Project : 400 KV S/s,Suratgarh, Rajasthan

Description
Unit -6
X-14 X-13 Y-1
(Intercon (Intercon (Intercon
necting necting necting
line -2 ) line -1) line -1)
1 CB
a. Erection & gas filling ok ok ok
b. Earthing X X x
X X x
c. Pole to CB MK cabling
d. MOM Box to Panel cabling X X x
e. Glanding, ferulling & termination X X x
f. Internal testing by supplier's rep. X X x
g. Megger X X x
h. Timing X X x
i. Contact resistance X X x
j. DCRM X X x
k. C & Tan Delta X X x
l. Alarm annunciation X X x
2 Isolator
a. Erection ok ok ok
b. Earthing X X x
c. Pole to pole cabling X X ok
d. MOM Box to Panel cabling X X X
e. Glanding, ferulling & termination X X ok
f. Megger X X X
g. Contact resistance X X X
h. Local op. X X X
i. Operating time, motor current etc. X X X
j. Remote op. X X X
k. Interlock X X X
3 CT
Erection X X ok
a. earthing X x ok
b. Terminal Box to JB cabling X X OK
c. JB to Panel cabling X X X
d. Glanding, ferulling & termination X X OK
e. Megger X X OK
f. Wdg Res. X X OK
g. Knee point test X X OK
X X OK
h. Ratio
i. Polarity X X OK
j. C & Tan Delta X X X
4 CVT
a. Erection x x OK
b. N2 pr.checking X X OK
c. Terminal Box to JB cabling X X OK
d. JB to Panel cabling X X X
e. Glanding, ferulling & termination X X OK
f. Megger X X OK
g. Wdg Res. X X OK
h. Ratio X X X
C & Tan Delta X X X
5 LA
a. Erection x x OK
b. Megger X X X
c. Earth resistance X X X
d. Surge Counter testing X X X
tan delta X X X
6 REACTOR
a. N2 pr. check after receiving at site
b. Megger between Core, tank and limb
c. Bushing CT testing before erection
d. C & Tan Delta of Bushing before erection
e. Trafo accessories to MK cabling
f. MK to Panel cabling
g. Glanding, ferulling & termination
h. Megger
i. Wdg resistance
j. Ratio
k. Mag Current
l. Wdg continuity
m. Vector group
n. C & Tan Delta of winding
o. OLTC operation
p. RTCC commissioning
q. Trafo. Alarm and annunciation
r. CB tripping through Trf prot.
SFRA(sweep frequency resonance ana)

7 C & R Panel
a. Erection ok ok ok
b. Earthing X X X
c. Panel greening X X X
d. Aux. relay testing X X X
e. Annunciation X X X
f. Meter calibration X X X
g. Control and indication X X X
8 Bus bar prot.
a. Erection ok
b. Earthing X X X
c. Panel greening X X X
d. Aux. relay testing X X X
e. Main relay testing X X X
9 PLCC & Exchange
a. Cabling and termination X X X
b. Speech X X X
c. Line loss measurement X X X
d. Noise measurement X X X
e. Best phase selection X X X
f. Interfacing with Prot. panel X X X
10 TS & DR
a. Antena mounting and TS cabling to relays X X X
b. Time sync. X X X
c. Event logger programming X X X
d. External cabling and termination X X X
e. Event simulation and time stamping X X X
f. Relay networking X X X
g. Accessing relays from remote PC X X X

11 Battery Battery make -Excide (Acid fill cell)


220 B1 220 B2 OK
a. Erection
a. Cabling and termination X X X
b. Acid filling X X X
c. Charging as per manufacturer's guide X X X
d. Discharging for 10 hrs X X X
e. Recharging X X X
12 Battery Charger Charger make -statcon (Float cum boost,220 volt)
a. Erection (panel greening & earthing) ok ok ok
b. Cabling and termination X X X
c. Charger voltage setting X X X
d. Load testing X X X
e. Battery charging X X X
13 ACBD/DCDB ACDB1 ACDB2 DCDB1
a. Erection (panel greening & earthing) X X X
b. Cabling and termination X X X
c. Testing of panels and protection X X X
14 BMK
a. Erection (panel greening & earthing) ok ok ok
b. Cabling and termination X X x
c. Testing of panels X X X
15 System commissioning
a. CT primary inj. X X X
b. CVT secondary Inj X X X
c. CB tripping through protection X X X
d. PLCC end to end testing X X X
e. Main relay testing with scheme X X X
f. Bus bar stability X X X
16

Note-:X13 and X14 bays are extention


bays of existing unit 6
Prepared by -vijay kumar rabidas (TBTS),camp- Suratgarh, rajsthan
Commissioning progress report for 400 KV S/s suratgarh, rajsthan

than

Bays to be tested
Unit -7 & 8
Y-2 Y-3 Y-4 Y3Y4 Y-5 Y-6 Y5Y6 Y-7
(Intercon Bus Bus
necting reactor-1 reactor-2 TIE Line-1 Line-2 TIE GT-7
line -2)
supplied bu CGL
ok ok ok ok x x ok ok
X X X X X X X X
x X X X X X X X

X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
supplied by seimens
ok ok ok ok ok ok ok ok
x x x x X X x X
ok ok ok ok ok ok ok ok
X X X X X X X X
ok X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
Supplied by CGL
ok ok ok ok ok ok ok ok
ok X X X X X X X
ok X X X X X X X
X X X X X X X X
OK X X X X X X X
OK X X X X X X X
OK X X X X X X X
OK X X X X X X X
OK X X X X X X X

OK X X X X X X X
X X X X X X X X
Supplied by BHEL
ok ok ok
OK X X
ok X X
X X X
OK X X
OK X X
OK X X
X X X
X X X

OK ok ok
X X X
X X X
X X X
X X X
supplied by Bhel
ok ok ok ok
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X
X X X X

Supplied by bhel
ok ok ok ok ok ok ok ok
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
Supplied by bhel
Busbar- I ok
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X

X X X
X X X
X X X
X X X
X X X
X X X

X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

id fill cell)
48 B2
OK
X
X
X
X
X
loat cum boost,220 volt)
ok
X
X
X
X
DCDB2
X
X
X

ok ok ok ok ok ok ok ok
x X X X X X X X
X X X X X X X X

X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X
X X X X X X X X

periorities bays : X-13, X-14 ,Y1, Y2, Y7,


arh, rajsthan

Period : 14/09/2016

Y-8 Y-9 Y-10 Y10Y11 Y-11 Y-12

Bikaner Bikaner
TIE TIE TIE GT-8
line-1 line-2

ok x x ok ok ok
X X X X X X
X X X X X X

X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

ok ok ok ok ok ok
x x x x X X
ok ok ok ok ok ok
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

ok ok ok ok ok ok
ok X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

X X X X X X
X X X X X X

ok ok
X X
X ok
X X
X X
X X
X X
X X
X X

ok ok
X X
X X
X X
X X

ok ok
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X

ok ok ok ok ok ok
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

Busbar-II
X X X X X X
X X X X X X
X X X X X X
X X X X X X

X X
X X
X X
X X
X X
X X

X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X
X X X X X

ok ok ok ok ok ok
X X X X X X
X X X X X X

X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X
X X X X X X

-13, X-14 ,Y1, Y2, Y7, and Y8


d : 14/09/2016

Remarks

Erection of intruptter unit is in progress.

interpool cabling schedule yet not received at


site.

Earthing is in progress

Only termination pending for interpole

ratio is pending due to unavaibality of correct


leakage tester
plcc panel not arrived at site yet , it is in
customer scope