You are on page 1of 1

NOTE:

1. DRAWING NOT TO SCALE


2. ALL DIMENSION IN MM

Kirk Cells CABLE SCHEDULE:


(Polarization Cells) 1. Tank Earth to Kirk Cell, 25mm
XLPE/PVC
between Tank and Main 2. Kirk Cell to Main Earth, 25mm
Plant Earth Grid XLPE/PVC

REVISIONS

REV DATE DESCRIPTION

00 5.1.17 ISSUE FOR APPROVAL

PROJECT TITLE:

LPG STORAGE & TERMINAL FACILITIES


Breather AT HAMBANTOTA
Tube
DRAWING TITLE:

Kirk Cells for Water Tanks

DRAWING NO: PROJECT NO:


LWI-16-3TANK LWI-16-074

DRAWN BY: APPROVED BY:


OK RL
Kirk Cell in
IP55 Enclosure Cable to Tank
Cable to Main Earth Grid
on Stand Support
Earth Grid

Information shown on this drawing is


confidential and must not be copied or conveyed
to third party without the permission of Lerwick
Corrosion Technologies Pte Ltd.

You might also like