Project: DESIGN AND CONSTRUCTION OF PUTATAN WATER TREATMENT PLANT

Location: Putatan, Muntinlupa City


Client: Maynilad Water Services Inc. (MWSI)
Contractor: FREY-FIL Corporation
Reference: MT15-CIV0016

Subject: QUANTIFICATION OF BORED PILE MATERIALS PER STRUCTURE

BORED PILES
NO.
LENGT
ITEM LOCATION OF DIA. VOLUME UNIT REBAR QTY
H (L)
PILES

1.0 BAF 72 74.00 35.00 1.50 4,805.75 cum 760,718.74

2.0 UF/RO 116 0.00 0.00 0.00 - cum -

3.0 SLUDGE / CHEM 1 41 41.00 35.00 1.00 1,183.40 cum 265,632.16

4.0 DAF 92 92.00 36.00 1.20 3,933.07 cum 602,565.33

5.0 GENSET 35 22.00 16.00 1.00 290.28 cum 120,255.39

6.0 CONTROL BLDG 18.00 16.00 1.00 237.50 cum 98,390.77

TOTAL 356 ### ### cum ###

BORED PILE PER PIECE 1.00 35.00 1.20 41.56 cum 6,604.26
BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 26/9/2016
BAF
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m - pcs 4,805.75 cu.m
16mm x 12.0m - pcs
20mm x 6m 1,206 pcs
20mm x 12m 7,918 pcs
25mm x 12m 938 pcs G.I. Wire #16
36mm x 12m 3,330 pcs
36mm x 10.5m 333 pcs
36mm x 9m 1,332 pcs
36mm x 7.5m - pcs
UF/RO
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m - pcs 0.00 cu.m
16mm x 12.0m - pcs
20mm x 12m - pcs G.I. Wire #16
25mm x 12.0m - pcs
36mm x 12m - pcs
36mm x 10.5m - pcs
36mm x 9m - pcs
SLUDGE & CHEM. BLDG. 1
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 615 pcs 1,183.40 cu.m
16mm x 12.0m 328 pcs
20mm x 10.5m 334 pcs G.I. Wire #16
25mm x 6m 779 pcs
36mm x 12m 1,722 pcs
36mm x 10.5m 144 pcs
36mm x 9m 574 pcs
DAF
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 1,656 pcs 3,933.07 cu.m
16mm x 12.0m 920 pcs
20mm x 10.5m - pcs G.I. Wire #16
25mm x 6m 1,748 pcs
36mm x 12m 3,864 pcs
36mm x 10.5m 322 pcs
36mm x 9m 1,288 pcs
-
GENSET
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 308 pcs 290.28 cu.m
12mm x 6.0m 176 pcs
20mm x 6.0m - pcs G.I. Wire #16
25mm x 12.0m 198 pcs
36mm x 12m 924 pcs
36mm x 9m 154 pcs
36mm x 6m 77 pcs

CTRL BLDG
RSB : 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 252 pcs 237.50 cu.m
16mm x 12.0m 144 pcs
20mm x 6m - pcs G.I. Wire #16
25mm x 6m 162 pcs
36mm x 12m 756 pcs
36mm x 10.5m - pcs
36mm x 9m 126 pcs

NOTE: QUANTITIES STILL SUBJECT FOR CHANGE DUE TO CHANGE IN DESIGN


UNIT

kgs.

kgs.

kgs.

kgs.

kgs.

kgs.

kgs.

kgs.

RMC (28 DAYS) FOR PR:

634 rolls

RMC (28 DAYS) FOR PR:

0 rolls

RMC (28 DAYS) FOR PR:

222 rolls
RMC (28 DAYS) FOR PR:

502 rolls

RMC (28 DAYS) FOR PR:

101 rolls

RMC (28 DAYS) FOR PR:

82 rolls
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

BORED PILES #REF! pile pos.

QTY sets
Vertical bars B1 5 1 36 #REF! 4.95 #REF! #REF! #REF! #REF!
###
Vertical bars B2 5 1 36 #REF! 6.35 #REF! #REF! #REF! #REF!
###
Vertical bars B3 5 1 36 #REF! 12 #REF! #REF! #REF! #REF!
###
Vertical bars B4 5 1 36 #REF! 12 #REF! #REF! #REF! #REF!
###
Vertical bars B5 5 1 36 #REF! 12 #REF! #REF! #REF! #REF!
###
Vertical bars B6 5 1 36 #REF! 12 #REF! #REF! #REF! #REF!
###
Vertical bars B7 5 1 36 #REF! 12 #REF! #REF! #REF! #REF!
###
Vertical bars B8 5 1 36 #REF! 9 #REF! #REF! #REF! #REF!
###
Vertical bars B9 5 1 36 #REF! 7.25 #REF! #REF! #REF! #REF!
###
Spirals S1 188 1 12 #REF! 4.00 #REF! #REF! #REF! #REF!
###
Spirals S2 51 1 12 #REF! 4.00 #REF! #REF! #REF! #REF!
###
Confinement ring C1 #REF! 1 25 #REF! 4.00 #REF! #REF! #REF! #REF!
###
Spacer bar C2 #REF! 1 20 #REF! 0.70 #REF! #REF! #REF! #REF!
###

#REF! #REF!

VOLUME #REF! cu.m. #REF! kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


10 - - - - -
12 #REF! #REF! #REF! #REF! #REF!
16 - - - - -
20 #REF! #REF! #REF! #REF! #REF!
25 #REF! #REF! #REF! #REF! #REF!
28 - - - - -
32 - - - - -
36 #REF! #REF! #REF! #REF! #REF!

BORED PILES QUANTITY BASED ON THE 2ND ISSUE OF DRAWING DATED 3/6/2015
RSB FOR PR: 4,000Psi RMC (7 DAYS) FOR PR:
12mm x 12.0m #REF! pcs #REF! cu.m.
20mm x 10.5m #REF! pcs
25mm x 12.0m #REF! pcs G.I. Wire #16 #REF!
36mm x 12m #REF! pcs
36mm x 10.5m #REF! pcs
36mm x 9m #REF! pcs
36mm x 7.5m #REF! pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

BAF
BORED PILES 74 pile pos.
1.5 35
QTY sets
Vertical bars B1 9 74 36 666 4.95 333 10.5 27,938.18 -##
Vertical bars B2 9 74 36 666 7.95 666 9 47,894.02 -##
Vertical bars B3 9 74 36 666 12 666 12 63,858.69 -##
Vertical bars B4 9 74 36 666 12 666 12 63,858.69 -##
Vertical bars B5 9 74 36 666 12 666 12 63,858.69 -##
Vertical bars B6 9 74 36 666 12 666 12 63,858.69 -##
Vertical bars B7 9 74 36 666 12 666 12 63,858.69 -##
Vertical bars B8 9 74 36 666 9 666 9 47,894.02 -##
Spirals S1 71 74 20 5254 12.00 5254 12 155,485.84 -##
Spirals S2 36 74 20 2664 12.00 2664 12 78,837.89 -##
Confinement ring C1 38 74 25 2812 3.91 938 12 43,373.42 -##
Spacer bar C2 114 74 20 8436 0.84 1206 6 17,845.06 -##

738,561.88 -

VOLUME 4,805.75 cu.m. 153.68 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


10 - - - - -
12 - - - - -
16 - - - - -
20 7,918 - - - 1,206
25 938 - - - -
28 - - - - -
32 - - - - -
36 3,330 333 1,332 - -

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m - pcs 4,806.00 cu.m.
16mm x 12.0m - pcs
20mm x 6m 1,206 pcs
20mm x 12m 7,918 pcs
25mm x 12m 938 pcs G.I. Wire #16 634 rolls
36mm x 12m 3,330 pcs
36mm x 10.5m 333 pcs
36mm x 9m 1,332 pcs
36mm x 7.5m - pcs
Project: PWTP2
Subject: BAF AREA BORED PILE (74 Pcs)
DATE: 26-Sep-16

Size Rebars Wt / mt TOTAL CUT LENGTH QUANTITIES


REMAINING LENGTH / COMML
Designation LENGTH COMPUTATION (mm)
Item Structure Sketch LENGTH No of No RSB TOTAL TOTAL Comml
Structure Rebars (mm) (kg/m) a b c d e f ( mm ) Structure per Struct REBARS WEIGHT Lt
a
1 Bored Pile Vertical B1 36 7.99 4950 - - 4950 74 9 666 26,347.25###

a
2 Bored Pile Vertical B2 36 7.99 7950 7950 74 9 666 42,315.28###

a
3 Bored Pile Vertical B3 36 7.99 12000 12000 74 9 666 63,872.13###

a
4 Bored Pile Vertical B4 36 7.99 12000 12000 74 9 666 63,872.13###

a
5 Bored Pile Vertical B5 36 7.99 12000 12000 74 9 666 63,872.13###

a
6 Bored Pile Vertical B6 36 7.99 12000 12000 74 9 666 63,872.13###

a
b
7 Bored Pile Vertical B7 36 7.99 11400 600 12000 74 9 666 63,872.13###

a
8 Bored Pile Vertical B8 36 7.99 b 8400 600 9000 74 9 666 47,904.10###

b a
11 Bored Pile Spiral S1 20 2.47 b 1350 150 12000 74 71 5254 155,518.56###
b
b
a
b
12 Bored Pile Spiral S2 20 2.47 b 1350 75 12000 74 36 2664 78,854.48###
b
b

Confinement
13 Bored Pile C1 25 3.85 a 3910 3910 74 38 2812 42,376.30###
Ring

c
14 Bored Pile Space Bar C2 20 2.47 b d 150 170 200 170 150 840 74 114 8436 17,479.41###
a e

730,156.01
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

UFRO

PRECAST WALL
PCW1 nos.

QTY sets
Top & Bot Bars, B1 14 0 0 5.866 0 6 - #N/A
##
Dowel Bar, B2 14 0 0 3.767 0 6 - #N/A
##
Stiffener Bar, B3 14 0 0 1.472 0 6 - #N/A
##
Horizontal Bar, B4 43 0 0 3.1 0 6 - #N/A
##
PC Vert. Bar, B5 11 0 0 6.822 0 7.5 - #N/A
##
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
Top & Bot Bars, B1 14 0 25 0 5.866 0 6 - -##
Dowel Bar, B2 14 0 16 0 3.767 0 6 - -##
Stiffener Bar, B3 14 0 10 0 1.472 0 6 - -##
Horizontal Bar, B4 43 0 16 0 3.10 0 6 - -##
PC Vert. Bar, B5 11 0 25 0 6.82 0 7.5 - -##
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###
0 #DIV/0! #DIV/0! - #DIV/0!
###

- #N/A

VOLUME - cu.m. #N/A kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 - - - - -
16 - - - - -
20 - - - - -
25 - - - - -
28 - - - - -
32 - - - - -
36 - - - - -

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m - pcs - cu.m.
16mm x 12.0m - pcs
20mm x 12m - pcs
25mm x 12.0m - pcs G.I. Wire #16 0 rolls
36mm x 12m - pcs
36mm x 10.5m - pcs
36mm x 9m - pcs
36mm x 7.5m - pcs
Project: PWTP2
Subject: BAF AREA BORED PILE (74 Pcs)
DATE: 26-Sep-16

Size Rebars Wt / mt TOTAL CUT LENGTH QUANTITIES


REMAINING LENGTH / COMML
Designation LENGTH COMPUTATION (mm)
Item Structure Sketch LENGTH No of No RSB TOTAL TOTAL Comml
Structure Rebars (mm) (kg/m) a b c d e f ( mm ) Structure per Struct REBARS WEIGHT Lt
a
1 Bored Pile Vertical B1 36 7.99 4950 - - 4950 74 9 666 26,347.25###

a
2 Bored Pile Vertical B2 36 7.99 7950 7950 74 9 666 42,315.28###

a
3 Bored Pile Vertical B3 36 7.99 12000 12000 74 9 666 63,872.13###

a
4 Bored Pile Vertical B4 36 7.99 12000 12000 74 9 666 63,872.13###

a
5 Bored Pile Vertical B5 36 7.99 12000 12000 74 9 666 63,872.13###

a
6 Bored Pile Vertical B6 36 7.99 12000 12000 74 9 666 63,872.13###

a
b
7 Bored Pile Vertical B7 36 7.99 11400 600 12000 74 9 666 63,872.13###

a
8 Bored Pile Vertical B8 36 7.99 b 8400 600 9000 74 9 666 47,904.10###

b a
11 Bored Pile Spiral S1 20 2.47 b 1350 150 12000 74 71 5254 155,518.56###
b
b
a
b
12 Bored Pile Spiral S2 20 2.47 b 1350 75 12000 74 36 2664 78,854.48###
b
b

Confinement
13 Bored Pile C1 25 3.85 a 3910 3910 74 38 2812 42,376.30###
Ring

c
14 Bored Pile Space Bar C2 20 2.47 b d 150 170 200 170 150 840 74 114 8436 17,479.41###
a e

730,156.01
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

DAF
BORED PILES 92 pile pos.
1.20 36
QTY sets
Vertical bars B1 7 1 36 644 4.95 322 10.5 27,015.29 -##
Vertical bars B2 7 1 36 644 7.95 644 9 46,311.93 -##
Vertical bars B3 7 1 36 644 12 644 12 61,749.25 -##
Vertical bars B4 7 1 36 644 12 644 12 61,749.25 -##
Vertical bars B5 7 1 36 644 12 644 12 61,749.25 -##
Vertical bars B6 7 1 36 644 12 644 12 61,749.25 -##
Vertical bars B7 7 1 36 644 12 644 12 61,749.25 -##
Vertical bars B8 7 1 36 644 9 644 9 46,311.93 -##
Vertical bars B9 7 1 36 644 12 644 12 61,749.25 -##
Spirals S1 18 1 12 1656 12.00 1656 12 17,642.64 -##
Spirals S2 10 1 16 920 12.00 920 12 17,424.83 -##
Confinement ring C1 38 1 25 3496 3.00 1748 6 40,414.04 -##
Spacer bar C2 114 1 20 10488 0.75 1311 6 19,398.74 -##

585,014.88 -

VOLUME 3,933.07 cu.m. 148.74 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 1,656 - - - -
16 920 - - - -
20 - - - - 1,311
25 - - - - 1,748
28 - - - - -
32 - - - - -
36 3,864 322 1,288 - -

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 1,656 pcs 3,934.00 cu.m.
16mm x 12.0m 920 pcs
20mm x 10.5m - pcs
25mm x 6m 1,748 pcs G.I. Wire #16 502 rolls
36mm x 12m 3,864 pcs
36mm x 10.5m 322 pcs
36mm x 9m 1,288 pcs
36mm x 7.5m - pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

SLUDGECHEM1
BORED PILES 41 pile pos.
1.0 35
QTY sets
Vertical bars B1 7 1 36 287 4.95 144 10.5 12,081.37 -##
Vertical bars B2 7 1 36 287 7.95 287 9 20,639.01 -##
Vertical bars B3 7 1 36 287 12 287 12 27,518.69 -##
Vertical bars B4 7 1 36 287 12 287 12 27,518.69 -##
Vertical bars B5 7 1 36 287 12 287 12 27,518.69 -##
Vertical bars B6 7 1 36 287 12 287 12 27,518.69 -##
Vertical bars B7 7 1 36 287 12 287 12 27,518.69 -##
Vertical bars B8 7 1 36 287 9 287 9 20,639.01 -##
Vertical bars B9 7 1 36 287 12 287 12 27,518.69 -##
Spirals S1 15 1 12 615 12.00 615 12 6,552.07 -##
Spirals S2 8 1 16 328 12.00 328 12 6,212.33 -##
Confinement ring C1 38 1 25 1558 3.00 779 6 18,010.60 -##
Spacer bar C2 114 1 20 4674 0.75 334 10.5 8,648.79 -##

257,895.31 -

VOLUME 1,183.40 cu.m. 217.93 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 615 - - - -
16 328 - - - -
20 - 334 - - -
25 - - - - 779
28 - - - - -
32 - - - - -
36 1,722 144 574 - -

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 615 pcs 1,184.00 cu.m.
16mm x 12.0m 328 pcs
20mm x 10.5m 334 pcs
25mm x 6m 779 pcs G.I. Wire #16 222 rolls
36mm x 12m 1,722 pcs
36mm x 10.5m 144 pcs
36mm x 9m 574 pcs
36mm x 7.5m - pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

BORED PILES 1 pile pos.


1.2 35
QTY sets
Vertical bars B1 7 1 36 7 4.95 7 6 335.59 -##
Vertical bars B2 7 1 36 7 7.95 7 9 503.39 -##
Vertical bars B3 7 1 36 7 12 7 12 671.19 -##
Vertical bars B4 7 1 36 7 12 7 12 671.19 -##
Vertical bars B5 7 1 36 7 12 7 12 671.19 -##
Vertical bars B6 7 1 36 7 12 7 12 671.19 -##
Vertical bars B7 7 1 36 7 12 7 12 671.19 -##
Vertical bars B8 7 1 36 7 9 7 9 503.39 -##
Vertical bars B9 7 1 36 7 12 7 12 671.19 -##
Spirals S1 18 1 12 18 12.00 18 12 191.77 -##
Spirals S2 10 1 16 10 12.00 10 12 189.40 -##
Confinement ring C1 38 1 25 38 3.00 19 6 439.28 -##
Spacer bar C2 114 1 20 114 0.75 15 6 221.95 -##

6,411.90 -

VOLUME 1,183.40 cu.m. 5.42 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 18 - - - -
16 10 - - - -
20 - - - - 15
25 - - - - 19
28 - - - - -
32 - - - - -
36 42 - 14 - 7

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 18 pcs 1,184.00 cu.m.
16mm x 12.0m 10 pcs
20mm x 6m 15 pcs
25mm x 6.0m 19 pcs G.I. Wire #16 6 rolls
36mm x 12m 42 pcs
36mm x 9m 14 pcs
36mm x 6m 7 pcs
36mm x 7.5m - pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

BAF
BORED PILES 1 pile pos.
1.2 35
QTY sets
Vertical bars B1 7 1 36 7 4.95 7 6 335.59 -##
Vertical bars B2 7 1 36 7 7.95 7 9 503.39 -##
Vertical bars B3 7 1 36 7 12 7 12 671.19 -##
Vertical bars B4 7 1 36 7 12 7 12 671.19 -##
Vertical bars B5 7 1 36 7 12 7 12 671.19 -##
Vertical bars B6 7 1 36 7 12 7 12 671.19 -##
Vertical bars B7 7 1 36 7 12 7 12 671.19 -##
Vertical bars B8 7 1 36 7 9 7 9 503.39 -##
Vertical bars B9 7 1 36 7 12 7 12 671.19 -##
Spirals S1 18 1 12 18 12.00 18 12 191.77 -##
Spirals S2 10 1 16 10 12.00 10 12 189.40 -##
Confinement ring C1 38 1 25 38 3.00 19 6 439.28 -##
Spacer bar C2 114 1 20 114 0.75 15 6 221.95 -##

6,411.90 -

VOLUME 1,183.40 cu.m. 5.42 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 18 - - - -
16 10 - - - -
20 - - - - 15
25 - - - - 19
28 - - - - -
32 - - - - -
36 42 - 14 - 7

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 18 pcs 1,184.00 cu.m.
20mm x 10.5m - pcs
25mm x 12.0m - pcs G.I. Wire #16 6 rolls
36mm x 12m 42 pcs
36mm x 10.5m - pcs
36mm x 9m 14 pcs
36mm x 7.5m - pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

GENSET
BORED PILES 22 pile pos.
1.0 16
QTY sets
Vertical bars B2 7 1 36 154 2.95 77 6 3,691.53 -##
Vertical bars B3 7 1 36 154 12.00 154 12 14,766.12 -##
Vertical bars B4 7 1 36 154 12.00 154 12 14,766.12 -##
Vertical bars B5 7 1 36 154 12.00 154 12 14,766.12 -##
Vertical bars B6 7 1 36 154 12.00 154 12 14,766.12 -##
Vertical bars B7 7 1 36 154 12.00 154 12 14,766.12 -##
Vertical bars B8 7 1 36 154 9.00 154 9 11,074.59 -##
Vertical bars B9 7 1 36 154 12.00 154 12 14,766.12 -##
Spirals S1 14 1 12 308 12.00 308 12 3,281.36 -##
Spirals S2 8 1 16 176 12.00 176 12 3,333.45 -##
Confinement ring C1 18 1 25 396 3.00 198 6 4,577.79 -##
Spacer bar C2 54 1 20 1188 0.75 99 9 2,197.34 -##

116,752.80 -

VOLUME 1,444.82 cu.m. 80.81 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 308 - - - -
16 176 - - - -
20 - - 99 - -
25 - - - - 198
28 - - - - -
32 - - - - -
36 924 - 154 - 77

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 308 pcs 1,445.00 cu.m.
12mm x 6.0m 176 pcs
20mm x 6.0m - pcs
25mm x 12.0m 198 pcs G.I. Wire #16 101 rolls
36mm x 12m 924 pcs
36mm x 9m 154 pcs
36mm x 6m 77 pcs
36mm x 7.5m - pcs
REBAR REQUIREMENTS
nt L ncom lcom G60 G40
COMM COMM ###

weight weight

CTRL BLDG
BORED PILES 18 pile pos.
1.0 16
QTY sets
Vertical bars B2 7 1 36 126 2.95 63 6 3,020.34 -##
Vertical bars B3 7 1 36 126 12.00 126 12 12,081.37 -##
Vertical bars B4 7 1 36 126 12.00 126 12 12,081.37 -##
Vertical bars B5 7 1 36 126 12.00 126 12 12,081.37 -##
Vertical bars B6 7 1 36 126 12.00 126 12 12,081.37 -##
Vertical bars B7 7 1 36 126 12.00 126 12 12,081.37 -##
Vertical bars B8 7 1 36 126 9.00 126 9 9,061.03 -##
Vertical bars B9 7 1 36 126 12.00 126 12 12,081.37 -##
Spirals S1 14 1 12 252 12.00 252 12 2,684.75 -##
Spirals S2 8 1 16 144 12.00 144 12 2,727.36 -##
Confinement ring C1 18 1 25 324 3.00 162 6 3,745.47 -##
Spacer bar C2 54 1 20 972 0.75 81 9 1,797.82 -##

95,525.02 -

VOLUME 1,444.82 cu.m. 66.12 kgs/cum

12.0M 10.5M 9.0M 7.5M 6.0M


7.45 28 35 10 - - - - -
5.108571429 19.2 24 12 252 - - - -
16 144 - - - -
20 - - 81 - -
25 - - - - 162
28 - - - - -
32 - - - - -
36 756 - 126 - 63

BORED PILES QUANTITY BASED ON THE ADVANCE COPY OF DRAWING ISSUED 25/5/2016
RSB FOR PR: 5,000Psi RMC (28 DAYS) FOR PR:
12mm x 12.0m 252 pcs 1,445.00 cu.m.
16mm x 12.0m 144 pcs
20mm x 6m - pcs
25mm x 6m 162 pcs G.I. Wire #16 82 rolls
36mm x 12m 756 pcs
36mm x 10.5m - pcs
36mm x 9m 126 pcs
36mm x 7.5m - pcs