INSPECTION REQUEST FORM FOR PILING WORKS (BORED PILENO:

Unless otherwise approved,this inspection request form shall be submitted durin


meeting among LTA,Contractor and QP(S)
Contractor: Project:
ER296-CONSTRUCTION AND COMPLECTION OF SENTOSA
SAMWOH CORPORATION PTE LTD SK E & C GATEWAY TUNNEL FROM TELOK BLANGAH ROAD TO KEPPEL
ROAD / KAMPONG BAHRU ROAD/ LOWER DELTA ROAD AND
ASSOCIATED ROAD WIDENING WORKS INTERCHANGE

To: Date:
LTA Time:

The work described below has been inspected by our Site Engineer and is complete
and ready for your inspection. A checklist is attached overleaf.
Location
Checked and Requested By:
Chainage

Activity

Drawings Used for Construction

Other Description
Contractor's PM Name & Signature

The meeting noted that the information provided by the Contrator is adequate/not adequate*.

QP(S) may proceed Request Rejected


* delete where appropriate

INITIAL INSPECTION DECISION BY QP(S)

We have inspected the above referenced works and found them acceptable. You may proceed.
However, please return the completed checklist upon completion of the remaining work.

You cannot proceed. Please carry out corrective works as noted on the checklist and
submit a fresh request for inspection.
Other comments:

RE/RTO Name & Signature/ Date

FINAL INSPECTION DECISION BY QP(S)


_________________________________________
QP(S) Name&Signature/Date

work approved to start:________________ work completed on:_________________________________

LTA
The above process for request for inspection of work by Contractor and approval by QP(S) is noted

___________________________________
LTA's representative/Date/Time
CHECKLIST FOR PILING WORKS (BORED PILE) No.

Date/Time: Location: chainage:


S/No Description of Works Checked by Confirmed by
Contractor QP(S)
1 Check setting out

2 Check pegged position of individual pile

3 Check services plan

4 Locate services with cable detector and digging trial trench

5 Check soil sample at pile base and confirm by contractor's


Professional Engineer
6 Check certificate of fitness of bored piling machine and service crane

7 Check certificate of crane operator

8 Check piling frame and crane located on firm bases

9 Check cover blocks/spacers

10 Check steel cage reinforcement

11 Check provision of couplers

12 Check galvanising (if applicable)

13 Ensure cleanliness of bored hole

14 Provision of tremie pipe

15 Ensure concrete is placed 1000mm above cut-off level

16 Quantity of ready-mix concrete : m3


--------------
17 Check concrete grade Grade:
-------------------
18 Take slump test Desired slump: mm
-------------------
19 Take cube samples
No of sets: Reference:

20 Check verticality of piles

21 Check calculated depth of penetration

22 Check eccentricity of piles

23 Check cut-off level of piles

24 Check sufficient temporary traffic devices if lane


closure is required
25 Others

file:ER288:Irforms/Bore plg./pg2/2