Project description

Historic Context
The project site is at the Historic
Heart of Badagry Town. It is in
close proximity to buildings of
great heritage importance, such 4
as: the Brazilian Baracoon which
served as a holding cell for the
captured slaves prior to extraction, 1
the first storey building in Nigeria,
Lord Lugard’s house and several
other examples of precolonial 2
architecture are situated on the
Marina road.

The site holds the reconstructed


slave jetty and the original boat
anchors installed during the slave
trade era.
1. The First Storey Building in Nigeria
The proposed masterplan aims to
preserve all the historic elements
- slave jetty and anchors- in
their original locations. It is also
important that the historic buildings
3
are restored as part of the overall 5
regeneration of the Badagry slave
port. Marina Road
We believe that this coastal area
has great potential for economic
development, offering opportunities
to support the coastal populations Original proposal with key Heritage sites highlighted 2. Lord Lugard’s outpost
and contribute to national
economic growth, while continuing
to provide sustainable habitats for
the communities.

FT
R A
3. Replica Slave Jetty built in 2001 4. The Brazilian Baracoon
D
5. Anchor site - protected

Regeneration of Badagry Slave Port | Tosan Popo Architects 15


Site Analysis

Constraints and
Opportunities

The original reclamation proposal


presented several constraints.
The constant 65 meter offset

0
+ 00
.0
CH
from the road impacted the

5
+ 02
.0
CH
location of the existing historic

0
+ 05
.0
CH
elements. It also did not mimic

5
+ 07
.0
CH
or exemplify the natural form of

0
+ 10
.0
CH

5
+ 12
coastal edge formation, which is

.0
CH

0
+ 15
often undulating and organic in

.0
CH

5
+ 17
APPROVED LANDFILL AREA

.0
character.

CH
= 70, 806 MSQ (7.08 HECTARE)

0
+ 20
.0
CH

5
+ 22
.0
CH
The new proposal augments

0
+ 25
LANDFILL AREA COMPARISON

.0
1

CH

5
+ 27
.0
shoreline profile whilst keeping
ST-01 PROPOSED AND APPROVED 1:1000

CH

0
+ 30

525
.0

500
CH

550
CH. 0 +
+ 32

475

CH. 0 +
it approximately within the

CH. 0 +
.0

CH. 0 +
450

CH. 0 +575
CH

CH. 0 +
+ 35
.0

425
5
CH

+ 37

CH. 0 +600
CH. 0 +
contractual construction scope.

.0
CH

0
+ 40

CH. 0 +625
.0
CH
Merely adding 10% to linear length
of concrete sheet piling and the

CH. 0 +650

CH. 0 +850
CH. 0 +675
same percentage gain in landfill

CH. 0 +875

CH. 0 +900

+925

CH. 1 +050
CH. 0 +700

+950
CH. 0
area.

CH. 0

+975
APPROVED LANDFILL

CH. 1 +025
CH. 0

CH. 1 +000
CH. 0 +725
LINEAR METER = 1095M

CH. 0 +825
CH. 0 +750

CH. 0 +800
CH. 0 +775
We believe that the new profile will
create hierarchy in the order of the PROPOSED LANDFILL
urban spaces, by signifying the LINEAR METER = 1217M A

historic area as the place of real


.23
65

importance.
.25
0

65
+ 00

PROPOSED LANDFILL AREA


.0
CH

.25

= 78,819 MSQ (7.88 HECTARE)


65
5
+ 02
.0

25
CH

.01
.81
65
0
+ 05
.0
CH

25
.01
5
+ 07

25
.00
.0
CH

.86
91
0
+ 10
.0

.64
CH

91
5
+ 12
36.91

.71
.0
CH

89
0
+ 15

.95
.0

84
CH

5
+ 17

25.0
.0
CH

6
0
+ 20

25.1
.0

9
CH

5
+ 22

25.6
47

3
07
133.

.0

66
114.
CH

8
100.

87.2
0
+ 25
.0
CH

5
+ 27

8
96.0
.0

1
CH

91.3
+ 30
61.44

31.60

525
38.62
46.01
.0

500
27.67
2
CH

88.4

25.41
61.20
5

550
CH. 0 +
+ 32

475

CH. 0 +
4
80.8

26.15
CH. 0 +
.0

CH. 0 +
450

CH. 0 +575
CH

27.70
CH. 0 +
+ 35
.0

31.74
425
5
CH

23.95 26.00
+ 37

CH. 0 +600
28.64 CH. 0 + 26.59 24.85

38.31
.0

28.37 26.07
CH

25.09
0
+ 40

39.70 26
.2

CH. 0 +625
5 36.42
.0

25.4

58.28
0
CH

25.54

72.09

65.00
8 25.7
35.9

65.00
30.84 0

65.72
87.06
26.15

68.84
65.00
CH. 0 +650

102.96
40

102.21
.90

65.14
115.29

68.84
116.82

CH. 0 +850
119.06

65.14
CH. 0 +675

CH. 0 +875

66.33
CH. 0 +900
29 25.00
.04

+925

CH. 1 +050
CH. 0 +700

+950
CH. 0

CH. 0

+975
29
.44

CH. 1 +025
CH. 0

CH. 1 +000
1
CH. 0 +725

.9
CH. 0 +825

44
2 PROPOSED SETTING OUT 30
.29

CH. 0 +750

CH. 0 +800
CH. 0 +775
ST-01 REVISED CHAINAGE 1:1000
28.5
9 4
28.9

9.94 25.15

FT
R A
D
16 Badagry Marina | Masterplan Design concept
Design principles

The Approach
The Masterpan form is derived
from the existing urban form.
The new shoreline profile is a
combination of the offset of the
Marina road and creating an indent
in the area where slave jetty and
the anchors are located. This
geometry ensures that the Slave
jetty area remains untouched and
also creates a counter point to the
alignment of the road. A bay area
in consequently formed at the point
adjacent to the baracoons. The
proposed marina profile will allow
the water’s edge to interact with
the slave port area (i.e. the Slave Previous proposal
Jetty and Anchor plinth) thereby
creating a Marina Bay.
The Vision
The bay area i.e. the slave port
should have a more distinctive
footprint. The idea is that the
trees would radiate concentrically
about the geometry of the bay,
terminating in seating and eating
areas along the waters edge.

This concept will form the anchor


for the entire masterplan design.
The main aspect and focus of
the slave port (the bay) will be
the water’s edge and the views
towards the Gberefu jetty (hence
towards the point of no return), the creating the Marina Bay
commercial zones flanking the bay
will assume a different geometry
with aspect and focus towards
the road, with drop off and limited
parking.
Development exclusion
zone
There should be commercial
development exclusion zones
on the marina side, 400m radius
around the Slave Port
Commercial flank
FT
A
The East and West sides of the

R
slave port should be extended

D
towards the water so as to
accentuate the bay. These areas
should be designated commercial Development Exclusion zone The new Masterplan diagram
zones, with bars, restaurants, civic
centres, hotels etc. Regeneration of Badagry Slave Port | Tosan Popo Architects 17
Design principles

Public Realm
The area within the development
exclusion zone should be
dedicated to the public realm,
landscaped with local tree species
with the provision of seating areas
where the public can enjoy the
scenery and view the historic sites.

We believe that this spaces will


promote social interaction and a
sense of social wellbeing. This is a
crucial component for creating an
inclusive urban environment.

Provision of sun decks and terraces


True Panoramic Views

FT
Park as seen from Gberefu

R A
D
18 Badagry Marina | Masterplan Design concept
Design principles

Built Form
The scale and height of the
buildings set within the masterplan
should respond and complement
the context of the setting. It is
proposed that the maximum
building height be set between 4-5
storeys. The higher massing should
be towards the East and west
boundaries of the site.

The use of materials should


complement local techniques, but
employ world class standards in
finishing. The development must
source local sustainable materials.

Accsessibility

It is crucial to the success of the


development that adequate mass
transit system is provided to the
site.

The masterplan proposes a ferry


terminal towards the South West
end of the project site. It is key that
a ferry service is provided from the
Lagos Island to the site in order to
avoid the grid lock of the “Mile 2” -
Festac axis.

Access to Gberefu’s and the


”point of no return” ferry should
be provided via the local wooden
boats. This will ensure that human
traffic on the slave trail is controlled
and the journey in turn remains
a more personal experience.
it is suggested that the local
inhabitants are engaged to operate
this mode of transportation.

FT
R A
D
Regeneration of Badagry Slave Port | Tosan Popo Architects 19
Design principles

Core strategic themes


In summary, the core strategic themes of this proposal are as follows:
Design
• To commission stimulating architecture and urban design of the highest
quality.To create a strong identity and sense of place.

• To achieve public spaces and routes which are appealing, permeable,


legible and well managed.

• To devise an integrated and considered development framework.

Transport
• Improve public and private transport routes to the site, encourage the
use of the waterways . Provide pedestrian walkways and cycling paths
for the site and for further expansion and integration into the marina
development.
Land Use
• To secure integrated mixed use development

• To generate vibrancy and vitality in the day, evening and at the weekend.

• To complement and extend Marina Road, integrate the existing historic


centre to the lagoon front.

• To provide a range of retail and commercial uses.

• To provide the opportunity for local employment in Retail and


commercial areas of the site.

• To meet the needs of those living in Badagry

Socio-economic and Cultural


• To contribute to the town’s economy through tourism & commerce in the
long term.

• To spread the benefits of regeneration into the existing local community

• To create a new, sustainable community of people who live in, work in


and visit the new development.

• To support training and employment access initiatives.

• To encourage a range of employment opportunities both during and


FT
A
Vieiw from inside the Pavilion looking towards the Heritage Park
post construction

DR
20 Badagry Marina | Masterplan Design concept
illustrative View

FT
A
Viewing Pavilion with boardwalk beyond

DR
Regeneration of Badagry Slave Port | Tosan Popo Architects 21
illustrative Masterplan
LEGEND
1 SLAVE JETTY HERITAGE SITE
2 CANON LOCATION HERITAGE SITE
3 SLAVE BOAT ANCHORS REINSTATED HERITAGE SITE
4 NEW SLAVE PRT PARK HERITAGE SITE
5 EXISTING MUSEUM BUILDING REINSTATED
6 WATERFRONT BAR
7 WATERFRONT BAR & RESTAURANT
8 PIER RESTAURANT & VIEWING PLATFORM
9 PARKING
10 HOTEL 1
11 RETAIL SHOPPING COMPLEX
12 RETAIL SHOPPING COMPLEX
13 HOTEL 2
14 FERRY TERMINAL BUILDING
15 MARINA PIER
16 FERRY JETTY
17 ARTS AND CRAFT MARKET
18 FRESH PRODUCE MARKET
19 RESTAURANT AND RETAIL BUILDING
20 CONFERENCE AND CONVENTION CENTER
21 EVENTS AND COMMUNITY CENTER
22 HOTEL 3
9 23 RESIDENTIAL DEVELOPMENT
24 LORD LUGARD'S HOUSE HERITAGE SITE
25 FIRST STOREY BUILDING HERITAGE SITE
26 MOBEE PALACE HERITAGE SITE

18 27 BRAZILIAN BARACOONS HERITAGE SITE


28 TAXI AND COACH DROP OFF
29 AMPHITHEATER & OUTDOOR EVENTS SPACE
30 PEDESTRIAN PROMENADE

17

13

12

14 28
11
10
27 26 25
24
16 5

15
20
9 23

7 6 4 1 2 3 21
30 22
8 19

29

PHASE TWO - THE BOARDWALK RETAIL PARK

FT
A
PHASE ONE - MARINA BAY AND SLAVE PORT PARK

Masterplan land use plan


PHASE THREE - BUSINESS PARK & RESIDENTIAL

DR
22 Badagry Marina | Masterplan Design concept
illustrative View

Pedestrian Promenade along Badagry Marina

FT
R A
D
Regeneration of Badagry Slave Port | Tosan Popo Architects 23
illustrative View

FT
A
View of Heritage Park from West

DR
24 Badagry Marina | Masterplan Design concept
illustrative View

FT
A
View of Heritage Park from East

DR
Regeneration of Badagry Slave Port | Tosan Popo Architects 25
illustrative View

View showing activites at the Lagoon front

FT
A
View of slave jetty with Canons to the west

DR
26 Badagry Marina | Masterplan Design concept
illustrative View

View showing amphitheatre type seating. Visitors wait for Local boats

FT
R A
D
Regeneration of Badagry Slave Port | Tosan Popo Architects 27
illustrative View

FT
A
View of slave jetty with Canons to the west

DR
28 Badagry Marina | Masterplan Design concept
illustrative View

FT
A
View of Boat anchors preserved for public viewing

DR
Regeneration of Badagry Slave Port | Tosan Popo Architects 29
Notes

30 Badagry Marina | Masterplan Design concept


Notes

Regeneration of Badagry Slave Port | Tosan Popo Architects 31


Header

Header 2
Olore do del iure molor atin henit adio odolore tio
odipis accum nulputpat aciliquis exero enim iliquat,
quis er si.

Te venim duisim ad tations nim quat nim velit nos alit


autpat. Ullaore dolor iurerit ullan vulla aliqui bla commy
nullum er ad moloborer iriure tin ea facincipsum etue
dunt esto od eraessim ea am zzriureet eu feuguer alit
vulla faciduisi.

Onsequi smolor ipsuscin verat auguer summodolobor


incin hendrem zzrit ad magna facing ese commod
do dolobore dolum vero consenit nis diamconse
erilis ecte commy nis nos autpat wissis dolore dunt
la feugiametum init ipsum ad enim vel dolor iure diate
consequis ating eugait ilismod tie velent la feugait
incilis nim vel delesto odolor acip erilit verosto endipis
amet nostincin ea feu faccumsan ullandigna feu
feugait iuscilit, qui blam volorpe rostinis nosto odiam
quis eu faci te magna feuisi eriure vel ullan et, con el
dipsum vel iriusci endreet, verit nonsendit alit augue
commolore volore verostrud dolore min el elenim
veliquis aut veraestrud ex eum inisl dolessecte et,
quiscidui tat ad dolorercin ver irilis nonsequat lum
zzrilla feumsandrero commy nisl utpatuer sustinis
nonullum ipsuscil utpat wissit ullut num amet lorem
nisis aliqui te tie commy niamet, quamcon ullamet
niam, volobore duis niat loreet, consed tetuer iurerci
duipsum modipiscing essi blamconse dit vel iuscinci
eum dolor sent duipsum sandipis dignis adip eum
velent delisl diation utpat autem ipis digna feugue mod
te dolore facipissim augiam iriustis alis alit amet, velit
utpat.

Ecte dionsequi tincilit, conullandit, consequamet vel


esto conullam ilis euguerat.

Odolobor amcorpercil init aute velisim zzrit aliquis


ismodit ad doloreet ea feuisi exer sequis nim nit nos
augue con ercil ing etum exercinci tatue dolorem
zzrit ent am iure tetuerosto corem illa at aut nibh el
dipsustrud tetum zzrit luptatinci bla faccummy nis
duismolobor sequi te facipisis alisi blam veriustis dit del
irit volorer ip endrem zzriustrud ming ea feuis eugue
faciliq uatet, vel exerit dolorem quat lorerosto esequis
cillaor eriure dit augue velestin ut wisisci liquam del et
nos nons ea feu feugiatueros nos et iureetum etuero

You might also like