Place inspected AL-REHMAN CONSTRUCTOION SOLUTION Date of inspection 16 / 11/ 2016

Observations Control measures Timescale

1. Poor housekeeping on site. Immediate:- Immediate


Hazard: Clean all unwanted material & Stock
Risk of slip and trip Personal injury will properly. Walkways should be free of
occur. Materials & Segregate walkways.
Consequence: Short-Term Control:- 02- Days
Personal injuries. Need to follow & implement the Site
inspection.
Long-Term Control:-
Provide tool-box talk to ensure the 02- Weeks
working areas Clean & tidy.

2. Observed the stairs hand rail missing Immediate:- Immediate


but workers using the Stairs. Advised to closed access and display no
entry sign- board.
Hazard:- Short-Term Control:-
Risk of slip & Fall. Instructed o provide scaffoldings pipes to 02- Days
hard barricade opening and remove no
Consequence:- entry sign-board.
Personal injuries. Long-Term Control:-
Provide proper hand rail stairs for 01- Weeks
permanent use.

3. No spill kit tray available in chemical Immediate:- Immediate


storage area. Provide proper spill kit tray for catch
Hazard:- spillage at chemical storage area. And
Risk of ground Contamination. area should be ventilated.
Consequence:- Short-Term Control:-
III-health MSDS should be considered while 05- Days
dealing with chemicals Inspection to be
needed.
Long-Term Control:-
Training to be conducting on inspection 01- month
chemical storage area & containers.
4. Fire Extinguisher obstructed by Immediate:-
All obstruction has to remove and Immediate
material.
Hazard: provides signage to not store anything
Risk of loss material & life due delaying near fire extinguisher.
in event of fire. Short-Term Control:-
Consequence: Inspection to be carried out of fire
stations & follow the site emergency plan. 01- Weeks
Material Damage personal loss.
5 Diesel Container stored on site Immediate:-
without fire precaution measure. Highly flammable materials to be
Hazard:- recovered from location & ignition Source Immediate
Risk of major fire & explosion. prohibited.
Consequence:- Short-Term Control:-
Property & personal loss. Provide proper fire protection to
designated area for storage & follow
procedure for flammable material. 03- Days
Long-Term Control:-
Need to provide info. Instruction &
training for not to store any flammable
material site. 02- Weeks
6. Over loading of block (Material) on Immediate:-
the scaffolding above the toe-board. Remove excessive stored blocks from
Hazard:- scaffolding platform.
Risk of material & objects fall from Long-Term Control:- Immediate
height & personal injury. Conducting the training for discussing the
Consequence:- consequence of fall object & material
Personal injury & Material loss from height.
02-weeks
7. From lifter upload the heavy pipes Immediate:-
from trailer on site. Stopped activity and explained about Immediate
Hazard: hazards.
Un-balance lifting cause of falling Short-Term Control:-
objects or injury. Instructed the supervisor for arrange
Consequence: crane for lifting. 02-Days
Material damage personal injury. Long-Term Control :-
Advised to provide third party
certificate to the operator. 01- Month

8. Material stored at escape routes of Immediate:-


office. Stored material has removed and need to
Hazard:- provide clean & marking exit routes. Immediate
Risk of personal injury in emergency Short-Term Control:-
evacuation due to entrapment with Need to place prohibitive signage for
material. material store in exist routes. 02- Week
Consequence:- Long-Term Control :-
Personal injury. Training to be given all persons
regarding emergency procedure & fire 01- Month
evacuation.
9. Chemical Stored in drinking water Immediate:-
bottles at site without product labels. Disposal all these bottles with chemical
Hazard:- and use proper PPE during disposal. Immediate
Risk of occupational health hazards. Short-Term Control:-
Consequence:- MSDS Should be provided while strong
Health hazard. any chemical and provide appropriate 05- Days
small storage.
Long-Term Control:-
Provide tanning & Supervising for safe
use of substance. 01- Month

10. Observed there is improper Immediate:-


technique used for lifting & Carrying the Stop the activity & informed the Immediate
blocks from ground to shoulder level. supervisor.
Hazard: Short-Term Control
Risk of musculoskeletal. Need to implement the proper manual
Consequence: handling procedure & safe lifting 01-Week
Work related upper limb disorders. technique.
11. Water dropping on live electrical Immediate:-
cables from overhead main supply. A/C. Isolate the area & switch off power. Immediate
Hazard:- Short-Term Control:-
Risk of electrocution and fire. Daily inspection to be carried out by
Consequence:- competent person and make precaution 06- Days
Fire & explosion. for such situations.
Long-Term Control :-
Need to provide training on such
situations for avoid reoccurrence. 02- Weeks

12. Hot work in progress without proper Immediate:-


PPE & proper ventilation. Stop activity & Provide appropriate PPE
Hazard:- & provide fire extinguisher. Immediate
Risk of eyes & serious health issue. Short-Term Control:-
Consequence:- Provide proper ventilation & implement
Severe injury. safe strategy like permit-to-work system. 03- Days
Long-Term Control:-
Need to provide the training &
supervision for such kind of activities. 01- Month
13. Observed that in proper mobile Immediate:-
scaffolding is used. Stop activity & provide Complete Immediate
Hazard: scaffolding to be erected dismantled by
Risk of fall from height. person.
Consequence: Short-Term Control
Personal injury. Scaffolding checklist should be
completed prior to start work on 01-Week
scaffolding.
Long-Term Control:-
Need to provide training to scaffolders
regarding scaffolding. Inspection & 02- Weeks
supervision should be carried out.
14. Contact with wet cement while Immediate:-
working with cement mixer at ground Stop the work and advised to wash
floor. hands & face which is contacted with wet Immediate
Hazard:- cement.
Corrosive if confect with skin. Short-Term Control:-
Consequence:- Provide proper resistant long sleeves
Dermatitis of skin irritant. gloves & hard water proof boats safety 02- hours
glasses.
Long-Term Control :-
Need to training & supervision to workers
on use of proper personal protective 03- days
equipment. (PPEs).
15. No edge or sides protection deep Immediate:-
excavation. Stop activity & need to shoring to avoid
Hazard:- cave in structure & proper access& Immediate
Risk of Collapse the structure & serious egress.
injury fatalities occur. Short-Term Control:-
Consequence:- Need to implement the safe strategy like
Serious injury. permit-to-work. 04- Days
Long-Term Control:-
Need to provide the info training &
instruction to worker in order to avoid 01- Month
cave in structure & supervise then.
16. Using power tools (Metal cutter) Immediate:- Immediate
without guards & proper handle. Stop activity & appropriate ground to be
Hazard: fixed.
Risk of entanglement with moving parts Short-Term Control
puncture by scarf ejected during cutting. All power tools should be inspected by 02-weeks
Consequence: checklist. Implement the logout & logout
Personal injury. system should be implemented.
Long-Term Control:-
Need to provide info training on proper 01-month
use of power tools and importance of
guard also discuss to entanglement
hazards.

17. Unlocked & open electrical Immediate:-


distribution board on the floor & Need to closed & locked as well Immediate
temporary walls. barricade.
Hazard:- Short-Term Control:-
Risk of electrocution fire. Isolate that area & provide adequate 02- Days
Consequence:- warning signage.
Fire Explosion. Long-Term Control :-
Need to be random inspection by 02- Weeks
competent person.

18. Paint containers left open inside the Immediate:- Immediate


electrical room. Cover the containers & stored in
Hazard:- designated area. Use appropriate PPE
Risk of inhalation absorption of toxic during transfer it.
vapours. Long-Term Control:-
Consequence:- Training of storage & usage of flammable 02- Weeks
IIL Health. chemical material.

19. Observed that naked wires are Immediate:-


placed in the multiple plug sockets. Proper plug & cable provided & replaced Immediate
Hazard: the multiple plug socket..
Risk of fire explosion & electrocution. Short-Term Control
Consequence: Need to follow the electrical appliance & 04- Days
Explosion. wires.
Long-Term Control:-
Need to provide too-box tall on safe 02- Weeks
method while dealing with electrical
appliance.
20. Hot work being carried out without Immediate:-
Immediate
accurate precautions like no fire Stop activity and instruct to place fire
extinguisher available near the work. extinguishers.
Hazard:- Short-Term Control:-
01- Week
Risk of property damage & personal Need to follow the permit to-work
injury/death due to fire. system for this activity to avoid such
Consequence:- reoccurrence.
Loss of property & personal. Long-Term Control :-
01- Month
Need to provide training before start
activities competent person should
monitor activity.
21. Observe the platform of scaffolding Immediate:-
created around the floor. Barricade the area & near scaffolding
Immediate
Hazard:- make warning tape.
Risk of falling objects that can result in Short-Term Control:-
02- Days
serious injuries or property damage. Advised them to certified lifting belts.
Consequence:- Long-Term Control:-
Material damage & serious injuries. Training of storage & usage of flammable 01 Week
chemical material.
22. Un-safe platform of scaffolding Immediate:- Immediate
created around the floor. Barricade the area & near scaffolding
Hazard: make working tape.
Risk of falling objects & loss it. Short-Term Control
Consequence: Arrange fully broadest form at scaffolding. 02- Days
Loss Objects. Long-Term Control:-
Arrange competent worker for erect 02- Weeks
scaffolding.
23. Using lifting crave without banks Immediate:-
man at site. Stop the activity & advised to provide Immediate
Hazard:- banks man for proper direction.
Structure collapse & overtone. Long-Term Control :-
Consequence:- Need to conduct training for given 03- Weeks
Property & material damage. instructions& information to all worker on
such kind of activity.

24. Observed that one of the workers at Immediate:- Immediate


constant site were shouting and yelling Told them zero- tolerance policy and do
at the other co-worker to do something. not take part at such circumstances.
Hazard:- Short-Term Control:- 02- Days
Violence at work. Reporting system will be introduced &
Consequence:- Nee to provide training to all workers on
Stress & demotivation in front of the their (behaviour issue).
other workers. Long-Term Control:- 02 Week
Training of storage & usage of flammable
chemical material.
25. Security Staff are present at site. Good Practices Maintained

26. Trained first aides are present at Good Practices


site. N.A

27. All employees attend the tool-box


talk & Consult about their daily activities Maintained
Good Practices
by group.

28. Welfare facilities are available at


site. According to standards do inking Good Practices
water, Toilets, hand wash area and first Maintained
aid facilities.

29. Provide full body harness hard head Good Practices


helmet with proper chinstrap & other On Going
lifting appliance available & stored.

30. Consult with workers on their health Good Practices


& provide health & provide health On Going
surveillance.

31. Prohibited on un-authorised entry at Good Practices


site. Maintained

You might also like