemical
9999 Sundries 1.72 L.S. 17.94 L.S.
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost for 10 metres
Cost for 1 metre
Say

1.36 2.36 Deduct for disposed soil not levelled and neatly dressed.
Code Description Rate Unit Qty
Details of cost for 10 cum.
LABOUR
0128 Mate 270.00 Day 0.08 Day
0115 Coolie 270.00 Day 0.8 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say

1.37 2.37 Supply and stacking of Fly ash conforming to IRC- 58 at site including
Code carriage,
Descriptionloading , unloading & stacking
Rate up to Unit
any lead (measured stacks
Qty
Details of cost for 1 cum.
Ref :- Based on DAR Item No :
1.1.1 A) ii)_x000D_
Labour and carriage
1980 Flyash 7.75 cum 1 cum
(Available free of cost at thermal
power_x000D_
plant at Baderpur power plant.
Lead = 35_x000D_
km)

2262 Carriage of Flyash 87.60 cum 1 cum


(1st Lead 0 to 5km)
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Total
Cost of 1 cum.
Say

1.38 2.38 Filling with available fly ash and earth (excluding rock) in trenches
Code or embankment in layers (each layer
Description Rate should not exceed
Unit 15 cm), with
Qty
Details of cost for 10 cum.
Ref :- Based on DAR Item No :
2.25
LABOUR
0128 Mate 270.00 Day 0.2 Day
0115 Coolie 270.00 Day 2.5 Day
0101 Bhisti 270.00 Day 0.2 Day
TOTAL
Add 1 % for water charges
TOTAL
Add 15 % for contractor's profit
and overheads
TOTAL
KST @ 4 %
Labour Cess @ 1 %
Cost of 10 cum.
Cost of 1 cum.
Say
depth but
ding disposal of
Total

1944
1620
3564
35.64
3599.64
539.946

4139.59
165.58
41.40
4346.57
43.47

h in layers not
ing each layer
Total

1593
972
108
2.16

12

5.94576
0.012264

4.6956
2697.814
26.97814
2724.792
408.7188

3133.511
125.3404
31.33511
3290.186
329.0186
329.00

n depth,
roller, or wooden
Total

594
972
108

12

2.16
5.94576
0.012264

4.6956
1698.814
16.98814
1715.802
257.3703

1973.172
78.92688
0.789269
2052.888
205.2888
205.25

nnes for banking


Total

2.16
12

5.95
0.01

3.1304
23.2504
0.232504
23.4829
3.522436

27.00534
1.080214
0.270053
28.35561
2.835561
2.80

Total

108
108
1.08
109.08
16.362

125.442
5.01768
1.25442
131.7141
13.17141
13.15

c excavator )/
m in width as well
Total

276.375

41.25

108
540
965.625
9.65625
975.2813
146.2922

1121.573
44.86294
11.21573
1177.652
117.7652
117.75

ic Excavator)/
m in width as
Total

418.75

106.25

174.14
392.73
87.69
135
364.5
18.5588
1697.619
16.97619
1714.595
257.1892

1971.784
78.87137
19.71784
2070.373
207.0373
207.00

ic Excavator)/
m in width as
Total

837.5

212.5

261.82
697.78
218.6
121.5
364.5
137.55

60
27.7264
2939.476
29.39476
2968.871
445.3307

3414.202
136.5681
34.14202
3584.912
358.4912
358.45

ic Excavator)/
m in width as
Total

837.5

212.5

610.09
1482
275.6
61.25
202.5
486
27.7264
4195.166
41.95166
4237.118
635.5677

4872.686
194.9074
48.72686
5116.32
511.632
511.60

c Excavator )/
eding 1.5 m in
Total

276.375
41.25

108
553.5
979.125
9.79125
988.9163
148.3374

1137.254
45.49015
11.37254
1194.116
119.4116
119.40

tor) / manual
5 m in width or 10
Total

418.75

106.25

218.6
435.96
130.91
135
351
23.2544
1819.724
18.19724
1837.922
275.6882

2113.61
84.5444
21.1361
2219.29
221.929
221.90

tor) / manual
5 m in width or 10
Total
837.5

212.5

306.28
741
261.82
135
351
224.7

105
32.422
3207.222
32.07222
3239.294
485.8941

3725.188
149.0075
37.25188
3911.448
391.1448
391.10

tor) / manual
5 m in width or 10
Total

837.5

212.5

654.55
1525.23
275.6
61.25
202.5
405
30.8568
4204.987
42.04987
4247.037
637.0555

4884.092
195.3637
48.84092
5128.297
512.8297
512.80

etc including
f bottoms, depth

Total

11677.37

7484.4

19161.77
19161.77
106.45
106.45

etc including
f bottoms, depth
ng 300 mm dia.
Total
11655.4

7470.32

19125.72
19125.72
173.87
173.85

etc including
f bottoms, depth
ng 600 mm.
Total

9925.42

6361.52

16286.94
16286.94
271.45
271.45

kinds of soil for


Total
49736.93

31878

21728

14080

5145.53

122568.5

-52155

70413.46

234.71

135.01

135

kinds of soil for


x000D_ Total

17299.8

11088
27160

17600

4573.8

77721.6

-17385

60336.6

603.37

347.06

347

etc, including
ng out the

Total

18932.13

7484.4

540
26956.53
269.5653

27226.1
4083.914

31310.01
1252.4

313.1001

32875.51

182.6417
182.60

etc, including
ng out the
g 300 mm dia.
Total

20835.36

8236.8

594
29666.16
296.6616

29962.82
4494.423

34457.24
1378.29

13.7829

35849.32
448.1165
448.10

etc, including
ng out the
00mm dia
Total

8992.82

3555.11

253.8
12801.73
128.0173
12929.75
1939.462

14869.21
594.7684

148.6921

15612.67

520.4223

520.40

etc, including
ng out the

Total

33828.64

7484.4

675
41988.04
419.8804

42407.92
6361.188
48769.11
1950.764

487.6911

51207.56

284.4865
284.45

etc, including
ng out the
ng 300 mm dia.
Total

37229.4

8236.8

742.5
46208.7
462.087

46670.79
7000.618

53671.41
2146.856
536.7141

56354.98
704.4372
704.40

etc, including
ng out the
ng 600mm dia
Total

16068.7

3555.11

315.9
19939.71
199.3971

20139.11
3020.866

23159.97
926.3989

231.5997

24317.97
810.5991
810.55
etc, including
ng out the

Total

43932.58

7484.4

675
52091.98
520.9198

52612.9
7891.935

60504.83
2420.193

605.0483

63530.08

352.9449
352.90

etc, including
ng out the
ng 300 mm dia.
Total
48349.08

8236.8

742.5
57328.38
573.2838

57901.66
8685.25

66586.91
2663.477

665.8691

69916.26
873.9532
873.95

etc, including
ng out the
ng 600mm dia.
Total
20868.1

3555.11

315.9
24739.11
247.3911

24986.5
3747.975

28734.48
1149.379

287.3448

30171.2
1005.707
1005.70

dinary/hard rock
Total

205835.6

69388
62260

13182.75

4455
355121.4
3551.214

358672.6
53800.89

412473.5
16498.94

4124.735

433097.2
-173610

182026.8
606.76
104.85

105

dinary/hard rock
Total
71595

86735

11718

36740

2284.75
209072.8
22.85

209095.6
346.14

209441.7
106.15

26.54

209574.4
-57870

151704.4
1517.04
262.15

262
and packing
o be taken of the
Total

74812.5

22500

127.5

131.3944
175
270
46.2852
98062.68
980.6268
99043.31
14856.5

113899.8
4555.992
1138.998
119594.8
1328.831
1328.80

and packing
o be taken of the
Total

74812.5

22500

127.5
131.3944
262.5
540
69.5396
98443.43
984.4343
99427.87
14914.18

114342
4573.682
1143.42
120059.2
1333.991
1333.95

and packing
o be taken of the
Total

74812.5

22500
127.5

131.3944

525
1080
138.8556
99315.25
993.1525
100308.4
15046.26

115354.7
4614.187
1153.547
121122.4
1345.804
1345.80

es and the like


er required) etc.
Total
0

16.472

10.36139

21
32.4
4.6956
84.92899
0.84929
85.77827
12.86674

98.64502
3.945801
0.98645
103.5773
15.69353
145.55

es and the like


er required) etc.
Total

0
16.472

10.36139

42
67.5
9.3912
145.7246
1.457246
147.1818
22.07727

169.2591
6.770364
1.692591
177.7221
26.92758
156.75

es and the like


er required) etc.
Total
0

97.13453

10.36139

66.5
102.6
13.8632
290.4591
2.904591
293.3637
44.00456

337.3683
13.49473
3.373683
354.2367
53.67222
183.50

nd packing,
nts to be taken of
Total

63.6

58.16391
87.5
135
54.1112
398.3751
3.983751
402.3589
60.35383

462.7127
18.50851
4.627127
485.8483
10.79663
127.40

nd packing,
nts to be taken of
Total

0
63.6

58.16391

175
270
58.5832
625.3471
6.253471
631.6006
94.74009

726.3407
29.05363
0.290536
755.6848
16.793
132.30

nd packing,
nts to be taken of
Total
0

63.6

58.16391

262.5
405
81.8376
871.1015
8.711015
879.8125
131.9719

1011.784
40.47138
10.11784
1062.374
23.6083
140.20

vities (in close


_x000D_ Total

1785.2

267.7943
2052.994
20.52994
2073.524
311.0286

2384.553
95.38211
23.84553
2503.78
27.81978
1873.95

ng complete

Total

127.2
74.0814

87.5
135
33.9872
457.7686
4.577686
462.3463
69.35194

531.6982
21.26793
5.316982
558.2831
6.203146
70.45

ng complete

Total

0
0

127.2

74.0814

175
270
57.018
703.2994
7.032994
710.3324
106.5499

816.8823
32.67529
8.168823
857.7264
9.530293
73.80

ng complete

Total
0

127.2

74.0814

350
472.5
80.2724
1104.054
11.04054
1115.094
167.2642

1282.358
51.29434
12.82358
1346.476
14.96085
79.20

es and the like


to be taken of
Total

16
5.30583

10.5
16.2
3.1304
51.13623
0.511362
51.64759
7.747139

59.39473
2.375789
0.593947
62.36447
9.449162
60.80

es and the like


to be taken of
Total

0
0

16

5.30583

21
32.4
4.6956
79.40143
0.794014
80.19544
12.02932

92.22476
3.68899
0.922248
96.836
14.67212
66.05

es and the like


to be taken of
Total
0

16

5.30583

35
54
6.2608
116.5666
1.165666
117.7323
17.65984

135.3921
5.415686
0.054157
140.862
21.34272
72.25

tc. complete.

Total

150

32.78603
42
67.5
33.9872
326.2732
3.262732
329.536
49.43039

378.9664
15.15865
3.789664
397.9147
8.842548
42.60

tc. complete.

Total

150

32.78603
87.5
135
57.018
462.304
4.62304
466.9271
70.03906

536.9661
21.47865
5.369661
563.8144
12.52921
46.30

tc. complete.

Total

150
32.78603

175
237.6
81.8376
677.2236
6.772236
683.9959
102.5994

786.5952
31.46381
7.865952
825.925
18.35389
52.10

uired to be left
Total

0
1785.2

148.6634

1933.863
19.33863
1953.202
292.9803

2246.182
89.84729
22.46182
2358.491
26.20546
926.15

ches, plinth, sides


h, consolidating
Total

54
675
54
783
7.83
790.83
118.6245

909.4545
36.37818
0.363782
946.1965
94.61965
94.60

excavation

Total

27
297
324
3.24
327.24
49.086

376.326
15.05304
3.76326
395.1423
39.51423
39.50

excavation

Total

54
526.5
580.5
5.805
586.305
87.94575

674.2508
26.97003
6.742508
707.9633
70.79633
70.75

oors including,
. Total

5000
876

240.3
288.9
94.5
6499.7
64.997
6564.697
984.7046

7549.402
301.9761
75.49402
7926.872
792.6872
792.65

ation and in-


bish, lead upto
Total

531.9
348.3
880.2
8.802
889.002
133.3503

1022.352
40.89409
10.22352
1073.47
1073.45

cm and watering

Total

742.5
135
877.5
8.775
886.275
132.9413

1019.216
40.76865
10.19216
1070.177
1070.15

luding getting
d in layers not
Total

411.9

23.2544
435.1544
0.2

432.24
3.05

435.29
0.94

0.23

436.46
43.65
43.65

luding getting
d in layers not
Total

667.8

20.14
687.94
0.2

688.14
3.05

691.19
0.94

0.23

692.36
69.24
69.25

luding getting
d in layers not
Total

1193.25

20.14
1213.39
0.2

1213.59
3.05

1216.64
0.94

0.23

1217.81
121.78
121.8

luding getting
d in layers not
Total

1549.65

20.14
1569.79
0.2

1569.99
3.05

1573.04
0.94

0.23

1574.21
157.42
157.4

rass, brush wood,


ght of 1 m above
Total

266.76
148.2
414.96
4.15
419.11
62.87

481.98
19.28
4.82
506.08
506.1

e of 50 m outside
Total

162
67.5
3.1304
232.6304
2.326304
234.9567
35.24351

270.2002
10.80801
0.10808
281.1163
281.10

ove ground level)


ots and stacking
Total

89.1
45.9
4.6956
139.6956
1.396956
141.0926
21.16388

162.2564
6.490258
1.622564
170.3693
170.35

ove ground level)


ots and stacking
Total

405
202.5
9.3912
616.8912
6.168912
623.0601
93.45902

716.5191
28.66077
7.165191
752.3451
752.30

ove ground level)


ots and stacking
Total
1890
945
13.8632
2848.863
28.48863
2877.352
431.6028

3308.955
132.3582
33.08955
3474.402
3474.40

ove ground level)


ots and stacking
Total

3780
1890
46.2852
5716.285
57.16285
5773.448
866.0172

6639.465
265.5786
66.39465
6971.439
6971.40

ing delivery as

Total

16000

8.76

16008.76
160.09
16168.85
2425.33

18594.18
743.77
185.94
19523.89
195.24
195.25

RUCTIONAL anti-
on)
g :
chemical
substructure
tion. to a
Total

89.1

23.2544

112.3544
1.123544
113.4779
17.02169

130.4996
5.219985
1.304996
137.0246
13.70246
13.70

RUCTIONAL anti-
non) : chemical
using
and plugging
tion.
Total

108

61.7136

169.7136
1.697136
171.4107
25.71161

197.1223
7.884894
1.971223
206.9785
20.69785
20.65

RUCTIONAL anti-
on) : @ one litre
mulsion
r holes and
tion.
Total
540

175
61.7136

776.7136
7.767136
784.4807
117.6721

902.1528
36.08611
9.021528
947.2605
105.2512
105.25

RUCTIONAL anti-
on)
@ : litre per
one
gree
tion. and
Total

0
81
17.5
30.8568
129.3568
1.293568
130.6504
19.59756

150.2479
6.009917
1.502479
157.7603
15.77603
15.75

RUCTIONAL anti-
on) :
emulsion
n) @ 0.5 litres per
Total

2099.5

70

54

30.8568
2254.357
22.54357
2276.9
341.5351

2618.435
104.7374
26.18435
2749.357
274.9357
274.90

Total

21.6
216
237.6
2.376
239.976
35.9964

275.9724
11.0389
2.759724
289.771
28.9771
28.95

site including
measured stacks
Total

7.75

87.6

95.35
0.95
96.3
14.45

110.75
4.43
1.11
116.29
116.29
116.3

ck) in trenches
5 cm), withTotal

54
675
54
783
7.83
790.83
118.6245

909.4545
36.37818
9.094545
954.9272
95.49272
95.45