You are on page 1of 2

Feedback from previous engagement

Would welcome a

It would have a secondary


zebra. Would also like
a contraflow cycling at
Cairns Road/Coldharbour Road
effect of improving vehicle
safety on that stretch. Despite the
junctions with Cairns Road
so children can cycle Crossing Proposal
recent 20mph signs, motorists still without contravening
approach the Kellaway Avenue/ no entries in place.
Bishop Road traffic lights quite
fast and a new crossing might
help slow them down.

This proposal will


provide a safe and
convenient crossing

Programme
The current programme for delivery of the improvements is:

Date Action
February 2017 Consult local residents and businesses
March 2017 Commence detailed design
Spring/Summer 2017 Start statutory consultation for crossing
and associated TRO
Autumn 2017 Construction

Comments and feedback Documents available


in other formats:
You can provide You can send an email to:
comments on the CAF@bristol.gov.uk If you would like this
proposals and give us information in another
Alternatively, you can
your feedback. Please language, Braille, audio
write to us at:
submit your comments tape, large print, easy
Cycle Ambition Fund
by the 8 March 2017 Funded by
City Transport English, BSL video or CD rom
City Hall 3C or plain text please contact:
PO Box 3176
CAF@bristol.gov.uk
Bristol BS3 9FS
BD9080
Introduction This technical drawing shows our preliminary design of the suggested proposals.
Previous Community Engaement
In September 2014 we:
Bristol has been awarded additional funding

n
from the UK government to upgrade and Informally consulted residents on the
extend walking and cycling routes across the proposed location of a zebra crossing.
city. With Council funding included, a total
of 12m has been allocated for projects from Raised awareness through the
2015 to 2018 in the Bristol area. Neighbourhood Partnership.

One of these routes is the Southmead At this time, the lack of formal crossings on
Quietway. We are working to make this Coldharbour Road was highlighted as an
route a quiet, safe and enjoyable route to issue by residents wishing to access the shops
get people to work or play all year round. New contra-flow and playgroups in the area. There are also a
cycle lane facility
Improving facilities for pedestrians and cyclists number of schools in the area and crossing
New contra-flow
along the Southmead Quietway will help give Coldharbour Road during peak times can be
cycle lane facility difficult.
communities in North Bristol a better, healthier Proposed "No-right turn" into "Trief Cadet" kerbs on corner
alternative for transport. Coldharbour Road
New contra-flow Benefits Engineering Design Team (CH)
cycle lane facility
To find out more information of other routes Bristol City Council, PO Box 3176, BS3 9FS

Proposed "No-right turn" into Proposed "No-right turn" into "Trief Cadet" kerbs on corner
The improvement will result in a number of
Tel: 0117 92 22000

and initiatives being financed by the Cycle Road


Coldharbour Cairns Road benefits, including:
Ambition Fund, visit www.travelwest.info/ New contra-flow Engineering Design Team (CH)
projects/cycle-ambition-fund cycle lane facility Bristol City Council, PO Box 3176, BS3 9FS The parallel pedestrian and cyclist
Tel: 0117 92 22000
Proposed "No-right turn" into B
crossing* will provide a safer crossing
Cairns Road/Coldharbour Road Cairns Road New pedestrian and cycle crossing Rev. point for pedestrians and cyclists, without
Date Description By

Project

Crossing Proposal unnecessarily


Cycle Ambition Fund 2 effecting traffic flow.
Southmead Quietway
The junction is to be improved by: Improved crossing facilities for users
B Title travelling along the Southmead Quietway
Introducing a parallelNew pedestrianand
pedestrian and cycle crossing Cairns
By Road Parallel Crossing
Existing traffic island to be removed. Rev. Date Description
between The Arches and Southmead
cyclist crossing* at the Cairns Road/ Existing signage to be relocated to footway Project General Arrangement
1 of 2 Hospital.
Coldharbour Road junction. Cycle Ambition Fund 2
Southmead Quietway Client
Gari Garmston Resurfaced footways reduce existing
Building out around the junction. Project Manager Scale
ND trip hazards.
1:200@A2
Title Telephone Number Checked by
ND
Resurfacing areas of existing footways. Cairns Road Parallel Crossing Contraflow cycle lane provides marked
Drawn by Date Issued
Existing traffic island to be removed. RB
Existing signage to be relocated to footway General Arrangement space for cyclists using Cairns Road.
Date Drawn Issued by

Introducing contra flow cycle lane on 1 of 2


02/09/16
STATUS
Cairns Road. Client Additional tactile paving helps visually
Preliminary Tender Construction As Built

Gari Garmston DRAWING NUMBER

Installing new dropped kerbs for0 4 8 12 impaired users. Project Number Drawing Revision
Project Manager Scale
Scale 1:200 @ A3 ND 1:200@A2 E16016 - P101 - B
pedestrians and cyclists. Telephone Number Checked by
Zig-zags and restrictions remove
ND
Installing additional tactile paving.
Drawn by Date Issued obstructive parking around the junctions.
RB
Date Drawn Issued by
02/09/16
Introducing waiting restrictions to
STATUS
enhance safety around the crossing. Preliminary Tender Construction As Built
We propose
toD Rimprove
AWING NUMBER

8 12 Project Numberthe junction


Drawing Revision Please visit our website
e 1:200 @ A3 E16016by -introducing P101 - B www.travelwest.info/projects/cycle-
a parallel
pedestrian ambition-fund/bristol/southmead-
and cyclists
* A parallel pedestrian and cyclists crossing is crossing. quietway to view the proposal in more
similar to a zebra crossing, but cyclists can Building out around the junction of Cairns Road
cross without having to dismount.
detail
will give more space for users.
All Maps Crown Copyright and database rights 2017.
Ordnance Survey 100023406.

You might also like