Job Safety Analysis

JOB DESCRIPTION

TYPES OF WORK : Placing Teflon rods under the pipelines GWP :


LOCATION OF WORK : Cable Gantry
RISK RATING : High

REQUIRED PERSONAL PROTECTIVE EQUIPMENT

x Safety Helmet x Cotton Gloves Work Vest


x Safety Shoes / Boots Welding Gloves Safety Vest
x Safety Glasses x Leather Gloves Safety Harness
Face / Welding Shield Leather Apron Face Mask
Goggles Rubber / Nitrile Gloves Ear Protection
Life Jackets (Type 1-offshore) Dust Mask Others (Specify):____________

OTHER SAFETY EQUIPMENT / REQUIREMENTS HAZARD IDENTIFICATION

Fire Extinguisher Tag Out / Lock Out


Gas Detector x Work Permit
x Safety Signs x Green Tag
Barricades Respirator
Lifeline First Aid Equipment

JSA DEVELOPED BY :
Name Position
Jayammohan Safety
Balachandaram Supervisor
N Activity
Kit Yew Sin Potential Hazard
Safety Control/ Recovery Measures Responsib
o ( Job Steps ) Manager le/ Action
Aris Hooi General
Manager
HOW CHIN ENGINEERING

By
1. Work permit Unauthorized Authorized lead-operator / in-charge shall ensure obtaining and Lead-
from Client commencement of maintaining valid work permit. operator
to be works may result in The worksite supervisor responsible for this activity has to check
obtained. exposing workers the PPE of his staff to ensure that all required items are available Supervisor
and or potential to and properly used.
harm or danger Inform all workers regarding permit condition before work starts.
Worksite supervisor shall conduct toolbox talks about nature of
works and associated potential hazards and their essential
precautionary measure.
Safety standby is required
2 Pre-task The work force does Ensure that the pre task briefing is given out in a language Supervisor
briefing not understand the understood by the work force, have it translated.
toolbox pre task briefing Issue required appropriate PPE and replace PPE that has signs of Lead-
talks. therefore does not defect. operator
understand the Discuss about emergency rescue plan
potential dangers Workers
Explain to address abnormal conditions such as windy weather,
and control gasoline odor, rainy weather and humidity
measures to be
Ask question regarding the briefing to get feedback from the staff,
implemented. Some
this ensures full comprehension.
of the workers could
be lacking PPE or
using defective PPE.
3 Taking Ignition Turn off the flash Supervisor
Photograph
4 Use of hand Broken or All tools and equipment must be inspected. Any tool or piece Supervisor
tools Unauthorized Tools of equipment deemed unsatisfactory will be tagged and
removed from the worksite. Workers
Wear appropriate gloves when handling the hand tools
5 Placing the Falls Work carefully and consciously Supervisor
Teflon block Do not hold more than one block at a time.
& No personnel working under the skylift Workers
Tightening
them by u-
HOW CHIN ENGINEERING

bolt and
holder

6 General Unattended/ Pack-up all the tools and Barricades Before Leaving The Job Supervisor
Items Before abandoned Clear debris From Equipment And job site, Secure All Material
Leaving Job materials or tool Before Exiting The Job Workers
Site / House that can able the Remove the masking tape or wrapping
-keeping Employees Exposed Restore Property To Its Original Condition To The Best Of Your
To Falling In Ability
Messy or Unsafe
Work Site-Looks Bad
For Company &
Unsafe For others
Prepared By : Reviewed By : Date : 22/1/2017
Contractor / Contractor Representative Lead-operator / In-charge